Loading...
HomeMy WebLinkAbout3.0 - Magic Nails Use Permits - PA2015-194 CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT November 5, 2015 Meeting Agenda Item No. 3 SUBJECT: Magic Nails CUP - (PA2015-194) 3404 Via Lido Conditional Use Permit No. UP2015-044 APPLICANT: Magic Nails OWNER: A Square, LLC, Diana Thomas PLANNER: Brenda Wisneski, Deputy Community Development Director (949) 644-3297, bwisneski@newportbeachca.gov PROJECT SUMMARY A conditional use permit to reduce the required parking spaces associated with a new nail salon which will have six stations. RECOMMENDATION 1) Conduct a public hearing; and 2) Adopt Resolution No. _ approving Conditional Use Permit No. UP2015-044 (Attachment No. PC 1). INTRODUCTION Project Setting The subject property is located near the northwest corner of Via Oporto and Via Lido. The property is developed with a two-story building containing two suites at the street level and two office suites on the second level. The building was constructed in 1956 and is undergoing renovation with a design theme consistent with Lido Marina Village. The nail salon proposes to occupy the rear of the ground level suite at 3404 Via Lido and take access from the alley. A jeweler would occupy the front of the suite. The adjacent ground level suite (3406 Via Lido) has been leased to a retail business. The existing development is nonconforming as no parking is provided on-site. Surrounding uses include Lido Marina Village, a retail/office destination, which surrounds the subject property to the north, east, and west. Via Lido Plaza, a retail shopping center is located to the south across Via Lido. Site photographs of the subject property and surrounding uses are included as Attachment No. PC 3. 1 V� QP �P Magic Nails CUP Planning Commission, November 5, 2015 Page 2 VICINITY MAP \ P Subject Property 16 h h�hb�p�e4 - b 7 ' GENERAL PLAN ZONING txN' tr _ ,�pA ��tr eo o-T o 3gpA 3400 t trtr } ,♦ C trtr y , ,� � LOCATION GENERAL PLAN ZONING CURRENT USE MU-W2 (Mixed-Use MU-W2 (Mixed-Use Retails (Ground Level) ON-SITE Water Related Water Related Office 2nd Level MU-W2 (Mixed-Use MU-W2 (Mixed-Use NORTH Water Related Water Related Lido Marina Village Retail Center SOUTH CG (General CG (Commercial Lido Plaza-Retail Shopping Commercial) General Center MU-W2 (Mixed-Use MU-W2 (Mixed-Use EAST Water Related Water Related Lido Marina Village Retail Center WEST M Water(Rela ed)Mixed-Use MUWater(Rela ed se Lido Marina Village Retail Center 3 Magic Nails CUP Planning Commission, November 5, 2015 Page 3 Background The subject business, Magic Nails, occupied 3418 Via Lido, Unit B for the past 19 years and seeks to relocate to 3404 Via Lido. Both properties have no on-site parking. An off-site parking agreement had previously been in place for the uses at 3404 Via Lido to utilize the off-site parking structure, but that agreement has expired. On December 18, 2104, the Planning Commission approved a Conditional Use Permit allowing for a reduction in on-site parking requirements and a parking management program in conjunction with the renovation and reauthorization of uses within Lido Marina Village. Five parcels (3405 Via Oporto, 3404, 3410, 3416, and 3430 Via Lido), including the subject property, were not included in this approval and each have no on- site parking. Therefore, any uses on these parcels which require more than one space per 250 square feet require a conditional use permit to reduce their parking requirements. In March 2015, a Conditional Use Permit was approved for a coffee shop to locate at 3405 Via Oporto. Project Description The applicant requests a Conditional Use Permit to accommodate a new tenant, Magic Nails, to occupy a portion of the ground level suite located at 3404 Via Lido. The ground floor totals 2,850 square feet. The adjacent retail suite is 1,425 square feet. The jeweler would occupy 875 square feet and Magic Nails proposes to occupy 550 square feet for no more than six stations. No more than six employees would be present at the site. The hours of operation would be 9:00 a.m. to 7:00 p.m. Monday through Saturday. Conditional use permit approval is necessary to reduce the required parking spaces because the subject property does not provide on-site parking. DISCUSSION Consistency with General Plan/Coastal Land Use Plan/Zoning The Land Use Element of the General Plan and Zoning Code designates the properties within Lido Marina Village as Mixed-Use Water Related (MU-W2). Permitted uses include commercial development on or near the bay in a manner that will encourage the continuation of coastal-dependent and coastal-related uses, maintain the marine theme and character, encourage mutually supportive businesses, encourage visitor-serving and recreational uses, and encourage physical and visual access to the bay on waterfront commercial and industrial building sites on or near the bay. The project would allow for the continuation of a use which was previously located in the area. The proposed project requires a conditional use permit to authorize a reduction in parking because no on-site parking is provided. A nail salon at this location will be a complimentary use to 4 Magic Nails CUP Planning Commission, November 5, 2015 Page 4 other uses in the area and will continue to serve patrons from the surrounding neighborhoods. Under the General Plan land use designation of MU-W2, the Floor Area Ratio (FAR) for the subject property is limited to 0.5 for nonresidential development. The existing building is nonconforming because it exceeds the FAR limit. The proposed application will not result in an increase in the gross floor area or FAR. Parking Modification In accordance with Section 20.38.060 (Nonconforming Parking) of the Zoning Code, the use may be changed without providing additional parking, provided the new use requires no more than one space per 250 square feet of gross building area. If the new use requires more parking, the new use must provide the additional parking equal to a difference between the two. In this case, no on-site parking is provided, which results in a six parking space credit under this provision. Thus, a reduction in the off-street parking requirement of five parking spaces is necessary. Table 1 summarizes the parking requirements. Table 1 Parking Requirements Use Parking Standard Required Parkin Historic Use I Retail — 1,425 sq.ft. 1 per 250 sq.ft. 6 spaces Historic use 6 space credit Proposed Use Retail— 875 sq.ft. 1 per 250 sq.ft. 4 spaces Salon —550 sq.ft. 1 per 80 sq.ft. 7 spaces Proposed uses 11 spaces required 5 parking space deficit Parking Management Plan A parking management plan is necessary to mitigate impacts associated with a reduction in the number of required parking spaces. In accordance with Section 20.40.110 (Adjustments to Off-Street Parking Requirements), the Planning Commission must also consider whether sufficient data is provided to indicate that parking demand will be less than the required number of spaces or that other parking is available (e.g. City parking lot located nearby, on-street parking available, greater than normal walk-in trade, mixed-use development) in conjunction with a parking management plan. In November, 2014, a parking study was prepared for the Lido Marina Village parking structure located at 3434 Via Lido (Attachment No. PC 4). The study details the availability of parking in the area and although the subject site was not specifically part of the study or the Lido Marina Village Parking Management Plan, the availability of parking in the street and in the nearby public parking structure are applicable to this project. Magic Nails CUP Planning Commission, November 5, 2015 Page 5 The following conditions are applicable to the proposed project, which reduce the overall parking demand of the proposed nail salon: • Captive Market. Land uses in Lido Marina Village that are within close proximity of one another generate the opportunity for shared trips. Also, Lido Marina Village contains on-street parking along Via Lido, Via Oporto, and Central Avenue that is available to patrons. • Different Peak Periods. The Parking Management Plan provides details regarding the peak demand for the proposed use in relation to surrounding retail, restaurant, and office uses. The proposed nail salon will close at 7:00 p.m. and on Sundays which will complement the peak periods of restaurants. The Lido Marina Village area offers public parking. A potential impact between uses may occur on weekend days during the summer season when demand for parking is at its greatest. However, the use will serve visitors at Lido Marina Village, thereby not always generating a new trip. • Promoting pedestrian and bicycle access to the subject property to limit the impact on off-street parking. Lido Marina Village is characterized by a higher level of pedestrian and bicycle traffic. The nail salon has been a tenant in the area for 19 years and has many patrons who reside in the nearby area and opt to walk or bike to the facility. In a dense commercial environment with multiple uses within close proximity, each building may not need a full supply of parking. The location of land uses within walking distance of one another generates the opportunity for shared trips and there is a component of walk-in patronage from nearby areas. In conclusion, the proposed nail salon is a neighborhood serving use which is consistent with the City's goals and objectives for Lido Marina Village. Staff recommends approval of the subject application and the reduction of required off-street parking. Conditional Use Permit Findings The requested reduction in the parking requirement requires the approval of a conditional use permit. Pursuant to Section 20.52.020.F (Findings and Decision) of the Newport Beach Municipal Code, the Planning Commission must make the following findings in order to approve a conditional use permit: 1. The use is consistent with the General Plan and any applicable Specific Plan; 2. The use is allowed within the applicable zoning district and complies with all other applicable provisions of this Zoning Code and the Municipal Code; 3. The design, location, size, and operating characteristics of the use are compatible with the allowed uses in the vicinity; Magic Nails CUP Planning Commission, November 5, 2015 Page 6 4. The site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle (e.g., fire and medical) access and public services and utilities;and 5. Operation of the use at the location proposed would not be detrimental to the harmonious and orderly growth of the City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed use. Sufficient facts exist in support of each finding. The use is consistent with the purpose and intent of MU-W2 (Mixed-Use Water Related) General Plan land use designation and Zoning District. The MU-W2 designation applies to waterfront properties in which marine-related uses may be intermixed with general commercial, visitor-serving commercial, and residential dwelling units on the upper floors. Personal service uses can be expected to be found in this area and similar locations and are complementary to the surrounding commercial uses. The proposed use is located in a district which is subject to a captive market that results in shared trips, different peak periods for a variety of land uses, and a high level of pedestrian and bicycle activity. These characteristics will reduce the parking demand to a number lower than the required parking. Public parking is provided nearby along Via Lido and Via Oporto to accommodate the proposed use. Alternatives 1. The Planning Commission may suggest specific project modifications or operational changes that are necessary to alleviate concerns. If the changes are substantial, the item should be continued to a future meeting to allow redesign of the project. 2. If the Planning Commission believes that there are insufficient facts to support the findings for approval, the Planning Commission should deny the application request (Attachment No. PC 2). Environmental Review The project is categorically exempt under Section 15301, of the California Environmental Quality Act (CEQA) Guidelines - Class 1 (Existing Facilities). The Class 1 exemption includes the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use. The proposed project involves a reduction in the parking requirement associated with a new use. Therefore, the project qualifies for a categorical exemption under Class 1. Magic Nails CUP Planning Commission, November 5, 2015 Page 7 If denied, projects which a public agency rejects or disapproves are not subject to the California Environmental Quality Act (CEQA) review, pursuant to Section 15270 of the CEQA Guidelines. Public Notice Notice of this application was published in the Daily Pilot, mailed to all owners of property within 300 feet of the boundaries of the site (excluding intervening rights-of- way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled meeting, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. Prepared by: rn-�� r n a Wisnes i, ICP, Deputy Director ATTACHMENTS PC 1 Draft Resolution with Findings and Conditions PC 2 Draft Resolution for Denial PC 3 Site Photos PC 4 Lido Marina Village Parking Demand Analysis, November 2014 PC 5 Project plans Q Attachment No. PC 1 Draft Resolution for Approval With Findings and Conditions 9 V� QP �P 20 RESOLUTION NO. A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH APPROVING CONDITIONAL USE PERMIT NO. UP2015-044 TO MODIFY THE PARKING REQUIREMENTS ASSOCIATE WITH A NAIL SALON LOCATED AT 3404 VIA LIDO (PA2015-194) THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by J. Scott Souders on behalf of Magic Nails, with respect to property located at 3404 Via Lido, and legally described as N-Tract: 1235 Block: Lot 3, and Assessor Parcel Number 423-122-09 requesting approval of a Conditional Use Permit. 2. The applicant proposes to operate a nail salon within a portion of a tenant suite. Conditional use permit approval is necessary to reduce the required parking spaces through the approval of a parking management plan because the subject property does not provide on-site parking. 3. The subject property is located within the MU-W2 (Mixed-Use Water Related) Zoning District and the General Plan Land Use Element category MU-W2 (Mixed-Use Water Related). 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is MU-W (Mixed-Use Water Related). 5. A public hearing was held on November 5, 2015, in the Council Chambers at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the meeting was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this meeting. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project has been determined to be categorically exempt pursuant to Title 14 of the California Code of Regulations (Section 15301, Article 19 of Chapter 3, Guidelines for Implementation of the California Environmental Quality Act) under Class 1 (Existing Facilities). The Class 1 exemption includes the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use. 2. The proposed project involves a reduction of the parking requirement associated with a permitted use within an existing structure. Therefore, the project qualifies for a categorical exemption under Class 1. 11 Planning Commission Resolution No. Page 2 of 7 SECTION 3. REQUIRED FINDINGS. The proposed use, a nail salon is a permitted use within the Mixed use Water Related zoning district. The requested reduction in the parking requirement is required approval of a conditional use permit per Section 20.40.110.B (Reduction of Required Off-Street Parking). In accordance with Section 20.52.020.F (Conditional Use Permit, Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. The use is consistent with the General Plan and any applicable Specific Plan. Facts in Support of Finding: 1. The MU-W2 (Mixed-Use Water Related) land use designation applies to waterfront properties in which marine-related uses may be intermixed with general commercial, visitor-serving commercial and residential dwelling units on the upper floors. Although the subject property does not include residential uses, the proposed personal service use is consistent with the visitor-serving land uses intended for the MU-W2 (Mixed- Use Water Related) land use designation of the General Plan. 2. The Circulation Element Goal 7.1 (Parking) is to ensure that an adequate supply of convenient parking is available throughout the City. The proposed use would include six chairs for providing nail service. Therefore the number of patrons would be limited. Analysis provided by the Lido Marina Village Parking Demand Analysis demonstrates that an adequate supply of parking is provided based upon the shared use of parking within Lido Marina Village. 3. The project site is not located within a Specific Plan area. Finding: B. The use is allowed within the applicable zoning district and complies with all other applicable provisions of this Zoning Code and the Municipal Code. Facts in Support of Finding: 1. The MU-W2 (Mixed-Use Water Related) zoning district applies to waterfront properties in which marine-related uses may be intermixed with general commercial, visitor- serving commercial, and residential dwelling units on the upper floors. Nail salons are classified as permitted uses within the MU-W2 (Mixed-Use Water Related) Zoning District. 07-22-2014 12 Planning Commission Resolution No. Page 3 of 7 2. A total of five (5) parking spaces to accommodate the nail salon are waived with this approval. No on-site parking is required to accommodate the establishment. The reduction in the parking requirement is consistent with Section 20.40.110 (Adjustments to Off-Street Parking Requirements) of the Zoning Code based upon the captive market conditions in Lido Marina Village that result in shared trips and the high level of pedestrian and bicycle activity from nearby patrons. 3. The existing development is nonconforming to the 0.5 Floor Area Ratio (FAR). The proposed interior renovation of the existing structure will not result in an increase to the existing gross floor area and resulting FAR. Finding: C. The design, location, size, and operating characteristics of the use are compatible with the allowed uses in the vicinity. Facts in Support of Finding: 1. The commercial building was previously occupied by a retail use. The front portion of the suite, to be accessed from Via Lido, will be occupied by a jeweler. The Nail Salon will be accessed from the rear alley. The location is compatible with other nail salon may also be an important visitor-serving use that benefits the area, which is in furtherance of the City's Coastal Land Use Plan and the Coastal Act. 2. The subject property is located in a relatively dense village area with multiple uses within a short distance of each other. Lido Marina Village is conducive to a significant amount of walk-in patrons. No on-site parking is available for the subject property but adequate parking is provided in the area. Public parking exists in the vicinity along Via Lido and Via Oporto. 3. The proposed use will not necessitate high levels of lighting or illumination and all outdoor lighting must conform to Newport Beach Municipal Code Section 20.30.070 (Outdoor Lighting). Finding: D. The site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle (e.g., fire and medical) access and public services and utilities. Facts in Support of Finding: 1. The project site is located within an existing commercial building and the tenant space is appropriate for a nail salon. The design, size, location, and operating characteristics of the use are compatible with the surrounding neighborhood. The remaining portion of the ground level tenant space will be utilized for retail purposes. 07-22-2014 13 Planning Commission Resolution No. Page 4 of 7 2. Although the site does not provide on-site parking, the proposed use is located in a district which is subject to a captive market that results in shared trips, different peak periods for a variety of land uses, and a high level of pedestrian and bicycle activity. These characteristics reduce the demand for parking to serve the proposed use. Adequate parking is provided nearby along Via Lido and Via Oporto to accommodate the proposed use. 3. Adequate public and emergency vehicle access, public services, and utilities exist for the site. 4. The design of the tenant improvements will comply with all Building, Public Works, and Fire Codes, and will be approved by the Orange County Health Department. Finding: E. Operation of the use at the location proposed would not be detrimental to the harmonious and orderly growth of the City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed use. Facts in Support of Finding: 1. The project includes conditions of approval to ensure that potential conflicts with the surrounding land uses are minimized to the greatest extent possible. The limited number of patrons to the facility would reduce potential impacts to surrounding land uses and sufficient parking is available in the area to accommodate the establishment. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Planning Commission of the City of Newport Beach hereby approves Conditional Use Permit No. UP2015-044 (PA2015-194), subject to the conditions set forth in Exhibit A, which is attached hereto and incorporated by reference. 2. This action shall become final and effective fourteen (14) days following the date this Resolution was adopted unless within such time an appeal is filed with the City Clerk in accordance with the provisions of Title 20 (Planning and Zoning), of the Newport Beach Municipal Code. PASSED, APPROVED, AND ADOPTED THIS 5T" DAY OF NOVEMBER, 2015. AYES: NOES: 07-22-2014 Planning Commission Resolution No. Page 5 of 7 ABSTAIN: ABSENT: BY: Kory Kramer, Chair BY: Peter Koetting, Secretary 07-22-2014 15 Planning Commission Resolution No. Page 6 of 7 EXHIBIT "A" CONDITIONS OF APPROVAL PLANNING 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval. (Except as modified by applicable conditions of approval.) 1. Use Permit No. UP2015-044 shall expire unless exercised within twenty-four (24) months from the date of approval as specified in Section 20.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 2. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 3. The applicant shall comply with all federal, state, and local laws. Violation of any of those laws in connection with the use may be cause for revocation of this Use Permit. 4. This Conditional Use Permit may be modified or revoked by the City Council or Planning Commission should they determine that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or is materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 5. Any change in operational characteristics, expansion in area, or other modification to the approved plans, shall require an amendment to this Use Permit or the processing of a new Use Permit. 6. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner or the leasing agent. 7. The hours of operation shall be limited between 9:00 a.m. and 7:00 p.m., Monday through Saturday. No more than six nail stations shall be established. 8. The operator is required to take reasonable steps to discourage and correct objectionable conditions that constitute a nuisance within the facility, adjacent properties, or surrounding public areas, sidewalks, or parking lots of the restaurant, during business hours, if directly related to the patrons of the establishment surrounding residents. 9. A copy of this resolution shall be incorporated into the Building Division and field sets of plans prior to issuance of the building permits. 10. Prior to issuance of building permits, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the Conditional Use Permit file. The plans shall be identical to those approved by all City departments 07-22-2014 10 Planning Commission Resolution No. Page 7 of 7 for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this Conditional Use Permit and shall highlight the approved elements such that they are readily discernible from other elements of the plans. 11. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City's approval of the Magic Nails Conditional Use Permit including, but not limited to, Conditional Use Permit No. UP2015-044 (PA2015-194). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. 07-22-2014 27 V� QP �P sg Attachment No. PC 2 Draft Resolution for Denial 19 V� QP �P �o RESOLUTION NO. #### A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH DENYING CONDITIONAL USE PERMIT NO. UP2015-0044 TO MODIFY THE PARKING REQUIREMETNS ASSOCIATED WITH A NAIL SALON LOCATED AT 3404 VIA LIDO, SUITE B (PA2015-194) THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by J. Scott Souders on behalf of Magic Nails, with respect to property located at 3404 Via Lido, and legally described as N-Tract: 1235 Block: Lot 3, and Assessor Parcel Number 423-122-09 requesting approval of a Conditional Use Permit. 2. The applicant proposes to operate a nail salon within a portion of a tenant suite. Conditional use permit approval is necessary to reduce the required parking spaces through the approval of a parking management plan because the subject property does not provide on-site parking. 3. The subject property is located within the MU-W2 (Mixed-Use Water Related) Zoning District and the General Plan Land Use Element category MU-W2 (Mixed-Use Water Related). 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is MU-W (Mixed-Use Water Related). 5. A public hearing was held on November 5, 2015, in the Council Chambers at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the meeting was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this meeting. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1 . Pursuant to Section 15270 of the California Environmental Quality Act (CEQA) Guidelines, projects which a public agency rejects or disapproves are not subject to CEQA review. SECTION 3. REQUIRED FINDINGS. In accordance with Section 20.52.020.F (Findings and Decision) of the Zoning Code, the Planning Commission may approve a use permit only after making each of the five required findings set forth in Section 20.52.020.F. In this case, the Planning Commission was unable to make the required findings based upon the following: 21 Planning Commission Resolution No. #### Page 2 of 3 1. The Planning Commission determined, in this case, that the proposed use permit for the reduction of parking is inconsistent with the legislative intent of Title 20 of the NBMC. 2. The design, location, size, and operating characteristics of the use are not compatible with the allowed uses in the vicinity. 3. The site is not physically suitable in terms of design, location, shape, size, operating characteristics. The property does not provide on-site parking to accommodate the proposed use. The Planning Commission does not consider the existing structure on the subject property a unique circumstance resulting in any necessity to warrant approval for a reduction in the off-site parking requirement through the approval of a parking management program. 4. The proposed use is neither required by code nor necessary for the enjoyment of the property. If desired, and as shown through previously approved building permits, the subject property can be utilized to comply with the requirements of the NBMC and be used for general commercial or retail uses. 5. The subject property is consistent in orientation, size and shape with typical lots in this neighborhood which are designed with commercial and mixed-use development. Parking is already deficient in this district. Operation of the use at the location proposed would be detrimental to the harmonious and orderly growth of the City. 6. Granting of the use permit would provide special privileges to the subject property as the City has required the minimum parking provided by the Zoning Code in similar circumstances with nonconforming commercial uses. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Planning Commission of the City of Newport Beach hereby denies Conditional Use Permit No. UP2015-044 (PA2015-194). 2. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal is filed with the City Clerk PASSED, APPROVED, AND ADOPTED THIS 5th DAY OF NOVEMBER, 2015. AYES: NOES: ABSTAIN: 07-22-2014 22 Planning Commission Resolution No. #### Page 3 of 3 ABSENT: BY: Kory Kramer, Chairman BY: Pater Koetting, Secretary 07-22-2014 23 V� QP �P Attachment No. PC 3 Site Photos 25 V� QP �P �� ,. - ACL? � ,p � � ■ � h � I from • • • '�. s a . � aY 4 � =� � 0 li � \� � I / t i 1 t 1 • ,�, � � . _ d� �• Attachment No. PC 4 Lido Marina Village Parking Analysis Summary Only. Figures and tables available upon request. 29 V� QP �P 30 November 14, 2014 Engineers&Planners Traffic Transportation Mr. Ron Lomtzen Parking Lido Group Retail, Inc. 60 South Market Street, Suite 11200 Unscon,Law& San Jose, CA 95113 Greenspan,Engineers 2 Executive Circle LLG Reference No. 2.13.3412.1 Suite 250 Irvine,CA 92614 Subject: Parking Demand Analysis for Lido Marina Village 949.825.61175 a Newport Beach, California 949,6256173 f www.11gengin eers.c om Dear Mr. Lomtzen: Pasadena As requested, Linscott, Law & Greenspan, Engineers (LLG) is pleased to submit this Irvine San Diego Parking Demand Analysis for Lido Marina Village. Lido Marina Village is generally Woodland Hills located on the northeast quadrant of Newport Boulevard and Via Lido in the City of Newport Beach, California. Figure 1, located at the rear of this letter report, presents a Vicinity Map, which illustrates the general location of the project site and depicts the surrounding street system. Lido Marina Village is an existing mixed-use center comprised of various retail, restaurant, health club, general office, and medical office uses with a gross building area (GBA) of 112,029 square feet (SF) and a net floor area (GLA) of 108,234 SF. Lido Marina Village currently has 27,141 SF of retail vacancies, 21,218 SF of restaurant vacancies and 6,291 SF of office vacancies. The parking supply for Lido Marina Village will total 422 spaces (inclusive of 12 tandem spaces), which consists of a combination of surface parking spaces and parking structure spaces, totaling 368 private parking spaces and 54 public parking spaces. Figure 2 presents the proposed site plan for Lido Marina Village, which shows the proposed buildings, the on-street parking spaces and the parking structure. This parking demand analysis evaluates the proposed Project, which consists of the conversion of 3636 Newport Boulevard (i.e. 1,971 SF) to restaurant space, the conversion of 3422 Via Lido (i.e. 1,467 SF) to a nail salon, the conversion of 3444 Philip M.Linscon,PElnz mi Via Lido (i.e. 12,071 SF) to a grocery store, the conversion of a portion of 3424 Via Jack M.Greenspan,PE irnl Oporto (i.e. 1,773 SF) and a portion of 3432 Via Oporto (i.e. 1,757 SF) to quick serve William A.Law,PE lan) Paul W Wilkinson.PE food use with less than 6 seats, the conversion of a vacant 6,840 SF game room to John P Keating,PE restaurant space, the conversion of a portion of 3505 Via Oporto (i.e. 1,955 SF) to David S.Shender,PE retail space, various patio additions, and the re-occupancy of the remaining vacant John Boarman,PE square-footage to their current use. Clare M.Look-Jaeger.PE Richard E.Baneac,PE Keil D.Maherry,PE M IG" ft."d IM Based on our understanding, a parking study is required by the City of Newport Beach as part of the `Blanket CUP" application and to determine the parking demand for the existing center with the aforementioned project modifications to ensure that adequate parking will be provided. This report evaluates the parking demand of the existing and proposed land uses at Lido Marina Village. The parking demand analysis evaluates the Project's parking requirements based on the City of Newport Beach Municipal Code and utilization of existing parking surveys combined with the ULI Shared Parking methodology. Our method of analysis, findings, and recommendations are detailed in the following sections of this report. PROJECT DESCRIPTION Table 1, located at the end of this letter report, following the figures, summarizes the existing and proposed land uses/tenants and associated floor areas for Lido Marina Village. The ULI Shared Parking category is also listed for each use. Review of Table I indicates that with the proposed modifications, Lido Marina Village will have a GBA of 112,029 SF (117,492 SF including the restaurant outdoor dining areas) and a GLA of 108,234 SF. Existing vacancies within Lido Marina Village consist of 27,141 GBA SF of retail space, 21,218 GBA SF of restaurant space (18,890 SF restaurant space and 2,328 SF patio space) and 6,291 GLA SF of office space. As we understand it, the proposed Project consists of the conversion of 3636 Newport Boulevard (i.e. 1,971 SF) to restaurant space, the conversion of 3422 Via Lido (i.e. 1,467 SF) to a nail salon, the conversion of a portion of 3444 Via Lido (i.e. 12,071 SF) to a grocery store, the conversion of a portion of 3424 Via Oporto (i.e. 1,773 SF) and a portion of 3432 Via Oporto (i.e. 1,757 SF) to quick serve food use with less than 6 seats, the conversion of a vacant 6,840 SF game room to restaurant space, the conversion of a portion of 3505 Via Oporto (i.e. 1,955 SF) to retail space, various patio additions, and the re-occupancy of the remaining vacant square-footage to their current use. At completion of the proposed conversion/re-occupancy, Lido Marina Village will continue to provide a total GBA of 117,492 SF and a GLA of 108,234 SF with a total parking supply of 422 spaces (inclusive of 12 tandem spaces). Appendix A contains figures illustrating the gross building area square footages for Lido Marina Village. 32 PARKING SUPPLY-DEMAND ANALYSIS The parking analysis for the Lido Marina Village Project involves determining the expected parking needs, based on the size and type of existing and proposed development components versus the parking supply. For this Project, there are two appropriate methods that can be used to estimate the site's peak parking requirements. These methods include: 1. Application of City Parking Code requirements. 2. Application of parking survey information combined with the ULI Shared Parking methodology, which combines actual parking demand data with proposed uses based on City Code and time of day profiles. CITY PARKING CODE REQUIREMENTS To determine the number of parking spaces required to support the proposed Lido Marina Village Project, the parking demand was first calculated using parking code requirements per the City of Newport Beach Municipal Code — Chapter 20.40, Off- Street Parking, Table 3-10, Off-Street Parking Requirements. The following parking ratios were used to determine the required parking: • Marinas— 0.75 spaces per slip or 0.75 spaces per 25 feet of mooring space. ■ Offices — 1.0 space per 250 SF net floor area for the first 50,000 SF, then 1.0 space per 300 SF net floor area for the next 75,000 SF and then 1.0 space per 350 SF net floor area for any floor area above 125,001 SF. • Retail Sales— 1.0 space per 250 SF. • Grocery Store— 1.0 space per 250 SF. • Nail Salons— 1.0 space per 80 SF • Restaurant— 1.0 space per 30-50 SF of net public area, including outdoor dining areas, but excluding the first 25% or 1,000 SF of outdoor dining area, whichever is less.I ■ Health/Fitness Facilities — 1.0 space per 250 SF (small—2,000 SF or less) or 1.0 space per 200 SF(large—over 2,000 SF). Table 2 summarizes the parking requirements for Lido Marina Village inclusive of the aforementioned modifications as described in the project description section of this letter report using the aforementioned parking code ratios. As shown, direct application of City parking ratios to existing/proposed uses at Lido Marina Village 1 It should be noted that this parking analysis utilized a restaurant code requirement of 1.0 space per 40 SF of net public area plus the parking required for the outdoor dining area,as directed by City of Newport Beach staff. 33 results in a total code parking requirement of 838 parking spaces (inclusive of non- DJM properties, which have a code parking requirement of 81 spaces). The non-DJM property addresses consist of 3400 Via Lido, 3404-3406 Via Lido, 3410 Via Lido, 3412 Via Lido, 3416 Via Lido and 3430 Via Lido. With a proposed parking supply of 368 private spaces, a theoretical parking deficiency of 470 spaces is forecast. It should be noted that the City code parking requirement significantly overstates the amount of parking that will be needed to accommodate the mix of uses within Lido Marina Village since there is a significant opportunity to share parking spaces based on the utilization profile of each land use component as well as the opportunity for customers and employees to walk-in or boat-in to the site. It should be further noted that the City Code parking requirement for restaurant consists of a combination of prior approved Conditional Use Permits for the existing restaurants and the net City Code requirement for the proposed restaurant uses. Appendix B contains the restaurant Conditional Use Permit information as provided by City of Newport Beach staff. PARKING SURVEY DATA ANALYSIS To determine the current parking demand of the existing uses at Lido Marina Village, parking surveys were conducted on two weekdays and one weekend day by Transportation Studies, Inc. The parking surveys were performed at one-hour intervals between 10:00 AM and 11:00 PM on Thursday August 22, 2013, Friday August 23, 2013, and Saturday August 24, 2013. The parking surveys consisted of counting the number of parked vehicles within three zones for the entire mixed-use center site. Figure 3 shows the location of the three parking zones. The results of the weekday (Thursday and Friday) and weekend day (Saturday) parking surveys are summarized in Tables 3, 4 and 5, respectively. As shown in Table 3, the study site experienced a weekday (Thursday) peak parking demand of 151 vehicles (40% utilization) within the entire site at 6:00 PM. In addition, as shown in Table 4, the study site experienced a weekday(Friday)peak parking demand of 108 vehicles (29% utilization) within the entire site at 12:00 PM. Lastly, as shown in Table 5, the study site experienced a weekend day(Saturday) peak parking demand of 214 vehicles (57% utilization) that occurred within the entire site at 3:00 PM. Appendix C contains the Electra Cruises parking demand data recorded during the on- site parking survey days. 3.4 Survey Data Shared Parking Demand Analysis and Results In order to determine the most appropriate peak-parking requirement for the Lido Marina Village Project, utilization of the survey data for the existing land uses is combined with the parking demand within the ULI shared parking model for the proposed conversion of 3636 Newport Boulevard (i.e. 1,971 SF) to restaurant space, the conversion of 3422 Via Lido (i.e. 1,467 SF) to a nail salon, the conversion of a portion of 3444 Via Lido (i.e. 12,071 SF) to a grocery store, the conversion of a portion of 3424 Via Oporto (i.e. 1,773 SF) and a portion of 3432 Via Oporto (i.e. 1,757 SF) to quick serve food use with less than 6 seats, the conversion of a vacant 6,840 SF game room to restaurant space, the conversion of a portion of 3505 Via Oporto (i.e. 1,955 SF) to retail space, various patio additions and the re-occupancy of the remaining vacant square-footage. This methodology reflects the most accurate peak parking demand for this development because the shopping center is currently approximately 50% occupied, such that the current/actual peak parking demand can be easily measured by conducting parking surveys while the parking demand for the re-occupied/converted and vacant uses can be forecasted using the ULI Shared Parking methodology. The hourly parking demand profiles (expressed in percent of peak demand) utilized in this study and applied to the re-occupied/converted and vacant uses (i.e. existing/proposed land uses — Table 1) are based on profiles developed by the Urban Land Institute (ULI) and published in Shared Parking, 2nd Edition. These factors present a profile of parking demand over time and have been used directly in the analysis of the re-occupied/converted and vacant uses. Specifically, the profiles for retail uses, restaurant uses (i.e. fine/casual dining restaurant) and office uses were utilized and there characteristics are described below. For retail uses, peak demand occurs between 12:00 PM and 3:00 PM on weekdays and between 1:00 PM and 5:00 PM on weekends. The hourly factors shown for retail uses are taken directly from ULI. The retail demand profile was applied to the vacant and/or new retail suites identified previously in Table 1 (i.e. 28,676 SF). The City's parking code requirement of 1 space per 250 SF was utilized for general retail, the City's parking code requirement of 1 space per 250 SF was utilized for the grocery store and the City's parking code requirement of 1 space per 80 SF was utilized for the nail salon. In addition, the retail parking demand includes a 10% reduction to account for walk-in customers from the surrounding area. 3.� • The ULI Shared Parking publication indicates that fine/casual dining restaurant uses are shown to experience peak demand between 7:00 PM and 9:00 PM for both the weekday and weekend. The restaurant use profile is based on a fine/casual dining restaurant. Like the retail profiles, the fine/casual dining restaurant profile derives exactly from the ULI baseline and was applied to the vacant and/or new restaurant suites identified previously in Table I [i.e. 20,861 SF restaurant space and 4,780 SF patio space for a total 23,996 SF of restaurant space (inclusive of a 430 SF restaurant increase) and a total of 5,463 SF of patio space]. The parking requirement is based on the restaurant number shown in Table 2 minus the conditional use permit parking requirements for the existing occupied restaurants. In addition, the restaurant parking demand includes a 10% reduction to account for walk-in customers and a 5% reduction to account for boat-in customers from the surrounding area. • For office uses, the ULI Shared Parking publication indicates that peak demand occurs between 10:00 AM and 12:00 PM on weekdays and weekends. The hourly factors shown for office uses are taken directly from ULI. The office parking demand profile was applied to all vacant office suites identified previously in Table I (i.e. 6,291 SF). The City's parking code requirement of 1.0 space per 250 SF net floor area for the first 50,000 SF, then 1.0 space per 300 SF net floor area for the next 75,000 SF and then 1.0 space per 350 SF net floor area for any floor area above 125,001 SF was utilized for general office. Tables 6 and 7 present an approach, which applies the City code parking requirement and ULI time of day parking profiles to the re-occupancy of the remaining vacant retail, restaurant and office square-footage (including the aforementioned modifications as described in the project description section of this letter report) for the weekday (Thursday and Friday, respectively) time frame while directly applying the parking survey data results as a time of day parking profile for the occupied square-footage within the existing Lido Marina Village. In addition, Table 8 presents an approach, which applies the City code parking requirement and site-specific time of day parking profiles to the re-occupancy of the remaining vacant retail, restaurant and office square-footage (including the aforementioned modifications as described in the project description section of this letter report) for the weekend day (Saturday) time frame while directly applying the parking survey data results as a time of day parking profile for the occupied square-footage within the existing Lido Marina Village. Appendix D contains the weekday and weekend day ULI shared parking analysis calculation worksheets for the vacant/new retail, vacant/new restaurant and vacant office uses (i.e. proposed Project). so As shown in Table 6, the peak parking requirement for Lido Marina Village during a typical weekday (Thursday) totals 485 parking spaces and occurs at 7:00 PM. In addition, as shown in Table 7, the peak parking requirement for Lido Marina Village during a non-typical weekday(Friday) totals 439 parking spaces and occurs at 7:00 PM. Finally, as shown in Table 8, the peak parking requirement for Lido Marina Village during a weekend day(Saturday)totals 522 parking spaces and occurs at 6:00 PM. As a result, based on a review of Tables 6, 7 and 8, the peak parking survey data shared parking demand for Lido Marina Village is 522 parking spaces and occurs at 6:00 PM on a Saturday. With a total (combined private and public) parking supply of 422 parking spaces, a peak parking deficiency of 100 spaces is forecast for the entire site. It should be noted that Lido Marina Village will also experience a parking deficiency of 63 spaces on a Thursday and a parking deficiency of 17 spaces on a Friday. Consequently, in order to offset/manage the forecast parking deficiencies, a Parking Management Plan (PMP) is recommended to be implemented at Lido Marina Village. The primary component(s) of the Parking Management Plan will consist of a valet and/or off-site parking program, thus reducing parking demand at various times during the day at Lido Marina Village. Based on review of Tables 6, 7 and 8, the valet parking program at a minimum is recommended to be in service on Thursdays during the lunch and dinner hours (i.e. 12:00 PM — 2:00 PM and 5:00 PM — 9:00 PM), on Fridays during the dinner hours (i.e. 6:00 PM — 8:00 PM) and on Saturdays between 12:00 PM and 10:00 PM. Sensitivity Parking Demand Analysis This section of the report presents an approach that determines the amount of redevelopment and/or re-occupancy that can occur within Lido Marina Village, while maintaining an on-site parking surplus within the proposed parking supply and thus eliminating the need for a PMP that would require valet and/or off-site employee parking program(s). Two options, referred to as Sensitivity Scenario A and Sensitivity Scenario B have been developed and consist of the following. Sensitivity Scenario A Sensitivity Scenario A includes all of the modifications described in the project description section of this letter report. The only exception is that the vacant ls` floor restaurant (i.e. 7,996 SF) and proposed 2nd floor restaurant (i.e. 6,840 SF) located at 3450 Via Oporto have been omitted from the proposed redevelopment program for Sensitivity Scenario A. 37 Sensitivity Scenario B Sensitivity Scenario B includes approximately half of the vacant/new retail uses (i.e. 14,000 SF); the entire vacant/new restaurant uses, [except for 3636 Newport Boulevard, 3416 Via Oporto (Suite 104) and 3420 Via Oporto (Suite 101)], and the vacant office space. Sensitivity Parking Demand Analysis Results Sensitivity Scenario A Tables 9, 10 and 11 present the survey-shared parking results for Sensitivity Scenario A for a Thursday, Friday and Saturday, respectively. Review of Tables 9, 10 and 11 shows that Lido Marina Village (Sensitivity Scenario A) will experience a peak parking requirement of 313 parking spaces at 6:00 PM on a Thursday, 277 parking spaces at 1:00 PM on a Friday, and 362 parking spaces at 3:00 PM on a Saturday. As a result, based on a review of Tables 9, 10 and 11, the peak parking survey data shared parking demand for Lido Marina Village (Sensitivity Scenario A) is 362 parking spaces and occurs at 3:00 PM on a Saturday. With a total (combined private and public) parking supply of 422 parking spaces, a parking surplus of 60 spaces is forecast for the entire site. It should be noted that Lido Marina Village (Sensitivity Scenario A) will also experience a minimum parking surplus of 109 spaces on a Thursday and a minimum surplus of 145 spaces on a Friday. Consequently, in order to move forward with the redevelopment and occupancy of the restaurant space at 3450 Via Oporto, it is recommended that a supplemental parking analysis be prepared. The supplemental parking analysis would consist of updated on- site parking utilization counts at Lido Marina Village to establish a new weekday and weekend day parking baseline for the preparation of an updated survey data shared parking demand analysis. Based on the results of the updated parking demand analysis, a PMP would be implemented, if needed, consistent with the PMP detailed above for the proposed ultimate redevelopment program. Appendix E contains the weekday and weekend day ULI shared parking analysis calculation worksheets for the vacant/new retail, vacant/new restaurant and vacant office uses for Sensitivity Scenario A. Sensitivity Scenario B Tables 12, 13 and 14 present the survey-shared parking results for Sensitivity Scenario B for a Thursday, Friday and Saturday, respectively. Review of Tables 12, 13 and 14 shows that Lido Marina Village (Sensitivity Scenario B) will experience a peak parking requirement of 381 parking spaces at 7:00 PM on a Thursday, 335 parking spaces at 7:00 PM on a Friday, and 420 parking spaces at 6:00 PM on a Saturday. Asa 38 result, based on a review of Tables 12, 13 and 14, the peak parking survey data shared parking demand for Lido Marina Village (Sensitivity Scenario B) is 420 parking spaces and occurs at 6:00 PM on a Saturday. With total (combined private and public) parking supply of 422 parking spaces, a parking surplus of 2 spaces is forecast for the entire site. It should be noted that Lido Marina Village (Sensitivity Scenario B) will also experience a minimum parking surplus of 41 spaces on a Thursday and a minimum surplus of 87 spaces on a Friday. Consequently, in order to move forward with the redevelopment and occupancy of the remaining retail and restaurant square-footage, it is recommended that a supplemental parking analysis be prepared, consistent with the findings of Sensitivity Scenario A. Appendix F contains the weekday and weekend day ULI shared parking analysis calculation worksheets for the vacant/new retail, vacant/new restaurant and vacant office uses for Sensitivity Scenario B. SUMMARY OF FINDINGS AND CONCLUSIONS 1. Lido Marina Village is generally located on the northeast quadrant of Newport Boulevard and Via Lido in the City of Newport Beach, California. Lido Marina Village is an existing mixed-use center comprised of various retail, restaurant, health club, general office and medical office uses with a total gross building area (GBA) of 112,029 SF (117,492 SF including the restaurant outdoor dining areas) and a net floor area (GLA) of 108,234 SF. Lido Marina Village currently has 27,141 GBA SF of retail vacancies, 21,218 GBA SF of restaurant vacancies (18,890 SF restaurant space and 2,328 SF patio space) and 6,291 GLA SF of office vacancies. The parking supply for Lido Marina Village will total 422 spaces (inclusive of 12 tandem spaces), which consists of a combination of surface parking spaces and parking structure spaces, totaling 368 private parking spaces and 54 public parking spaces. The proposed Project consists of the conversion of 3636 Newport Boulevard (i.e. 1,971 SF) to restaurant space, the conversion of 3422 Via Lido (i.e. 1,467 SF) to a nail salon, the conversion of 3444 Via Lido (i.e. 12,071 SF) to a grocery store, the conversion of a portion of 3424 Via Oporto (i.e. 1,773 SF) and a portion of 3432 Via Oporto (i.e. 1,757 SF) to quick serve food use with less than 6 seats, the conversion of a vacant 6,840 SF game room to restaurant space, the conversion of a portion of 3505 Via Oporto (i.e. 1,955 SF) to retail space, various patio additions, and the re-occupancy of the remaining vacant square-footage to their current use. At completion of the proposed conversion/re-occupancy, Lido Marina Village will continue to provide 39 a total GBA of 117,492 SF and a GLA of 108,234 SF with a total parking supply of 422 spaces (inclusive of 12 tandem spaces). 2. Direct application of City parking ratios to Lido Marina Village results in a total code parking requirement of 838 spaces (inclusive of non-DJM properties, which have a code parking requirement of 81 spaces). With a proposed private parking supply of 368 spaces, a theoretical parking deficiency of 470 spaces is forecast. 3. The Survey Data Shared Parking Demand Analysis indicates that the peak parking requirement for Lido Marina Village during a typical weekday(Thursday) totals 485 parking spaces and occurs at 7:00 PM (Table 6). In addition, the peak parking requirement for Lido Marina Village during a non-typical weekday (Friday) totals 439 parking spaces and occurs at 7:00 PM (Table 7). Finally, the peak parking requirement for Lido Marina Village during a weekend day (Saturday) totals 522 parking spaces and occurs at 6:00 PM(Table 8). As a result, the peak parking survey data shared parking demand for Lido Marina Village is 522 parking spaces and occurs at 6:00 PM on a Saturday. With a total (combined private and public) parking supply of 422 parking spaces, a peak parking deficiency of 100 spaces is forecast for the entire site. Consequently, in order to offset/manage the forecast parking deficiencies, a Parking Management Plan (PMP) is recommended to be implemented at Lido Marina Village. The primary component(s) of the Parking Management Plan will consist of a valet and/or off-site parking program, thus reducing parking demand at various times during the day at Lido Marina Village. The valet parking program at a minimum is recommended to be in service on Thursdays during the lunch and dinner hours (i.e. 12:00 PM — 2:00 PM and 5:00 PM — 9:00 PM), on Fridays during the dinner hours (i.e. 6:00 PM— 8:00 PM) and on Saturdays between 12:00 PM and 10:00 PM. 4. The Sensitivity Scenario A Survey Data Shared Parking Demand Analysis indicates that the peak parking requirement for Lido Marina Village during a typical weekday (Thursday) totals 313 parking spaces and occurs at 6:00 PM (Table 9). In addition, the peak parking requirement for Lido Marina Village during a non-typical weekday (Friday) totals 277 parking spaces and occurs at 1:00 PM (Table 10). Finally, the peak parking requirement for Lido Marina Village during a weekend day(Saturday) totals 362 parking spaces and occurs at 3:00 PM (Table 11). As a result, the peak parking survey data shared parking demand for Lido Marina Village (Sensitivity Scenario A) is 362 parking spaces and occurs at 3:00 PM on a Saturday. With a total (combined private and public) parking supply of 422 parking spaces, a parking surplus of 60 spaces is forecast for the entire site. It 40 should be noted that Lido Marina Village (Sensitivity Scenario A) will also experience a minimum parking surplus of 109 spaces on a Thursday and a minimum surplus of 145 spaces on a Friday. Consequently, in order to move forward with the redevelopment and occupancy of the restaurant space at 3450 Via Oporto, it is recommended that a supplemental parking analysis be prepared. The supplemental parking analysis would consist of updated on-site parking utilization counts at Lido Marina Village to establish a new weekday and weekend day parking baseline for the preparation of an updated survey data shared parking demand analysis. Based on the results of the updated parking demand analysis, a PMP would be implemented, if needed, consistent with the PMP detailed above for the proposed ultimate redevelopment program. 5. The Sensitivity Scenario B Survey Data Shared Parking Demand Analysis indicates that the peak parking requirement for Lido Marina Village during a typical weekday (Thursday) totals 381 parking spaces and occurs at 7:00 PM (Table 12). In addition, the peak parking requirement for Lido Marina Village during a non-typical weekday (Friday) totals 335 parking spaces and occurs at 7:00 PM (Table 13). Finally, the peak parking requirement for Lido Marina Village during a weekend day(Saturday)totals 420 parking spaces and occurs at 6:00 PM (Table 14). As a result, the peak parking survey data shared parking demand for Lido Marina Village (Sensitivity Scenario B) is 420 parking spaces and occurs at 6:00 PM on a Saturday. With a total (combined private and public)parking supply of 422 parking spaces, a parking surplus of 2 spaces is forecast for the entire site. It should be noted that Lido Marina Village (Sensitivity Scenario B) will also experience a minimum parking surplus of 41 spaces on a Thursday and a minimum surplus of 87 spaces on a Friday. Consequently, in order to move forward with the redevelopment and occupancy of the remaining retail and restaurant square-footage, it is recommended that a supplemental parking analysis be prepared, consistent with the findings of Sensitivity Scenario A. -r{-1 Mr. Ron Lorntzen LINSCOTT November 14, 2014 Page 12 GREENSPAN We appreciate the opportunity to prepare this analysis for Lido Group Retail, Inc. Should you have any questions or need additional assistance, please do not hesitate to call us at (949) 825-6175. Very truly yours, Linscott, Law & Greenspan, Engineers Keil D. Mabe E. Daniel A. Kloos, P.E. Principal Senior Transportation Engineer ,�pRMAESS/0 9� OQY OFESS/0,� BFRq F �e<c, �rcl9./�01�2 No. 6,= t A S Exp. 1-'Se"5 sl9TF�CALIFOFN\P rT4��AFFiGP�P OF CAUI Attachment No. PC 5 Project Plans 4S V� QP �P P 2015-194 Attachment No. PC 5 - Project Plans I IU A w IIA LO Av /ll,t 16 3 tai?/,J1�� I K ch7yrytMh Subject: ADDITIONAL MATERIALS RECEIVED - PC MEETING - NOVEMBER 5, 2015 PLANNING COMMISSION—NOVEMBER 5, 2015 ITEM NO. 3a:ADDITIONAL MATERIALS RECEIVED MAGIC NAILS PARKING WAIVER (PA2015-194) -----Original Message----- From: Dina [mailto:dinamoatazedi@gmail.coml Sent: Wednesday, November 04, 2015 11:24 AM To:Wisneski, Brenda Subject: Magic Nails Dear Ms. Wisneski, I am writing to show my support for our local nail shop.This shop has been on Lido long before I moved to the neighborhood seven years ago. I have a weekly tradition of walking over the bridge from our home on Via Eboli with my mom and my daughter and getting our nails done together. It's this type of ritual that makes living on Lido special for my family.The women who work at Magic Nails have become our friends over the years. Magic Nails is a local favorite and as much apart of Lido's history as the historic theatre and Woody's. I am in favor of the Lido Village renovation and am excited about the new businesses coming to the area. I just want to see my favorite nail shop stay in the village. I understand that the issue is related to parking, but so many of us walk and ride our bikes to get our nails done. Sincerely, Dina Moatazedi 117 Via Eboli Newport Beach, Ca 92663 t Subject: ADDITIONAL MATERIALS RECEIVED - PC MEETING - NOVEMBER 5, 2015 PLANNING COMMISSION—NOVEMBER 5, 2015 ITEM NO. 3b:ADDITIONAL MATERIALS RECEIVED MAGIC NAILS PARKING WAIVER(PA2015-194) From: Cynthia koller [mailto:gracenblOyahoo.com] Sent: Wednesday, November 04, 2015 9:19 PM To: Brown, Leilani Subject: Fw: MAGIC NAILS PARKING WAIVER ----- Forwarded Message ----- From: cynthia koller<gracenb1 CcDvahoo.com> To: "pzak newportbeachca.gov"<pzak@newportbeachca.gov>; "eweigand .newportbeachca.gov" <eweigand mewportbeachca.gov>; "ray.lawler .hines.com" <ray.lawler hines.com>; "bhillgren(dhighrhodes.com" <BHillgren .HighRhodes.com>; "pkgleneagles .gmail.com" <pkgleneagles .gmail.com>; Tim Brown <tim- brown(gDsbcglobal.net>; "kkramerCa)pacifichospitality.com"<kkramer(?�pacifichospitality.com>; "lbrown(cDnewportbeach.ca.gov" <Ibrown(cDnewportbeach.ca.gov> Cc: Diane Dixon <ddixon(cDnewportbeachca.gov>; Lori Morris <IorlrmorrisCcDgmaII.com>; Linda Klein <Iklein14(cDme.com>; Bettina Deininger<bettina22Cc roadrunner.com>; Bobbie Fesler<bobbief100ame.com>; George Schroeder<schroederg(a)gmail.com>; Kathryn Branman <kbranman(@gmail.com>; Ken Darleen Kuhlmann <darleenku hl(c)yahoo.com> Sent: Wednesday, November 4, 2015 9:17 PM Subject: MAGIC NAILS PARKING WAIVER PLEASE ENTER INTO THE PUBLIC RECORD: COMMISSIONERS; I have lived permanently in West Newport for the last 13 years and I have been a client of Magic Nails for a good part of those years. This is a business that withstood the recession and the blight of Lido Village and managed to keep the ladies and yes some gentlemen very happy through it all. Over the years our city has worked with many business owners here on the Peninsula providing accommodations. We are hopeful you will do the same for Magic Nails and grant the requested parking wavier so Magic Nails can continue to serve their very large, loyal costumer base. Respectfully, Cindy Koller West Newport i z Magic Nails CUP Reduction in on -site parking requirements j 115 'j- Planning 15j-Planning Commission, November 5, 2015 3404 Via Lido - Conditional Use Permit No. UP2015-044 (PA2015-194) Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Vicinity Map b � .� P ♦! �� � ,.raj uy �+ \ A O _ ;1 ` F Subject '- b r Property ol � 4po i4 9Aoo i \ � . ;: • `ate i ,3 ,mow 34?3 07/13/2012 Community Development Department - Planning Division 2 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) f a 07/13/2012 Community Development Department- Planning Division 3 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Alley Entrance • lon •I �3 4 � ' I �t ! 07/13/2012 Community Development Department- Planning Division 4 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Adjacent Land Uses i y :art[ 07/13/2012 Community Development Department- Planning Division 5 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting agic Nails Parking Waiver 194) �dEW�R> A Floor Plan V a cqC/FORNP ONail Salon Jeweler 550 sq.ft. 875 sq.ft. v El El El El Q Retail 1,425 sq.ft. 07/13/2012 Community Development Department - Planning Division 6 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Parking Requirements Required • - Parking ' - 1 ,425 sq.ft. 1 : 250 sq.ft. 6 spaces (credit) Retail 875 sq.ft. 1 : 250 sq.ft. 11 spaces Salon 550 sq.ft. 1 : 80 sq.ft. Parking Deficit 5 spaces 07/13/2012 Community Development Department - Planning Division 7 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Parking Demand Analysis CompletedAugustof 2013 to reflect future occupancy of Lido Marina Village . Shortfall of loo spaces at 6 : oo p . m . on Saturday. Real -time data to be collected with re - occupancy of Lido Marina Village . 07/13/2012 Community Development Department- Planning Division 8 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) LMV Parking Analysis ya a NIB'20•J9•f .S @Q �f 2911 N09.09 w 122 W Fee Simple Ieev f I EIKs Lodge 9,849 sq It �A (0.23 acres) g "� "��. O�T Leasehold f ,e•°i „• Sion-site R g"g I soaces and ^E e 6 k• 38 spaces Not'99 8`-®ia C Not a Part Q--f after bpm in eP municipal lot `d salvor 191.16 a � II i e_rese'is I I ejJ �A � e°m59r n s i € II ��a n a I I O V n! � P �"•�� Subject PropertyA , �lie y � l I E 109i'JM1yW� BC 9e• ���PPPIII��� I j nonconformingto a ng` _ Q� iJia.35'/BTV�'3]5 4M•a]-]al , • 9 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Parking Management Lido Marina Village area Captive Market — many uses in close proximity generate the opportunity for shared trips . Different Peak Periods — Nail salon different peak hours than retail, office, and restaurant uses . High pedestrian and bicycle access — in close proximity of residential 07/13/2012 Community Development Department- Planning Division 10 i r 46 y�N *i a ti 4 r I _ For more information contact: - Makana Nova,Associate Planner 949-644-3249 mnova@newportbeachca.gov www.newportbeachca.gov Magic Nails CUP Reduction in on -site parking requirements j 115 'j- Planning 15j-Planning Commission, November 5, 2015 3404 Via Lido - Conditional Use Permit No. UP2015-044 (PA2015-194) Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Vicinity Map b � .� P ♦! �� � ,.raj uy �+ \ A O _ ;1 ` F Subject '- b r Property ol � 4po i4 9Aoo i \ � . ;: • `ate i ,3 ,mow 34?3 07/13/2012 Community Development Department - Planning Division 2 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) f a 07/13/2012 Community Development Department- Planning Division 3 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Alley Entrance • lon •I �3 4 � ' I �t ! 07/13/2012 Community Development Department- Planning Division 4 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Adjacent Land Uses i y :art[ 07/13/2012 Community Development Department- Planning Division 5 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting agic Nails Parking Waiver 194) �dEW�R> A Floor Plan V a cqC/FORNP ONail Salon Jeweler 550 sq.ft. 875 sq.ft. v El El El El Q Retail 1,425 sq.ft. 07/13/2012 Community Development Department - Planning Division 6 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Parking Requirements Required • - Parking ' - 1 ,425 sq.ft. 1 : 250 sq.ft. 6 spaces (credit) Retail 875 sq.ft. 1 : 250 sq.ft. 11 spaces Salon 550 sq.ft. 1 : 80 sq.ft. Parking Deficit 5 spaces 07/13/2012 Community Development Department - Planning Division 7 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Parking Demand Analysis CompletedAugustof 2013 to reflect future occupancy of Lido Marina Village . Shortfall of loo spaces at 6 : oo p . m . on Saturday. Real -time data to be collected with re - occupancy of Lido Marina Village . 07/13/2012 Community Development Department- Planning Division 8 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) LMV Parking Analysis ya a NIB'20•J9•f .S @Q �f 2911 N09.09 w 122 W Fee Simple Ieev f I EIKs Lodge 9,849 sq It �A (0.23 acres) g "� "��. O�T Leasehold f ,e•°i „• Sion-site R g"g I soaces and ^E e 6 k• 38 spaces Not'99 8`-®ia C Not a Part Q--f after bpm in eP municipal lot `d salvor 191.16 a � II i e_rese'is I I ejJ �A � e°m59r n s i € II ��a n a I I O V n! � P �"•�� Subject PropertyA , �lie y � l I E 109i'JM1yW� BC 9e• ���PPPIII��� I j nonconformingto a ng` _ Q� iJia.35'/BTV�'3]5 4M•a]-]al , • 9 Planning Commission - November 5, 2015 Item No. 3c: Additional Materials Presented at Meeting 194) Parking Management Lido Marina Village area Captive Market — many uses in close proximity generate the opportunity for shared trips . Different Peak Periods — Nail salon different peak hours than retail, office, and restaurant uses . High pedestrian and bicycle access — in close proximity of residential 07/13/2012 Community Development Department- Planning Division 10 i r 46 y�N *i a ti 4 r I _ For more information contact: - Makana Nova,Associate Planner 949-644-3249 mnova@newportbeachca.gov www.newportbeachca.gov