HomeMy WebLinkAbout02 - MOD Activity ReportTO: Parks, Beaches and Recreation Commission FROM: Parks and Trees Maintenance Supermt ent and Operations Support Superintendent SUBJECT: October Parks, Trees, and Operations Divisions Activity Report Parks Maintenance Division Activities 1. Parks Maintenance Division staff continues working with the Public Works Department on numerous projects in the planning and construction phases. Projects currently underway: • Jamboree Road Widening at Bristol • Bitterpoint and Rocky Point Pump Stations • Sidewalk, Curb and Gutter Contract - various locations • Sewer Pump Station Improvements — various locations • Civic Center o Buck Gully Lower Canyon Stabilization Projects that are in the planning phases: o Sunset Ridge Park o Marina Park 0 19`x' Street Tide Valve o China Cove Slope Stabilization o Bristol Street North and South Landscapes o Dover Drive Median o Irvine Ave., Westcliff to Dover o Lido Village 2. The Municipal Operations Department and Merchants Landscape Services staff worked together to complete an irrigation upgrade project at Castaways Park. The Park was first developed in 1998, and later, a Re- vegetation Project was completed in 2004 with Grant funding and public input. As part of the Re- vegetation project, a native Meadow Sedge (Carex Pansa) grass area was planted, and the irrigation system was expanded to water these newly landscaped areas. However, due to budget restrictions, wiring for the irrigation valves was not installed, and automation of the valves relied on a remote controlled system that has recently become unreliable and antiquated. The recent irrigation upgrade project included the installation of irrigation wires to run through all the Park's irrigation valves. As an added incentive, the new wires will make use of the City's weather -based irrigation controllers, taking full advantage of water saving techniques for all areas of the Park. Trees Division Activities During the month of September, 913 trees were trimmed, 117 trees removed, 8 trees planted. The City's tree services contractor, pruned trees within the Corona Del Mar, Spyglass Hills, Buffalo Hills, Santa Ana Heights, Balboa Peninsula and Lido Isle areas, as part of the City's overall grid trimming schedule. Additionally, the annual pruning of selected Eucalyptus, Coral and Palm trees are currently taking place throughout the City. During the week of September 21 ", our Department was very involved in working with our tree contractor, West Coast Arborist (WCA), in the emergency removal of 104 large Eucalyptus globulus (Blue Gum) trees from the medians on Irvine Avenue. With approximately 12 hours to stage equipment and personnel, WCA removed the 104 trees in less than 8 hours. It was a JOB WELL DONE to Dan Sereno and the Parks Team, and the crew from WCA. Over the past month we have had to deal with very tough issues, and I am extremely proud of the professionalism and dedication of the MOD Team, including the Field Maintenance staff who assembled a team to shut down the street. Thank you all. We have now turned our attention to the renovation of these Irvine medians. To that end, staff is working closely with the Parks, Beaches, and Recreation Commission to form a committee to recommend replacement trees for this area, including any remedial landscape work that will be required. We have involved the neighboring communities in these discussions so that they have had the opportunity to weigh in on what the new "look" for that street should be. At the same time this work started, we continued our inspection program for the remaining 300+ Blue Gum eucalyptus trees in the City. Staff and contract arborists have worked together to insure that the remaining trees are safe and healthy. My sincere thanks to the City Manager's Office, Police Department, City Attorney's Office and Human Resources Department for all your help in addressing these tree concerns. 2. In October 2011, the City Manager, Risk Manager and Municipal Operations Deputy Director approved an emergency removal of two City Tomlinson Ash trees that are listed as a Special Tree, Neighborhood Tree, in accordance with the removal criteria of Council Policy G -1. The trees were inspected by a Certified Arborist, R. Dan Jensen and Association, which noted that both trees suffered from a severe crack along one of its major stems. Additionally, the trees had extensive decay in its scaffold limbs which had become structurally weak. The trees were posing an imminent danger of collapsing. Staff concurred with the Arborist's recommendation to remove the City trees immediately due to public safety concerns. The trees were removed on September 29, 2011. 2018 Leeward Lane 2024 Leeward Lane In October 2011, the City Manager, Risk Manager and Municipal Operations Deputy Director approved an emergency removal of a City Eucalyptus tree that is listed as a Special Tree, Neighborhood Tree, in accordance with the removal criteria of Council Policy G -1. The tree was severely root decayed at the base of the trunk. The tree was posing a potential public hazard and was removed on September 28, 2011. 430 Povpv Avenue The attached Tree Activity Report summarizes requests and field activities performed during the past months. Beach Maintenance Activities 1. Department staff recorded 2,343 hours of scheduled overtime for summer activities during the 17 weekends from Memorial Day through Labor Day. Crew members from the Operations Support division continued to maintain the high level of cleanliness and safety in the beach areas and surrounding commercial districts for the summer visitors who come to enjoy the City's hospitality and beaches. Among the summer maintenance activities is the supplemental restroom cleaning program, which is in its l lth successful year. An on -site contract attendant restocks paper products, and provides continued cleaning of the facilities at Corona del Mar State Beach, Washington Street, Balboa and Newport Piers, 15th Street, and on Balboa Island. The Operations Support division overcame several challenges this summer, including the recent big surf and high tides event, the transition to a new janitorial services contractor for beach area restrooms, and the fast season of beach refuse collection by a private contractor. 2. During the week of September 19th, the Storm Drain Maintenance Crew finished the removal of 435 inlet guards in front of catch basins on Balboa Island, Balboa Boulevard, and portions of Coast Highway in West Newport and Corona Del Mar to minimize the potential for flooding during the upcoming rainy season. The program was implemented nine years ago, and the inlet guards have proven to be one of the best structural improvements that the City has made in order to improve water quality and to keep debris from entering into our harbor and ocean during the dry spring and summer months. 3. The week of September 5th, Operations Support and Parks Maintenance staff were busy with the post -Labor Day weekend clean-up and the preparation for the 8th Annual Coastline Car Classic Show at Corona del Mar State Beach parking lot. The beach, park, and restroom facilities, were groomed, cleaned, and washed down. On Sunday, September 11, crews made the final touches to the site in preparation for the 250 classic cars to be displayed. It was an extraordinary automotive and lifestyle event showcasing the craftsmanship, elegance, and sheer exhilaration of some of the most distinguished automobiles and luxury exhibitors in Southern California. Staff ensured that visitors were comfortable by cleaning and restocking the restroom facilities throughout the day. 4. During the week of September 26`h, Corona del Mar State Beach was groomed and detailed by the Beach Maintenance Crew for the SOth Annual Sandcastle Contest, which was held on Sunday, October 2nd. Clear skies and warm temperatures set the stage for an enthusiastic crowd of participants and attendees who turned out for the annual event. As the contest continues to grow in popularity, so do the maintenance activities that are necessary to ensure a clean and safe environment for all involved. 380 Street Park - Shade Structure Replacement Facility Maintenance staff discovered several cracks in the lower beams of the shade structure during a normal inspection of the restroom facility at the 38th Street Park. A temporary support was installed to stabilize the structure. City inspectors and supervisors from Public Works, Community Development, and Municipal Operations Departments, following inspections, discussions, and visualizations, agreed to remove the structure and replace it with new material. Due to the condition of the existing lumber of the beams, an emergency contract to remove the aging structure was prepared. The work is being completed by a private contractor (All Pro Builders) under the supervision of the project manager Rick Scott. All Pro Builders safely removed and hauled away the old material on September 26. When weather permits, the contractor will be back on site to start the framing aspect of the job. Once that's completed, the new lumber will receive a primer /sealer application and a fresh coat of paint. We are all eagerly waiting to see the finished product! See attached Municipal Operations Department, Activities Report for September 2011. ed by: 'Dinono Parks and Trees Maintenance Superintendent 51 James L. Auger Operations Support Superintendent Attachments: (A) Tree Activity Report 2011 -2012 (B) Municipal Operations Department, September 2011 Activities Report �m ƒ ^ & 0 � . � . 4� loss � f � �> » lose . % loss loss 1111111 � loss ¥ NONE .\ n 2 A ° � R . loss lose loss loss 1111111 loss NONE NINE 2 S ° ° 2 ° ° ° 0) o * o k 0 D 0 E co § $ I 0 F- 2 % / ) k k A to ) 2 \ E � � loss lose loss loss 1111111 loss NONE NINE ���� (4) Parks and Trees Division Fiscal Year 2011 -2012 Problem Tree Removals Reforestation Tree Removals Municipal Operations Department - General Services Divisions - Activities Report - September 2011 This Moh Month Month Lest Year Total To Date TTD Last Year AsphaltfConcrete Street Patching (Tons of Blacktop) 180 278 670 614 Sidewalk Repaired (sq. ft.) 2,401 3,435 8,966 10,622 Curb & Gutter Replacement (lin. ft.) 46 187 347 671 Sweeping, Beach Cleaning, Demo Materials (tons) 393 216 988 804 Asphalt/Concrete Recycled (tons) 326 280 910 752 Signs & Traffic Markings Signs Made 0 60 237 224 Signs Installed 226 200 600 599 Decals 5 50 6 130 Special Purpose Signs/Banners Made 6 105 25 330 Street Striping (lin. ft.) Added/Replaced 4,238 1,207 74,888 8,048 Pavement Markings (including reflective) 24 2 141 76 Parking Stalls 81 12 92 14 Curb Painting (lin. ft.) 552 251 17,057 8,205 Thermoplastic (lin. ft.) 0 0 0 0 Sign Posts Installed 7 22 47 57 Graffiti Graffiti Incidents Removed by Staff 15 26 31 127 Graffiti Incidents Removed by Contractor 56 50 233 164 Refuse Collecdon Residential (tons) 2,798 2,773 8,839 8,784 Liquid HaaMat Incidents 18 21 50 73 E -Waste Incidents 2 18 10 48 U -Waste Incidents 3 9 22 30 Recydables (tons) 1,161 1,166 3,687 3,735 Trees Trimmed by Staff 11 8 30 31 Trimmed by Contractor 913 1,070 4,545 3,355 Removed 117 18 142 39 Planted 8 0 15 10 Roots Pruned by Contractor 0 11 14 11 Roots Pruned by Staff 0 0 10 6 Automotive. - Repairs 130 282 573 861 Preventive Maintenance Completed 57 66 187 230 PM Labor Hours - 140 171 488 587 Beach Maintenance Beach Area Refuse (tons) - 122 133 529 446 Beach Debris (tons) 82 43 233 203 Sweeping /Storm Drain Gutter Miles Swept 3,406 4,389. 10,806 13,830 Sweeping Debris (cubic yards) 594 523 1,943 1,715 Storm Drain Debris (cubic yards) 174 94 222 163