Parks, Beaches and Recreation Commission
Parks and Trees Maintenance Superintendent
Operations Support Superintendent
July Parks and Trees, and Operations Support Divisions Activity Report
Parks Maintenance Division Activities
Parks Maintenance Division staff continues working with the Public Works Department
on numerous projects in the planning and construction phases.
Projects currently underway:
Jamboree Road Widening at Bristol
point Pump Station
Sidewalk, Curb and Gutter Contract -
various locations
—Bitter
Civic Center
Buck Gully Lower Canyon
Stabilization — complete
Irvine Terrace Park Shade Structure
Upper Buck Gully trail and bridges
Bristol Street North Landscape
Irvine Avenue. Westcliff to Dover
I Street median
19' Street Tide Valve
Booster Irrigation Pump for Lincoln
Athletic Center
San Joaquin Hills Rd. median — turn
lane adjustments
Projects that are in the planning phases:
Sunset Ridge Park
Bristol Street South Landscape
Marina Park
Dover Drive Median
China Cove Slope Stabilization
Lido Village and existing City Hall
site
CDM Entrance at MacArthur Blvd
Balboa Blvd medians
Irvine Terrace Park CERT storage
Playground donation at Balboa Blvd
and Miramar Street
Cypress Street End
Sea wall repair at 37` and Lake
Recently, the first phase of a landscape renovation on the Spyglass Hilt Road parkways
• from San Miguel Drive to El Capitan Drive was completed. Plant materials were
selected based on their drought- tolerance, ease of maintenance, and overall beauty.
Trees Division Activities
Month of:
Trees
Trimmed
Trees
Removed
Trees Planted
July
14
18
As part of the City's overall grid and annual trimming schedule, the City's tree service •
contractor pruned trees within the Spyglass Hill, Buffalo Ranch, and Newport Heights
areas.
The attached Tree Activity Report summarizes requests and field activities performed
during the past months.
Beach Maintenance Activities
Recently, the Natural Resources Defense Council (NRDC) issued a 5 -star rating for 38th
Street and 52nd/53rd Street beaches, and a 4 -star rating for Orange Street beach. NRDC
rates 200 popular beaches across the country based on exceptionally low violation rates
for bacterial standards, and strong testing and safety practices from 2009 - 2011. These
high ratings are a direct result of the excellent work of the beach maintenance, storm
drain, and street sweeping crews in the Operations Support Division.
I
•
L_I
•
•
See attached Municipal Operations Department, Activities Reports for July 2012.
Submitted by:
Dan P. Sereno, Superintendent
Parks and Trees Maintenance
J es L. Auger, Superintendent
Operations Support
Attachments: (A) Tree Activity Report 2011 -2012
(B) Municipal Operations Department, July 2012 Activities Reports
�i
GODi
■
■
�I
Hy �C'q
y
'y'.LI V? •.
*te,O
a
`h!
v
o
0
�Q� V
T
r
Oil-
did JC'
T
�
qay
'�
Q
quad
L
Fiy
y.,
y
Cti
Jd
m
b
�
J
ag4td
�O,aS
v
o
0
h6
N
v
o
0
0
T
r
v
o
0
0
N
N
Co
a
Q7
M
>
O
E
N
O
O
O
E
N
(U
F-
N
U)
C
N
>
y
O
d
E
N
U
21
m
2
H
Q
Q
C
O
is
N
N
z
Q
N
O
CL
t—
LL
C'
a_
T
N
CO
O
E
Q'
0
0
F-
N
CO
O
O
O
r
N
CO
O
O
O
r
U)
y
N
O
c
N
>
O
.N
a
N
m
CL
N
N
F-
C
O
E
N
Cd
C
O
m
Q
Q
C
O
is
N
N
z
Q
N
O
CL
0
•
•
0
•
municipal operations Departme
Parks and Trees Division
Fiscal Year 2012 -2013
Problem Tree Removals
Month I #Trees Location(s)
!July -12 0
Reforestation Tree Removals
Month I #Trees I Location(s)
(July -12 1 0
Replacement Trees
Month 14 Trees I Location(s)
(July -12 16
Municipal Operations Department - General Services Divisions -
Activities Report -July 2012
This Month
This Month
Last Year
Total To Date
TTD Last Year
AS haWConcrete
Street Patching (Tons of Blacktop)
135
221
135
221
Sidewalk Repaired (sq. ft.)
2,816
2,980
2,816
2,980
Curb & Gutter Replacement (lin. ft.)
132
162
132
162
Sweeping, Beach Cleaning, Demo Materials (tons)
351
364
351
364
Asphalt/Concrete Recycled (tons)
136
256
136
256
Signs & Traffic Markings
Signs Made
0
36
0
36
Signs Installed
182
183
182
183
Decals
4,240
0
4,240
0
Special Purpose Signs /Banners Made
16
11
16
11
Street Striping (]in. ft.) AddedJReplaced
186,435
51,292
186,435
51,292
Pavement Markings (including reflective)
296
50
296
50
Parking Stalls
0
7
0
7
Curb Painting ([in. ft.)
1,302
3,832
11302
3,832
Thermoplastic (Iin. ft.)
0
0
0
0
Sign Posts Installed
21
13
21
13
Graffiti
Graffiti Incidents Removed by Staff
25
10
25
10
Graffiti Incidents Removed by Contractor
453
67
453
67
Refuse Collection
Residential (tons)
3,071
2,994
3,071
2,994
Liquid HazMat Incidents
22
16
22
16
E -Waste Incidents
7
6
7
6
U -Waste Incidents
4
16
4
16
Recyclables (tons)
1,290
1,250
1.290
1,250
Trees
Trimmed by Staff
15
11
15
11
Trimmed by Contractor
671
2,376
671
2,376
Removed
14
13
14
13
Planted
18
5
18
5
Roots Pruned by Contractor
0
2
0
2
Roots Pruned by Staff
9
4
9
4
Automotive
Repairs
129
224
129
224
Preventive Maintenance Completed
64
58
64
58
PM Labor Hours
123
165
123
165
Beach Maintenance
Beach Area Refuse (tons)
198
210
198
210
Beach Debris (tons)
85
75
85
75
Sweeping/Storm Drain
Gutter Miles Swept
3,204
3,659
3,204
3,659
Sweeping Debris (cubic yards)
464
614
464
614
Storm Drain Debris (cubic yards)
37
25
37
25
•
•
Fj