Loading...
HomeMy WebLinkAbout09 - Seashore & Pearl Tide Gate Replacement�a�WPOR� == CITY OF NEWPORT BEACH City Council Staff Deport Agenda Item No. 9 June 28, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Tom Sandefur, P.E. APPROVED: �� G_llA N —a V4 TITLE: SEASHORE DRIVE AND PEARL AVENUE TIDE GATE REPLACEMENT -- COMPLETION AND ACCEPTANCE OF CONTRACT NO. 4476 ABSTRACT: On July 27, 2010, City Council awarded Contract No. 4476 to Atlas- Allied, Inc. for a total contract cost of $92,300 plus a 8% allowance for contingencies. The required work is now complete and staff requests City Council accept and close out the contract. RECOMMENDATION: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following account: Account Description Account Number Tide and Submerged Lands 7231- C2502007 Total Amount $ 92,300.00 $ 92,300.00 SEASHORE DRIVE AND PEARL AVENUE TIDE GATE REPLACEMENT -- COMPLETION AND ACCEPTANCE OF CONTRACT NO. 4476 June 28, 2011 Page 2 DISCUSSION: Overall Contract Cost/Time Summary Construction Final Cost at Contingency Actual Contract Time Contract Award Com pletion Target Contract Time Under or Amount Change days Over $92,300.00 $92,300 8% or less 0% 60 +15 The work necessary for the completion of this contract on Seashore Drive consisted of removing the existing flap tide gate and procuring and installing a Tideflex valve. The work on Pearl Avenue consisted of removing the existing tide gate and lid, installing a new tide gate, repairing the concrete around lip of structure, installing a new lid, and procuring and installing a Tideflex CheckMate check valve in the outlet pipe. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $92,300.00 Actual cost of bid items constructed: 92,300.00 Total change orders: Final construction contract cost: 0.00 $92,300.00 Additional time was needed in the construction phase to accommodate the winter storm season and to fix some leakage in the new TideFlex valve. In addition, the contract time was extended to allow for the fabrication of the valves. Estimated completion date per July 2010 Schedule: December 14, 2010 Project Award for construction: July 27, 2010 Contract Completion Date Plus Approved Extensions: April 29, 2011 Actual Construction Completion Date: May 23, 2011 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(e). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. SEASHORE DRIVE AND PEARL AVENUE TIDE GATE REPLACEMENT -- COMPLETION AND ACCEPTANCE OF CONTRACT NO. 4476 June 28, 2011 Page 3 NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Submitted by: Attachments: A. Location Maps LOCATION MAP PEARL AVENUE TIDE GATE REPLACEMENT P PROJECT LOCA CONTRACT NO. 4476 (PAGE 2 OF 2) L It LOCATION MAP SEASHORE DRIVE TIDE GATE REPLACMENT CONTRACT NO. 4476 (PAGE 1 OF 2) COAST HIGHWAY Z 4 N