Loading...
HomeMy WebLinkAbout09 - Ocean Front Street and Alley Replacement���WPOa CITY OF F00.NP City Council Staff Report Agenda Item No. 9 November 8, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Frank Tran, Associate Civil Engineer APPROVED: 0, Y TITLE: Ocean Front Street and Alley Replacement - Completion and Acceptance of Contract No. 4316 ABSTRACT: On February 8, 2011, City Council awarded Contract No. 4316 (Ocean Front Street and Alley Replacement) to Nobest, Inc., for a total contract cost of $907,000 plus a 15% allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. 2. Authorize the City Clerk to release the Labor and Materials Bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after this Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description General Fund AD -99 Street Rehabilitation AD -99 Const. Contingency Water Enterprise Fund Wastewater Enterprise Fund Oil Field Maintenance & Repair Account Number Amount 7013- C2002033 $357,204.63 74099 -9804 209,580.46 74099 -9805 154,011.32 7511- C2002033 165,764.09 7531- C7001002 10, 780.00 5400 -8160 34,000.00 Total: $931,340.50 1 DISCUSSION: Ocean Front Street and Alley Replacement — Completion and Acceptance of Contract No. 4316 November 08, 2011 Page 2 Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual Contract Time Contract Amount Completion Target Contract Time Under ( -) Change (days) or Over ( +) $907,000.00 $931,340.50 15% or less +2.7% 100 0 The work necessary for the completion of this contract consisted of removing existing asphalt and concrete alleys and constructing new concrete alleys, adjusting utilities to grade and performing other appurtenant and incidental items of work as required. The alley replacement included in this contract was the final work effort for the Assessment District 99 Utility Underground District. In addition, asphalt concrete overlay was completed on 19th Street from Balboa Boulevard to the Newport Channel; concrete pavement, and sidewalk replacement was completed on cross streets from 14th Street to 20th Street between Balboa Boulevard and Ocean Front sidewalk. The work also included constructing an 8 -inch thick concrete containment pad at the City of Newport Beach's Oil and Gas Facility in West Newport for compliance with the City's Spill Control and Countermeasure Plan (SPCC). This containment facility was required by the EPA to prevent the spill of crude oil from contaminating navigable waters such as the canal north of Newport Shores community when transferring crude oil from the facility to tanker transport trucks. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $907,000.00 Actual cost of bid items constructed: $876,478.00 Total change orders: $54,862.50 Final contract cost: $931,340.50 Actual cost of bid items constructed was less than the original bid amount due to actual quantities constructed. The final construction contract cost was approximately 2.7 percent above the original bid amount. The additional cost resulted from the opportunity to include replacing and re- finishing existing handrails, and bollards in the work area, as well as upgrading telephone and cable TV pull boxes. 2 Ocean Front Street and Alley Replacement — Completion and Acceptance of Contract No. 4316 November 08, 2011 Page 3 A summary of the project schedule is as follows: Estimated Completion Date per 2010 Baseline Schedule August 12, 2011 Project Awarded for Construction March 14, 2011 Completion Date from Award with Approved Extensions August 2, 2011 Actual Substantial Construction Completion Date August 2, 2011 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). Submitted by: tstepneq,,u. tsaaum Public Works Director Attachment: A. Location Map 3 LOCATION MAP OCEAN FRONT STREET & ALLEY REPLACEMENT 14TH TO 21 ST STREETS C -4316 NFL 'OO R y rcN�NNF 6 yI� NEWPORTCHANNEL \e0q N BAY AVE. lO g<G� rn � �"-� -uJ1W F 'O L- LJ- LJ- LJJ- L- LI1L7,° -� IW I'II I� Ij '� LAS ARENAS PARK W i «FY Bq WEST BALBOA BLVD. I I ; CxoxCx EI EEU. SCHOOE / I 9L A E 68 AL 6- 6- A E 6E rL 2 - I L_ S �- WEST OCEAN FRONT ' N a m am µn N.T.S. PROJECT AREA PROJECT (1 LOCATION REST 9h BITTER POINT CONCRETE CONTAINMENT PAD N.T.S. Attachment A 4