Loading...
HomeMy WebLinkAbout4C - MOD Activity Report`u U J sw ��GIFOMi°�� TO FROM: SUBJECT I Y [ �{- � � t!. ll i i�:� PB &R Commission Agenda Item No. September 4, 2012 Parks, Beaches and Recreation Commission Parks and Trees Maintenance Superintendent Operations Support Superintendent July Parks and Trees, and Operations Support Divisions Activity Report Parks Maintenance Division Activities Parks Maintenance Division staff continues working with the Public Works Department on numerous projects in the planning and construction phases. Projects currently underway: Jamboree Road Widening at Bristol point Pump Station Sidewalk, Curb and Gutter Contract - various locations —Bitter Civic Center Buck Gully Lower Canyon Stabilization — complete Irvine Terrace Park Shade Structure Upper Buck Gully trail and bridges Bristol Street North Landscape Irvine Avenue. Westcliff to Dover I Street median 19' Street Tide Valve Booster Irrigation Pump for Lincoln Athletic Center San Joaquin Hills Rd. median — turn lane adjustments Projects that are in the planning phases: Sunset Ridge Park Bristol Street South Landscape Marina Park Dover Drive Median China Cove Slope Stabilization Lido Village and existing City Hall site CDM Entrance at MacArthur Blvd Balboa Blvd medians Irvine Terrace Park CERT storage Playground donation at Balboa Blvd and Miramar Street Cypress Street End Sea wall repair at 37` and Lake Recently, the first phase of a landscape renovation on the Spyglass Hilt Road parkways • from San Miguel Drive to El Capitan Drive was completed. Plant materials were selected based on their drought- tolerance, ease of maintenance, and overall beauty. Trees Division Activities Month of: Trees Trimmed Trees Removed Trees Planted July 14 18 As part of the City's overall grid and annual trimming schedule, the City's tree service • contractor pruned trees within the Spyglass Hill, Buffalo Ranch, and Newport Heights areas. The attached Tree Activity Report summarizes requests and field activities performed during the past months. Beach Maintenance Activities Recently, the Natural Resources Defense Council (NRDC) issued a 5 -star rating for 38th Street and 52nd/53rd Street beaches, and a 4 -star rating for Orange Street beach. NRDC rates 200 popular beaches across the country based on exceptionally low violation rates for bacterial standards, and strong testing and safety practices from 2009 - 2011. These high ratings are a direct result of the excellent work of the beach maintenance, storm drain, and street sweeping crews in the Operations Support Division. I • L_I • • See attached Municipal Operations Department, Activities Reports for July 2012. Submitted by: Dan P. Sereno, Superintendent Parks and Trees Maintenance J es L. Auger, Superintendent Operations Support Attachments: (A) Tree Activity Report 2011 -2012 (B) Municipal Operations Department, July 2012 Activities Reports �i GODi ■ ■ �I Hy �C'q y 'y'.LI V? •. *te,O a `h! v o 0 �Q� V T r Oil- did JC' T � qay '� Q quad L Fiy y., y Cti Jd m b � J ag4td �O,aS v o 0 h6 N v o 0 0 T r v o 0 0 N N Co a Q7 M > O E N O O O E N (U F- N U) C N > y O d E N U 21 m 2 H Q Q C O is N N z Q N O CL t— LL C' a_ T N CO O E Q' 0 0 F- N CO O O O r N CO O O O r U) y N O c N > O .N a N m CL N N F- C O E N Cd C O m Q Q C O is N N z Q N O CL 0 • • 0 • municipal operations Departme Parks and Trees Division Fiscal Year 2012 -2013 Problem Tree Removals Month I #Trees Location(s) !July -12 0 Reforestation Tree Removals Month I #Trees I Location(s) (July -12 1 0 Replacement Trees Month 14 Trees I Location(s) (July -12 16 Municipal Operations Department - General Services Divisions - Activities Report -July 2012 This Month This Month Last Year Total To Date TTD Last Year AS haWConcrete Street Patching (Tons of Blacktop) 135 221 135 221 Sidewalk Repaired (sq. ft.) 2,816 2,980 2,816 2,980 Curb & Gutter Replacement (lin. ft.) 132 162 132 162 Sweeping, Beach Cleaning, Demo Materials (tons) 351 364 351 364 Asphalt/Concrete Recycled (tons) 136 256 136 256 Signs & Traffic Markings Signs Made 0 36 0 36 Signs Installed 182 183 182 183 Decals 4,240 0 4,240 0 Special Purpose Signs /Banners Made 16 11 16 11 Street Striping (]in. ft.) AddedJReplaced 186,435 51,292 186,435 51,292 Pavement Markings (including reflective) 296 50 296 50 Parking Stalls 0 7 0 7 Curb Painting ([in. ft.) 1,302 3,832 11302 3,832 Thermoplastic (Iin. ft.) 0 0 0 0 Sign Posts Installed 21 13 21 13 Graffiti Graffiti Incidents Removed by Staff 25 10 25 10 Graffiti Incidents Removed by Contractor 453 67 453 67 Refuse Collection Residential (tons) 3,071 2,994 3,071 2,994 Liquid HazMat Incidents 22 16 22 16 E -Waste Incidents 7 6 7 6 U -Waste Incidents 4 16 4 16 Recyclables (tons) 1,290 1,250 1.290 1,250 Trees Trimmed by Staff 15 11 15 11 Trimmed by Contractor 671 2,376 671 2,376 Removed 14 13 14 13 Planted 18 5 18 5 Roots Pruned by Contractor 0 2 0 2 Roots Pruned by Staff 9 4 9 4 Automotive Repairs 129 224 129 224 Preventive Maintenance Completed 64 58 64 58 PM Labor Hours 123 165 123 165 Beach Maintenance Beach Area Refuse (tons) 198 210 198 210 Beach Debris (tons) 85 75 85 75 Sweeping/Storm Drain Gutter Miles Swept 3,204 3,659 3,204 3,659 Sweeping Debris (cubic yards) 464 614 464 614 Storm Drain Debris (cubic yards) 37 25 37 25 • • Fj