HomeMy WebLinkAbout16 - C-3556 Bayside Drive ResurfacingCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 16 December 9, 2003 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department R.Gunther, P.E. 949 -644 -3311 rgunther@city.newport-beach.ca.us SUBJECT: BAYSIDE DRIVE RESURFACING —COMPLETION AND ACCEPTANCE OF CONTRACT NO. 3556 RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. DISCUSSION: On June 24, 2003, the City Council authorized the award of the Bayside Drive Resurfacing contract to R.J. Noble. The contract provided the resurfacing of Bayside Drive from Coast Highway to the north end of the street (Dunes Resort). This project provided the removal of existing deteriorated asphalt roadway and the construction of new asphalt roadway to street grades to improve drainage. The project also included removing existing deteriorated driveway approaches, grinding existing roadway and constructing P.C.C. cross gutters, sidewalk, curb access ramps, driveway approaches, curb and gutter, and asphalt patch back. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $207,489.00 Actual amount of bid items constructed: 215,076.80 Total amount of Change Orders: 9,415.00 Final contract cost: $224,491.80 SUBJECT: Bayside Drive Resurfacing - Completion And Acceptance of Contract No. 3556 December 9, 2003 Page 2 The increase in the amount of actual bid items constructed over the original bid amount resulted from the need for additional excavation, crushed miscellaneous base and asphalt base course. The final overall construction cost including Change Orders was 8.19 percent over the original bid amount. One Change Order in the amount of $9,415.00 provided for the removal and replacement of asphalt behind bike trails and drive approaches and for additional construction survey for redesign work. Environmental Review: The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302 of the CEQA Implementing Guidelines at the time the project was authorized by the City Council. This exemption covers the maintenance and alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. The project involved the reconstruction of an existing street and driveway approaches and did not impact any environmental resources. Funding Availability: Funds for the project were expended from the following account(s): Account Description Gas Tax Street/Bikeway Improvement The original contract completion date wa s and redesign of a portion of the work the 21, 2003. All work was completed to the by the revised completion date. Prepared by: R. Gunther, P.E. Construction Engineer Account Number 7181- C5100692 7181- C5100302 October 17, 200: completion date w satisfaction of the f : \users\pbw\shared \council \fy03- 04 \dec- 9\bayside resurface- noc- c- 3556.doc Amount $117,002.80 $107,489.00 Total: $224,491.80 . Due to Change Orders as extended to November Public Works Department Submitted Badum s Director