HomeMy WebLinkAboutCapital Improvement Program 2017Capital Improvement Program
C I T Y O F N E W P O R T B E A C H
F I S C A L Y E A R 2 0 1 6 - 2 0 1 7
i
City of Newport Beach
CAPITAL IMPROVEMENT PROGRAM
FY 2016-2017 Adopted CIP Budget Highlights
The City of Newport Beach Capital Improvement Program (CIP)
serves as a plan for the provision of public improvements, special
projects, on-going maintenance programs, and the implementation
of the City’s master plans. Projects in the CIP include improvements
and major maintenance on arterial highways, local streets, and alleys; storm drain and water quality
improvements; harbor, bay, pier, and beach improvements; park and facility improvements; water
and wastewater system improvements; transportation safety, reliability, and traffic signal
improvements; and planning programs and studies.
This adopted CIP budget consists of $26.4 million in new appropriations and about $40.5
million in rebudgeted funds estimated to carry forward from this fiscal year for a total adopted
budget of $66,941,668. Projects are programmed by long range master plans and as directed by the
City Council priorities and community input.
This CIP budget document is designed for ease of use and relevance of information
transmitted. The document is presented in conventional book format and includes a location map or
photograph for clear visual orientation. Each project page includes a brief description, an
appropriation plan by expense category, a funding plan by source, the name and telephone number
for the assigned project manager and project specific identification and contract numbers.
There is no standard length of time to complete a capital project. A project can take several
months or several years to finish. Capital spending can span multiple fiscal years. The Newport
Beach CIP budget is adopted annually along with the City’s operating budget. Generally, sufficient
funds are appropriated for the work to be performed one year at a time. Funding estimates for future
components of a project appear in the Five Year Look Ahead tab. This presentation projects a multi-
year financial forecast for more anticipatory and transparent capital management while
maintaining annual review of capital planning.
Projects are organized by primary function or benefit into one of the following categories:
Facilities; Streets and Drainage; Transportation; Parks, Harbors and Beaches; Water Quality and
Environmental; Water; Wastewater; and Miscellaneous.
The capital improvement program budget is a living document that continues to evolve
throughout the budgeting process to reflect City Council and community goals, needs and desires.
Our project delivery team of engineers, support staff and consultants are tasked with
managing complex workloads and maintaining high quality standards at the best possible value. This
proposed CIP is a key foundational document for the City that responds to the needs and desires of
our citizens for a well maintained, attractive and safe community, while maintaining functionality,
effective fiscal and property stewardship, and value.
ii
FY 16-17 Adopted CIP Budget
Funding Summaries
By Category - $66,941,668
By Fund - $66,941,668
* Assessment District, Balboa Village Parking District, Transportation & Circulation, Building Excise Tax, CDBG, and 800 MhZ
Facilities
$12.3 M
18%
Streets & Drainage
$23.0 M
34%
Transportation
$2.5 M
4%
Parks, Harbors,
& Beaches
$13.6 M
20%
Water Quality &
Environmental
$6.5 M
10%
Water
$3.8 M
6%
Wastewater
$1.9 M
3%
Misc
$3.1 M
5%
Dollars in Millions
Grants - Contributions
$5.5 M
8%
General Fund
$14.8 M
22%
Neighborhood
Enhancement
$2.2 M
3%
Tidelands
Maintenance
$4.0 M
6% Tidelands Capital
$9.0 M
13%
Major Facilities
Financing Plan
$9.7 M
15%
Facilities
Maintenance
$2.5 M
4%
Water
$3.9 M 6%
Wastewater
$1.9 M 3%
Other*
$1.7 M
2%
Gas Tax
$4.9 M
7%
Measure M
Fair Share
$5.1 M
8%
Grants -
Measure M
$1.9 M
3%
Dollars in Millions
iii
FY 16-17 Adopted CIP Budget
Project Summaries
Capital projects are grouped into eight functional categories to form the Capital Improvement Program
budget. Detailed project sheets are assembled alphabetically within each tabbed section. Highlights of
the adopted CIP budget for FY 2016-17 are presented by category as follows:
Facilities
Projects organized under Facilities include construction, rehabilitation and repair of City buildings
and facilities. Major projects within this category approximate $12.3 million and include:
Corona del Mar Fire Station 5 and Branch Library Replacement
Facilities Capital Maintenance Master Plan
Fire Station Replacements and Remodels
Master Facilities Plan Strategic Planning
Police Facilities Remodel
West Newport Community Center Design
Streets and Drainage
Projects organized under Streets and Drainage include construction, rehabilitation and repair of City
roads, alleys, medians, bridges, sidewalks, streetlights, storm drains slopes and tide structures.
Projects within this category approximate $23.1 million and major highlights include:
Arterial Streets and Highway Modifications
Landscaping and other Streetscape
Enhancements
Median Landscape Turf Replacement
Park Avenue Bridge Over Grand Canal
Replacement
Slurry Seal Program
Storm Drain Water Quality Improvements
Street and Alley Construction and
Rehabilitation
Streetlight Replacement Program and Retrofit
iv
Transportation
Projects organized under Transportation include traffic signal system maintenance and
improvements, neighborhood traffic management, pedestrian improvements and signage. Projects
within this category exceed $2.5 million and major highlights include:
Arroyo Creek Multi-Purpose Trail
Corona del Mar Bypass Plan Studies
Coyote Canyon Landfill Bike Trail
Mariners Mile Street Configuration and Land Use
Traffic Signage, Striping, Marking , Modeling
and Studies
Traffic Management and Modernization
Traffic Signal Rehabilitation and
Equipment Maintenance
Traffic Signal Synchronization
Parks, Harbors and Beaches
Projects organized under Parks, Harbors and Beaches include improvements or repairs to the City’s
parks, harbors, docks, wharfs, piers and beaches. Projects within this category exceed $13.6 million
and major highlights include:
Park Improvements:
Back Bay View Park
Bonita Canyon Sports Park Pickleball Court
Lower Castaways Park
Lower Sunset View Park Concept
Newport Elementary School Park Maintenance
Park Wall and Staircase Rehabilitation at various locations
Sunset Ridge Park Access Studies
Veterans Park Modifications
v
Parks, Harbors and Beaches
Harbor and Tidelands Projects:
Maintenance
Bay Beach Sand Management and Minor Dredging
Eelgrass Surveys
Newport Pier Building Platform and Piles
Ocean Piers Inspection and Maintenance
Regional Coastal Sand Replenishment
Seawall and Bulkhead Repairs
Capital
American Legion Bulkhead
Balboa Islands Seawalls Design and Capping
Grand Canal Dredging
Harbor Capital Finance Plan
Harbor Tide Gauge
Public Piers - Central Ave and Balboa Marina
Water Quality and Environmental
Projects organized under Water Quality and Environmental include studies, improvements and
programs that benefit the City’s natural resources. Projects within this category exceed $6.5 million
and major highlights include:
Arches Storm Drain Dry Weather Diversion Project
Bayview Heights Drainage and Runoff Treatment
Big Canyon Golf Course Pond Treatment
Big Canyon Rehabilitation
Little Corona Infiltration Gallery
Santa Ana Delhi Regional Project
Semeniuk Slough Dredging
vi
Water and Wastewater
Projects listed as Water and Wastewater improvements are funded from respective utility service
charges and are used for the rehabilitation, upkeep, and expansion of these services. Projects in these
categories exceed $5.7 million and major highlights include:
Big Canyon Flow Metering/Treatment
Grade Adjustments – Water Valves and Manhole Covers
Master Plan Program Projects for Wastewater Mains and Water Mains
Sewer Main Lining and Repairs
Shallow Wells Rehabilitation
Water Master Plan Update
Miscellaneous
Projects listed as Miscellaneous are ones that do not fit into any other category and include capital
purchases and special projects with a budget exceed $3.1 million. Major highlights include:
Assessment District Formation Coordination
Balboa Island Enhancements
Balboa Village Entry Arch, Façade Improvements, and Wayfinding
City Radio Tower
Slope Erosion Control
Title Page
Facilities
Civic Center OCIP Loss Claims / Warranty 1
Corona del Mar Fire Station No. 5 / Library Replacement 2
Facilities Maintenance Master Plan Program 3
Fire Station Remodels 4
Lido Fire Station No. 2 Replacement 5
Mariners Fire Station No. 6 Apparatus Bay 6
Master Facilities Plan Strategic Planning 7
Police Station Remodel 8
West Newport Community Center 9
Streets and Drainage
15th Street / Balboa Boulevard Reconstruction 10
Balboa Village Streetscape Improvements 11
Bayside Drive Modification 12
Concrete and Pavement Replacement Program 13
Corona del Mar Concrete Pavement Reconstruction 14
Irvine Avenue Pavement Rehabilitation 15
Landscape Enhancement Program 16
MacArthur Boulevard Pavement Rehabilitation 17
Marine Avenue Rehabilitation 18
Median Landscape Turf Replacement 19
Newport Boulevard / 32nd Street Modification 20
Newport Heights Alley Reconstruction 21
Old Newport Blvd / West Coast Hwy Modifications 22
Park Avenue Bridge Over Grand Canal Replacement 23
Residential Street Rehabilitation Program 24
Slurry Seal Program 25
Storm Drain Evaluation and Repairs 26
Storm Drain / Water Quality Improvements 27
Streetlight LED Retrofit 28
Streetlight Master Plan Update 29
Streetlight Replacement Program 30
West Coast Highway Landscaping 31
TABLE OF CONTENTS
Adopted FY 2016-2017
Capital Improvement Program
City of Newport Beach
TOC-1
Title Page
TABLE OF CONTENTS
Adopted FY 2016-2017
Capital Improvement Program
City of Newport Beach
Transportation
Arroyo Canyon Bike Trail 32
Bristol Street Traffic Signal Synchronization 33
Coast Highway Traffic Signal Synchronization 34
Corona del Mar Bypass Plan Studies 35
Coyote Canyon Bike Trail 36
East Coast Highway Traffic Signal Rehabilitation 37
Mariners Mile Hwy Configuration / Land Use Review 38
Newport Boulevard Traffic Signal Synchronization 39
Traffic Management and Modernization 40
Traffic Signage, Striping and Marking 41
Traffic Signal Modernization: Phase 8 42
Traffic Signal Rehabilitation Program 43
Parks, Harbors and Beaches
Abandoned Watercraft Abatement 44
American Legion Bulkhead 45
Back Bay View Park Enhancements 46
Balboa Island Seawall Cap (North and South Sides)47
Balboa Island Seawall Replacement - West End 48
Balboa Marina Public Pier 49
Beach and Bay Sand Management (S.A. River)50
Bonita Canyon Sports Park Pickleball Court 51
Central Ave Public Pier / Street End Improvement 52
Eelgrass Survey 53
Grand Canal Dredging 54
Harbor Capital Projects Finance Plan 55
Harbor Tide Gauge 56
Lower Castaways Park 57
Lower Sunset View Park Extension Concept 58
Marina Park 59
Newport Elementary School Park Maintenance 60
Newport Pier Building Platform and Piles 61
Ocean Piers Inspection and Maintenance 62
Park Walls and Staircases Rehabilitation 63
Seawall and Bulkhead Repairs 64
Sunset Ridge Park Access Improvements 65
Surfside Sunset Coastal Sand Replenishment 66
Veterans Park Modifications 67
TOC-2
Title Page
TABLE OF CONTENTS
Adopted FY 2016-2017
Capital Improvement Program
City of Newport Beach
Water Quality and Environmental
Arches Storm Drain Dry Weather Diversion 68
Bayview Heights Drainage / Runoff Treatment 69
Big Canyon Golf Course Pond Treatment 70
Big Canyon Rehabilitation Project 71
Little Corona Infiltration Gallery 72
Santa Ana Delhi Regional Project 73
Semeniuk Slough Dredging 74
Water
Balboa Island Water Main Replacement 75
Bay Crossing Main Replacement 76
Big Canyon Reservoir Flow Metering / Treatment 77
Dolphin and Tamura Shallow Wells Rehabilitation 78
Grade Adjustments - Water Valves 79
Lido Village Water Main Replacement 80
Newport Boulevard Water Main 81
SCADA System Upgrade 82
Water Main Master Plan Program 83
Water Master Plan Update 84
Wastewater
Grade Adjustments - Sewer Manhole Covers 85
OCSD Sewer Trunk Project Inspection 86
Sewer Main Lining and Repairs 87
Miscellaneous
Affordable Housing 88
Arts and Culture Master Plan 89
Assessment District Engineering 90
Assessment District Payment for City Parcels 91
Balboa Island Enhancements 92
Balboa Pier ADA Access for Fire Rings 93
Balboa Village Entry Arch Sign 94
Balboa Village Façade Improvement Program 95
Balboa Village Wayfinding Improvements 96
City Radio Tower 97
Local Coastal Program Plan Implementation 98
Slope Erosion Control / Enhancement 99
TOC-3
Title Page
15th Street / Balboa Boulevard Reconstruction 10
Abandoned Watercraft Abatement 44
Affordable Housing 88
American Legion Bulkhead 45
Arches Storm Drain Dry Weather Diversion 68
Arroyo Canyon Bike Trail 32
Arts and Culture Master Plan 89
Assessment District Engineering 90
Assessment District Payment for City Parcels 91
Back Bay View Park Enhancements 46
Balboa Island Enhancements 92
Balboa Island Seawall Cap (North and South Sides)47
Balboa Island Seawall Replacement - West End 48
Balboa Island Water Main Replacement 75
Balboa Marina Public Pier 49
Balboa Pier ADA Access for Fire Rings 93
Balboa Village Entry Arch Sign 94
Balboa Village Façade Improvement Program 95
Balboa Village Streetscape Improvements 11
Balboa Village Wayfinding Improvements 96
Bay Crossing Main Replacement 76
Bayside Drive Modification 12
Bayview Heights Drainage / Runoff Treatment 69
Beach and Bay Sand Management (S.A. River)50
Big Canyon Golf Course Pond Treatment 70
Big Canyon Rehabilitation Project 71
Big Canyon Reservoir Flow Metering / Treatment 77
Bonita Canyon Sports Park Pickleball Court 51
Bristol Street Traffic Signal Synchronization 33
Central Ave Public Pier / Street End Improvement 52
City Radio Tower 97
Civic Center OCIP Loss Claims / Warranty 1
Coast Highway Traffic Signal Synchronization 34
Concrete and Pavement Replacement Program 13
Corona del Mar Bypass Plan Studies 35
Corona del Mar Concrete Pavement Recon. 14
Corona del Mar Fire Station No. 5 / Library Replacement 2
Coyote Canyon Bike Trail 36
Dolphin and Tamura Shallow Wells Rehabilitation 78
East Coast Highway Traffic Signal Rehabilitation 37
Eelgrass Survey 53
Facilities Maintenance Master Plan Program 3
Fire Station Remodels 4
ALPHABETICAL INDEX
Adopted FY 2016-2017
Capital Improvement Program
City of Newport Beach
Alpha-1
Title Page
ALPHABETICAL INDEX
Adopted FY 2016-2017
Capital Improvement Program
City of Newport Beach
Grade Adjustments - Sewer Manhole Covers 85
Grade Adjustments - Water Valves 79
Grand Canal Dredging 54
Harbor Capital Projects Finance Plan 55
Harbor Tide Gauge 56
Irvine Avenue Pavement Rehabilitation 15
Landscape Enhancement Program 16
Lido Fire Station No. 2 Replacement 5
Lido Village Water Main Replacement 80
Little Corona Infiltration Gallery 72
Local Coastal Program Plan Implementation 98
Lower Castaways Park 57
Lower Sunset View Park Extension Concept 58
MacArthur Boulevard Pavement Rehabilitation 17
Marina Park 59
Marine Avenue Rehabilitation 18
Mariners Fire Station No. 6 Apparatus Bay 6
Mariners Mile Hwy Configuration / Land Use Review 38
Master Facilities Plan Strategic Planning 7
Median Landscape Turf Replacement 19
Newport Boulevard / 32nd Street Modification 20
Newport Boulevard Traffic Signal Synchronization 39
Newport Boulevard Water Main 81
Newport Elementary School Park Maintenance 60
Newport Heights Alley Reconstruction 21
Newport Pier Building Platform and Piles 61
Ocean Piers Inspection and Maintenance 62
OCSD Sewer Trunk Project Inspection 86
Old Newport Blvd / West Coast Hwy Modifications 22
Park Avenue Bridge Over Grand Canal Replacement 23
Park Walls and Staircases Rehabilitation 63
Police Station Remodel 8
Residential Street Rehabilitation Program 24
Santa Ana Delhi Regional Project 73
SCADA System Upgrade 82
Seawall and Bulkhead Repairs 64
Semeniuk Slough Dredging 74
Sewer Main Lining and Repairs 87
Slope Erosion Control / Enhancement 99
Slurry Seal Program 25
Storm Drain Evaluation and Repairs 26
Storm Drain / Water Quality Improvements 27
Alpha-2
Title Page
ALPHABETICAL INDEX
Adopted FY 2016-2017
Capital Improvement Program
City of Newport Beach
Streetlight LED Retrofit 28
Streetlight Master Plan Update 29
Streetlight Replacement Program 30
Sunset Ridge Park Access Improvements 65
Surfside Sunset Coastal Sand Replenishment 66
Traffic Management and Modernization 40
Traffic Signage, Striping and Marking 41
Traffic Signal Modernization: Phase 8 42
Traffic Signal Rehabilitation Program 43
Veterans Park Modifications 67
Water Main Master Plan Program 83
Water Master Plan Update 84
West Coast Highway Landscaping 31
West Newport Community Center 9
Alpha-3
Facilities
Pg Org Project Title Rebudget Budget Total
1 51101 15F21 Civic Center OCIP Loss Claims / Warranty $105,505 $0 $105,505
2 53201 15F12 Corona del Mar Fire Station No. 5 / Library Replc.$5,845,475 $1,144,900 $6,990,375
3 57101 17F02 Facilities Maintenance Master Plan Program $949,786 $1,200,000 $2,149,786
4 57101 17F11 Fire Station Remodels $0 $300,000 $300,000
5 53201 15F13 Lido Fire Station No. 2 Replacement $350,000 $250,000 $600,000
6 53201 16F11 Mariners Fire Station No. 6 Apparatus Bay $1,000,000 $0 $1,000,000
7 57201 15F01 Master Facilities Plan Strategic Planning $150,000 $0 $150,000
8 01201925 17F12 Police Station Remodel $0 $550,000 $550,000
9 55001 15F17 West Newport Community Center $450,000 $0 $450,000
Total Facilities $8,850,766 $3,444,900 $12,295,666
Category: Facilities Project No.:15F21
Project Manager: Sheri Anderson, 949-644-3307
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $105,505
Total $105,505
ORG OBJECT REBUDGET $BUDGET $TOTAL
51101 980000 $105,505 $0 $105,505
$105,505 $0 $105,505
Location: 100 Civic Center Drive
WLC Architects, 16252; C6074
1
TOTAL
Major Facilities Financing Plan
Proposed Expenses:
The Civic Center project was completed and opened for use in April 2013. This funding provides for
ongoing insurance costs for loss claims and warranty work related to the construction project. The
program is administered by the City's Risk Management Division.
Civic Center OCIP Loss Claims / Warranty
FUNDING SOURCE
Category: Facilities Project No.:15F12
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $6,990,375
Other $0
Total $6,990,375
ORG OBJECT REBUDGET $BUDGET $TOTAL
53201 980000 $5,845,475 $1,144,900 $6,990,375
$5,845,475 $1,144,900 $6,990,375
Location: 410 Marigold Avenue
Proposed Expenses:
This project replaces and reconstructs the existing Fire Station No. 5 and Branch Library on Marigold
Avenue in Corona del Mar. Both of these buildings have exceeded their useful lives and need to be
replaced. To maximize the available lot space and to take advantage of common public areas, the two
buildings will be replaced with a new facility and a shared lobby. This arrangement allows for better
utilization of the overall properties and increases the amount of onsite parking and landscaping.
Corona del Mar Fire Station No. 5 / Library Replacement
FUNDING SOURCE
2
TOTAL
Major Facilities Financing Plan
Category: Facilities Project No.:17F02
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Design/Environmental/Permits $200,000 $100,000 $100,000 $100,000 $100,000
Right-of-Way/Acquisition $0 $0 $0 $0 $0
Construction $1,949,786 $1,400,000 $1,400,000 $1,400,000 $1,400,000
Other $0 $0 $0 $0 $0
Total $2,149,786 $1,500,000 $1,500,000 $1,500,000 $1,500,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
57101 980000 $949,786 $1,200,000 $2,149,786
$949,786 $1,200,000 $2,149,786
Location: Multiple
Proposed Expenses:
The Facilities Maintenance Master Plan includes a summary of all City facilities and prioritizes capital
repairs or replacements based on a variety of factors including current condition and age of facilities. In
the past two years, this annual program has funded a variety of trade specific projects such as roofs,
exterior finishes, interior finishes, painting, carpeting, flooring, HVAC units, and back up generators.
Some of the planned improvements for the current fiscal year include additional roof replacements,
electrical system upgrades, plumbing system rehabilitation, and site improvements.
Facilities Maintenance Master Plan Program
FUNDING SOURCE
3
TOTAL
Facilities Maintenance
Category: Facilities Project No.:17F11
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017
Design/Environmental/Permits $300,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $300,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
57101 980000 $0 $300,000 $300,000
$0 $300,000 $300,000
Location:
Proposed Expenses:
This project, part of the Facilities Master Maintenance Program, updates Fire Station No. 3 on Santa
Barbara Drive (Newport Center) and Fire Station No. 4 on Balboa Island. Fire Station No. 3 was
constructed in 1971 and houses up to 12 staff. This project reconstructs the station's second floor to
improve living quarters space use, expands and reconstructs the turn-out gear locker area to bring the
building up to current codes. Fire Station No. 4 was constructed in 1994 and houses a staff of 3.
Existing cabinetry, equipment, countertops, and appliances will be replaced with space and energy
efficient units to maximize functionality.
Fire Station Remodels
FUNDING SOURCE
4
TOTAL
Facilities Maintenance
Fire Station #3 - 868 Santa Barbara Dr and Fire Station #4 - 124 Marine Ave
Category: Facilities Project No.:15F13
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017
Design/Environmental/Permits $600,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $600,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
53201 980000 $350,000 $250,000 $600,000
$350,000 $250,000 $600,000
Location: 475 32nd Street
5
TOTAL
Major Facilities Financing Plan
Proposed Expenses:
Fire Station No. 2 was constructed in 1952 and requires frequent maintenance and repairs. The
structure, while functional, does not fully meet requirements of current demands for fire operations and
emergency medical services, which houses a staff of 10. This project completes the site planning,
design and environmental planning for a replacement station at the current location or within close
proximity. Construction is programmed in a future year.
Lido Fire Station No. 2 Replacement
FUNDING SOURCE
Category: Facilities Project No.:16F11
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $1,000,000
Other $0
Total $1,000,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
53201 980000 $1,000,000 $0 $1,000,000
$1,000,000 $0 $1,000,000
Location: 1348 Irvine Avenue
6
TOTAL
Major Facilities Financing Plan
Proposed Expenses:
The existing fire station and truck bay, which houses a staff of 3, was constructed in 1957 to
accommodate equipment used in that era. Since then, fire engines and medical response rolling
equipment have continued to grow in size to the extent that the most recently acquired replacement fire
truck does not fit inside the existing apparatus bay. This project replaces the rolling equipment portion of
the existing station, known as the apparatus bay or garage.
Mariners Fire Station No. 6 Apparatus Bay
FUNDING SOURCE
Category: Facilities Project No.:15F01
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $150,000
Total $150,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
57201 980000 $150,000 $0 $150,000
$150,000 $0 $150,000
Location: Not applicable
7
TOTAL
Major Facilities Financing Plan
Proposed Expenses:
This project provides for necessary studies and concept development needed to further refine the Major
Facilities Financing Plan. It also continues developing, both interim and long term, use concepts and
plans for various city owned properties including the consolidation of City yards.
Master Facilities Plan Strategic Planning
FUNDING SOURCE
Category: Facilities Project No.:17F12
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $550,000
Other $0
Total $550,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201925 980000 $0 $550,000 $550,000
$0 $550,000 $550,000
Location: 870 Santa Barbara Drive
Proposed Expenses:
This project consists of a complete remodel of the Police Department’s shooting range, which was last
rehabilitated approximately 20 years ago. Additionally, a remodel of the Detective Division, various office
work areas, and locker restrooms at the Police Station on Santa Barbara is planned to make more
efficient use of existing space and to meet current codes. The station was originally constructed in 1974.
Police Station Remodel
FUNDING SOURCE
8
TOTAL
General Fund
Category: Facilities Project No.:15F17
Project Manager: Peter Tauscher, 949-644-3316
Description:
2016-2017
Design/Environmental/Permits $450,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $450,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
55001 980000 $450,000 $0 $450,000
$450,000 $0 $450,000
Location: TBD
Proposed Expenses:
The City is evaluating sites and feasibility for a new community center in West Newport. This project
funds the services of an architect and other professionals to provide preliminary concepts and
preliminary design of a replacement community center for this area.
West Newport Community Center
FUNDING SOURCE
9
TOTAL
Major Facilities Financing Plan
Streets and Drainage
Pg Org Project Title Rebudget Budget Total
10 12101 15R11 15th Street / Balboa Boulevard Reconstruction $451,214 $0 $451,214
11 53501 17R11 Balboa Village Streetscape Improvements $0 $90,000 $90,000
12 01201927 16R12 Bayside Drive Modification $350,000 $0 $350,000
12 12101 16R12 Bayside Drive Modification $0 $900,000 $900,000
12 12201 16R12 Bayside Drive Modification $0 $1,750,000 $1,750,000
13 01201927 16R11 Concrete and Pavement Replacement Program $9,227 $0 $9,227
13 01201927 17R06 Concrete and Pavement Replacement Program $0 $400,000 $400,000
14 01201927 17R12 Corona del Mar Concrete Pavement Recon. $2,186,330 $0 $2,186,330
15 01201927 15R16 Irvine Avenue Pavement Rehabilitation $496,021 $0 $496,021
15 12101 15R16 Irvine Avenue Pavement Rehabilitation $938,227 $0 $938,227
15 53601 15R16 Irvine Avenue Pavement Rehabilitation $0 $500,000 $500,000
16 01201927 15L01 Landscape Enhancement Program $345,476 $0 $345,476
17 12201 15R27 MacArthur Boulevard Pavement Rehabilitation $1,099,707 $0 $1,099,707
17 13501 15R27 MacArthur Boulevard Pavement Rehabilitation $1,000,000 $0 $1,000,000
18 01201927 17R13 Marine Avenue Rehabilitation $0 $250,000 $250,000
19 01201926 16L02 Median Landscape Turf Replacement $134,942 $0 $134,942
19 53601 16L02 Median Landscape Turf Replacement $455,846 $500,000 $955,846
20 12101 15R17 Newport Boulevard / 32nd St Modification $542,979 $0 $542,979
21 01201927 15R18 Newport Heights Alley Reconstruction $1,755,341 $1,050,000 $2,805,341
22 01201927 15R19 Old Newport Blvd / West Coast Hwy Modifications $24,824 $0 $24,824
22 12101 15R19 Old Newport Blvd / West Coast Hwy Modifications $0 $25,200 $25,200
23 01201927 15R20 Park Avenue Bridge Over Grand Canal Replacement $92,717 $0 $92,717
23 13501 15R20 Park Avenue Bridge Over Grand Canal Replacement $1,102,912 $0 $1,102,912
24 12101 15R02 Residential Street Rehabilitation Program $1,445,129 $0 $1,445,129
24 12201 15R02 Residential Street Rehabilitation Program $2,226,000 $0 $2,226,000
25 01201927 17R04 Slurry Seal Program $0 $670,000 $670,000
26 01201926 15D01 Storm Drain Evaluation and Repairs $111,172 $0 $111,172
27 01201926 17D11 Storm Drain / Water Quality Improvements $0 $500,000 $500,000
28 01201928 16V11 Streetlight LED Retrofit $1,169,000 $0 $1,169,000
29 01201927 17V01 Streetlight Master Plan Update $0 $40,000 $40,000
30 01201927 17V02 Streetlight Replacement Program $410,889 $0 $410,889
31 01201927 15L15 West Coast Highway Landscaping $63,019 $0 $63,019
Total Streets and Drainage $16,410,972 $6,675,200 $23,086,172
Category: Streets and Drainage Project:15R11
Project Manager: Iris Lee, 949-644-3323
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $451,214
Other $0
Total $451,214
ORG OBJECT REBUDGET $BUDGET $TOTAL
12101 980000 $451,214 $0 $451,214
$451,214 $0 $451,214
Location:
Proposed Expenses:
This project provides median reconstruction, landscaping, and beautification on 15th Street, between
West Bay Avenue and West Oceanfront, and West Balboa Boulevard, from 12th Street to 21st Street.
The majority of the construction was completed by Summer 2016.
15th Street and Balboa Boulevard Reconstruction
FUNDING SOURCE
10
TOTAL
Gas Tax
15th Street between West Bay Avenue and West Oceanfront; West Balboa
Boulevard between 12th Street and 21st Street
Category: Streets and Drainage Project No.:17R11
Project Manager: TBD
Description:
2016-2017
Design/Environmental/Permits $90,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $90,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
53501 980000 $0 $90,000 $90,000
$0 $90,000 $90,000
Location:
Proposed Expenses:
This project involves the design of the streetscape improvements for Balboa Boulevard and secondary
streets (Phase 1), and Main Street (Phase 2) within Balboa Village as described in the Concept Plan
approved by the Balboa Village Advisory Committee (BVAC). Construction of the Phase 1 and Phase 2
improvements will be budgeted and completed in subsequent years. Plans will likely be prepared by a
consultant.
Balboa Village Streetscape Improvements
FUNDING SOURCE
11
TOTAL
Balboa Village Parking Mgmt. District
Main Street, Balboa Boulevard and Secondary Streets
Category: Streets and Drainage Project No.:16R12
Project Manager: Patrick Arciniega, 949-644-3347
Description:
2016-2017
Design/Environmental/Permits $350,000
Right-of-Way/Acquisition $0
Construction $2,650,000
Other $0
Total $3,000,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $350,000 $0 $350,000
12101 980000 $0 $900,000 $900,000
12201 980000 $0 $1,750,000 $1,750,000
$350,000 $2,650,000 $3,000,000
Location:
12
Measure M Fair Share
TOTAL
General Fund
Gas Tax
Bayside Drive from East Coast Highway to Jamboree Road and Jamboree Road
from Bayside Drive to East Coast Highway
Proposed Expenses:
This project includes pavement reconstruction on Bayside Drive from Jamboree to Coast Highway and
the south leg of Jamboree Road. As part of the roadway design, staff will consider modifications to the
existing pavement striping, including the channelization of vehicles, bike lanes and parking. Raised
landscape medians may also be considered. Plans and specifications are prepared by a consultant.
Construction is performed by a private contractor.
Bayside Drive Modification
FUNDING SOURCE
Category: Streets and Drainage Project No.:17R06
Project Manager: Alfred Castanon, 949-644-3314
Description:
2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Design/Environmental/Permits $0 $0 $0 $0 $0
Right-of-Way/Acquisition $0 $0 $0 $0 $0
Construction $409,227 $400,000 $400,000 $400,000 $400,000
Other $0 $0 $0 $0 $0
Total $409,227 $400,000 $400,000 $400,000 $400,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $9,227 $0 $9,227
01201927 980000 $0 $400,000 $400,000
$9,227 $400,000 $409,227
Location: Citywide
13
TOTAL
General Fund (16R11)
General Fund
Proposed Expenses:
This project replaces deteriorated concrete streets, sidewalks, curb and gutters within designated areas
as part of a 7-year rotation cycle. Construction of curb and access ramps are included to improve
pedestrian and wheelchair access in accordance with the Americans with Disabilities Act (ADA) where
applicable. Plans and specifications are prepared by a consultant. Construction is performed by a
private contractor.
Concrete and Pavement Replacement Program
FUNDING SOURCE
Category: Streets and Drainage Project No.:17R12
Project Manager: Patrick Arciniega, 949-644-3347
Description:
2016-2017
Design/Environmental/Permits $300,000
Right-of-Way/Acquisition $0
Construction $1,886,330
Other $0
Total $2,186,330
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $2,186,330 $0 $2,186,330
$2,186,330 $0 $2,186,330
Location:
14
TOTAL
Ocean Boulevard and Marguerite Avenue to Poppy Avenue
Proposed Expenses:
The project removes and reconstructs concrete pavement on Poppy Avenue between East Coast
Highway and Ocean Boulevard and Ocean Boulevard between Poppy and Marguerite Avenues in
Corona del Mar. New landscaping may be included to aesthetically enhance the wide segment of Ocean
Boulevard. Reconstruction of deteriorated sidewalk and curb and gutter is also included. Plans and
specifications are prepared by a consultant. Construction is performed by a private contractor.
Corona del Mar Concrete Pavement Reconstruction
FUNDING SOURCE
General Fund
Category: Streets and Drainage Project No.:15R16
Project Manager: Alfred Castanon, 949-644-3314
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $1,934,248
Other $0
Total $1,934,248
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $496,021 $0 $496,021
12101 980000 $938,227 $0 $938,227
53601 980000 $0 $500,000 $500,000
$1,434,248 $500,000 $1,934,248
Location:
Proposed Expenses:
This project grinds and overlays portions of Irvine Avenue from Santiago to Monte Vista Avenue with
rubberized asphalt concrete. Reconstruction of deteriorated concrete improvements is included. Plans
and specifications are prepared by a consultant. Construction is performed by a private contractor.
Additionally, the center median turf from Santiago Avenue to University Drive includes water wise
landscaping.
Irvine Avenue Pavement Rehabilitation
FUNDING SOURCE
15
Neighborhood Enhancement
TOTAL
General Fund
Gas Tax
Irvine Avenue from Santiago Drive to Monte Vista Avenue.
Category: Streets and Drainage Project No.:15L01
Project Manager: Patrick Arciniega, 949-644-3347
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $345,476
Other $0
Total $345,476
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $345,476 $0 $345,476
$345,476 $0 $345,476
Location: Various
16
TOTAL
General Fund
Proposed Expenses:
This project designs or facilitates the installation or rehabilitation of various small landscape projects.
Potential projects include landscape and irrigation gap closure improvements along the west side of
MacArthur Boulevard between San Joaquin Hills Road and Ford Road and other miscellaneous projects.
Design is performed by a consultant if needed. Installation is completed by a private contractor.
Landscape Enhancement Program
FUNDING SOURCE
Category: Streets and Drainage Project No.:15R27
Project Manager: Frank Tran, 949-644-3340
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $2,099,707
Other $0
Total $2,099,707
ORG OBJECT REBUDGET $BUDGET $TOTAL
12201 980000 $1,099,707 $0 $1,099,707
13501 980000 $1,000,000 $0 $1,000,000
$2,099,707 $0 $2,099,707
Location:
Proposed Expenses:
This project grinds and overlays MacArthur Boulevard with rubberized asphalt concrete. Reconstruction
of deteriorated concrete improvements is also included. Construction is partially funded with federal
grant funds as part of the Arterial Pavement Management program. Plans and specifications are
prepared by a consultant. Construction is performed by a private contractor.
MacArthur Boulevard Pavement Rehabilitation
FUNDING SOURCE
17
TOTAL
Measure M Fair Share
Contributions
MacArthur Boulevard from Coast Highway to Ford Road
Category: Streets and Drainage Project No.:17R13
Project Manager: TBD
Description:
2016-2017
Design/Environmental/Permits $250,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $250,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $0 $250,000 $250,000
$0 $250,000 $250,000
Location: Marine Avenue from North Bayfront to South Bayfront on Balboa Island
Proposed Expenses:
This project involves concept development, design and permitting of the complete reconstruction of
Marine Ave from North Bay Front to South Bay Front.
Marine Avenue Rehabilitation
FUNDING SOURCE
18
TOTAL
General Fund
Category: Streets and Drainage Project No.:16L02
Project Manager: Patrick Arciniega, 949-644-3347
Description:
2016-2017
Design/Environmental/Permits $200,000
Right-of-Way/Acquisition $0
Construction $890,000
Other $0
Total $1,090,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201926 980000 $134,942 $0 $134,942
53601 980000 $455,846 $500,000 $955,800
$590,788 $500,000 $1,090,742
Location: Various
19
TOTAL
General Fund
Neighborhood Enhancement
Proposed Expenses:
State water-usage reduction orders include a ban on irrigating ornamental turf on medians in public
streets, unless it is done with non-drinking or reclaimed water. Street medians relying on potable water
are under evaluation with the goal to replace existing turf with drought-tolerant plants and other
sustainable landscape measures. This project removes and replaces turf medians with more water
friendly landscaping. Irrigation systems and controllers may be upgraded with weather based smart
controllers and water efficient spray heads.
Median Landscape Turf Replacement
FUNDING SOURCE
Category: Streets and Drainage Project No.:15R17
Project Manager: Andy Tran, 949-644-3315
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $542,979
Other $0
Total $542,979
ORG OBJECT REBUDGET $BUDGET $TOTAL
12101 980000 $542,979 $0 $542,979
$542,979 $0 $542,979
Location: Newport Boulevard from Via Lido to 30th Street
20
TOTAL
Gas Tax
Proposed Expenses:
This project widens and beautifies Newport Boulevard to accommodate one additional northbound
through lane from 30th Street to 32nd Street and one additional southbound through lane from Via Lido
to 32nd Street terminating as a right-turn only lane at 32nd Street. A new parking lot and four traffic
signal modifications are also included within the project limits. A Measure M competitive grant funded
portions of the design, right-of-way and construction phases. The majority of construction was
completed by Summer 2016.
Newport Boulevard / 32nd Street Modification
FUNDING SOURCE
Category: Streets and Drainage Project No.:15R18
Project Manager: Frank Tran, 949-644-3340
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $2,800,000
Other $0
Total $2,800,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $1,755,341 $1,050,000 $2,805,341
$1,755,341 $1,050,000 $2,805,341
Location: Various alleys in the Newport Heights community
21
TOTAL
General Fund
Proposed Expenses:
This project removes and reconstructs deteriorated alleys in the Newport Heights community. This work
is coordinated with sewer pipeline improvements also planned for this area. Following replacement of
sewer laterals in this area, alley pavement reconstruction will be completed in 2 phases. Phase 1
includes alleys east of Riverside Avenue and Phase 2 includes alleys west of Riverside Avenue. Plans
and specifications are prepared by a consultant. Construction is performed by a private contractor.
Newport Heights Alley Reconstruction
FUNDING SOURCE
Category: Streets and Drainage Project No.:15R19
Project Manager: Patrick Arciniega, 949-644-3347
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $50,024
Total $50,024
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $24,824 $0 $24,824
12101 980000 $0 $25,200 $25,200
$24,824 $25,200 $50,024
Location: Intersection of Old Newport Boulevard and West Coast Highway
Proposed Expenses:
This project widens the westbound side of West Coast Highway at Old Newport Boulevard to
accommodate a third through lane, a right turn pocket, a bike lane and a sidewalk. Additional right-of-
way from Caltrans is required. Project funding to date includes a Measure M2 competitive grant with a
25 percent funding match ($90,000) for the design of this project. Plans and specifications are prepared
by a consultant. Design and envriomental review is complete. Staff is seeking grant funding for right-of-
way and construction to be performed in a future year.
Old Newport Blvd / West Coast Hwy Modifications
FUNDING SOURCE
22
TOTAL
General Fund
Gas Tax
Category: Streets and Drainage Project No.:15R20
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $1,045,629
Other $150,000
Total $1,195,629
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $92,717 $0 $92,717
13501 980000 $1,102,912 $0 $1,102,912
$1,195,629 $0 $1,195,629
Location: Park Avenue connecting Balboa Island and Little Balboa Island
23
TOTAL
General Fund
Contributions
Proposed Expenses:
This project replaces the Little Balboa Island Bridge. Design and environmental of the replacement
bridge is complete. During construction, a temporary bridge allows for traffic to flow to and from Little
Balboa Island. Construction is performed by a private contractor. Funding is provided by a grant from the
Federal Highway Administration administered by Caltrans.
Park Avenue Bridge Over Grand Canal Replacement
FUNDING SOURCE
Category: Streets and Drainage Project No.:15R02
Project Manager: Frank Tran, 949-644-3340
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $3,671,129
Other $0
Total $3,671,129
ORG OBJECT REBUDGET $BUDGET $TOTAL
12101 980000 $1,445,129 $0 $1,445,129
12201 980000 $2,226,000 $0 $2,226,000
$3,671,129 $0 $3,671,129
Location:
Proposed Expenses:
This program provides for the reconstruction of asphalt concrete pavement. Reconstruction of
deteriorated concrete improvements will also be included. Plans and specifications are prepared by
staff. Construction is performed by a private contractor. This year's project includes improvements in
the Cameo Shores community.
Residential Street Rehabilitation Program
FUNDING SOURCE
24
Measure M Fair Share
TOTAL
Gas Tax
Cameo Shores
Category: Streets and Drainage Project No.:17R04
Project Manager: Ben Davis, 949-644-3317
Description:
2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Design/Environmental/Permits $0 $0 $0 $0 $0
Right-of-Way/Acquisition $0 $0 $0 $0 $0
Construction $670,000 $637,000 $712,000 $698,000 $724,000
Other $0 $0 $0 $0 $0
Total $670,000 $637,000 $712,000 $698,000 $724,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $0 $670,000 $670,000
$0 $670,000 $670,000
Location:
25
TOTAL
General Fund
Mariners, Dover Shores, Bay Knolls communities (Area 1)
Proposed Expenses:
The slurry seal program is a pavement surface treatment system, providing cost effective aesthetic value
to pavement surfaces, while correcting minor deficiencies and preventing further deterioration. The
current project involves slurry sealing and seal coating residential streets and parking lots in the
Mariners, Dover Shores and Bay Knolls communities (Area 1) as part of a 7-year cycle rotation. Plans
and specifications are prepared by staff. Construction is performed by a private contractor.
Slurry Seal Program
FUNDING SOURCE
Category: Streets and Drainage Project No.:15D01
Project Manager: Iris Lee, 949-644-3323
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $111,172
Total $111,172
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201926 980000 $111,172 $0 $111,172
$111,172 $0 $111,172
Location: Various
Proposed Expenses:
The City owns and operates an extensive drainage system built into roads and housing tracts in the
1960’s and earlier. This program retains the services of a private pipeline video inspection firm to assess
the condition of the existing storm drain pipeline system and to identify a pipeline maintenance and repair
schedule.
Storm Drain System Repairs and Evaluation
FUNDING SOURCE
26
TOTAL
General Fund
Category: Streets and Drainage Project No.:17D11
Project Manager: Iris Lee, 949-644-3323; Bob Stein, 949-644-3322
Description:
2016-2017
Design/Environmental/Permits $200,000
Right-of-Way/Acquisition $0
Construction $300,000
Other $0
Total $500,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201926 980000 $0 $500,000 $500,000
$0 $500,000 $500,000
Location: Citywide
27
TOTAL
General Fund
Proposed Expenses:
The City owns and maintains an extensive storm drainage system. Recent video inspections identified
areas that need repair or rehabilitation. Also, various water quality improvements, studies and monitoring
may need to be performed as part of the City's efforts and compliance with the state National Pollution
Discharge Elimination System and Total Maximum Daily Load program requirements.
Storm Drain and Water Quality Improvements
FUNDING SOURCE
Category: Streets and Drainage Project No.:16V11
Project Manager: Iris Lee, 949-644-3323
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $1,061,780
Other $107,220
Total $1,169,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $1,169,000 $0 $1,169,000
$1,169,000 $0 $1,169,000
Location: Citywide
Proposed Expenses:
This project retrofits up to 3,200 streetlights to LED fixtures in accordance with the Energy Action Plan
(EAP). Southern California Edision (SCE) will provide approximately $620,000 in incentive
reimbursements upon project completion. Additionally, SCE will finance the balance of project costs
through its On-Bill Financing program, which finances the loan at zero interest by collecting payments on
utility bills.
Streetlight LED Retrofit
FUNDING SOURCE
28
TOTAL
General Fund
Category: Streets and Drainage Project No.:17V01
Project Manager: Peter Tauscher, 949-644-3316
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $40,000
Total $40,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $0 $40,000 $40,000
$0 $40,000 $40,000
Location: Citywide
29
TOTAL
General Fund
Proposed Expenses:
This project provides funding for a comprehensive Streetlight Master Plan update. The study assesses
current and potential future needs within City owned streetlight network and lays out a planned approach
for installations and upgrades. Over the years, the City has completed many street lighting improvement
projects.
Streetlight Master Plan Update
FUNDING SOURCE
Category: Streets and Drainage Project No.:17V02
Project Manager: Peter Tauscher, 949-644-3316
Description:
2016-2017
Design/Environmental/Permits $60,000
Right-of-Way/Acquisition $0
Construction $350,889
Other $0
Total $410,889
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $410,889 $0 $410,889
$410,889 $0 $410,889
Location: Various
30
TOTAL
General Fund
Proposed Expenses:
This project is a continuation of the City’s 15-year Streetlight Replacement Master Plan. This year’s
project rehabilitates old circuits associated with other street projects. Work replaces obsolete street
lights, conduits, wires, pull boxes and service cabinets. The existing lights are replaced with energy
efficient LED lamp fixtures. Design services are provided by a consultant. The construction contract is
performed by a private contractor.
Streetlight Replacement Program
FUNDING SOURCE
Category: Streets and Drainage Project No.:15L15
Project Manager: Peter Tauscher, 949-644-3316
Description:
2016-2017
Design/Environmental/Permits $63,019
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $63,019
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $63,019 $0 $63,019
$63,019 $0 $63,019
Location: West Coast Highway between Santa Ana River and Newport Boulevard
31
TOTAL
General Fund
Proposed Expenses:
This project proposes installation of new and enhanced water friendly landscaping and irrigation system
in the medians along West Coast Highway between the Santa Ana River and Newport Boulevard and the
intersection of West Coast Highway and Balboa Boulevard/Superior Avenue. A construction and
maintenance agreement from Caltrans is required and is being reviewed by Caltrans. Design is
complete.
West Coast Highway Landscaping
FUNDING SOURCE
Transportation
Pg Org Project Title Rebudget Budget Total
32 01201928 17T11 Arroyo Canyon Bike Trail $0 $250,000 $250,000
33 01201927 15T02 Bristol Street Traffic Signal Synchronization $14,037 $0 $14,037
34 12101 17T12 Coast Highway Traffic Signal Synchronization $0 $550,000 $550,000
35 14001 16T11 Corona del Mar Bypass Plan Studies $50,000 $0 $50,000
36 01201928 16T12 Coyote Canyon Bike Trail $40,000 $0 $40,000
37 13701 15T04 East Coast Highway Traffic Signal Rehabilitation $140,132 $75,000 $215,132
38 01201928 15T06 Mariners Mile Hwy Configuration / Land Use Review $206,922 $0 $206,922
38 53601 15T06 Mariners Mile Hwy Configuration / Land Use Review $0 $60,000 $60,000
39 01201927 15T08 Newport Boulevard Traffic Signal Synchronization $20,120 $0 $20,120
39 14001 15T08 Newport Boulevard Traffic Signal Synchronization $40,000 $0 $40,000
40 01201927 17T02 Traffic Management and Modernization $0 $350,000 $350,000
41 01201927 17T03 Traffic Signage, Striping and Marking $36,238 $45,000 $81,238
42 12101 15T11 Traffic Signal Modernization: Phase 8 $13,621 $0 $13,621
42 14001 15T11 Traffic Signal Modernization: Phase 8 $120,880 $0 $120,880
43 01201927 17T01 Traffic Signal Rehabilitation Program $0 $500,000 $500,000
Total Transportation $681,950 $1,830,000 $2,511,950
Category: Transportation Project No.:17T11
Project Manager: Brad Sommers, 949-644-3326
Description:
2016-2017
Design/Environmental/Permits $250,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $250,000
ORG OBJECT REBUDGET $ BUDGET $ TOTAL
01201928 980000 $0 $250,000 $250,000
$0 $250,000 $250,000
Location: Arroyo Canyon from MacArthur bike trail to Ford Road
Proposed Expenses:
This project funds the design and environmental phases for a separated paved bike trail from the
MacArthur bike trail to Ford Road. Design and environmental documentation are prepared by a private
consultant. This project is included in the 2014 City of Newport Beach Bicycle Master Plan.
Arroyo Canyon Bike Trail
FUNDING SOURCE
32
TOTAL
General Fund
Category: Transportation Project No.:15T02
Project Manager: Eric Loke, 949-644-3336
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $14,037
Other $0
Total $14,037
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $14,037 $0 $14,037
$14,037 $0 $14,037
Location:
Proposed Expenses:
This project enhances traffic signal coordination and reduces travel time delay along a number of
intersections on Bristol Street North and Bristol Street South. The project upgrades the traffic signal
control hardware and CCTV cameras at eight intersections. The project also updates and implements
traffic signal timing and coordination plans for the intersections. Partnering with local cities, staff received
Measure M grant funding from Orange County Transportation Authority (OCTA). OCTA serves as lead
agency. This funding provides the remaining grant match.
Bristol Street Traffic Signal Synchronization
FUNDING SOURCE
33
TOTAL
General Fund
Bristol Street North from Jamboree Road to Campus Drive; Bristol Street South from
Irvine Avenue to Jamboree Road; Bayview Place/Bayview Circle
Category: Transportation Project No.:17T12
Project Manager: Brad Sommers, 949-644-3326
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $550,000
Other $0
Total $550,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
12101 980000 $0 $550,000 $550,000
$0 $550,000 $550,000
Location:
34
TOTAL
Gas Tax
Coast Highway (SR-1) within the City of Newport Beach, from the westerly city limit
with Huntington Beach to the easterly city limit with Laguna Beach
Proposed Expenses:
This project enhances traffic signal coordination and reduces travel time delay along a number of
intersections on Pacific Coast Highway. The project upgrades traffic signal control hardware at 13 City
of Newport Beach and 14 Caltrans intersections, extends and closes gaps in the City's Fiber Optic
communication network, installs three CCTV cameras, and updates traffic signal timing and coordination
plans. This project is partially funded by the Orange County Transportation Authority (OCTA) Regional
Traffic Signal Synchronization Program (RTSSP) as part of Measure M2.
Coast Highway Traffic Signal Synchronization
FUNDING SOURCE
Category: Transportation Project No.:16T11
Project Manager: Tony Brine, 949-644-3329
Description:
2016-2017
Design/Environmental/Permits $50,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $50,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
14001 980000 $50,000 $0 $50,000
$50,000 $0 $50,000
Location:
35
TOTAL
Transportation & Circulation
Not applicable
Proposed Expenses:
This project studies traffic patterns and routes around Corona del Mar and prepares a signage plan to
use electronic changeable message signs to provide real-time data to motorists. The aim is to address
congestion on Coast Highway in Corona del Mar. The study also reviews infrastructure and tolling
information on SR73 to encourage alternate routes around Corona del Mar.
Corona del Mar Bypass Plan Studies
FUNDING SOURCE
Category: Transportation Project No.:16T12
Project Manager: Brad Sommers, 949-644-3326
Description:
2016-2017
Design/Environmental/Permits $40,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $40,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $40,000 $0 $40,000
$40,000 $0 $40,000
Location: Ford Road to Newport Coast Drive via the Coyote Canyon Landfill
36
TOTAL
General Fund
Proposed Expenses:
This project funds the preparation of a concept plan for the construction of a separated bicycle trail from
Ford Road to Newport Coast Drive including a segment on the closed Coyote Canyon landfill site.
Concept plans are prepared by a private consultant. This project is included in the 2014 City of Newport
Beach Bicycle Master Plan.
Coyote Canyon Bike Trail
FUNDING SOURCE
Category: Transportation Project No.:15T04
Project Manager: Eric Loke, 949-644-3336
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $215,132
Other $0
Total $215,132
ORG OBJECT REBUDGET $BUDGET $TOTAL
13701 980000 $140,132 $75,000 $215,132
$140,132 $75,000 $215,132
Location: East Coast Highway from Irvine Terrace to Pelican Point Drive
37
TOTAL
PCH Relinquishment
Proposed Expenses:
This project consists of traffic signal rehabilitation work for the existing traffic signal equipment along
East Coast Highway in Corona del Mar. Work involves replacing hardware including control equipment,
signal poles, and cabinets, and re-wiring of the intersections. Plans and specifications are prepared by a
consultant. Most of the construction was completed by Summer 2016.
East Coast Highway Traffic Signal Rehabilitation
FUNDING SOURCE
Category: Transportation Project No.:15T06
Project Manager: Tony Brine, 949-644-3329
Description:
2016-2017
Design/Environmental/Permits $266,922
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $266,922
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $206,922 $0 $206,922
53601 980000 $0 $60,000 $60,000
$206,922 $60,000 $266,922
Location: Pacific Coast Highway between Newport Boulevard and Dover Drive
Coast Highway and Arches historic photo
Proposed Expenses:
Staff is working with Mariners Mile property owners and possibly a Citizens Advisory Panel to review the
ultimate street configuration and multi-model use of Coast Highway through Mariners Mile.
Corresponding land uses and parking requirements of the adjacent properties also are being reviewed.
Mariners Mile Hwy Configuration/Land Use Review
FUNDING SOURCE
38
TOTAL
General Fund
Neighborhood Enhancement
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Transportation Project No.:15T08
Project Manager: Eric Loke, 949-644-3336 Contract No.:5776
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $60,120
Other $0
Total $60,120
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $20,120 $0 $20,120
14001 980000 $40,000 $0 $40,000
$60,120 $0 $60,120
Location:
39
TOTAL
General Fund
Transportation/Circulation
Newport Boulevard from Via Lido to 23rd Street; Balboa Boulevard from 23rd Street
to Main Street
Proposed Expenses:
This project enhances traffic signal coordination and reduces travel time delay along a number of
intersections on Newport Boulevard and Balboa Boulevard. The project upgrades traffic signal control
hardware at eight intersections, completes gaps in fiber optic communication networks including
connection to Marina Park, installs a real-time traffic response system to better clear traffic from Balboa
Peninsula during peak seasons, and updates traffic signal timing and coordination plans. Staff received
Measure M grant funding from Orange County Transportation Authority (OCTA). OCTA serves as lead
agency and credits the City for its portion of the grant award. This provides the remaining grant match.
Newport Boulevard Traffic Signal Synchronization
FUNDING SOURCE
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Transportation Project No.:17T02
Project Manager: Tony Brine, 949-644-3329
Description:
2016-2017
Design/Environmental/Permits $50,000
Right-of-Way/Acquisition $0
Construction $300,000
Other $0
Total $350,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $0 $350,000 $350,000
$0 $350,000 $350,000
Location: Citywide
40
TOTAL
General Fund
Proposed Expenses:
This program funds potential Intelligent Transportation Systems (ITS) projects including electronic speed
feedback signs, dynamic message signs, and/or flashing beacons. Also, funding may be used for
neighborhood traffic management studies to address resident traffic concerns.
Traffic Management and Modernization
FUNDING SOURCE
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Transportation Project No.:17T03
Project Manager: Brad Sommers, 949-644-3326
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $81,238
Other $0
Total $81,238
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $36,238 $45,000 $81,238
$36,238 $45,000 $81,238
Location: Citywide
Proposed Expenses:
This program consists of various street and bicycle signing, striping and pavement markings, and other
minor improvements to enhance traffic safety. Plans are prepared by staff or a consultant. Work is
performed by a private contractor or City crews.
Traffic Signage, Striping and Marking
FUNDING SOURCE
41
TOTAL
General Fund
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Transportation Project No.:15T11
Project Manager: Brad Sommers, 949-644-3326
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $134,501
Other $0
Total $134,501
ORG OBJECT REBUDGET $BUDGET $TOTAL
12101 980000 $13,621 $0 $13,621
14001 980000 $120,880 $0 $120,880
$134,501 $0 $134,501
Location: San Miguel Drive, Jamboree Road, Birch Street, Orchard Street, and Bayview Place
42
TOTAL
Gas Tax
Transportation & Circulation
Proposed Expenses:
Traffic Signal Modernization is a multi-year, multi-phased program to update the City's traffic signal
system. Phase 8 is the final phase of the Citywide improvement program. Phase 8 includes installation
of new hardware, fiber optic cable upgrades and CCTV cameras to intersections along San Miguel Drive,
Jamboree Road at Marine Avenue and Bayside Drive intersection, and Birch Street and Von Karman
Avenue intersection. The project also completes gaps in the fiber optic communication network along
Orchard Street and Bayview Place.
Traffic Signal Modernization: Phase 8
FUNDING SOURCE
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Transportation Project No.:17T01
Project Manager: Eric Loke, 949-644-3336
Description:
2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Design/Environmental/Permits $0 $0 $0 $0 $0
Right-of-Way/Acquisition $0 $0 $0 $0 $0
Construction $500,000 $400,000 $400,000 $400,000 $400,000
Other $0 $0 $0 $0 $0
Total $500,000 $400,000 $400,000 $400,000 $400,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $0 $500,000 $500,000
$0 $500,000 $500,000
Location: Citywide
Proposed Expenses:
This program consists of rehabilitation and maintenance of existing traffic signal equipment throughout
the City. Work may include replacement of hardware including control equipment, signal poles, cabinets,
and re-wiring traffic signals. Plans and specifications for a specific project are prepared by a consultant
and/or staff. Construction is completed by a private contractor.
Traffic Signal Rehabilitation Program
FUNDING SOURCE
43
TOTAL
General Fund
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Parks, Harbors and Beaches
Pg Org Project Title Rebudget Budget Total
44 13501 15H24 Abandoned Watercraft Abatement $61,200 $0 $61,200
45 10101 16H11 American Legion Bulkhead $300,000 $700,000 $1,000,000
46 01201929 17P11 Back Bay View Park Enhancements $329,939 $0 $329,939
47 10101 17H11 Balboa Island Seawall Cap (North and South Sides)$0 $2,000,000 $2,000,000
48 10101 15H11 Balboa Island Seawall Replacement - West End $539,925 $4,523,600 $5,063,525
49 10101 15H12 Balboa Marina Public Pier $48,000 $0 $48,000
50 10001 17H04 Beach and Bay Sand Management (S.A. River)$0 $500,000 $500,000
51 01201929 17P12 Bonita Canyon Sports Park Pickleball Court $0 $400,000 $400,000
52 10101 17H12 Central Ave Public Pier / Street End Improvement $0 $300,000 $300,000
53 10001 15H14 Eelgrass Survey $75,000 $0 $75,000
54 10101 16H12 Grand Canal Dredging $229,000 $132,000 $361,000
55 10101 17H13 Harbor Capital Projects Finance Plan $0 $30,000 $30,000
56 10101 16H13 Harbor Tide Gauge $50,000 $0 $50,000
57 10101 15P13 Lower Castaways Park $100,000 $0 $100,000
58 01201927 15T09 Lower Sunset View Park Extension Concept $285,652 $0 $285,652
58 56201 15T09 Lower Sunset View Park Extension Concept $150,000 $0 $150,000
59 55101 15P14 Marina Park $125,000 $0 $125,000
60 10001 17P15 Newport Elementary School Park Maintenance $0 $250,000 $250,000
61 10001 16H14 Newport Pier Building Platform and Piles $998,233 $0 $998,233
62 10001 17H03 Ocean Piers Inspection and Maintenance $0 $500,000 $500,000
63 14101 16P12 Park Walls and Staircases Rehabilitation $500,000 $0 $500,000
64 10001 15H18 Seawall and Bulkhead Repairs $38,380 $0 $38,380
65 56101 17P13 Sunset Ridge Park Access Improvements $95,044 $0 $95,044
66 10001 17H05 Surfside Sunset Coastal Sand Replenishment $0 $150,000 $150,000
67 01201929 17P14 Veterans Park Modifications $0 $200,000 $200,000
Total Parks, Harbors and Beaches $3,925,373 $9,685,600 $13,610,973
Category: Parks, Harbors and Beaches Project No.:15H24
Project Manager: Shannon Levin, 949-644-3043
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $61,200
Total $61,200
ORG OBJECT REBUDGET $BUDGET $TOTAL
13501 980000 $61,200 $0 $61,200
$61,200 $0 $61,200
Location: Harborwide
Proposed Expenses:
The City received a Surrendered and Abandoned Vessel Exchange (SAVE) grant from the State Division
of Boating and Waterways in 2014. The grant allows the City to be reimbursed for costs incurred for the
removal of abandoned or surrendered nuisance vessels from the waters of Newport Harbor.
Abandoned Watercraft Abatement
FUNDING SOURCE
44
TOTAL
Contributions
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:16H11
Project Manager: Chris Miller, 949-644-3043
Description:
2016-2017
Design/Environmental/Permits $150,000
Right-of-Way/Acquisition $0
Construction $850,000
Other $0
Total $1,000,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10101 980000 $300,000 $700,000 $1,000,000
$300,000 $700,000 $1,000,000
Location: West Balboa Boulevard at 15th Street
Proposed Expenses:
The City owns the property at 215 E. 15th Street. The buildings and marina are leased to the American
Legion. As part of the Rhine Channel/American Legion dredging project in 2011, the City agreed to
study the feasibility of repairing or replacing existing vertical bulkheads near the American Legion facility.
This project funds an engineering analysis of the seawall, which is needed to develop plans and permits
through regulatory agencies. Construction should follow after further discussions and agreements with
the American Legion.
American Legion Bulkhead
FUNDING SOURCE
45
TOTAL
Tidelands Capital
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:17P11
Project Manager: Patrick Arciniega, 949-644-3347
Description:
2016-2017
Design/Environmental/Permits $50,000
Right-of-Way/Acquisition $0
Construction $279,939
Other $0
Total $329,939
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201929 980000 $329,939 $0 $329,939
$329,939 $0 $329,939
Location: 1900 Back Bay Drive (East Coast Highway and Jamboree Road)
46
TOTAL
General Fund
Proposed Expenses:
This project provides additional landscape and potential enhancements to the park such as shade and
viewing structure, perimeter fencing, amenities for cyclists, improved signage and/or public art.
Back Bay View Park Enhancements
FUNDING SOURCE
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:17H11
Project Manager: Bob Stein, 949-644-3322
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $2,000,000
Other $0
Total $2,000,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10101 980000 $0 $2,000,000 $2,000,000
$0 $2,000,000 $2,000,000
Location: Balboa Island
47
TOTAL
Tidelands Capital
Proposed Expenses:
This project funds the design and construction of a seawall cap on the north and south sides of Balboa
Island. Design services are provided by a consultant. Construction will be provided by a contractor.
Balboa Island Seawall Cap - North & South Sides
FUNDING SOURCE
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:15H11
Project Manager: Bob Stein, 949-644-3322
Description:
2016-2017
Design/Environmental/Permits $650,000
Right-of-Way/Acquisition $0
Construction $4,413,525
Other $0
Total $5,063,525
ORG OBJECT REBUDGET $BUDGET $TOTAL
10101 980000 $539,925 $4,523,600 $5,063,525
$539,925 $4,523,600 $5,063,525
Location: Balboa Island
48
TOTAL
Tidelands Capital
Proposed Expenses:
This project funds design, permit applications, CEQA documents, permits, and construction of a new
seawall along the the West end of Balboa Island. Design services are provided by a consultant.
Construction will be by a contractor.
Balboa Island Seawall Replacement - West End
FUNDING SOURCE
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:15H12
Project Manager: Chris Miller, 949-644-3043
Description:
2016-2017
Design/Environmental/Permits $48,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $48,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10101 980000 $48,000 $0 $48,000
$48,000 $0 $48,000
Location: 201 E. Coast Highway
Proposed Expenses:
This is a joint project between The Irvine Company, which is adding slips to its existing private marina at
201 E. Coast Highway, and the City, which proposes to build a public dock at the same location on
private property. This budget is for the entitlement process only (CEQA, permitting, and studies). The
Irvine Company proposes to fund an estimated $680,000 towards this entitlement effort.
Balboa Marina Public Pier
FUNDING SOURCE
49
TOTAL
Tidelands Capital
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:17H04
Project Manager: Chris Miller, 949-644-3043
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $500,000
Total $500,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10001 980000 $0 $500,000 $500,000
$0 $500,000 $500,000
Location:
Proposed Expenses:
This program consists of normal sand and sediment maintenance operations throughout the harbor's bay
beaches and street ends. Also, the County of Orange is working on a project to dredge around
1,000,000 cubic yards of sand out of lower Santa Ana River and place it in the near shore off Newport
Beach. The cities of Newport Beach, Huntington Beach and Seal Beach all requested to take a portion
of this sand material to replenish their individual bay and/or harbor beaches. This sand would be placed
in Newport Harbor, specifically on Balboa Island and China Cove beaches, once all required California
Environmental Quality Act (“CEQA”) documentation is completed for the designated beaches.
Beach and Bay Sand Management
FUNDING SOURCE
50
TOTAL
Tidelands Maintenance
Santa Ana River and various bay fronts and beaches, including Balboa Island and
China Cove
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:17P12
Project Manager: Iris Lee, 949-644-3323
Description:
2016-2017
Design/Environmental/Permits $50,000
Right-of-Way/Acquisition $0
Construction $350,000
Other $0
Total $400,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201929 980000 $0 $400,000 $400,000
$0 $400,000 $400,000
Location: 1641 Ford Road, Bonita Canyon Sports Park
51
TOTAL
General Fund
Proposed Expenses:
This project consists of building new pickleball courts at Bonita Canyon Sports Park.
Bonita Canyon Sports Park Pickleball Court
FUNDING SOURCE
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:17H12
Project Manager: Iris Lee, 949-644-3323
Description:
2016-2017
Design/Environmental/Permits $50,000
Right-of-Way/Acquisition $0
Construction $250,000
Other $0
Total $300,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10101 980000 $0 $300,000 $300,000
$0 $300,000 $300,000
Location: Lido Village Area
Proposed Expenses:
This project provides for necessary construction drawings, permit applications and CEQA documents
and construction of a new public pier at the end of Central Avenue in Lido Village.
Central Avenue Public Pier / Street End Improvement
FUNDING SOURCE
52
TOTAL
Tidelands Capital
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:15H14
Project Manager: Chris Miller, 949-644-3043
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $75,000
Total $75,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10001 980000 $75,000 $0 $75,000
$75,000 $0 $75,000
Location: Lower Harbor Shoreline
53
TOTAL
Tidelands Maintenance
Proposed Expenses:
This project surveys eelgrass along the lower harbor shoreline, as well as performs basic water quality
analyses (light, salinity, temperature, dissolved oxygen). The project helps the City maintain accurate
data on eelgrass distribution and quantity. These aspects are important to quantify so that support for
policy development with federal and state agencies can proceed for a Newport Beach specific eelgrass
plan.
Eelgrass Survey
FUNDING SOURCE
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:16H12
Project Manager: Chris Miller, 949-644-3043
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $361,000
Other $0
Total $361,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10101 980000 $229,000 $132,000 $361,000
$229,000 $132,000 $361,000
Location: Grand Canal, between Balboa Island and Little Balboa Island
54
TOTAL
Tidelands Capital
Proposed Expenses:
This project is for the design, permitting and construction for the dredging of the Grand Canal.
Grand Canal Dredging
FUNDING SOURCE
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:17H13
Project Manager: Chris Miller, 949-644-3043
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $30,000
Total $30,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10101 980000 $0 $30,000 $30,000
$0 $30,000 $30,000
Location: Not applicable
Proposed Expenses:
This project provides funding for a comprehensive Harbor Capital Projects Finance Plan. The study
assesses current and potential future needs for Newport Harbor and lays out a planned approach for
future projects and funding options.
Harbor Capital Projects Finance Plan
FUNDING SOURCE
55
TOTAL
Tidelands Capital
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:16H13
Project Manager: Bob Stein, 949-644-3322
Description:
2016-2017
Design/Environmental/Permits $10,000
Right-of-Way/Acquisition $0
Construction $40,000
Other $0
Total $50,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10101 980000 $50,000 $0 $50,000
$50,000 $0 $50,000
Location: Between Balboa Island and Balboa Yacht Basin
Proposed Expenses:
This project installs a tide gauge to measure water surface elevations in Newport Bay as elevations
measured by NOAA tide gauges in LA Harbor or La Jolla may differ from local data. A possible
installation location is on the north side of Balboa Island in the vicinity of Balboa Yacht Basin. The
project includes third-party analysis of data during the first year. Staff may take over responsibility of
data analysis in subsequent years.
Harbor Tide Gauge
FUNDING SOURCE
56
TOTAL
Tidelands Capital
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Bid Contract No.:
Drawing No.:
Milestones:
Work Item Date Contract Vendor Amount PL
1 Studies, Surveys, Concepts
2 RFP/RFQ
3 Environmental
4 Design
5 Surveying
6 Geotechnical
7 Community Outreach
8 Permitting
9 Bid Opening
10 City Council Award
11 Construction
12 Notice of Completion
13 Maintenance Period
14 Plant Establishment
15 Project Closeout
16 Grant Reimbursement
17 Grant Closeout
18 Other:
19 Other:
20 Other:
Key Notes:
Category: Parks, Harbors and Beaches Project No.:15P13
Project Manager: Chris Miller, 949-644-3043
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $100,000
Other $0
Total $100,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10101 980000 $100,000 $0 $100,000
$100,000 $0 $100,000
Location: 700 Dover Drive (NW corner of Dover Drive and Coast Highway)
Proposed Expenses:
The existing Lower Castaways public property consists of a vacant lot with dirt and gravel areas. This
project provides for a small path and a hand launch pier.
Lower Castaways Park
FUNDING SOURCE
57
TOTAL
Tidelands Capital
Category: Parks, Harbors and Beaches Project No.:15T09
Project Manager: Andy Tran, 949-644-3315
Description:
2016-2017
Design/Environmental/Permits $435,652
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $435,652
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201927 980000 $285,652 $0 $285,652
56201 980000 $150,000 $0 $150,000
$435,652 $0 $435,652
Location: Intersection of Coast Highway and Superior Avenue
58
TOTAL
General Fund
Major Facilities Financing Plan
Proposed Expenses:
This project studies possible pedestrian overcrossings, parking and park uses for Lower Sunset View
Park at the intersection of Coast Highway and Superior Avenue. Work includes concept development,
coordination with the Orange County Transportation Authority (OCTA) PCH Corridor Study, possible
grant funding application, and coordinating with State agencies on necessary permits.
Lower Sunset View Park Extension Concept
FUNDING SOURCE
Category: Parks, Harbors and Beaches Project No.:15P14
Project Manager: Iris Lee, 949-644-3323
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $125,000
Total $125,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
55101 980000 $125,000 $0 $125,000
$125,000 $0 $125,000
Location: West Balboa Boulevard between 15th and 19th Streets
Photography by Dan Herman, Rabben/Herman Design Office
59
TOTAL
Major Facilities Financing Plan
Proposed Expenses:
Marina Park, a 10-acre multipurpose public facility on the bayside of Balboa Peninsula, opened in
December 2015. Facilities include a 23 slip visitor serving marina, 10,500SF community center,
11,000SF sailing center, children’s themed playground and picnic area, two half-court basketball
surfaces, and a fitness circuit. An onsite café operates privately under lease. This funding provides for
incidental expenses as the facility moves into full operation.
Marina Park
FUNDING SOURCE
Category: Parks, Harbors and Beaches Project No.:17P15
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $250,000
Other $0
Total $250,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10001 980000 $0 $250,000 $250,000
$0 $250,000 $250,000
Location: 1327 Balboa Blvd
60
TOTAL
Tidelands Maintenance
Proposed Expenses:
This joint project with the Newport Mesa Unified School District improves the playfield at Newport
Elementary for functionality and aesthetic purposes. When school is not in session, the field is used by
the public as a park. The design will be provided by a consultant. Construction will begin by Summer
2017 to take advantage of the summer break to minimize school disruptions.
Newport Elementary School Park Maintenance
FUNDING SOURCE
Category: Parks, Harbors and Beaches Project No.:16H14
Project Manager: Iris Lee, 949-644-3323
Description:
2016-2017
Design/Environmental/Permits $250,000
Right-of-Way/Acquisition $0
Construction $748,223
Other $0
Total $998,223
ORG OBJECT REBUDGET $BUDGET $TOTAL
10001 980000 $998,223 $0 $998,223
$998,223 $0 $998,223
Location: Newport Pier
Proposed Expenses:
This project replaces deteriorated or damaged support piles and platform decking under the existing
restaurant building on Newport Pier. It is less costly and less destructive to make necessary pile repairs
and below deck improvements when the building has been removed. A consultant will prepare
construction contract documents. A marine contractor will construct the improvements.
Newport Pier Building Platform and Piles
FUNDING SOURCE
Tidelands Maintenance
61
TOTAL
Category: Parks, Harbors and Beaches Project No.:17H03
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $350,000
Other $150,000
Total $500,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10001 980000 $0 $500,000 $500,000
$0 $500,000 $500,000
Location: Newport Pier and Balboa Pier
Proposed Expenses:
This project provides for the bi-annual inspection and maintenance of the Newport Pier and Balboa Pier.
A consultant will prepare an inspection report that focuses on the condition of both piers and to form the
basis of the construction work. Staff prepares construction project plans and specifications based on the
report recommendations. Needed maintenance work may include crack sealing stringers and piles and
replacing missing or broken timber members, corroded straps, and other identified deficiencies.
Ocean Piers Inspection and Maintenance
FUNDING SOURCE
62
TOTAL
Tidelands Maintenance
Category: Parks, Harbors and Beaches Project No.:16P12
Project Manager: Patrick Arciniega, 949-644-3347
Description:
2016-2017
Design/Environmental/Permits $75,000
Right-of-Way/Acquisition $0
Construction $425,000
Other $0
Total $500,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
14101 980000 $500,000 $0 $500,000
$500,000 $0 $500,000
Location: Various parks
63
TOTAL
Building Excise Tax
Proposed Expenses:
This project repairs aged, damaged and non-compliant walls, retaining walls and staircases at several
parks throughout the City. Many walls and stairs were originally constructed with timber. Reconstruction
materials include concrete. Possible locations include Cliff Drive Park, Spyglass Hill Park, Peninsula
Park, Bayview Park and Grant Howald Park.
Park Walls and Staircases Rehabilitation
FUNDING SOURCE
Category: Parks, Harbors and Beaches Project No.:15H18
Project Manager: Fong Tse, 949-644-3321
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $38,380
Other $0
Total $38,380
ORG OBJECT REBUDGET $BUDGET $TOTAL
10001 980000 $38,380 $0 $38,380
$38,380 $0 $38,380
Location: Various locations around the harbor (typically street ends)
Proposed Expenses:
This project repairs and replaces sections of City owned seawalls and bulkheads around Newport
Harbor. Design efforts include public outreach, necessary CEQA review, technical support and
assistance with regulatory reviews and permitting, final plan development, and construction.
Seawall and Bulkhead Modifications
FUNDING SOURCE
64
TOTAL
Tidelands Maintenance
Category: Parks, Harbors and Beaches Project No.:17P13
Project Manager: Andy Tran, 949-644-3315
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $95,044
Total $95,044
ORG OBJECT REBUDGET $BUDGET $TOTAL
56101 980000 $95,044 $0 $95,044
$95,044 $0 $95,044
Location: West Coast Highway and Superior Avenue
65
TOTAL
Major Facilities Financing Plan
Proposed Expenses:
Completed in 2014, Sunset Ridge Park provides baseball and soccer fields, restrooms and picnic
facilities, flower gardens and coastal views for active and passive use. This funding provides for minor
changes and design for access options to/from the park.
Sunset Ridge Park Access Improvements
FUNDING SOURCE
Category: Parks, Harbors and Beaches Project No.:17H05
Project Manager: Chris Miller, 949-644-3043
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $150,000
Total $150,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10001 980000 $0 $150,000 $150,000
$0 $150,000 $150,000
Location: Ocean Beaches
66
TOTAL
Tidelands Maintenance
Proposed Expenses:
This project reoccurs approximately every six years as a multi-agency beach replenishment project.
Coastal cities, State Department of Boating and Waterways, and Army Corps of Engineers share the
cost of placing sand at a feeder beach located in Surfside Sunset Beach. Sand erodes from the feeder
beach and replenishes sand down the coast to the westerly breakwater entrance at Newport Harbor.
City of Newport Beach typically pays about 1% of the total cost of this regional sand management
program.
Surfside Sunset Coastal Sand Replenishment
FUNDING SOURCE
Category: Parks, Harbors and Beaches Project No.:17P14
Project Manager: Iris Lee, 949-644-3323
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $200,000
Other $0
Total $200,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201929 980000 $0 $200,000 $200,000
$0 $200,000 $200,000
Location: 215 15th Street
Proposed Expenses:
Enhancements and modifications include demolition of an existing wood and metal shade structure, new
asphalt and concrete improvements, fence, parking improvements, landscaping and architectural
features, and new park furnishings and amenities.
Veterans Park Modifications
FUNDING SOURCE
67
TOTAL
General Fund
Water Quality and Environmental
Pg Org Project Title Rebudget Budget Total
68 10001 16X11 Arches Storm Drain Dry Weather Diversion $270,000 $0 $270,000
68 13801 16X11 Arches Storm Drain Dry Weather Diversion $890,000 $0 $890,000
69 01201928 15X11 Bayview Heights Drainage / Runoff Treatment $6,238 $0 $6,238
69 10001 15X11 Bayview Heights Drainage / Runoff Treatment $30,000 $0 $30,000
69 1230052 15X11 Bayview Heights Drainage / Runoff Treatment $275,000 $0 $275,000
70 01201928 17X11 Big Canyon Golf Course Pond Treatment $0 $20,000 $20,000
71 01201928 15X12 Big Canyon Rehabilitation Project $33,457 $0 $33,457
71 1230052 15X12 Big Canyon Rehabilitation Project $1,432,780 $0 $1,432,780
71 13501 15X12 Big Canyon Rehabilitation Project $653,255 $0 $653,255
72 01201926 15X14 Little Corona Infiltration Gallery $11,695 $0 $11,695
72 1230052 15X14 Little Corona Infiltration Gallery $250,000 $0 $250,000
73 13501 15X16 Santa Ana Delhi Regional Project $1,500,000 $0 $1,500,000
74 10001 15X17 Semeniuk Slough Dredging $1,172,304 $0 $1,172,304
Total Water Quality and Environmental $6,524,729 $20,000 $6,544,729
Category: Water Quality and Environmental Project No.:16X11
Project Manager: John Kappeler, 949-644-3218
Description:
2016-2017
Design/Environmental/Permits $100,000
Right-of-Way/Acquisition $0
Construction $900,000
Other $160,000
Total $1,160,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
10001 980000 $270,000 $0 $270,000
13801 980000 $890,000 $0 $890,000
$1,160,000 $0 $1,160,000
Location: Newport Blvd north of Coast Highway
68
TOTAL
Tidelands Maintenance
Contributions
Proposed Expenses:
Arches drain outlet is the endpoint for two large storm drains that collect and deliver runoff from
neighboring areas to Newport Harbor. The west storm drain collects runoff from Hoag Hospital and areas
upstream and the east storm drain runs along Old Newport Boulevard and into Costa Mesa upstream of
15th Street. A conceptual plan to divert dry weather flows from these two subwatersheds to the sanitary
sewer system has been prepared. Grant funding for this project is expected from the State Water
Resources Control Board (SWRCB) under its Clean Beaches Initiative.
Arches Storm Drain Dry Weather Diversion
FUNDING SOURCE
Category: Water Quality and Environmental Project No.:15X11
Project Manager: John Kappeler, 949-644-3218
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $305,238
Other $6,000
Total $311,238
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $6,238 $0 $6,238
10001 980000 $30,000 $0 $30,000
1230052 980000 $275,000 $0 $275,000
$311,238 $0 $311,238
Location: Headlands area of Upper Bay downstream of Mesa Drive
69
Measure M Competitive
TOTAL
General Fund
Tidelands Maintenance
Proposed Expenses:
This project restores a drainage reach subject to erosion and creates a wetland at the end of the reach to
benefit enviornmental water quality in the Back Bay. Private contributions are provided by the County of
Orange and two property owners. The Measure M Tier 2 competitive grant awarded for this project by
Orange County Transportation Authority requires a $30,000 match by the City.
Bayview Heights Drainage and Runoff Treatment
FUNDING SOURCE
Category: Water Quality and Environmental Project No.:17X11
Project Manager: Bob Stein, 949-644-3322
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $20,000
Other $0
Total $20,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $0 $20,000 $20,000
$0 $20,000 $20,000
Location: 1 Big Canyon Drive
Proposed Expenses:
As a critical part of the City's selenium mitigation program in Big Canyon, a circulation improvement
device in Lake 3 of the Big Canyon Golf Course is planned. The purpose of the lake circulation
improvement device is to inhibit conversion of selenate to selenite, which is a more bioavailable and
more toxic form of selenium.
Big Canyon Golf Course Pond Treatment
FUNDING SOURCE
70
TOTAL
General Fund
Category: Water Quality and Environmental Project No.:15X12
Project Manager: Bob Stein, 949-644-3322
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $1,900,000
Other $219,492
Total $2,119,492
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $33,457 $0 $33,457
1230052 980000 $1,432,780 $0 $1,432,780
13501 980000 $653,255 $0 $653,255
$2,119,492 $0 $2,119,492
Location: Big Canyon, downstream of Jamboree Road and south of Big Canyon Creek
71
Contributions
TOTAL
General Fund
Measure M Competitive
Proposed Expenses:
This project constructs a water quality treatment bioretention cell to treat wet-weather runoff from
Jamboree Road. To isolate groundwater high in selenium seeping from into Big Canyon Creek near
Jamboree Road, dry weather creek flows will be diverted from the east side of Jamboree Road and
routed through an above ground pipe along the south bank of the creek and through the storm drain
culvert under Jamboree Road. This allows groundwater seeps to be collected and diverted into the
sanitary sewer. Creek restoration activities include floodplain restoration, streambank stabilization, and
habitat restoration. The total project area is six acres.
Big Canyon Rehabilitation Project
FUNDING SOURCE
Category: Water Quality and Environmental Project No.:15X14
Project Manager: John Kappeler, 949-644-3218
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $261,695
Other $0
Total $261,695
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201926 980000 $11,695 $0 $11,695
1230052 980000 $250,000 $0 $250,000
$261,695 $0 $261,695
Location: Little Corona Beach
Proposed Expenses:
This project funds the design and construction of a system for dry weather flows from Buck Creek into an
infiltration gallery located under or within the beach sand. Design is prepared by a consultant.
Construction is performed by a contractor. A substantial portion of this work is funded by a grant from
Orange County Transportation Authority.
Little Corona Infiltration Gallery
FUNDING SOURCE
72
TOTAL
General Fund
Measure M Competitive
Category: Water Quality and Environmental Project No.:15X16
Project Manager: Bob Stein, 949-644-3322
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $1,500,000
Other $0
Total $1,500,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
13501 980000 $1,500,000 $0 $1,500,000
$1,500,000 $0 $1,500,000
Location: Newport Beach Golf Course, 3100 Irvine Avenue
73
TOTAL
Contributions
Proposed Expenses:
The City of Santa Ana is the lead agency for a diversion project on the Santa Ana Delhi Channel near
Mesa Drive. This project diverts dry-weather flows to a golf course lake or a sanitary sewer and
proposes to eliminate bacteria, metals and other pollutant loads from entering the bay. The cities of
Newport Beach and Costa Mesa and the County of Orange are partners on this project.
Santa Ana Delhi Regional Project
FUNDING SOURCE
Category: Water Quality and Environmental Project No.:15X17
Project Manager: Bob Stein, 949-644-3322
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $1,172,304
Other $0
Total $1,172,304
ORG OBJECT REBUDGET $BUDGET $TOTAL
10001 980000 $1,172,304 $0 $1,172,304
$1,172,304 $0 $1,172,304
Location: West Newport east of the Newport Shores community
Proposed Expenses:
This project obtains necessary permits and dredges approximately 5,000 to 10,000 cubic yards of
sediment from the southeast portion of the slough. Dredged material may need to be dewatered and sent
to an upland disposal site in lieu of beach disposal pending determination of the condition of the material.
Semeniuk Slough Dredging
FUNDING SOURCE
74
TOTAL
Tidelands Maintenance
Water
Pg Org Project Title Rebudget Budget Total
75 70201931 16W11 Balboa Island Water Main Replacement $152,650 $0 $152,650
76 70201931 16W12 Bay Crossing Main Replacement $300,000 $0 $300,000
77 70101 16W13 Big Canyon Reservoir Flow Metering / Treatment $591,359 $300,000 $891,359
78 70101 15W04 Dolphin and Tamura Shallow Wells Rehabilitation $462,625 $0 $462,625
79 70101 17R09 Grade Adjustments - Water Valves $0 $50,000 $50,000
80 70201931 16W14 Lido Village Water Main Replacement $59,520 $800,000 $859,520
81 70201931 15W02 Newport Boulevard Water Main $126,432 $0 $126,432
82 70101 15W03 SCADA System Upgrade $47,159 $0 $47,159
83 70201931 17W01 Water Main Master Plan Program $62,100 $500,000 $562,100
84 70101 17W02 Water Master Plan Update $0 $375,000 $375,000
Total Water $1,801,845 $2,025,000 $3,826,845
Category: Water Project No.:16W11
Project Manager: Alfred Castanon, 949-644-3314
Description:
2016-2017
Design/Environmental/Permits $152,650
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $152,650
ORG OBJECT REBUDGET $BUDGET $TOTAL
70201931 980000 $152,650 $0 $152,650
$152,650 $0 $152,650
Location: Balboa Island
75
TOTAL
Water Capital Distrib./Piping
Proposed Expenses:
This project replaces deteriorated distribution and transmission water mains on Balboa Island pursuant to
the Water Master Plan. The work includes enlargement of mains and improvements to the operational
efficiency of the water system and fire protection. Plans and specifications are prepared by City staff
and/or a consultant. Construction is performed by a private contractor in a future year.
Balboa Island Water Main Replacement
FUNDING SOURCE
Category: Water Project No.:16W12
Project Manager: Ben Davis, 949-644-3317
Description:
2016-2017
Design/Environmental/Permits $300,000
Right-of-Way/Acquisition $0
Construction $0
Other $0
Total $300,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
70201931 980000 $300,000 $0 $300,000
$300,000 $0 $300,000
Location: Newport Harbor
Proposed Expenses:
This project replaces deteriorating water transmission mains pursuant to the Water Master Plan and Bay
Crossing Water Transmission Study. This year's project begins the design, environmental and permitting
efforts to replace various bay crossings. These critical lines serve several island communities, such as
Balboa Island. Plans and specifications are prepared by a consultant. Construction is performed by a
private contractor.
Bay Crossing Main Replacement
FUNDING SOURCE
76
TOTAL
Water Capital Distrib./Piping
Category: Water Project No.:16W13
Project Manager: Ben Davis, 949-644-3317
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $891,359
Other $0
Total $891,359
ORG OBJECT REBUDGET $BUDGET $TOTAL
70101 980000 $591,359 $300,000 $891,359
$591,359 $300,000 $891,359
Location: Big Canyon Reservoir
77
TOTAL
Water Enterprise
Proposed Expenses:
This project constructs a flow metering vault over the existing 30 inch outlet transmission main from Big
Canyon Reservoir (BCR). This project also involves the installation of mixing devices to improve water
treatment from BCR. The project improves operations staff's ability to monitor disinfection levels of the
City's drinking water supply. Plans and specifications are prepared by a consultant. Construction is
performed by a private contractor.
Big Canyon Reservoir Flow Metering / Treatment
FUNDING SOURCE
Category: Water Project No.:15W04
Project Manager: Andy Tran, 949-644-3315
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $462,625
Other $0
Total $462,625
ORG OBJECT REBUDGET $BUDGET $TOTAL
70101 980000 $462,625 $0 $462,625
$462,625 $0 $462,625
Location:
Proposed Expenses:
This project continues rehabilitation of two City water wells in Fountain Valley. In recent years, the City
rehabilitated the deep aquifer well located at the Dolphin Avenue site and two shallow wells, one located
at the Dolphin site and the other at the Tamura School site. The water wells are rehabilitated on a
regular five to seven year cycle to maintain optimal capacity of the well water supply to the City.
Dolphin and Tamura Shallow Wells Rehabilitation
FUNDING SOURCE
78
TOTAL
Water Enterprise
Dolphin Avenue (north of Fountain Valley High School) and Tamura Elementary School
(17340 Santa Suzanne St, Fountain Valley)
Category: Water Project No.:17R09
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Design/Environmental/Permits $0 $0 $0 $0 $0
Right-of-Way/Acquisition $0 $0 $0 $0 $0
Construction $50,000 $50,000 $50,000 $50,000 $50,000
Other $0 $0 $0 $0 $0
Total $50,000 $50,000 $50,000 $50,000 $50,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
70101 980000 $0 $50,000 $50,000
$0 $50,000 $50,000
Location: Citywide
79
TOTAL
Water Enterprise
Proposed Expenses:
This project improves access covers on existing vaults and raises water valve boxes to grade. Priority is
given to work related to street resurfacing and reconstruction. This project may include a separate
contract to raise numerous existing valve boxes that are buried or paved over and to replace vault lids
throughout the water system.
Grade Adjustments - Water Valves
FUNDING SOURCE
Category: Water Project No.:16W14
Project Manager: Alfred Castanon, 949-644-3314
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $859,520
Other $0
Total $859,520
ORG OBJECT REBUDGET $BUDGET $TOTAL
70201931 980000 $59,520 $800,000 $859,520
$59,520 $800,000 $859,520
Location: Newport Boulevard from Channel Bridge to 19th Street
80
TOTAL
Water Capital Distrib./Piping
Proposed Expenses:
This project removes and replaces older cast iron water mains identified in the Water Master Plan in and
around the old City Hall site. First year funding provides for design only. Design efforts may include
mains on West Coast Highway related to the current Newport Force Main Project by Orange County
Sanitation District. Plans and specifications are prepared by consultant. Construction is performed by a
private contractor.
Lido Village Water Main Replacement
FUNDING SOURCE
Category: Water Project No.:15W02
Project Manager: Andy Tran, 949-644-3315
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $126,432
Other $0
Total $126,432
ORG OBJECT REBUDGET $BUDGET $TOTAL
70201931 980000 $126,432 $0 $126,432
$126,432 $0 $126,432
Location: Newport Boulevard from Channel Bridge to 19th Street
81
TOTAL
Water Capital Distrib./Piping
Proposed Expenses:
This project rehabilitates the 20-inch and 16-inch Transmission Main on Newport Boulevard from 19th
Street to the Channel Bridge identified in the Water Master Plan. Plans and specifications are prepared
by a consultant. Construction was completed by Summer 2016.
Newport Boulevard Water Main Replacement
FUNDING SOURCE
Category: Water Project No.:15W03
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $47,159
Total $47,159
ORG OBJECT REBUDGET $BUDGET $TOTAL
70101 980000 $47,159 $0 $47,159
$47,159 $0 $47,159
Location: Not applicable
82
TOTAL
Water Enterprise
Proposed Expenses:
The City has six water pumping stations, two water treatment facilities and 20 wastewater pump stations
all controlled by a computerized SCADA system. SCADA is an acronym for Supervisory Control And
Data Acquisition. The program allows operators to monitor and control critical utilities remotely 24 hours
a day. This project provided a full upgrade of the system to current technology.
SCADA System Upgrade
FUNDING SOURCE
Category: Water Project No.:17W01
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017
Design/Environmental/Permits $50,000
Right-of-Way/Acquisition $0
Construction $512,100
Other $0
Total $562,100
ORG OBJECT REBUDGET $BUDGET $TOTAL
70201931 980000 $62,100 $500,000 $562,100
$62,100 $500,000 $562,100
Location: Various
Proposed Expenses:
This project removes and replaces older cast iron water mains identified in the Water Master Plan. The
focus is on smaller segment replacements throughout the City which are considered based on repair and
maintenance histories. Plans and specifications are prepared by staff. Construction is performed by a
private contractor.
Water Main Master Plan Program
FUNDING SOURCE
83
TOTAL
Water Capital Distrib./Piping
Category: Water Project No.:17W02
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $375,000
Total $375,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
70101 980000 $0 $375,000 $375,000
$0 $375,000 $375,000
Location: Not applicable
84
TOTAL
Water Enterprise
Proposed Expenses:
This project provides funding for a comprehensive Water Master Plan Update. The study assesses
current and future needs within the City's water delivery system and lays out a planned approach for
future projects and funding options. The last Master Plan update was completed in 2009.
Water Master Plan Update
FUNDING SOURCE
Wastewater
Pg Org Project Title Rebudget Budget Total
85 71101 17R09 Grade Adjustments - Sewer Manhole Covers $0 $100,000 $100,000
86 13501 16S10 OCSD Sewer Trunk Project Inspection $41,164 $0 $41,164
87 71201 17S03 Sewer Main Lining and Repairs $303,659 $1,500,000 $1,803,659
Total Wastewater $344,823 $1,600,000 $1,944,823
Category: Wastewater Project No.:17R09
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Design/Environmental/Permits $0 $0 $0 $0 $0
Right-of-Way/Acquisition $0 $0 $0 $0 $0
Construction $100,000 $100,000 $100,000 $100,000 $100,000
Other $0 $0 $0 $0 $0
Total $100,000 $100,000 $100,000 $100,000 $100,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
71101 980000 $0 $100,000 $100,000
$0 $100,000 $100,000
Location: Citywide
85
TOTAL
Wastewater Enterprise
Proposed Expenses:
This project improves access covers on existing vaults and raises sewer manholes to grade. Priority is
given to work performed related to street resurfacing and reconstruction. This project may include a
separate contract to raise numerous existing manholes that are buried or paved over and to replace
and/or add sewer manholes in the system.
Grade Adjustments - Sewer Manhole Covers
FUNDING SOURCE
Category: Wastewater Project No.:16S10
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $41,164
Total $41,164
ORG OBJECT REBUDGET $BUDGET $TOTAL
13501 980000 $41,164 $0 $41,164
$41,164 $0 $41,164
Location: TBD
86
TOTAL
Contributions
Proposed Expenses:
As the Orange County Sanitation District (OCSD) worked to rehabilitate its regional sewer lines within the
City of Newport Beach, the project was supported with City oversight and contract inspection services.
The goal of this work was to minimize community impacts by reviewing plan changes, monitoring
construction schedules, and providing onsite traffic control coordination. These costs are funded by
OCSD.
OCSD Sewer Trunk Project Inspection
FUNDING SOURCE
Category: Wastewater Project No.:17S03
Project Manager: Alfred Castanon, 949-644-3314
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $1,803,659
Other $0
Total $1,803,659
ORG OBJECT REBUDGET $BUDGET $TOTAL
71201 980000 $303,659 $1,500,000 $1,803,659
$303,659 $1,500,000 $1,803,659
Location: Newport Heights and various
87
TOTAL
Wastewater Capital
Proposed Expenses:
This program funds repair projects and other priority projects identified in the Wastewater Master Plan.
Sewer line areas discovered to be damaged, deteriorated or problematic are packaged into projects so
that repairs can be made. Plans and specifications are prepared by consultants. Construction is
performed by a private contractor. Replacement of sewer laterals in the Newport Heights area is being
coordinated with alley work in this area.
Sewer Main Lining and Repairs
FUNDING SOURCE
Miscellaneous
Pg Org Project Title Rebudget Budget Total
88 01201928 16M15 Affordable Housing $599,574 $0 $599,574
89 51401 15M11 Arts and Culture Master Plan $64,685 $0 $64,685
90 65002 941006 Assessment District Engineering $0 $150,000 $150,000
91 53601 17A11 Assessment District Payment for City Parcels $0 $679,500 $679,500
92 01201928 15M12 Balboa Island Enhancements $188,640 $0 $188,640
93 01201928 16M17 Balboa Pier ADA Access for Fire Rings $60,000 $0 $60,000
94 01201928 15M13 Balboa Village Entry Arch Sign $179,756 $0 $179,756
95 12001 16M11 Balboa Village Façade Improvement Program $125,320 $0 $125,320
95 53501 16M11 Balboa Village Façade Improvement Program $34,792 $0 $34,792
96 53501 16M12 Balboa Village Wayfinding Improvements $370,000 $0 $370,000
97 70101 16M13 City Radio Tower $43,443 $0 $43,443
97 71101 16M13 City Radio Tower $14,481 $0 $14,481
97 75401 16M13 City Radio Tower $220,894 $0 $220,894
98 01201928 15M14 Local Coastal Program Plan Implementation $64,425 $0 $64,425
99 01201928 17M12 Slope Erosion Control / Enhancement $0 $325,000 $325,000
Total Miscellaneous $1,966,010 $1,154,500 $3,120,510
Category: Miscellaneous Project No.:16M15
Project Manager: Jaime Murillo, 949-644-3209
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $599,574
Total $599,574
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $599,574 $0 $599,574
$599,574 $0 $599,574
Location: Various locations
Proposed Expenses:
The City has an agreement with Habitat for Humanity Orange County to establish a critical home repair
program for lower income seniors. Staff estimates approximately 30 repair projects will be completed.
Affordable Housing
FUNDING SOURCE
88
TOTAL
General Fund
Category: Miscellaneous Project No.:15M11
Project Manager: Tim Hetherton, 949-717-3810
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $64,685
Total $64,685
ORG OBJECT REBUDGET $BUDGET $TOTAL
51401 980000 $64,685 $0 $64,685
$64,685 $0 $64,685
Location: Not applicable
89
TOTAL
Public Art / Cultural
Proposed Expenses:
A master plan for arts and culture in Newport Beach has been prepared and includes a comprehensive
review of potential and existing facilities, development of collections, possible governance structures, and
financial requirements to support plan elements.
Arts and Culture Master Plan
FUNDING SOURCE
Category: Miscellaneous
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $150,000
Total $150,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
65002 941006 $0 $150,000 $150,000
$0 $150,000 $150,000
Location: Not applicable
90
TOTAL
Assessment Engineering
Proposed Expenses:
This program funds professional services to assist with the coordination of several pending assessment
district formations for the purpose of undergrounding overhead utilities. In the event an assessment
district is formed, these costs are reassigned to the respective improvement fund.
Assessment District Engineering
FUNDING SOURCE
Category: Miscellaneous Project No.:17A11
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $679,500
Total $679,500
ORG OBJECT REBUDGET $BUDGET $TOTAL
53601 980000 $0 $679,500 $679,500
$0 $679,500 $679,500
Location: Not applicable
Proposed Expenses:
Two approved assessment districts include city parcels within district boundaries. Assessment District
No. 116 was approved on January 12, 2016 and includes costs for Channel Park ($294,670).
Assessment District No. 117 was approved on November 24, 2015 and includes costs for Old School
($45,062) and Begonia Park ($272,932).
Assessment District Payment for City Parcels
FUNDING SOURCE
91
TOTAL
Neighborhood Enhancement
Category: Miscellaneous Project No.:15M12
Project Manager: Mark Vukojevic, 949-644-3319
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $188,640
Total $188,640
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $188,640 $0 $188,640
$188,640 $0 $188,640
Location: Balboa Island
92
TOTAL
General Fund
Proposed Expenses:
This project designs and constructs landscape and streetscape improvements on Balboa Island.
Balboa Island Enhancements
FUNDING SOURCE
Balboa Island, 1921
Category: Miscellaneous Project No.:16M17
Project Manager: Peter Tauscher, 949-644-3316
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $60,000
Other $0
Total $60,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $60,000 $0 $60,000
$60,000 $0 $60,000
Location: Balboa Pier
93
TOTAL
General Fund
Proposed Expenses:
Coastal Development Permit No. 5-14-1213 require the City to provide ADA access improvements to fire
rings near Balboa Pier.
Balboa Pier ADA Access for Fire Rings
FUNDING SOURCE
Category: Miscellaneous Project No.:15M13
Project Manager: Eric Loke, 949-644-3336
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $179,756
Other $0
Total $179,756
ORG OBJECT REBUDGET $BUDGET $TOTAL
01001928 980000 $179,756 $0 $179,756
$179,756 $0 $179,756
Location: Balboa Boulevard between Adams Street and Palm Street
Proposed Expenses:
This project funds a monument entry arch sign over Balboa Boulevard welcoming visitors to the Balboa
Village area. It features a painted steel structure with LED luminaries on top of each pilaster. Illuminated
logo sign and letters are complimented with decorated shell and starfish details. Design is completed by
a consultant. Installation is performed by a private contractor.
Balboa Village Entry Arch Sign
FUNDING SOURCE
94
TOTAL
General Fund
Category: Miscellaneous Project No.:16M11
Project Manager: Brenda Wisneski, 949-644-3297
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $196,800
Total $196,800
ORG OBJECT REBUDGET $BUDGET $TOTAL
12001 980000 $125,320 $0 $125,320
53501 980000 $34,792 $0 $34,792
$160,112 $0 $160,112
Location: Balboa Village and Balboa Boulevard
Proposed Expenses:
The Balboa Village Facade Improvement Program was created to partner with private property owners to
rehabilitate commercial structures in Balboa Village and Balboa Boulevard. The aim of the program is to
promote property owners' investment in the rehabilitation of their buildings by offering financial grants to
make exterior building improvements. It is expected that the success of this program can lead to a
renewed sense of place for the community.
Balboa Village Façade Improvement Program
FUNDING SOURCE
95
TOTAL
CDBG
Balboa Village Parking Mgmt Dist.
Category: Streets and Drainage Project No.:16M12
Project Manager: Eric Loke, 949-644-3336
Description:
2016-2017
Design/Environmental/Permits $70,000
Right-of-Way/Acquisition $0
Construction $300,000
Other $0
Total $370,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
53501 980000 $370,000 $0 $370,000
$370,000 $0 $370,000
Location:
Proposed Expenses:
This project provides for a new wayfinding program in the public rights of way to assist residents,
commuters and visitors find destinations and attractions in Balboa Village. The project aims to integrate
navigational and communication tools to direct people to key places such as parking facilities, retail
centers, bicycle and pedestrian access routes and other amenities and also to improve movement for
pedestrians, cyclists and motorists.
Balboa Village Wayfinding Improvements
FUNDING SOURCE
96
TOTAL
Balboa Village Parking Mgmt Dist
Balboa Boulevard between Adams Street and Palm Street
Category: Miscellaneous Project No.:16M13
Project Manager: Michael Sinacori, 949-644-3342
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $278,818
Other $0
Total $278,818
ORG OBJECT REBUDGET $BUDGET $TOTAL
70101 980000 $43,443 $0 $43,443
71101 980000 $14,481 $0 $14,481
75401 980000 $220,894 $0 $220,894
$278,818 $0 $278,818
Location: 949 W. 16th Street
Proposed Expenses:
The City owns and operates a 320-foot radio communications tower located at the City Utilities
Yard in West Newport. The tower is a critical communications link used by City departments for
routine and emergency communications. Also, County of Orange relies on the tower for
emergency communications and is expected to help fund this project. This tower is due for
immediate rehabilitation.
City Radio Tower
FUNDING SOURCE
97
800 MHZ
TOTAL
Water Entreprise
Wastewater Enterprise
Category: Miscellaneous Project No.:15M14
Project Manager: Jim Campbell, 949-644-3210
Description:
2016-2017
Design/Environmental/Permits $0
Right-of-Way/Acquisition $0
Construction $0
Other $64,425
Total $64,425
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $64,425 $0 $64,425
$64,425 $0 $64,425
Location: Not applicable
Proposed Expenses:
The City has a certified Coastal Land Use Plan (LUP) and is completing approval of its Implementation
Plan (IP). Approximately 70 “Approval in Concepts” are processed each year. A certified LCP eliminates
the burden of obtaining coastal development permits from the Coastal Commission, reducing time and
expenses to develop in the community.
Local Coastal Program Plan Implementation
FUNDING SOURCE
98
TOTAL
General Fund
Category: Streets and Drainage Project No.:17M12
Project Manager: TBD
Description:
2016-2017
Design/Environmental/Permits $50,000
Right-of-Way/Acquisition $0
Construction $275,000
Other $0
Total $325,000
ORG OBJECT REBUDGET $BUDGET $TOTAL
01201928 980000 $0 $325,000 $325,000
$0 $325,000 $325,000
Location: Avon Street, Bayside Drive, Santa Ana Avenue and other locations
Proposed Expenses:
The program provides funding to design and construct improvements to slope areas idenified as high
maintenance or subject to erosion.
Slope Erosion Control and Enhancements
FUNDING SOURCE
99
TOTAL
General Fund
Project Fund Summary
Fund Org
012 General Fund Rebudget Budget Total
01201925 Facilities $0 $550,000 $550,000
01201926 Drainage $257,809 $500,000 $757,809
01201927 Streets $6,089,891 $3,305,000 $9,394,891
01201928 Miscellaneous $2,548,012 $595,000 $3,143,012
01201929 Parks $329,939 $600,000 $929,939
Total General Fund $9,225,651 $5,550,000 $14,775,651
Tide and Submerged Lands Rebudget Budget Total
100 10001 Tide and Submerged Lands - Maintenance $2,583,917 $1,400,000 $3,983,917
101 10101 Tide and Submerged Lands - Capital $1,266,925 $7,685,600 $8,952,525
Total Tide and Submerged Lands $3,850,842 $9,085,600 $12,936,442
120 CDBG Rebudget Budget Total
12001 CDBG $125,320 $0 $125,320
Total CDBG $125,320 $0 $125,320
121 Gas Tax Rebudget Budget Total
12101 Gas Tax $3,391,170 $1,475,200 $4,866,370
Total Gas Tax $3,391,170 $1,475,200 $4,866,370
Measure M Rebudget Budget Total
122 12201 Measure M Fair Share $3,325,707 $1,750,000 $5,075,707
123 1230052 Measure M Competitive - Water Quality $1,957,780 $0 $1,957,780
Total Measure M $5,283,487 $1,750,000 $7,033,487
Contributions Rebudget Budget Total
135 13501 Contributions $4,358,531 $0 $4,358,531
137 13701 PCH Relinquishment $140,132 $75,000 $215,132
138 13801 Environmental Contributions $890,000 $0 $890,000
Total Contributions $5,388,663 $75,000 $5,463,663
140 Transportation and Circulation Rebudget Budget Total
14001 Transportation and Circulation $210,880 $0 $210,880
Total Transportation and Circulation $210,880 $0 $210,880
FY 2016-2017 Adopted Budget
Fund Summary-1
Project Fund Summary
Fund Org FY 2016-2017 Adopted Budget
141 Building Excise Tax Rebudget Budget Total
14101 Building Excise Tax $500,000 $0 $500,000
Total Building Excise Tax $500,000 $0 $500,000
Major Facilities Financing Plan Rebudget Budget Total
511 51101 Civic Center $105,505 $0 $105,505
514 51401 Public Arts and Cultural Facilities $64,685 $0 $64,685
532 53201 Fire Stations $7,195,475 $1,394,900 $8,590,375
550 55001 West Newport Community Center $450,000 $0 $450,000
551 55101 Marina Park $125,000 $0 $125,000
561 56101 Sunset Ridge Park $95,044 $0 $95,044
562 56201 Parks and Community Centers $150,000 $0 $150,000
572 57201 Master Facilities Plan $150,000 $0 $150,000
Total Major Facilities Financing Plan $8,335,709 $1,394,900 $9,730,609
535 Balboa Village Parking Management District Rebudget Budget Total
53501 Balboa Village Parking Mgmt District $404,792 $90,000 $494,792
Total Balboa Village Parking Management District $404,792 $90,000 $494,792
536 Neighborhood Enhancement Rebudget Budget Total
53601 Neighborhood Enhancement $455,846 $1,739,500 $2,195,346
Total Neighborhood Enhancement $455,846 $1,739,500 $2,195,346
571 Facilities Maintenance Rebudget Budget Total
57101 Facilities Maintenance $949,786 $1,500,000 $2,449,786
Total Facilities Maintenance $949,786 $1,500,000 $2,449,786
650 Assessment Districts Rebudget Budget Total
65002 Assessment District $0 $150,000 $150,000
Total Assessment Districts $0 $150,000 $150,000
701 Water Enterprise Rebudget Budget Total
70101 Water Enterprise $1,144,586 $725,000 $1,869,586
Total Water Enterprise $1,144,586 $725,000 $1,869,586
Fund Summary-2
Project Fund Summary
Fund Org FY 2016-2017 Adopted Budget
702 Water Capital Rebudget Budget Total
70201931 Distribution and Piping $700,702 $1,300,000 $2,000,702
Total Water Capital $700,702 $1,300,000 $2,000,702
711 Wastewater Enterprise Rebudget Budget Total
71101 Wastewater Enterprise $14,481 $100,000 $114,481
Total Wastewater Enterprise $14,481 $100,000 $114,481
712 Wastewater Capital Rebudget Budget Total
71201 Wastewater Capital $303,659 $1,500,000 $1,803,659
Total Wastewater Capital $303,659 $1,500,000 $1,803,659
754 800 MhZ Rebudget Budget Total
75401 800 MhZ $220,894 $0 $220,894
Total 800 MhZ $220,894 $0 $220,894
Total for All CIP Projects $40,506,468 $26,435,200 $66,941,668
Fund Summary-3
Pg Project 01201925 - Facilities Rebudget Budget Total
8 17F12 Police Station Remodel $0 $550,000 $550,000
$0 $550,000 $550,000
Pg Project 01201926 - Drainage Rebudget Budget Total
72 15X14 Little Corona Infiltration Gallery $11,695 $0 $11,695
19 16L02 Median Landscape Turf Replacement $134,942 $0 $134,942
26 15D01 Storm Drain Evaluation and Repairs $0 $500,000 $500,000
27 17D11 Storm Drain / Water Quality Improvements $111,172 $0 $111,172
$257,809 $500,000 $757,809
Pg Project 01201927 - Streets Rebudget Budget Total
12 16R12 Bayside Drive Modification $350,000 $0 $350,000
33 15T02 Bristol Street Traffic Signal Synchronization $14,037 $0 $14,037
13 16R11 Concrete and Pavement Replacement Program $9,227 $0 $9,227
13 17R06 Concrete and Pavement Replacement Program $0 $400,000 $400,000
14 17R12 Corona del Mar Concrete Pavement Recon. $2,186,330 $0 $2,186,330
15 15R16 Irvine Avenue Pavement Rehabilitation $496,021 $0 $496,021
16 15L01 Landscape Enhancement Program $345,476 $0 $345,476
58 15T09 Lower Sunset View Park Extension Concept $285,652 $0 $285,652
18 17R13 Marine Avenue Rehabilitation $0 $250,000 $250,000
39 15T08 Newport Boulevard Traffic Signal Synchronization $20,120 $0 $20,120
21 15R18 Newport Heights Alley Reconstruction $1,755,341 $1,050,000 $2,805,341
22 15R19 Old Newport Blvd / West Coast Hwy Modifications $24,824 $0 $24,824
23 15R20 Park Avenue Bridge Over Grand Canal Replacement $92,717 $0 $92,717
25 17R04 Slurry Seal Program $0 $670,000 $670,000
29 17V01 Streetlight Master Plan Update $0 $40,000 $40,000
30 17V02 Streetlight Replacement Program $410,889 $0 $410,889
40 17T02 Traffic Management and Modernization $0 $350,000 $350,000
41 17T03 Traffic Signage, Striping and Marking $36,238 $45,000 $81,238
43 17T01 Traffic Signal Rehabilitation Program $0 $500,000 $500,000
31 15L15 West Coast Highway Landscaping $63,019 $0 $63,019
$6,089,891 $3,305,000 $9,394,891
Pg Project 01201928 - Miscellaneous Rebudget Budget Total
88 16M15 Affordable Housing $599,574 $0 $599,574
32 17T11 Arroyo Canyon Bike Trail $0 $250,000 $250,000
92 15M12 Balboa Island Enhancements $188,640 $0 $188,640
93 16M17 Balboa Pier ADA Access for Fire Rings $60,000 $0 $60,000
94 15M13 Balboa Village Entry Arch Sign $179,756 $0 $179,756
69 15X11 Bayview Heights Drainage / Runoff Treatment $6,238 $0 $6,238
70 17X11 Big Canyon Golf Course Pond Treatment $0 $20,000 $20,000
71 15X12 Big Canyon Rehabilitation Project $33,457 $0 $33,457
36 16T11 Coyote Canyon Bike Trail $40,000 $0 $40,000
98 15M14 Local Coastal Program Plan Implementation $64,425 $0 $64,425
38 15T06 Mariners Mile Hwy Configuration / Land Use Review $206,922 $0 $206,922
99 17M12 Slope Erosion Control / Enhancement $0 $325,000 $325,000
28 16V11 Streetlight LED Retrofit $1,169,000 $0 $1,169,000
$2,548,012 $595,000 $3,143,012
Project Listing by Funding Source
General Fund
Funding-1
Project Listing by Funding Source
Pg Project 01201929 - Parks Rebudget Budget Total
46 17P11 Back Bay View Park Enhancements $329,939 $0 $329,939
51 17P12 Bonita Canyon Sports Park Pickleball Court $0 $400,000 $400,000
67 17P14 Veterans Park Modifications $0 $200,000 $200,000
$329,939 $600,000 $929,939
Total General Fund $9,225,651 $5,550,000 $14,775,651
Pg Project 10001 - Tide and Submerged Lands - Maint Rebudget Budget Total
68 16X11 Arches Storm Drain Dry Weather Diversion $270,000 $0 $270,000
69 15X11 Bayview Heights Drainage / Runoff Treatment $30,000 $0 $30,000
50 17H04 Beach and Bay Sand Management (S.A. River)$0 $500,000 $500,000
53 15H14 Eelgrass Survey $75,000 $0 $75,000
60 17P15 Newport Elementary School Park Maintenance $0 $250,000 $250,000
61 16H14 Newport Pier Building Platform and Piles $998,233 $0 $998,233
62 17H03 Ocean Piers Inspection and Maintenance $0 $500,000 $500,000
64 15H18 Seawall and Bulkhead Repairs $38,380 $0 $38,380
74 15X17 Semeniuk Slough Dredging $1,172,304 $0 $1,172,304
66 17H05 Surfside Sunset Coastal Sand Replenishment $0 $150,000 $150,000
$2,583,917 $1,400,000 $3,983,917
Pg Project 10101 - Tide and Submerged Lands - Capital Rebudget Budget Total
45 16H11 American Legion Bulkhead $300,000 $700,000 $1,000,000
47 17H11 Balboa Island Seawall Cap (North and South Sides)$0 $2,000,000 $2,000,000
48 15H11 Balboa Island Seawall Replacement - West End $539,925 $4,523,600 $5,063,525
49 15H12 Balboa Marina Public Pier $48,000 $0 $48,000
52 17H12 Central Ave Public Pier / Street End Improvement $0 $300,000 $300,000
54 16H12 Grand Canal Dredging $229,000 $132,000 $361,000
55 17H13 Harbor Capital Projects Finance Plan $0 $30,000 $30,000
56 16H13 Harbor Tide Gauge $50,000 $0 $50,000
57 15P13 Lower Castaways Park $100,000 $0 $100,000
$1,266,925 $7,685,600 $8,952,525
Total Tide and Submerged Lands $3,850,842 $9,085,600 $12,936,442
Pg Project 12001 - CDBG Rebudget Budget Total
95 16M11 Balboa Village Façade Improvement Program $125,320 $0 $125,320
$125,320 $0 $125,320
Total CDBG $125,320 $0 $125,320
General Fund continued
Tide and Submerged Lands
Community Development Block Grant (CDBG)
Funding-2
Project Listing by Funding Source
Pg Project 12101 - Gas Tax Rebudget Budget Total
10 15R11 15th Street / Balboa Boulevard Reconstruction $451,214 $0 $451,214
12 16R12 Bayside Drive Modification $0 $900,000 $900,000
34 17T12 Coast Highway Traffic Signal Synchronization $0 $550,000 $550,000
15 15R16 Irvine Avenue Pavement Rehabilitation $938,227 $0 $938,227
20 15R17 Newport Boulevard / 32nd St Modification $542,979 $0 $542,979
22 15R19 Old Newport Blvd / West Coast Hwy Modifications $0 $25,200 $25,200
24 15R02 Residential Street Rehabilitation Program $1,445,129 $0 $1,445,129
42 15T11 Traffic Signal Modernization: Phase 8 $13,621 $0 $13,621
$3,391,170 $1,475,200 $4,866,370
Total Gas Tax $3,391,170 $1,475,200 $4,866,370
Pg Project 12201 - Measure M Fair Share Rebudget Budget Total
12 16R12 Bayside Drive Modification $0 $1,750,000 $1,750,000
17 15R27 MacArthur Boulevard Pavement Rehabilitation $1,099,707 $0 $1,099,707
24 15R02 Residential Street Rehabilitation Program $2,226,000 $0 $2,226,000
$3,325,707 $1,750,000 $5,075,707
Pg Project 1230052 - M2 Competitive - Water Quality Rebudget Budget Total
69 15X11 Bayview Heights Drainage / Runoff Treatment $275,000 $0 $275,000
71 15X12 Big Canyon Rehabilitation Project $1,432,780 $0 $1,432,780
72 15X14 Little Corona Infiltration Gallery $250,000 $0 $250,000
$1,957,780 $0 $1,957,780
Total Measure M $5,283,487 $1,750,000 $7,033,487
Pg Project 13501 - Contributions Rebudget Budget Total
44 15H24 Abandoned Watercraft Abatement $61,200 $0 $61,200
71 15X12 Big Canyon Rehabilitation Project $653,255 $0 $653,255
17 15R27 MacArthur Boulevard Pavement Rehabilitation $1,000,000 $0 $1,000,000
86 16S10 OCSD Sewer Trunk Project Inspection $41,164 $0 $41,164
23 15R20 Park Avenue Bridge Over Grand Canal Replacement $1,102,912 $0 $1,102,912
73 15X16 Santa Ana Delhi Regional Project $1,500,000 $0 $1,500,000
$4,358,531 $0 $4,358,531
Pg Project 13701 - PCH Relinquishment Rebudget Budget Total
37 15T04 East Coast Highway Traffic Signal Rehabilitation $140,132 $75,000 $215,132
$140,132 $75,000 $215,132
Pg Project 13801 - Environmental Contributions Rebudget Budget Total
68 16X11 Arches Storm Drain Dry Weather Diversion $890,000 $0 $890,000
$890,000 $0 $890,000
Total Contributions $5,388,663 $75,000 $5,463,663
Gas Tax
Measure M
Contributions
Funding-3
Project Listing by Funding Source
Pg Project 14001 - Transportation and Circulation Rebudget Budget Total
35 16T11 Corona del Mar Bypass Plan Studies $50,000 $0 $50,000
39 15T08 Newport Boulevard Traffic Signal Synchronization $40,000 $0 $40,000
42 15T11 Traffic Signal Modernization: Phase 8 $120,880 $0 $120,880
$210,880 $0 $210,880
Total Transportation and Circulation $210,880 $0 $210,880
Pg Project 14101 - Building Excise Tax Rebudget Budget Total
63 16P12 Park Walls and Staircases Rehabilitation $500,000 $0 $500,000
$500,000 $0 $500,000
Total Building Excise Tax $500,000 $0 $500,000
Pg Project 51101 - Civic Center Rebudget Budget Total
1 15F21 Civic Center OCIP Loss Claims / Warranty $105,505 $0 $105,505
$105,505 $0 $105,505
Pg Project 51401 - Public Art and Cultural Facilities Rebudget Budget Total
89 15M11 Arts and Culture Master Plan $64,685 $0 $64,685
$64,685 $0 $64,685
Pg Project 53201 - Fire Stations Rebudget Budget Total
2 15F12 Corona del Mar Fire Station No. 5 / Library Replc.$5,845,475 $1,144,900 $6,990,375
5 15F13 Lido Fire Station No. 2 Replacement $350,000 $250,000 $600,000
6 16F11 Mariners Fire Station No. 6 Apparatus Bay $1,000,000 $0 $1,000,000
$7,195,475 $1,394,900 $8,590,375
Pg Project 55001 - West Newport Community Center Rebudget Budget Total
9 15F17 West Newport Community Center $450,000 $0 $450,000
$450,000 $0 $450,000
Pg Project 55101 - Marina Park Rebudget Budget Total
59 15P14 Marina Park $125,000 $0 $125,000
$125,000 $0 $125,000
Pg Project 56101 - Sunset Ridge Park Rebudget Budget Total
65 17P13 Sunset Ridge Park Access Improvements $95,044 $0 $95,044
$95,044 $0 $95,044
Pg Project 56201 - Parks and Community Centers Rebudget Budget Total
58 15T09 Lower Sunset View Park Extension Concept $150,000 $0 $150,000
$150,000 $0 $150,000
Pg Project 57201 - Master Facilities Plan Rebudget Budget Total
7 15F01 Master Facilities Plan Strategic Planning $150,000 $0 $150,000
$150,000 $0 $150,000
Total Major Facilities Financing Plan $8,335,709 $1,394,900 $9,730,609
Transportation and Circulation
Building Excise Tax
Major Facilities Financing Plan
Funding-4
Project Listing by Funding Source
Pg Project 53501 - Balboa Village Parking District Rebudget Budget Total
95 16M11 Balboa Village Façade Improvement Program $34,792 $0 $34,792
11 17R11 Balboa Village Streetscape Improvements $0 $90,000 $90,000
97 16M12 Balboa Village Wayfinding Improvements $370,000 $0 $370,000
$404,792 $90,000 $494,792
Total Balboa Village Parking District $404,792 $90,000 $494,792
Pg Project 53601 - Neighborhood Enhancement Rebudget Budget Total
91 17A11 Assessment District Payment for City Parcels $0 $679,500 $679,500
15 15R16 Irvine Avenue Pavement Rehabilitation $0 $500,000 $500,000
38 15T06 Mariners Mile Hwy Configuration / Land Use Review $0 $60,000 $60,000
19 16L02 Median Landscape Turf Replacement $455,846 $500,000 $955,846
$455,846 $1,739,500 $2,195,346
Total Neighborhood Enhancement $455,846 $1,739,500 $2,195,346
Pg Project 57101 - Facilities Maintenance Rebudget Budget Total
3 17F02 Facilities Maintenance Master Plan Program $949,786 $1,200,000 $2,149,786
4 17F11 Fire Station Remodels $0 $300,000 $300,000
$949,786 $1,500,000 $2,449,786
Total Facilities Maintenance $949,786 $1,500,000 $2,449,786
Pg Project 65002 - Assessment Districts Rebudget Budget Total
90 941006 Assessment District Engineering $0 $150,000 $150,000
$0 $150,000 $150,000
Total Assessment Districts $0 $150,000 $150,000
Pg Project 70101 - Water Enterprise Rebudget Budget Total
77 16W13 Big Canyon Reservoir Flow Metering / Treatment $591,359 $300,000 $891,359
97 16M13 City Radio Tower $43,443 $0 $43,443
78 15W04 Dolphin and Tamura Shallow Wells Rehabilitation $462,625 $0 $462,625
79 17R09 Grade Adjustments - Water Valves $0 $50,000 $50,000
82 15W03 SCADA System Upgrade $47,159 $0 $47,159
84 17W02 Water Master Plan Update $0 $375,000 $375,000
$1,144,586 $725,000 $1,869,586
Balboa Village Parking Management District
Neighborhood Enhancement
Facilities Maintenance
Assessment Districts
Water Fund
Funding-5
Project Listing by Funding Source
Pg Project 70201931 - Capital Distribution and Piping Rebudget Budget Total
75 16W11 Balboa Island Water Main Replacement $152,650 $0 $152,650
76 16W12 Bay Crossing Main Replacement $300,000 $0 $300,000
80 16W14 Lido Village Water Main Replacement $59,520 $800,000 $859,520
81 15W02 Newport Boulevard Water Main Replacement $126,432 $0 $126,432
83 17W01 Water Main Master Plan Program $62,100 $500,000 $562,100
$700,702 $1,300,000 $2,000,702
Total Water Fund $1,845,288 $2,025,000 $3,870,288
Pg Project 71101 - Wastewater Enterprise Rebudget Budget Total
97 16M13 City Radio Tower $14,481 $0 $14,481
85 17R09 Grade Adjustments - Sewer Manhole Covers $0 $100,000 $100,000
$14,481 $100,000 $114,481
Pg Project 71201 - Wastewater Capital Rebudget Budget Total
86 17S03 Sewer Main Lining and Repairs $303,659 $1,500,000 $1,803,659
$303,659 $1,500,000 $1,803,659
Total Wastewater Fund $318,140 $1,600,000 $1,918,140
Pg Project 75401 - 800 MhZ Rebudget Budget Total
97 16M13 City Radio Tower $220,894 $0 $220,894
$220,894 $0 $220,894
Total 800 MhZ $220,894 $0 $220,894
Total for All Funds $40,506,468 $26,435,200 $66,941,668
800 MHZ
Wastewater Fund
Water Fund continued
Funding-6
Project Listing by Category
Facilities
Pg Org Project Title Rebudget Budget Total
1 51101 15F21 Civic Center OCIP Loss Claims / Warranty $105,505 $0 $105,505
2 53201 15F12 Corona del Mar Fire Station No. 5 / Library Replc.$5,845,475 $1,144,900 $6,990,375
3 57101 17F02 Facilities Maintenance Master Plan Program $949,786 $1,200,000 $2,149,786
4 57101 17F11 Fire Station Remodels $0 $300,000 $300,000
5 53201 15F13 Lido Fire Station No. 2 Replacement $350,000 $250,000 $600,000
6 53201 16F11 Mariners Fire Station No. 6 Apparatus Bay $1,000,000 $0 $1,000,000
7 57201 15F01 Master Facilities Plan Strategic Planning $150,000 $0 $150,000
8 01201925 17F12 Police Station Remodel $0 $550,000 $550,000
9 55001 15F17 West Newport Community Center $450,000 $0 $450,000
Total Facilities $8,850,766 $3,444,900 $12,295,666
Streets and Drainage
Pg Org Project Title Rebudget Budget Total
10 12101 15R11 15th Street / Balboa Boulevard Reconstruction $451,214 $0 $451,214
11 53501 17R11 Balboa Village Streetscape Improvements $0 $90,000 $90,000
12 01201927 16R12 Bayside Drive Modification $350,000 $0 $350,000
12 12101 16R12 Bayside Drive Modification $0 $900,000 $900,000
12 12201 16R12 Bayside Drive Modification $0 $1,750,000 $1,750,000
13 01201927 16R11 Concrete and Pavement Replacement Program $9,227 $0 $9,227
13 01201927 17R06 Concrete and Pavement Replacement Program $0 $400,000 $400,000
14 01201927 17R12 Corona del Mar Concrete Pavement Recon. $2,186,330 $0 $2,186,330
15 01201927 15R16 Irvine Avenue Pavement Rehabilitation $496,021 $0 $496,021
15 12101 15R16 Irvine Avenue Pavement Rehabilitation $938,227 $0 $938,227
15 53601 15R16 Irvine Avenue Pavement Rehabilitation $0 $500,000 $500,000
16 01201927 15L01 Landscape Enhancement Program $345,476 $0 $345,476
17 12201 15R27 MacArthur Boulevard Pavement Rehabilitation $1,099,707 $0 $1,099,707
17 13501 15R27 MacArthur Boulevard Pavement Rehabilitation $1,000,000 $0 $1,000,000
18 01201927 17R13 Marine Avenue Rehabilitation $0 $250,000 $250,000
19 01201926 16L02 Median Landscape Turf Replacement $134,942 $0 $134,942
19 53601 16L02 Median Landscape Turf Replacement $455,846 $500,000 $955,846
20 12101 15R17 Newport Boulevard / 32nd St Modification $542,979 $0 $542,979
21 01201927 15R18 Newport Heights Alley Reconstruction $1,755,341 $1,050,000 $2,805,341
22 01201927 15R19 Old Newport Blvd / West Coast Hwy Modifications $24,824 $0 $24,824
22 12101 15R19 Old Newport Blvd / West Coast Hwy Modifications $0 $25,200 $25,200
23 01201927 15R20 Park Avenue Bridge Over Grand Canal Replacement $92,717 $0 $92,717
23 13501 15R20 Park Avenue Bridge Over Grand Canal Replacement $1,102,912 $0 $1,102,912
24 12101 15R02 Residential Street Rehabilitation Program $1,445,129 $0 $1,445,129
24 12201 15R02 Residential Street Rehabilitation Program $2,226,000 $0 $2,226,000
25 01201927 17R04 Slurry Seal Program $0 $670,000 $670,000
26 01201926 15D01 Storm Drain Evaluation and Repairs $111,172 $0 $111,172
27 01201926 17D11 Storm Drain / Water Quality Improvements $0 $500,000 $500,000
28 01201928 16V11 Streetlight LED Retrofit $1,169,000 $0 $1,169,000
29 01201927 17V01 Streetlight Master Plan Update $0 $40,000 $40,000
30 01201927 17V02 Streetlight Replacement Program $410,889 $0 $410,889
31 01201927 15L15 West Coast Highway Landscaping $63,019 $0 $63,019
Total Streets and Drainage $16,410,972 $6,675,200 $23,086,172
Category-1
Transportation
Pg Org Project Title Rebudget Budget Total
32 01201928 17T11 Arroyo Canyon Bike Trail $0 $250,000 $250,000
33 01201927 15T02 Bristol Street Traffic Signal Synchronization $14,037 $0 $14,037
34 12101 17T12 Coast Highway Traffic Signal Synchronization $0 $550,000 $550,000
35 14001 16T11 Corona del Mar Bypass Plan Studies $50,000 $0 $50,000
36 01201928 16T12 Coyote Canyon Bike Trail $40,000 $0 $40,000
37 13701 15T04 East Coast Highway Traffic Signal Rehabilitation $140,132 $75,000 $215,132
38 01201928 15T06 Mariners Mile Hwy Configuration / Land Use Review $206,922 $0 $206,922
38 53601 15T06 Mariners Mile Hwy Configuration / Land Use Review $0 $60,000 $60,000
39 01201927 15T08 Newport Boulevard Traffic Signal Synchronization $20,120 $0 $20,120
39 14001 15T08 Newport Boulevard Traffic Signal Synchronization $40,000 $0 $40,000
40 01201927 17T02 Traffic Management and Modernization $0 $350,000 $350,000
41 01201927 17T03 Traffic Signage, Striping and Marking $36,238 $45,000 $81,238
42 12101 15T11 Traffic Signal Modernization: Phase 8 $13,621 $0 $13,621
42 14001 15T11 Traffic Signal Modernization: Phase 8 $120,880 $0 $120,880
43 01201927 17T01 Traffic Signal Rehabilitation Program $0 $500,000 $500,000
Total Transportation $681,950 $1,830,000 $2,511,950
Parks, Harbors and Beaches
Pg Org Project Title Rebudget Budget Total
44 13501 15H24 Abandoned Watercraft Abatement $61,200 $0 $61,200
45 10101 16H11 American Legion Bulkhead $300,000 $700,000 $1,000,000
46 01201929 17P11 Back Bay View Park Enhancements $329,939 $0 $329,939
47 10101 17H11 Balboa Island Seawall Cap (North and South Sides)$0 $2,000,000 $2,000,000
48 10101 15H11 Balboa Island Seawall Replacement - West End $539,925 $4,523,600 $5,063,525
49 10101 15H12 Balboa Marina Public Pier $48,000 $0 $48,000
50 10001 17H04 Beach and Bay Sand Management (S.A. River)$0 $500,000 $500,000
51 01201929 17P12 Bonita Canyon Sports Park Pickleball Court $0 $400,000 $400,000
52 10101 17H12 Central Ave Public Pier / Street End Improvement $0 $300,000 $300,000
53 10001 15H14 Eelgrass Survey $75,000 $0 $75,000
54 10101 16H12 Grand Canal Dredging $229,000 $132,000 $361,000
55 10101 17H13 Harbor Capital Projects Finance Plan $0 $30,000 $30,000
56 10101 16H13 Harbor Tide Gauge $50,000 $0 $50,000
57 10101 15P13 Lower Castaways Park $100,000 $0 $100,000
58 01201927 15T09 Lower Sunset View Park Extension Concept $285,652 $0 $285,652
58 56201 15T09 Lower Sunset View Park Extension Concept $150,000 $0 $150,000
59 55101 15P14 Marina Park $125,000 $0 $125,000
60 10001 17P15 Newport Elementary School Park Maintenance $0 $250,000 $250,000
61 10001 16H14 Newport Pier Building Platform and Piles $998,233 $0 $998,233
62 10001 17H03 Ocean Piers Inspection and Maintenance $0 $500,000 $500,000
63 14101 16P12 Park Walls and Staircases Rehabilitation $500,000 $0 $500,000
64 10001 15H18 Seawall and Bulkhead Repairs $38,380 $0 $38,380
65 56101 17P13 Sunset Ridge Park Access Improvements $95,044 $0 $95,044
66 10001 17H05 Surfside Sunset Coastal Sand Replenishment $0 $150,000 $150,000
67 01201929 17P14 Veterans Park Modifications $0 $200,000 $200,000
Total Parks, Harbors and Beaches $3,925,373 $9,685,600 $13,610,973
Category-2
Water Quality and Environmental
Pg Org Project Title Rebudget Budget Total
68 10001 16X11 Arches Storm Drain Dry Weather Diversion $270,000 $0 $270,000
68 13801 16X11 Arches Storm Drain Dry Weather Diversion $890,000 $0 $890,000
69 01201928 15X11 Bayview Heights Drainage / Runoff Treatment $6,238 $0 $6,238
69 10001 15X11 Bayview Heights Drainage / Runoff Treatment $30,000 $0 $30,000
69 1230052 15X11 Bayview Heights Drainage / Runoff Treatment $275,000 $0 $275,000
70 01201928 17X11 Big Canyon Golf Course Pond Treatment $0 $20,000 $20,000
71 01201928 15X12 Big Canyon Rehabilitation Project $33,457 $0 $33,457
71 1230052 15X12 Big Canyon Rehabilitation Project $1,432,780 $0 $1,432,780
71 13501 15X12 Big Canyon Rehabilitation Project $653,255 $0 $653,255
72 01201926 15X14 Little Corona Infiltration Gallery $11,695 $0 $11,695
72 1230052 15X14 Little Corona Infiltration Gallery $250,000 $0 $250,000
73 13501 15X16 Santa Ana Delhi Regional Project $1,500,000 $0 $1,500,000
74 10001 15X17 Semeniuk Slough Dredging $1,172,304 $0 $1,172,304
Total Water Quality and Environmental $6,524,729 $20,000 $6,544,729
Water
Pg Org Project Title Rebudget Budget Total
75 70201931 16W11 Balboa Island Water Main Replacement $152,650 $0 $152,650
76 70201931 16W12 Bay Crossing Main Replacement $300,000 $0 $300,000
77 70101 16W13 Big Canyon Reservoir Flow Metering / Treatment $591,359 $300,000 $891,359
78 70101 15W04 Dolphin and Tamura Shallow Wells Rehabilitation $462,625 $0 $462,625
79 70101 17R09 Grade Adjustments - Water Valves $0 $50,000 $50,000
80 70201931 16W14 Lido Village Water Main Replacement $59,520 $800,000 $859,520
81 70201931 15W02 Newport Boulevard Water Main $126,432 $0 $126,432
82 70101 15W03 SCADA System Upgrade $47,159 $0 $47,159
83 70201931 17W01 Water Main Master Plan Program $62,100 $500,000 $562,100
84 70101 17W02 Water Master Plan Update $0 $375,000 $375,000
Total Water $1,801,845 $2,025,000 $3,826,845
Wastewater
Pg Org Project Title Rebudget Budget Total
85 71101 17R09 Grade Adjustments - Sewer Manhole Covers $0 $100,000 $100,000
86 13501 16S10 OCSD Sewer Trunk Project Inspection $41,164 $0 $41,164
87 71201 17S03 Sewer Main Lining and Repairs $303,659 $1,500,000 $1,803,659
Total Wastewater $344,823 $1,600,000 $1,944,823
Miscellaneous
Pg Org Project Title Rebudget Budget Total
88 01201928 16M15 Affordable Housing $599,574 $0 $599,574
89 51401 15M11 Arts and Culture Master Plan $64,685 $0 $64,685
90 65002 941006 Assessment District Engineering $0 $150,000 $150,000
91 53601 17A11 Assessment District Payment for City Parcels $0 $679,500 $679,500
92 01201928 15M12 Balboa Island Enhancements $188,640 $0 $188,640
93 01201928 16M17 Balboa Pier ADA Access for Fire Rings $60,000 $0 $60,000
94 01201928 15M13 Balboa Village Entry Arch Sign $179,756 $0 $179,756
95 12001 16M11 Balboa Village Façade Improvement Program $125,320 $0 $125,320
95 53501 16M11 Balboa Village Façade Improvement Program $34,792 $0 $34,792
96 53501 16M12 Balboa Village Wayfinding Improvements $370,000 $0 $370,000
Category-3
Miscellaneous continued
Pg Org Project Title Rebudget Total
97 70101 16M13 City Radio Tower $43,443 $0 $43,443
97 71101 16M13 City Radio Tower $14,481 $0 $14,481
97 75401 16M13 City Radio Tower $220,894 $0 $220,894
98 01201928 15M14 Local Coastal Program Plan Implementation $64,425 $0 $64,425
99 01201928 17M12 Slope Erosion Control / Enhancement $0 $325,000 $325,000
Total Miscellaneous $1,966,010 $1,154,500 $3,120,510
Total for All Categories $40,506,468 $26,435,200 $66,941,668
Category-4
Source Master Plan Documents
Bicycle Master Plan BMP Pavement Management Program PMP
Facilities Maintenance Plan FMMP Sewer Master Plan SMP
General Plan & Circulation Element GP/Cir Street Light Master Plan StLight
Facilities Financing Plan MFFP 5 Year Tideland Capital Plan TCP
Master Plan of Drainage MPD Traffic Signal Modernization & Rehab Plan TSM
Not Applicable na Water Master Plan WMP
Watershed Plan WP
FACILITIES Source FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
Civic Center OCIP Loss Claims / Warranty MFFP 105,505$ -$ -$ -$ -$ 105,505$
Corporate Yards Consolidation Phase 1 MFFP -$ -$ -$ 4,000,000$ -$ 4,000,000$
Facilities Maintenance Master Plan Program FMMP 2,149,786$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 8,149,786$
Fire Station No. 1 / Library Replc. (Peninsula)MFFP -$ -$ -$ 6,100,000$ -$ 6,100,000$
Fire Station No. 2 Replacement (Lido)MFFP 600,000$ 7,400,000$ -$ -$ -$ 8,000,000$
Fire Station No. 5 / Library Replacement (CdM) MFFP 6,990,375$ -$ -$ -$ -$ 6,990,375$
Fire Station No. 6 Apparatus Bay (Mariners)MFFP 1,000,000$ -$ -$ -$ -$ 1,000,000$
Fire Station Remodels FMMP 300,000$ -$ -$ -$ -$ 300,000$
Girls & Boys Club at Eastbluff Park Design MFFP -$ -$ -$ 678,500$ -$ 678,500$
Master Facilities Plan Strategic Planning na 150,000$ -$ -$ -$ -$ 150,000$
Police Station Remodel na 550,000$ -$ -$ -$ -$ 550,000$
West Newport Community Center MFFP 450,000$ 1,050,000$ 11,750,000$ 11,750,000$ -$ 25,000,000$
Total Facilities 12,295,666$ 9,950,000$ 13,250,000$ 24,028,500$ 1,500,000$ 61,024,166$
City of Newport Beach
Capital Improvement Program Five Year Look Ahead
FY 2016-17 through FY 2020-21
The following is a summary of adopted and estimated capital expenditures for the next five years. It does not show project allocations approved in
previous Capital Improvement Program budgets, however, carryovers are shown in the first year of the plan. The five-year look ahead is a
combination of needs analysis, project planning, timing and anticipated financing. Typically, projects are financed on a pay-as-you-go basis from
available balances of various funding sources. Supporting master plan documents are notated in the column marked Source. Also, the five-year
look ahead is a planning tool for discussion purposes, is subject to change and does not represent funding commitments beyond the current year.
Cost estimates are presented at current value / current dollars and are not escalated for inflation.
CIP 5 Year Look Ahead 1 July, 2016
STREETS / DRAINAGE Source FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
15th St and Balboa Blvd Reconstruction PMP 451,214$ -$ -$ -$ -$ 451,214$
Balboa Village Streetscape Improvements na 90,000$ -$ 1,500,000$ -$ 140,000$ 1,730,000$
Concrete Replacement Program PMP 409,227$ 400,000$ 400,000$ 400,000$ 400,000$ 2,009,227$
Concrete Streets Replacement Program PMP -$ 1,000,000$ 2,500,000$ 2,500,000$ 2,500,000$ 8,500,000$
Concrete Streets Reconstruction - Corona del Mar PMP 2,186,330$ 1,500,000$ -$ -$ -$ 3,686,330$
Concrete Streets Rehabilitation - Marine Avenue na 250,000$ 250,000$ TBD -$ -$ 500,000$
Landscape Enhancement Program na 345,476$ -$ -$ -$ -$ 345,476$
Median Landscape Turf Replacement Turf 1,090,788$ 300,000$ 150,000$ -$ -$ 1,540,788$
Newport Blvd 32nd St Modification PMP 542,979$ -$ -$ -$ -$ 542,979$
Newport Heights Alley Reconstruction PMP 2,805,341$ -$ -$ -$ -$ 2,805,341$
Old Newport Blvd / West Coast Hwy Modifications PMP 50,024$ -$ -$ -$ -$ 50,024$
Park Ave Bridge Over Grand Canal Replacement PMP 1,195,629$ -$ -$ -$ -$ 1,195,629$
Residential Street Rehabilitation Program PMP 3,671,129$ 2,940,000$ 1,864,000$ 3,444,000$ 1,544,685$ 13,463,814$
Slurry Seal Program PMP 670,000$ 637,000$ 712,000$ 698,000$ 724,000$ 3,441,000$
Storm Drain Evaluation and Repairs MPD 111,172$ -$ -$ -$ -$ 111,172$
Storm Drain and Water Quality Improvements MPD 500,000$ 500,000$ -$ -$ -$ 1,000,000$
Street Overlay Program PMP -$ 4,025,000$ 4,399,000$ 2,056,000$ 5,352,000$ 15,832,000$
Street Overlay - Bayside Dr Modification PMP 3,000,000$ -$ -$ -$ -$ 3,000,000$
Street Overlay - Irvine Ave Pavement Rehabilitation PMP 1,934,248$ -$ -$ -$ -$ 1,934,248$
Street Overlay - MacArthur Blvd Pavement Rehabilitation PMP 2,099,707$ -$ -$ -$ -$ 2,099,707$
Streetlight Master Plan and Projects StLight 40,000$ 600,000$ 600,000$ 600,000$ 600,000$ 2,440,000$
Streetlight Replacement Program StLight 410,889$ -$ -$ -$ -$ 410,889$
Streetlight Retrofit StLight 1,169,000$ -$ -$ -$ -$ 1,169,000$
West Coast Highway Landscaping na 63,019$ 2,600,000$ -$ -$ -$ 2,663,019$
Total Streets and Drainage 23,086,172$ 14,752,000$ 12,125,000$ 9,698,000$ 11,260,685$ 70,921,857$
CIP 5 Year Look Ahead 2 July, 2016
TRANSPORTATION Source FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
Arroyo Creek Bike Trail na 250,000$ TBD -$ -$ -$ 250,000$
Bicycle Programming and Improvements BMP -$ TBD -$ -$ -$ -$
Corona del Mar Bypass Plan Studies na 50,000$ -$ -$ -$ -$ 50,000$
Coyote Canyon Bike Trail na 40,000$ -$ -$ -$ -$ 40,000$
Mariners Mile Hwy Configuration / Land Use Review na 266,922$ -$ -$ -$ -$ 266,922$
Traffic Management and Modernization TSM 350,000$ -$ 350,000$ -$ 350,000$ 1,050,000$
Traffic Signage, Striping and Marking na 81,238$ 50,000$ 50,000$ 50,000$ 50,000$ 281,238$
Traffic Signal Modernization - Ph 8 TSM 134,501$ -$ -$ -$ -$ 134,501$
Traffic Signal Rehabilitation - East Coast Hwy na 215,132$ -$ -$ -$ -$ 215,132$
Traffic Signal Rehabilitation Program na 500,000$ 400,000$ 400,000$ 400,000$ 400,000$ 2,100,000$
Traffic Signal Synchronization - Bristol St na 14,037$ -$ -$ -$ -$ 14,037$
Traffic Signal Synchronization - Newport Blvd na 60,120$ -$ -$ -$ -$ 60,120$
Traffic Signal Synchronization - Coast Hwy na 550,000$ -$ -$ -$ -$ 550,000$
Total Transportation 2,511,950$ 450,000$ 800,000$ 450,000$ 800,000$ 5,011,950$
WATER QUALITY / ENVIRONMENTAL Source FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
Arches Storm Drain Dry Weather Diversion TCP 1,160,000$ -$ -$ -$ -$ 1,160,000$
Bayview Heights Drainage / Runoff Treatment WP 311,238$ -$ -$ -$ -$ 311,238$
Big Canyon Golf Course Pond Treatment WP 20,000$ -$ -$ -$ -$ 20,000$
Big Canyon Rehabilitation Project WP 2,119,492$ -$ -$ -$ -$ 2,119,492$
Little Corona Infiltration Gallery WP 261,695$ -$ -$ -$ -$ 261,695$
Santa Ana Delhi Regional Project WP 1,500,000$ -$ -$ -$ -$ 1,500,000$
Semeniuk Slough Dredging WP 1,172,304$ -$ -$ -$ -$ 1,172,304$
TMDL Projects WP -$ TBD -$ -$ -$ -$
Watershed Management Projects WP -$ -$ -$ -$ -$ -$
Total Water Quality and Environmental 6,544,729$ -$ -$ -$ -$ 6,544,729$
CIP 5 Year Look Ahead 3 July, 2016
PARKS, HARBORS AND BEACHES Source FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
Abandoned Watercraft Abatement na 61,200$ -$ -$ -$ -$ 61,200$
Balboa Island Seawalls - Fund Reserve TCP -$ 1,000,000$ 3,000,000$ 3,000,000$ 3,000,000$ 10,000,000$
Balboa Island Seawall Cap - North and South Sides TCP 2,000,000$ -$ -$ -$ -$ 2,000,000$
Balboa Island Seawall Replacement - West End TCP 5,063,525$ -$ -$ -$ -$ 5,063,525$
Back Bay View Park Enhancements na 329,939$ -$ -$ -$ -$ 329,939$
Balboa Marina Public Pier TCP 48,000$ -$ -$ -$ -$ 48,000$
Beach and Bay Sand Management (S.A. River)TCP 500,000$ -$ -$ -$ -$ 500,000$
Bonita Canyon Sports Park Pickleball Court na 400,000$ -$ -$ -$ -$ 400,000$
Bulkheads / Seawalls TCP 38,380$ 1,000,000$ -$ -$ -$ 1,038,380$
American Legion Bulkhead TCP 1,000,000$ -$ -$ -$ -$ 1,000,000$
Central Ave Public Pier / Street End Improvement TCP 300,000$ -$ -$ -$ -$ 300,000$
Eelgrass Survey TCP 75,000$ -$ 75,000$ -$ 75,000$ 225,000$
Dredging - Lower Bay Fund Reserve TCP -$ 500,000$ 500,000$ 500,000$ 500,000$ 2,000,000$
Dredging - Grand Canal TCP 361,000$ -$ 300,000$ -$ 300,000$ 961,000$
Harbor Capital Projects Finance Plan TCP 30,000$ -$ -$ -$ -$ 30,000$
Harbor Piers and Gangway Maintenance TCP -$ 500,000$ -$ -$ -$ 500,000$
Harbor Tide Gauge TCP 50,000$ -$ -$ -$ -$ 50,000$
Lower Castaways Park TCP 100,000$ -$ -$ -$ -$ 100,000$
Lower Sunset View Park, Pedestrian Bridge, Dog Park MFFP 435,652$ 5,000,000$ 5,000,000$ -$ -$ 10,435,652$
Marina Park MFFP 125,000$ -$ -$ -$ -$ 125,000$
Newport Elementary School Park Maintenance na 250,000$ -$ -$ -$ -$ 250,000$
Newport Harbor Dredging Permit RGP54 / Testing TCP -$ -$ 250,000$ -$ 250,000$
Newport Pier Building Platform and Piles TCP 998,233$ -$ -$ -$ -$ 998,233$
Ocean Piers Inspection and Maintenance TCP 500,000$ -$ 500,000$ -$ 500,000$ 1,500,000$
Park Playground Replacement and Improvements na -$ 300,000$ -$ 300,000$ -$ 600,000$
Park Restoration Projects na -$ TBD -$ -$ -$ -$
Park Walls and Staircases Rehabilitation na 500,000$ -$ 500,000$ -$ 500,000$ 1,500,000$
Sunset Ridge Park Access Improvements MFFP 95,044$ TBD -$ -$ -$ 95,044$
Surfside Sunset Coastal Sand Replenishment TCP 150,000$ -$ -$ -$ -$ 150,000$
Tidelands Maintenance TCP -$ 1,000,000$ 1,500,000$ 1,500,000$ 1,500,000$ 5,500,000$
Veterans Park Modifications na 200,000$ -$ -$ -$ -$ 200,000$
Total Parks, Harbors and Beaches 13,610,973$ 9,300,000$ 11,375,000$ 5,550,000$ 6,375,000$ 46,210,973$
CIP 5 Year Look Ahead 4 July, 2016
WATER Source FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
Balboa Island Main Replacement WMP 152,650$ 2,500,000$ -$ -$ -$ 2,652,650$
Bay Crossing Main Replacement WMP 300,000$ 3,500,000$ 3,500,000$ -$ 3,500,000$ 10,800,000$
Big Canyon Reservoir Meter Valve / Vault Replc WMP 891,359$ -$ -$ -$ -$ 891,359$
Dolphin and Tamura Shallow Wells Rehabilitation WMP 462,625$ -$ -$ -$ -$ 462,625$
East Coast Highway Pipeline Replacement (Jamboree)WMP -$ TBD -$ -$ -$ -$
Grade Adjustments - Water Valves na 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$
Lido Village Water Main Replacement WMP 859,520$ 2,200,000$ -$ -$ -$ 3,059,520$
Newport Boulevard Water Main Replacement na 126,432$ -$ -$ -$ -$ 126,432$
Newport Heights Main Replacement WMP -$ TBD -$ -$ -$ -$
SCADA System Upgrade na 47,159$ -$ -$ -$ -$ 47,159$
Transmission Main Valves Replacement na -$ 500,000$ -$ -$ -$ 500,000$
Water Main Master Plan Program WMP 562,100$ -$ -$ 3,000,000$ 3,000,000$ 6,562,100$
Water Master Plan Update WMP 375,000$ -$ -$ -$ -$ 375,000$
Water Wells and Pumps Rehabilitation na -$ -$ 1,500,000$ -$ -$ 1,500,000$
Total Water 3,826,845$ 8,750,000$ 5,050,000$ 3,050,000$ 6,550,000$ 27,226,845$
WASTEWATER Source FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
Grade Adjustments - Sewer Manhole Covers na 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$
OCSD Sewer Trunk Project Inspection na 41,164$ -$ -$ -$ -$ 41,164$
Sewer Main Lining and Repairs SMP 1,803,659$ 500,000$ 1,000,000$ 500,000$ 1,000,000$ 4,803,659$
Sewer Pump Station Improvements SMP -$ 150,000$ 1,000,000$ 150,000$ 850,000$ 2,150,000$
Total Wastewater 1,944,823$ 750,000$ 2,100,000$ 750,000$ 1,950,000$ 7,494,823$
CIP 5 Year Look Ahead 5 July, 2016
MISCELLANEOUS Source FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
Affordable Housing na 599,574$ -$ -$ -$ -$ 599,574$
Arts and Culture Master Plan na 64,685$ -$ -$ -$ -$ 64,685$
Assessment District Engineering na 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 750,000$
Assessment District Payment City Parcels na 679,500$ -$ -$ -$ -$ 679,500$
Balboa Island Enhancements na 188,640$ -$ -$ -$ -$ 188,640$
Balboa Pier ADA Access for Fire Rings na 60,000$ -$ -$ -$ -$ 60,000$
Balboa Village Entry Arch Sign na 179,756$ -$ -$ -$ -$ 179,756$
Balboa Village Façade Improvement Program na 160,112$ -$ -$ -$ -$ 160,112$
Balboa Village Wayfinding Improvements na 370,000$ -$ -$ -$ -$ 370,000$
City Radio Tower na 278,818$ -$ -$ -$ -$ 278,818$
General Plan Update na -$ 1,300,000$ 500,000$ -$ -$ 1,800,000$
Local Coastal Program Plan Implementation na 64,425$ -$ -$ -$ -$ 64,425$
Oil Well Field Maintenance - City na -$ -$ -$ -$ -$ -$
Slope Erosion Control / Enhancement na 325,000$ -$ -$ -$ -$ 325,000$
Total Miscellaneous 3,120,510$ 1,450,000$ 650,000$ 150,000$ 150,000$ 5,520,510$
Total for All Categories 66,941,668$ 45,402,000$ 45,350,000$ 43,676,500$ 28,585,685$ 229,955,853$
CIP 5 Year Look Ahead 6 July, 2016
Summary of CIP Five Year Look Ahead FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
Facilities 12,295,666$ 9,950,000$ 13,250,000$ 24,028,500$ 1,500,000$ 61,024,166$
Streets and Drainage 23,086,172$ 14,752,000$ 12,125,000$ 9,698,000$ 11,260,685$ 70,921,857$
Transportation 2,511,950$ 450,000$ 800,000$ 450,000$ 800,000$ 5,011,950$
Parks, Harbors and Beaches 13,610,973$ 9,300,000$ 11,375,000$ 5,550,000$ 6,375,000$ 46,210,973$
Water Quality and Environmental 6,544,729$ -$ -$ -$ -$ 6,544,729$
Water 3,826,845$ 8,750,000$ 5,050,000$ 3,050,000$ 6,550,000$ 27,226,845$
Wastewater 1,944,823$ 750,000$ 2,100,000$ 750,000$ 1,950,000$ 7,494,823$
Miscellaneous 3,120,510$ 1,450,000$ 650,000$ 150,000$ 150,000$ 5,520,510$
66,941,668$ 45,402,000$ 45,350,000$ 43,676,500$ 28,585,685$ 229,955,853$
Estimated Projected Funding Sources FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21 Total
General Fund 5,550,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 25,550,000$
Neighborhood Enhancement 1,739,500$ -$ -$ -$ -$ 1,739,500$
Major Facilities Financing Plan 1,394,900$ 13,450,000$ 16,750,000$ 22,528,500$ -$ 54,123,400$
Facilities Maintenance Master Plan 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 7,500,000$
Tidelands Capital 7,685,600$ 2,500,000$ 3,500,000$ 3,500,000$ 3,500,000$ 20,685,600$
Tidelands Maintenance 1,400,000$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 7,400,000$
Gas Tax 1,475,200$ 1,500,000$ 1,500,000$ 1,500,000$ 1,500,000$ 7,475,200$
Measure M Fair Share 1,750,000$ 2,000,000$ 2,000,000$ 2,100,000$ 2,200,000$ 10,050,000$
Transportation / Circulation -$ 250,000$ 250,000$ 250,000$ 250,000$ 1,000,000$
Water Fund 2,025,000$ 8,750,000$ 5,050,000$ 3,050,000$ 6,550,000$ 25,425,000$
Wastewater Fund 1,600,000$ 750,000$ 2,100,000$ 750,000$ 1,950,000$ 7,150,000$
Carryovers 40,506,468$ -$ -$ -$ -$ 40,506,468$
Other 315,000$ -$ -$ -$ -$ 315,000$
to be determined / unfunded -$ 8,202,000$ 6,200,000$ 1,998,000$ 4,635,685$ 21,035,685$
Important note: The five-year look ahead is a planning tool for discussion purposes, does not represent funding
commitments, and is subject to change. Cost estimates are presented at current value / current dollars and
are not escalated for inflation.
Capital Improvement Program Five Year Look Ahead
FY 2016-17 through FY 2020-21
City of Newport Beach
CIP 5 Year Look Ahead 7 July, 2016
NOTES
NOTES
NOTES
NOTES
NOTES
NOTES
NOTES
NOTES
100 Civic Center Drive¡ Newport Beach, CA 92660
(949) 644-3330
www.NewportBeachCA.gov