Proposed FY 2015/16
March 24, 2015
Item No. 01 - Joint Meeting
Capital Improvement Program
Continued from 3 -10 -15 City Council Special Meeting
041... Aff AV APF fi
� UNDIR CONSTIVIN /
,dOr Air AF Ar ff.
All 0 City Council Special Meeting
March 241 2015
STREETS & DRAINAGE
Bayside Drive Rehabilitation - Marine Ave to PCH (Design) $350,000
FYI Only - Council Direction Given at 3/10/15
Meeting to Include Bayside in 15/16 Budget
GF
CIP - General Fund Goals
$7,000,000
$6,000,000
$5,000,000
$4,000,000
$3,000,000
$2,000,000
$1,000,000
$0
FY08 FY09
FY10 FY11 FY12
General Fund CIP Focus:
FY13
FY14 FY15 FY16
Fund, or Supplement other Funding Sources to keep up with
Necessary On -Going Capital Maintenance, Repairs, Replacements
Maintain Existing Facilities, Streets, Sidewalks, Allies, Streetlights,
Parks, Landscaping, Beaches, Piers, Surface Water Quality, etc.
Provide Source for Grant Fund Matching
FACILITIES
CdM Fire Station and Branch Library Replacement (Construction)
Re- Budgeting - $5,564,000. for Total of $6,315,000
Lido Fire Station (FS #2) Replacement (Design)
Re- Budgeting - $250,000. for Total of $350,000
Balboa Angling Club Building Repair
Master Facilities Plan Strategic Planning
Major Capital Facilities Maintenance (Annual)
Mariners Fire Station —Apparatus Bay Replacement
(Des ignlConstruction)
Replacement of Central Library Lighting and Control Switches
Refurbishment of the Central Library & Mariners Branch Public
Restrooms
TOTAL NEW APPROPRIATIONS IN FACILITIES
$751,000 UP
$100,000 UP
$20,000 TL
$150,000 UP
$1,280,000 FCM
$1,100,000 UP
$20,000 FCM
$150,000 FCM
$3,621,000
FFP — Facilities Financing Plan FCM - Facilities Capital Maintenance Fund GF — General Fund
STREETS & DRAINAGE
B (mid v'e Reha it � n Hlo- ere. ` .. - ,. �'r� -� - �t� .
ud'y��,1 i�rll �Ic3bl!<<at:t },� - I'Jlarfil lU` o 'CIS (Desig,�j ;l 350,000 Vii,
15th Street /Balboa Reconstruction (construction)
Re-Budgeting-$772,200 for Total of $4,000,000
$3,827,800 GF /GT
FY 14/15 Residential Street Overlay (Cameo Shores, Dorchester) $1,993,000 M2
Re-Budgeting-$1,107,300 for Total of $3,100,000
Irvine Avenue Pavement Rehab (Santiago to Monte Vista) $730,500 GF /GT
Re-Budgeting-$769,500 for Total of $1,500,000
Newport Blvd /32nd Street Modifications (construction) $688,250 M2
Re-Budgeting-$2,920,000 for Total of $3,600,000
Ocean Blvd & Poppy Ave Pavement Reconstruction (construction) $253,500 GF
Re- Budgeting - $2,146,540 for Total of $2,400,000
Continued , , ,
GT - Gas Tax M2 - OCTA Measure M2 GF — General Fund TC — Transportation & Circulation
STREETS & DRAINAGE
PCH /Old Newport Blvd Street Modifications (Right -of way)
Balboa Village Wayfinding Improvements
Bayside Drive Rehabilitation
MacArthur Blvd Pavement Rehabilitation - PCH to Ford Rd. (Construction)
Re-Budgeting-$714,900 for Total of $2,700,000
FY 15/16 Street Light Replacement (Balboa, Cameo) (Design /Construction)
Storm Drain System Video Evaluation
Re-Budgeting-$50,000 for Total of $250,000
Citywide Concrete & Pavement Replacement Program (DesigniConstruction)
$1,000,000 M2 /TC
$370,000 CDBG
$350,000 GF
$1,385,100 M2 /CG
$360,000 GF
$200,000 GF
$500,000 GF
TOTAL NEW APPROPRIATIONS
IN
STREETS & DRAINAGE
$11,708,150
GT - Gas Tax M2 - OCTA Measure M2
GF — General Fund
CG — Contributions & Grants
TRANSPORTATION
V
Corona del Mar Bypass Study $50,000 TC
Also Requesting TCA to Conduct Study
Traffic Signal Rehabilitation Program (Annual) $200,000 G
Coyote Canyon Bike Trail (concept) $40,000 G
TOTAL NEW APPROPRIATIONS IN TRANSPORATION $330,000
w
TC — Transportation and Circulation GF — General Fund M2 — OCTA Measure M2
WATER QUALITY &ENVIRONMENTAL
Semeniuk Slough Dredging (construction)
Re- Budgeting- $671,700 for Totalof$1,171,700
Bayview Heights Drainage & Runoff Treatment (Construction)
Re-Budgeting-$405,000 for Total of $455,000
Arches Drainage Area - Bacteria Reduction Program
(Design7Construction)
TOTAL WATER QUALITY & ENVIRONMENTAL
►0.
$500,000 TL
$50,000 GF
$1,160,000
$1,710,000
GF — General Fund TL — Tidelands M2 — Measure M
TL/M2
J
PARKS, HARBOR & BEACHES
Balboa Island Seawall Rehabilitation (DesignlPermitting)
Re-Budgeting-$599,700 for Total of $650,000
Back Bay View Park Enhancements (Phase II construction)
Harbor Piers & Gangway Maintenance
Re-Budgeting-$248,400 for Total of $800,000
Grand Canal Dredging (construction)
American Legion Bulkhead (Design/Permitting)
Newport Pier Building Platform & Piles
Lower Castaways Park
Bonita Creek Synthetic Turf
Eastbluff Park Backstop Replacement (construction)
Various Park Walls and Staircase Rehabs (construction)
Eel Grass Plan Implementation /RGP 54 Permit
Other
$50,300 TL
$300,000 GF
$551,600
$500,000
$300,000
$1,100,000
$100,000
$412,602
$210,000
$500,000
$25,000
$300,000
TOTAL PARKS, HARBORS & BEACHES $41324502
FFP — Facilities Financing Plan BET — Building Excise Tax GF — General Fund TL - Tidelands
TL
TL
TL
TL
TL
UP
BET
BET
TL
WATER & WASTEWATER
Lido Marina Village WMP C I P Replacement (Design & construction)
Bay Crossing Main Replacements (Design)
Park Avenue Main Replacement (Design)
Newport Blvd. Water Main Replacement
Dolphin and Tamura Shallow Well
Central Irrigation System Upgrades in Parks
Big Canyon Reservoir Meter Valve & Vault Replacement
Sewer Main Lining & Repair Improvements (WMP) (construction)
Adjust Water Values and Sewer Manholes to Grade (construction)
TOTAL WATER & WASTEWATER
r: A
WWF — Wastewater Fund WF — Water Fund
$200,000
WF
$300,000
WF
$250,000
WF
$500,000
WF
$100,000
WF
$150,000
WF
$750,000
WF
$400,000 WWF
$150,000 WWF
$2,800,000
WT
Questions or Comments
before we continue?
ro 0 0
Early Look
Proposed FY 2015/16
Capital Improvement Program
Continued from 3 -10 -15 City Council Special Meeting
04, . .. Aff AV APF fi
� UNDIR CONSTIVIN /
,dOr Air AF Ar ff.
All 0 City Council Special Meeting
March 241 2015
How is Infrastructure Funded?
➢ City General Fund
➢ State Gas Tax
➢ County Measure M %C sales tax
➢ Tidelands Revenue
➢
Matching Grants
(Federal &
State)
➢
AQMD Clean Air
Subvention
Funds
➢ Federal CDBG
➢ Developer Fees (Drainage Fees,
Traffic Impact Fees, Park
Acquisition, etc.)
➢ Sewer Utility Fee
➢ Water Utility Fee
➢ Redevelopment
➢ Parking Revenues
➢ Grants
➢ Other
7
Fund Balances Identified to Program this FY
Funding Type Identified Amount Available
Proposed Amount
➢
City General Fund
$5,000,000
$5,000,000
➢
Neighborhood Enhan. Dist. A
$430,000
$0
➢
Neighborhood Enhan. Dist. B
$197,000
$197,000
➢
Balboa Village Parking Mang. Dist.
$437,000
$370,000
➢
Building Excise Funds
$779,160
$710,000
➢
Measure M %C Sales tax
$2,200,000
$21378,100
➢
Federal CDBG
$121,500
$121,500
➢
Tidelands Maintenance
$1,500,000
$2,215,000
➢
Tidelands Capital
$2,500,000
$1,326,900
➢
Circulation &Transportation
$572,000
$590,000
➢
Facility Finance Plan
Per UP Plan
$2,351,000
➢
Facility Capital Maintenance
$1,500,000
$1,500,000
➢
Water Capital (Master Plan)
$3,900,000
$1,400,000
➢
Wastewater Capital (Master Plan)
$500,000
$500,000
Balboa Island Seawall Rehabilitation
This Project is from the April 2011 Island Seawall Study
Primary Flood Defense System for the Islands
Total Estimated Seawall Project Cost: $20 to $70 million
Invested to Date: $222,800
(-° Funding Required: TBD
F i�
Balboa Island Seawall Rehabilitation
Suggestions to Possibly Reduce /Defer Project Cost
The Tidelands Committee has been working on
Reviewing /Refining a Solution for Several Years now.
Discussion Currently being Scheduled for a Council Study
Session on April 14, 2015.
Staff /Committee have been Narrowing in on a Plan to
Replace Some Segments, and Rehabilitate & Cap Other
Segments. Looking Closer to around $20 - $30 Million.
Staff Recommendation:
Ei Continue Forward with Defining, Developing
and Implementing a Long Team
Rehabilitation Solution.
Corona del Mar Fire Station & Branch Library
Replacement
i
L
.,11 I,
r [
Identified in Facility Finance Plan for Replacement in 2015
La Total Estimated Project Cost: $6,750,000
Invested to Date: $6,500
Funding Required: $6,750,000 (FFP)
Ready to Award Concept Development &
Design Contract Tonight (March 241h)
CdM Fire Station & Branch Library Replacement
Suggestions to Possibly Reduce /Defer Project Cost
• Preliminary Concept is for a 2,500sf Branch Library &
5,800sf Fire Station. Could Review /Value Engineer Out
some Potential Building Cost.
• Defer Replacement Project for a few more years (station
built in 1950 — May need Additional Maintenance Now)
■ Review the Need and How these City Services are provided
to Possibly Reduce Cost.
Staff Recommendation:
Design /Construction Funding Planned for in UP
and Currently in Budget.
Award Design Contract Tonight with any Specific
Council Direction. Staff will work with Library
Board and Community to Develop /Refine Concept
for Future Council Review /Approval.
Lido Fire Station Replacement
Alm - - - -- -
Identified in Facility Finance Plan for Replacement in 2015
Currently Reviewing Best Location for Facility
Total Estimated Project Cost: $6,750,000 (FFP - excludes property)
Invested to Date: $0
Lido Fire Station Replacement
Suggestions to Possibly Reduce /Defer Project Cost
■ Defer
Replacement
Project for a few
more years (station
Sell Present Site (Avoids the
built
Relocation
in 1952 — May
need
Additional
Maintenance Now)
Develop Efficient Design Concept with Smaller Footprint.
Look to Build New Station on
a Separate
Site, then
Lease or
Sell Present Site (Avoids the
Temporary
Relocation
Cost).
Other
Staff Recommendation:
Design /Construction Funding is Planned for in
FFP and Design Cost current in Budget.
Continue into Concept and Site Development.
Staff will work to Develop /Refine Concept for
Future Council and Community Review /Approval.
Superior Avenue & Pacific Coast Highway
Pedestrian /Cyclist Over - Crossings
FJ rL'NE PARK _°
Identified in City FFP and OCTA PCH Study as Desired Improvement
Very High Pedestrian and Cyclist Crossing Volumes.
Improves Level of Service and Safety of Intersection.
Connects New Sunset Ridge Park to Parking Lot.
Current Budget $300,000 (G F)
Uq Invested to Date: $5,000
LA Estimated Budget to Complete: $3 to $5 million
Superior Avenue & Pacific Coast Highway
Pedestrian /Cyclist Over - Crossings
Suggestions to Possibly Reduce /Defer Project Cost
• Pursue Grant Funding Opportunities for Bridges.
• Defer Starting Concept and Design Efforts.
• Other?
Staff Recommendation:
Design /Construction Funding is Planned for in FFP
and Concept /Permitting Cost Currently in Budget.
Continue into Concept and Site Development.
Staff will work with PB &R Commission and
Community to Develop /Refine Concept for Future
Council Review /Approval.
Develop Concept for Entire Lower Sunset View
Park as part of this effort for More Efficient &
Coordinated Design /Permitting.
Balboa Village C.A.P. Improvements
a
Iw
BALBOA BLVC,
a -
_ 3'
r -:
r 'r
r�
Legend
Phase 1 - Balboa Blvd.
! Phase i - Secondary Village
Streets (Streetscape Amenities
Only)
Phase 2 -Main St.
Phase 3 -Waterfront
Balboa Village C.A.P. Improvements
Proposed Project Funding Required
Balboa Village Fagade Improvements $220,000
Balboa Village Way- finding Signage $370,000
Balboa Village Streetscape $3,0001000
r
BAIBCANLLALE BIKE PACK
Way- finding
Signage, Amenities
& Bike Racks
This Project Identified by Balboa Village Citizens Advisory Panel
Recently Included Facility Finance Plan.
Total Estimated Cost to Complete: $3,590,000 (various)
Invested to Date: $392,750
7
�S O
,X
A�
X®E
%[LL�X J
IXISIIX.
slm
This Project Identified by Balboa Village Citizens Advisory Panel
Recently Included Facility Finance Plan.
Total Estimated Cost to Complete: $3,590,000 (various)
Invested to Date: $392,750
7
�S O
Balboa Village C.A.P. Improvements
Suggestions to Possibly Reduce /Defer Project Cost
■ Defer Start of Construction Several More Years.
• Fund Only a Portion or Percentage of Scope.
• Cancel Project(s).
• Other?
Staff Recommendation:
• Consider Funding the Fagade Improvement
Program now with "BV Parking District" & "CDBG"
Funding and Move Forward with Program.
• Consider Funding the Way- Finding
Design /Construction Improvements with "BV"
Parking District" and Move Forward with Project.
LUJ Hold Off on Streetscape Improvement until the
"BV Parking District" Fund has Accumulated the
Necessary Funding to Construct Project.
Big Canyon Water Quality Improvements
and Habitat Restoration
■ Multi -Phase Water Quality & Habitat Restoration Effort
■ Current Budget: $3,067,169 (Grants /Contributions)
❖ $74,389 GF
❖ $1,400,000 Settlement Funding
❖ $1,592.780 M2 Grant
■ Funding Required: $10 Million Plus
■ Invested to Date: $436,795
Big Canyon Water Quality Improvements
and Habitat Restoration
Suggestions to Possibly Reduce /Defer Project Cost
Partner with Volunteer Organizations as Much as Possible.
Pursue Grants, Pay As You Go & Use GF only as Match.
Defer further Restoration Efforts (A Good Thing but Not Required)
Other?
Staff Recommendation:
Continue with Current Budgeted Project as
Grant /Contribution Funding is Already in Place.
Hold Off on Committing Additional General Funds
unless Significant Grant Funding becomes
Available, then Review Against other Competing
General Needs at the Time.
Corona del Mar Entryway Improvements
This Project is from the Neighborhood Revitalization Committee
and Supported by CdM BID
° Current Total Project Cost Estimate $470,000
° Invested to Date: $56,100 ($50k Funded by CdM BID — that's 10.6 %)
Funding Required: $410,000 (GF)
Corona del Mar Entryway Improvements
Suggestions to Possibly Reduce /Defer Project Cost
Request Additional Contributions.
Defer Several More Years.
Cancel Project.
Other?
1
Staff Recommendation:
If there are Higher City Council General Funding
Needs for Other Projects, Programs or Services,
Defer Starting Construction Several More Years
until Fund become Available.
Request Additional Contributions from BID
(historically around 50 %)
s
F}var ?•.Et- �:i1 tct�'v
IA: ..Y 1...Y =, s �J 1 x1:..-
f Yee >
_ ,x � S
i J i r � _ 4="' r y C ' N. h'r E^ L y. 1 ' L" v, .f..t. x l f .L
x'.1..� i.. r. .. �. 4.-. 91^��' �. ...�.li-::+ s. 7r �_x xls .i.�Ls.E: 1ttx Y'� ..� -vr!L 6a. .71.I
FYI Only - Council Direction Given at 3/10/15
Meeting to Continue Forward with Effort
10111 T 1 tY..k
Semeniuk Slough Dredging
'Af
i
This Project Requested by Newport Shores HOA and Residents
H Prior City Council Committed to Project
Total Estimated Project Cost: $1,500,000 (10,000 - 15,000 CY)
Invested to Date: $243,296
Funding Required: $1,250,000 (Tidelands)
Semeniuk Slough Dredging
Suggestions to Possibly Reduce /Defer Project Cost
Reduce Dredge Removal Quantity.
Defer Start of Project.
Other?
Staff Recommendation:
ILA] Continue with Current Budgeted Project including
Adding $500,000 of Tideland Funding to this
Proposed CIP Budget for a Total of $1,500,000.
Use Proposed Encroachment Permit Program Fees
to Possibly Backfill Required Funding.
West Coast Highway landscape Rehabilitation
Newport Blvd to Santa Ana River
ziizta
.J.i44 --4-: •> -rte«
PI 4\ VIEW FNIARGEMI ?T
Preliminary Landscape Plan ........w.
West Coast Highway
CITY OP NEWPORT HEACN
"MORK.
Y r
„ . ..... ... hlt.. ... a...: �L. s.� - :i {a.."�K.r���ti'..•1.. =eta[: ��..
A ANIANIMAPFPPRSPECnW.
�I� Ilu�lc
This Project is from the West Newport Advisory Committee
r 1 Priority No. 2 Project on their List
Total Estimated Project Cost: $4,000,000
Invested to Date: $412,868
Funding Required: $3,452,000 (GF /NED'X)
West Coast Highway Landscape Rehabilitation
Newport Blvd to Santa Ana River
Suggestions to Possibly Reduce /Defer Project Cost
N
0
Value Engineer Out some
Scope /Cost.
Cancel Project.
Other?
Staff Recommendation:
Portion or Percentage of
If there are Higher City Council General Funding
Needs for Other Projects, Programs or Services,
Reduce Investment Level or Defer Starting of
Construction Several More Years.
Use the Remaining $430,000 of Neighborhood
Enhancement District "A" Funds to Reduce GF
Amount.
'
4$'
d�
®�
If there are Higher City Council General Funding
Needs for Other Projects, Programs or Services,
Reduce Investment Level or Defer Starting of
Construction Several More Years.
Use the Remaining $430,000 of Neighborhood
Enhancement District "A" Funds to Reduce GF
Amount.
7)
West Newport Community Center
E `
f ICI
o �
o � d♦
�, (� 1K ✓CK hYla'
2 o w
� s
Mvr� U t.
This Project is from the Facility Financing Plan
Estimated Project Cost: $25,000,000 (FFP)
%i M
West Newport Community Center
Proposed Program
(Based Upon Community Input)
Facility Size of Approx. 34,000 SF
Site Size - Requires approx. 3 Acres
Desired Amenities
➢ Gymnasium
➢ 3 Multipurpose Rooms
➢ Gymnastics Room
➢ Catering Kitchen
➢ Fitness Center
➢ Restrooms
➢ 171 Parking Spaces
➢ Dedicated Lap Pool
➢ Recreation /Activities Pool
➢ 3 Pickle Ball Courts
➢ Tot lot
West Newport Community Center
Suggestions to Possibly Reduce /Defer Project Cost
• Value Engineer Out some Portion or Percentage of
Scope /Cost.
• Seek Other Funding Partners.
• Single Pool? No Meeting Rooms with less Parking?
■ Other?
Staff Recommendation:
L This Facility Planned for in the UP and Concept
Development Funding Currently in Budget.
Council to Provide Direction on Target Funding
Level.
Continue into Concept and Site Development.
Staff will work with PB &R Commission and
Community to Develop /Refine Concept for Future
Council Review /Approval.
Balboa Blvd. landscape Improvements
(Medina Way to 12th Street)
This Project is from the West Newport Advisory Committee
U1 Total Estimated Cost to Complete: $1,200,000 (GF)
U1 Invested to Date: $0
Balboa Blvd. landscape Improvements
(Medina Way to 12th Street)
Suggestions to Possibly Reduce /Defer Project Cost
KI Design and Construct New Median Hardscape, but
Minimum Trees and Softscape.
u Cancel Project.
F Other?
Staff Recommendation:
Defer Starting Design and Construction for
Several More Years.
Balboa Village Fine Arts Center
61D11 IEt(Il11Mf 1t1f llEllft
1111(•1110•1111111 •1111
Current View
L]
Possible Concept View
Project Currently Included in Facility Finance Plan
r City Purchased Theater Property in 1988 for $480,000.
Supported by Balboa Village Citizens Advisory Panel.
Invested to Date for Concept: $20,000
Estimated Cost to Complete: $5,800,000 (FFP)
Balboa Village Fine Arts Center
Suggestions to Possibly Reduce /Defer Project Cost
L Defer /Cancel Current Project and put in Holding Patten
for Future Discussion.
• Sell Property for Private Re -Use.
• Seek Operating /Owning Partner.
Other?
Staff Recommendation:
- Re- Evaluate Proposed Project as it Appears to
Lack Strong Citywide Support.
Council Should Consider Other Options /Uses Up
To and Including Selling Property.
Note: - Current Building Shell is Not Usable.
Corona Del Mar Traffic By -Pass
Total Estimated Cost to Complete: $TBD
Invested to Date: $0
Suggestions to Possibly Reduce /Defer Project Cost
• Defer Start of Study for Several More Years.
• Cancel Effort.
M Other?
Staff Recommendation:
Request and Work with TCA to look at the Effects
of Lower Toll Cost at Newport Coast Ramp.
-a Workload Permitting, Review Potential of
Alternative Route Notification.
Consolidation of City Yards
This Project is from the Facility Financing Plan
Minimum Estimated Project Cost: $10,000,000 (FFP)
Need to Further Evaluate, Define, Select Best Option
Consolidation of City Yards
Suggestions to Possibly Reduce /Defer Project Cost
1-11 Cancel Project and Leave the Two Yards Operating As
Is for Now.
11 Other?
�r F
n- x
J Ile
' L
Staff Recommendation:
Proceed with Just Enough Effort to Accommodate
the Proposed New West Newport Community
Center for Now.
Defer Any Addition Consolidation or Remodeling
Efforts for Several More Years until Further
Organization /Facility Needs Assessment are
Undertaken.
Develop Future Dog Park(s)
Desired and Used by the Community
U" PBR Commission Recently Studied Several Possible Locations.
U" Invested to Date: $0
U" Funding Required: $825,000 to $1,600,000 (GF)
(1 -2 Acres, excludes land cost)
Possible Future Dog
Park?
PDR Recommendation - No. 1 Preferred Location
Lower Sunset View Park
�3 A
• a
Is �
. r
Develop Future Dog Park(s)
Suggestions to Possibly Reduce /Defer Project Cost
Work to Permit /Construct Small Temporary Dog
Facility(ies) Now.
Do Not Pursue another Dog Park.
Staff Recommendation:
Include Additional Funding for Development of a
Concept of a Possible Dog Park, as well as the
Rest of Lower Sunset View Park with the Effort to
Develop the Desired Pedestrian Bridges and
Needed Parking at this Site.
Work with PB &R Commission and Community to
Develop /Refine Concept(s) for Future Council
Review /Approval.
Lower Castaways Park
Project is from the Harbor Commission /PBR Commission
Project Included in Facility Finance Plan.
no City Owns the Property.
a Current Total Project Cost Estimate: $5,500,000 (FFP)
Til Invested to Date: $38,755
Funding Required: $5,450,000
UPPER
CASTAWAYS
01 . .�...
.w
Lower Castaways
Park
.AV's ®,
Concept View
0
BACK
BAY
i 1
C b
1
C.Q A W-N
Suggestions to Possibly Reduce /Defer Project Cost
Construct /Develop only Low Cost Interim Uses Now.
Defer Start of Project for Several More Years.
* Re -Scope Current Project.
Cancel and Leave Status Quo.
Other?
Lower Castaways Park
Staff Recommendation:
Defer Further Concept Development of Entire
Property for Several More Years.
® Continue to Use Property for Short Term Lease
Opportunities and Public Access to the Bay.
Pursue Development & Construction of New
Small Dock /Launch that Would Fit Into Future
Park Plan.
Lower Castaways Park
Possible Interim Facility
Existing Gravel
Public Parking Area
Possible New
Launch Dock
Newport Pier Building Rehabilitation
Current Status is Vacant Building and Not Rentable /Operational
F Staff Completed a Risk Assessment Report to Identify
Deficiencies in the Building.
Staff Engaged GRC Assoc. to Survey Other Piers in California
and Determined Highest & Best Use is for a Restaurant.
Staff Issued an RFP and Interviewed 6 Potential Tenants.
Assessment of Existing Building and Systems Identified Major Utility,
Accessibility, and Remodel Work is Required.
Extensive Dry Rot Electrical is non - compliant
■
Extensive Termite Damage ADA Access is non - compliant
Extensive Water Damage Kitchen is non - functional
HVAC non - operational
Newport Pier Building Rehabilitation
Project Phases to Replace Building
Pier Piles /Deck Rehabilitation and Support Utilities (City)
New Building Shell (City)
Tenant Improvements (by Future Tenant)
Project Included in Facility Finance Plan
Invested to Date: $50,000
Estimated Cost
$1,500,000
$1,250,000
$750,000
Total Estimated Cost for New Building: $2,720,000
Will Need to Replace Various Piles /Support Structure and
Supporting Utilities Prior to New Building Construction.
Replacement or Removal Will Require Coastal Commission Permit.
Newport Pier Building Rehabilitation
Suggestions to Possibly Reduce /Defer Project Cost
Remove Existing Building and Develop /Deploy Interim Uses
for Pier and End Platform.
Develop Smaller Building — Cafe or Snack Shop
Do Nothing & Maintain Status Quo.
c Other?
Staff Recommendation:
D Move Forward with Removal of Existing Building
and Necessary Pier Rehabilitation Efforts.
Develop Interim Programs, Uses and Events such
as Gourmet Food Truck Days, Nighttime Star
Gazing Lectures, Music Events, Etc.
D Council To Determine when Best to Explore
Possible Development on New Building.
Newport Boulevard Landscaping
(21St to 30th Street)
Identified by Balboa Village Citizens Advisory Panel
l
Total Estimated Cost to Complete: $900,000
Invested to Date: $0
Newport Boulevard Landscaping
(21St to 30th Street)
Staff Recommendation:
Defer Starting Design and Construction for
Several More Years Until Funding and
Workload Permit.
» Balboa Island Sea Walls — Design,
Environmental, and Permitting
» West Newport Community Center
These projects have a funding » Seminouk Slough Dredging
source identified that is either:
• Part of the overall FFP effort, » CdM Library /Fire Station
which means that this project » Lido Fire Station
fits in a managed plan for
regular allocations of » Mariners Fire Station — App Bay
development fees and other
general fund contributions. » Newport Pier — Demo Building and
• The $5M in "nuts and bolts" Structural Pier Fix
General Fund contribution that
we try to allocate every year. » Lower Castaways— Short Term Small
• Special revenue sources, such Project
as Measure M2 or similar. » CdM Bypass —Planning
» Corp Yard Changes — Smaller Project
to Accommodate WNCC
These projects are important
projects eligible for different
funding sources not in hand
yet, but likely to be:
» Ped Bridges at Superior /Balboa and
West Coast Highway (OCTA, other)
» Balboa Village:
• Fagade Improvements (now)
• Way Finding (now)
• Streetscape (defer until $ accumulate)
• Measure M2's On what schedule should these be
Environmental Grant
implemented?
programs;
• Dedication of a long -term » Mariners Mile — Planning Only,
stream of parking revenues following OCTA's PCH Study
(BVAC)
• Other OCTA grants » CdM Bypass —Study Solution
• Other environmental grants Big Canyon Nature Park —Water
• Some other Quality and Habitat Improvements
donation /sponsorship
» Future Dog Park (design)
Projects that Await Available 1. West Coast Highway Landscaping
Funds — in recommended 2. Peninsula Streetscapes:
priority order a) 12th Street to 21St Street
These projects are important (Balboa Blvd)
projects that are likely to be b) 21St Street to 30th Street
General Funded versus (Newport Blvd)
grants. As such, we
recommend waiting on these 3. Lower Castaways — Larger Park
efforts until General Funds Project
are in hand for them.
4. CdM Entryway Improvements (seek
at least 50% match from BID)
5. Newport Pier— New Building Shell
(about an 8 -10 year payback)
Construction of BI Sea Walls is here, too, but we need
to determine scope /timing first
These projects are important
and worthy projects, but may
not be attainable given
available funding.
Balboa Fine Arts Center
(would remove from the FFP)
Other Capital Project Items?
Comments and Questions