HomeMy WebLinkAbout05 - Bay Avenue Pavement Reconstruction - NOC and Acceptance of Contract No. 5580 (CAP15-0010)CTY OF F NEWPORT BEACH City Council Staff Report July 28, 2015 Agenda Item No. 5 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director- (949) 644 -3330, dawebb @newportbeachca.gov PREPARED BY: Frank Tran, Civil Engineer PHONE: (949) 644 -3340, ftran @newportbeachca.gov TITLE: Bay Avenue Pavement Reconstruction — Notice of Completion and Acceptance of Contract No. 5580 (CAP15 -0010) ABSTRACT: On February 10, 2015, City Council awarded Contract No. 5580, Bay Avenue Pavement Reconstruction Project, to Nobest, Inc., for a total contract cost of $826,000.00 plus a 10% allowance for contingencies. The required work is now complete and staff requests City Council accept the work as completed and close out the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: The construction project was funded from the following accounts: Account Description Gas Tax Contribution from Private Party Measure M Fair Share AD -101 Street Rehabilitation WV Grade Adjustment SMH Grade Adjustment Account Number 7181- C2002044 7251- C2002044 7282- C2002044 74101 -9804 7521- C2002049 7541- C2002049 Amount $ 757,460.50 $ 15,000.00 $ 39,905.33 $ 20,000.67 $ 1,300.00 $ 2,400.00 Total: $ 836,066.50 5 -1 DISCUSSION: Overall Contract Cost /Time Summary Actual Awarded Final Cost at Contingency % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change $826,000.00 $836,066.50 10% or less +1.1% 1 0 1.1 Actual Time Allowed Contract Time (days) 1 62 Under H or Over (+ The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $826,000.00 Actual cost of bid items constructed: $833,436.50 Total change orders: $2,630.00 Final contract cost: $836,066.50 This pavement reconstruction project is located on Bay Avenue from 8th Street to Palm Street. The work necessary for the completion of this contract consisted of removing and reconstructing the existing concrete pavement, upgrading all curb access ramps, adjusting street utility covers to the new surface grade, and performing other appurtenant and incidental items of work as required. In addition to the roadway work, the project provided an opportunity to install fiber optic conduit along Bay Avenue within the project area. This section of conduit will allow for future extension of the existing City's traffic signal fiber optic communication network to Main Street and Palm Street traffic signals, as well as to Balboa Branch Library and Fire Station 1. By installing the conduit as part of a major roadway replacement project, there is substantial future savings and reduced impact to residents and commuters. This contract also included removing and reconstructing the existing concrete pavement on "I" Street from Balboa Boulevard to the bay in the Peninsula Point community. This portion of work was requested by a private party who has contributed funds for the reconstruction of "I" Street. A summary of the project schedule is as follows: Estimated Completion Date per 2014 Baseline Schedule May 08, 2015 Project Awarded for Construction February 10, 2015 Contract Completion Date with Approved Extensions June 10, 2015 Actual Substantial Construction Completion Date June 10, 2015 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: This agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. 5 -2 The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. ATTACHMENTS: Description Attachment A - Project Location Map 5 -3 BAY AVENUE 1 11 w Ij BALBOA BLVD �n non nOn n0 nom' N� A NT S. LOCATION MAP N.TS. LEGEND - NEW PCC PAK ENT BAY AVENUE PAVEMENT RECONSTRUCTION LOCATION MAP EVNITATOT1111 a I' STREET i (PENINSULA POINT) CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C -5580 7/28/2015 I