HomeMy WebLinkAboutC-7152-1 - On-Call M/RSA for Traffic Control ServicesVV � r
It
N
AMENDMENT NO. ONE TO
r ON-CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
WITH STATEWIDE TRAFFIC SAFETY AND SIGNS, INC.
C, FOR TRAFFIC CONTROL SERVICES
THIS AMENDMENT NO. ONE TO ON-CALL MAINTENANCE/REPAIR
SERVICES AGREEMENT ("Amendment No. One") is made and entered into as of this
14th day of August, 2020 ("Effective Date"), by and between the CITY OF NEWPORT
BEACH, a California municipal corporation and charter city ("City"), and STATEWIDE
TRAFFIC SAFETY AND SIGNS, INC., a Delaware corporation ("Contractor"), whose
address is 1000 Main Street, Suite 100, Irvine, California 92614, and is made with
reference to the following:
RECITALS
A. On August 15, 2017, City and Consultant entered into a Professional Services
Agreement ("Agreement") for on-call maintenance and/or repair services for City
("Project").
B. The parties desire to enter into this Amendment No. One to extend the term of the
Agreement to August 14, 2022, to increase the total compensation, and to amend
the Notices and Insurance sections of the Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties
as follows:
1. TERM
Section 1 of the Agreement is amended in its entirety and replaced with the
following: "The term of this Agreement shall commence on the Effective Date, and shall
terminate on August 14, 2022, unless terminated earlier as set forth herein."
2. COMPENSATION TO CONSULTANT
Section 4.1 of the Agreement is amended in its entirety and replaced with the
following: "City shall pay Contractor for the Services on a time and expense not -to -exceed
basis in accordance with the provisions of this Section and the Letter Proposal and the
Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by
reference. Except as otherwise provided herein, no rate changes shall be made during
the term of this Agreement without the prior written approval of City. Contractor's
compensation for all Services performed in accordance with this Agreement, including all
reimbursable items, shall not exceed Seventy Five Thousand Dollars and 00/100
($75,000.00), without prior written amendment to the Agreement."
The total amended compensation reflects Consultant's additional compensation
for additional Services to be performed in accordance with this Amendment No. One,
including all reimbursable items and subconsultant fees, in an amount not to exceed
Thirty Thousand Dollars and 00/100 ($30,000.00).
3. NOTICES
Section 24.3 of the Agreement is amended in its entirety and replaced with the
following: "All notices, demands, requests or approvals from City to Contractor shall be
addressed to Contractor at:
Attn: Don Nicholas
Statewide Traffic Safety and Signs, Inc.
1000 Main Street, Suite 100
Irvine, California 92614"
4. INSURANCE REQUIREMENTS - MAINTENANCE/REPAIR SERVICES
Exhibit C to the Agreement shall be replaced in its entirety with the Exhibit C
attached hereto and incorporated herein by reference.
5. INTEGRATED CONTRACT
Except as expressly modified herein, all other provisions, terms, and covenants
set forth in the Agreement shall remain unchanged and shall be in full force and effect.
[SIGNATURES ON NEXT PAGE]
Statewide Traffic Safety and Signs, Inc. Page 2
IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be
executed on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date: Z'0
By:j 0
Aaron C. Harp Wj & • 1.0
City Attorney
ATTEST:
Date:
By:,
*ar�i Brown
City Clerk
r
r
CITY OF NEWPORT BEACH,
a California municipal corporation
Date:
By:
Da ' e b
Public Works Director
CONTRACTOR: Statewide Traffic
Safety and Signs, Inc., a Delaware
corporation
Date:
Signed in Counterpart
By:
Don Nichols
Chief Executive Officer
Date:
By: Signed in Counterpart
Martin Breen
Chief Financial Officer
[END OF SIGNATURES]
Attachments: Exhibit C — Insurance Requirements
Statewide Traffic Safety and Signs, Inc. Page 3
IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be
executed on the dates written below.
APPROVED AS TO FORM:
CITY ATTON Y'S OFFICE
Date: ?77 1 to Z-2
CITY OF NEWPORT BEACH,
a California municipal corporation
Date: 01,-.
By: • By:
Aaron C. Harp David`A. Webb
City Attorney Public Works Director
ATTEST:
Date:
Leilani I. Brown
City Clerk
Attachments
CONTRACTOR: Statewide Traffic
Safety and Signs, Inc., a Delaware
corporation
Date:' / L ` - /
c
By: T1I
Don Nichols
Chief Executive Officer
Date: V " `)
By: _�
Martin Breen
Chief Financial Officer
[END OF SIGNATURES]
Exhibit C - Insurance Requirements
Statewide Traffic Safety and Signs, Inc. Page 3
EXHIBIT C
INSURANCE REQUIREMENTS — MAINTENANCE/REPAIR SERVICES
1. Provision of Insurance. Without limiting Contractor's indemnification of City,
and prior to commencement of Work, Contractor shall obtain, provide and
maintain at its own expense during the term of this Agreement, policies of
insurance of the type and amounts described below and in a form satisfactory
to City. Contractor agrees to provide insurance in accordance with
requirements set forth here. If Contractor uses existing coverage to comply
and that coverage does not meet these requirements, Contractor agrees to
amend, supplement or endorse the existing coverage.
2. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders'
Rating of A- (or higher) and Financial Size Category Class VII (or larger) in
accordance with the latest edition of Best's Key Rating Guide, unless otherwise
approved by the City's Risk Manager.
3. Coverage Requirements.
A. Workers' Compensation Insurance. Contractor shall maintain Workers'
Compensation Insurance, statutory limits, and Employer's Liability
Insurance with limits of at least one million dollars ($1,000,000) each
accident for bodily injury by accident and each employee for bodily injury
by disease in accordance with the laws of the State of California, Section
3700 of the Labor Code.
Contractor shall submit to City, along with the certificate of insurance, a
Waiver of Subrogation endorsement in favor of City, its City Council,
boards and commissions, officers, agents, volunteers, employees, and
any person or entity owning or otherwise in legal control of the property
upon which Contractor performs the Project and/or Services
contemplated by this Agreement.
B. General Liability Insurance. Contractor shall maintain commercial
general liability insurance and, if necessary, umbrella liability insurance,
with coverage at least as broad as provided by Insurance Services Office
form CG 00 01, in an amount not less than one million dollars
($1,000,000) per occurrence, two million dollars ($2,000,000) general
aggregate. The policy shall cover liability arising from premises,
operations, products -completed operations, personal and advertising
injury, and liability assumed under an insured contract (including the tort
liability of another assumed in a business contract).
C. Automobile Liability Insurance. Contractor shall maintain automobile
insurance at least as broad as Insurance Services Office form CA 00 01
covering bodily injury and property damage for all activities of Contractor
Statewide Traffic Safety and Signs, Inc. Page C-1
arising out of or in connection with Work to be performed under this
Agreement, including coverage for any owned, hired, non -owned or
rented vehicles, in an amount not less than one million dollars
($1,000,000) combined single limit each accident.
4. Other Insurance Requirements. The policies are to contain, or be endorsed to
contain, the following provisions:
A. Waiver of Subrogation. All insurance coverage maintained or procured
pursuant to this Agreement shall be endorsed to waive subrogation
against City, its City Council, boards and commissions, officers, agents,
volunteers, employees, and any person or entity owning or otherwise in
legal control of the property upon which Contractor performs the Project
and/or Services contemplated by this Agreement or shall specifically
allow Contractor or others providing insurance evidence in compliance
with these requirements to waive their right of recovery prior to a loss.
Contractor hereby waives its own right of recovery against City, and shall
require similar written express waivers from each of its subcontractors.
B. Additional Insured Status. All liability policies including general liability,
products and completed operations, excess liability, pollution liability,
and automobile liability, if required, shall provide or be endorsed to
provide that City, its City Council, boards and commissions, officers,
agents, volunteers, employees, and any person or entity owning or
otherwise in legal control of the property upon which Contractor
performs the Project and/or Services contemplated by this Agreement
shall be included as insureds under such policies.
C. Primary and Non Contributory. All liability coverage shall apply on a
primary basis and shall not require contribution from any insurance or
self-insurance maintained by City.
D. Notice of Cancellation. All policies shall provide City with thirty (30)
calendar days notice of cancellation (except for nonpayment for which
ten (10) calendar days notice is required) or nonrenewal of coverage for
each required coverage.
5. Additional Agreements Between the Parties. The parties hereby agree to the
following:
A. Evidence of Insurance. Contractor shall provide certificates of insurance
to City as evidence of the insurance coverage required herein, along
with a waiver of subrogation endorsement for workers' compensation
and other endorsements as specified herein for each coverage.
Insurance certificates and endorsement must be approved by City's Risk
Manager prior to commencement of performance. Current certification
of insurance shall be kept on file with City at all times during the term of
this Agreement. The certificates and endorsements for each insurance
Statewide Traffic Safety and Signs, Inc. Page C-2
policy shall be signed by a person authorized by that insurer to bind
coverage on its behalf. At least fifteen (15) days prior to the expiration
of any such policy, evidence of insurance showing that such insurance
coverage has been renewed or extended shall be filed with the City. If
such coverage is cancelled or reduced, Contractor shall, within ten (10)
days after receipt of written notice of such cancellation or reduction of
coverage, file with the City evidence of insurance showing that the
required insurance has been reinstated or has been provided through
another insurance company or companies. City reserves the right to
require complete, certified copies of all required insurance policies, at
any time.
B. City's Right to Revise Requirements. City reserves the right at any time
during the term of the Agreement to change the amounts and types of
insurance required by giving Contractor sixty (60) calendar days
advance written notice of such change. If such change results in
substantial additional cost to Contractor, City and Contractor may
renegotiate Contractor's compensation.
C. Right to Review Subcontracts. Contractor agrees that upon request, all
agreements with subcontractors or others with whom Contractor enters
into contracts with on behalf of City will be submitted to City for review.
Failure of City to request copies of such agreements will not impose any
liability on City, or its employees. Contractor shall require and verify that
all subcontractors maintain insurance meeting all the requirements
stated herein, and Contractor shall ensure that City is an additional
insured on insurance required from subcontractors. For CGL coverage,
subcontractors shall provide coverage with a format at least as broad as
CG 20 38 04 13.
D. Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of City to inform
Contractor of non-compliance with any requirement imposes no
additional obligations on City nor does it waive any rights hereunder.
E. Requirements not Limiting. Requirements of specific coverage features
or limits contained in this Section are not intended as a limitation on
coverage, limits or other requirements, or a waiver of any coverage
normally provided by any insurance. Specific reference to a given
coverage feature is for purposes of clarification only as it pertains to a
given issue and is not intended by any party or insured to be all inclusive,
or to the exclusion of other coverage, or a waiver of any type. If the
Contractor maintains higher limits than the minimums shown above, the
City requires and shall be entitled to coverage for higher limits
maintained by the Contractor. Any available insurance proceeds in
excess of the specified minimum limits of insurance and coverage shall
be available to the City.
Statewide Traffic Safety and Signs, Inc. Page C-3
F. Self-insured Retentions. Any self-insured retentions must be declared
to and approved by City. City reserves the right to require that self-
insured retentions be eliminated, lowered, or replaced by a deductible.
Self-insurance will not be considered to comply with these requirements
unless approved by City.
G. City Remedies for Non -Compliance. If Contractor or any subcontractor
fails to provide and maintain insurance as required herein, then City shall
have the right but not the obligation, to purchase such insurance, to
terminate this Agreement, or to suspend Contractor's right to proceed
until proper evidence of insurance is provided. Any amounts paid by
City shall, at City's sole option, be deducted from amounts payable to
Contractor or reimbursed by Contractor upon demand.
H. Timely Notice of Claims. Contractor shall give City prompt and timely
notice of claims made or suits instituted that arise out of or result from
Contractor's performance under this Agreement, and that involve or may
involve coverage under any of the required liability policies. City
assumes no obligation or liability by such notice, but has the right (but
not the duty) to monitor the handling of any such claim or claims if they
are likely to involve City.
Contractor's Insurance. Contractor shall also procure and maintain, at its own cost
and expense, any additional kinds of insurance, which in its own judgment may be
necessary for its proper protection and prosecution of the Work.
Statewide Traffic Safety and Signs, Inc. Page C-4
Reyes, Raymund
From: Customer Service <customerservice@ebix.com>
Sent: Wednesday, June 16,20215:40 PM
To: Reyes, Raymund; Insurance
Cc: sagar@ebix.com
Subject: Compliance Alert -Vendor Number FV00000554
[EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.
This Account has moved from non-compliant to COMPLIANT status and is currently in compliance for certificate of
insurance requirements. FV00000554 Statewide Traffic Safety and Signs, Inc.
Sent by Ebix, designated insurance certificate reviewer for the City of Newport Beach.
ON-CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
WITH STATEWIDE TRAFFIC SAFETY AND SIGNS, INC. FOR
t TRAFFIC CONTROL SERVICES
C�
THIS ON-CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
("Agreement') is made and entered into as of this 15th day of August, 2017 ("Effective
Date"), by and between the CITY OF NEWPORT BEACH, a California municipal
corporation and charter city ("City"), and STATEWIDE TRAFFIC SAFETY AND SIGNS,
INC., a Delaware corporation ("Contractor"), whose address is 522 Lindon Lane, Nipomo,
California 93444, and is made with reference to the following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to carry on its business as it is now being
conducted under the statutes of the State of California and the Charter of City.
B. City desires to engage Contractor to perform on-call maintenance and/or repair
services for City (`Project').
C. Contractor possesses the skill, experience, ability, background, certification and
knowledge to provide the maintenance and/or repair services described in this
Agreement.
D. Contractor has examined the location of all proposed work, carefully reviewed and
evaluated the specifications set forth by City for the Project, is familiar with all
conditions relevant to the performance of services, and has committed to perform
all work required for the compensation specified in this Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties
as follows:
1. TERM
The term of this Agreement shall commence on the Effective Date, and shall
terminate on August 15, 2020, unless terminated earlier as set forth herein.
2. SERVICES TO BE PERFORMED
2.1 Contractor shall perform the on-call services described in the Scope of
Services attached hereto as Exhibit A and incorporated herein by reference ("Services"
or "Work"). Upon written request from the Project Administrator as defined herein,
Contractor shall provide a letter proposal for Services requested by the City (hereinafter
referred to as the "Letter Proposal'). The Letter Proposal shall include the following:
2.1.1 A detailed description of the Services to be provided;
2.1.2 The position of each person to be assigned to perform the Services,
and the name of the individuals to be assigned, if available;
and
2.1.3 The estimated number of hours and cost to complete the Services;
2.1.4 The time needed to finish the specific project.
2.2 No Services shall be provided until the Project Administrator has provided
written acceptance of the Letter Proposal. Once authorized to proceed, Contractor shall
diligently perform the duties in the approved Letter Proposal.
3. TIME OF PERFORMANCE
3.1 Time is of the essence in the performance of Services under this Agreement
and Contractor shall perform the Services in accordance with the schedule included in
Exhibit A and the Letter Proposal. In the absence of a specific schedule, the Services
shall be performed to completion in a diligent and timely manner. The failure by
Contractorto strictly adhere to the schedule set forth in Exhibit A and the Letter Proposal,
if any, or perform the Services in a diligent and timely manner may result in termination
of this Agreement by City.
3.2 Notwithstanding the foregoing, Contractor shall not be responsible for
delays due to causes beyond Contractor's reasonable control. However, in the case of
any such delay in the Services to be provided for the Project, each party hereby agrees
to provide notice within two (2) calendar days of the occurrence causing the delay to the
other party so that all delays can be addressed.
3.3 Contractor shall submit all requests for extensions of time for performance
in writing to the Project Administrator as defined herein, not later than two (2) calendar
days after the start of the condition that purportedly causes a delay. The Project
Administrator shall review all such requests and may grant reasonable time extensions
for unforeseeable delays that are beyond Contractor's control.
3.4 For all time periods not specifically set forth herein, Contractor shall respond
in the most expedient and appropriate manner under the circumstances, by fax, hand -
delivery or mail.
4. COMPENSATION TO CONTRACTOR
4.1 City shall pay Contractor for the Services on a time and expense not -to -
exceed basis in accordance with the provisions of this Section and the Letter Proposal
and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein
by reference. Except as otherwise provided herein, no rate changes shall be made during
the term of this Agreement without the prior written approval of City. Contractor's
compensation for all Services performed in accordance with this Agreement, including all
reimbursable items, shall not exceed Forty Five Thousand Dollars and 001100
($45,000.00), without prior written amendment to the Agreement.
4.2 Upon the first anniversary of the Effective Date and upon each anniversary
of the Effective Date thereafter, the billing rates set forth in Exhibit B ("Billing Rates") shall
be adjusted in proportion to changes in the Consumer Price Index, subject to the
maximum adjustment set forth below. Such adjustment shall be made by multiplying the
Statewide Traffic Safety and Signs, Inc. Page 2
Billing Rates in Exhibit B by a fraction, the numerator of which is the value of the
Consumer Price Index for the calendar month three (3) months preceding the calendar
month for which such adjustment is to be made, and the denominator of which is the value
of the Consumer Price Index for the same calendar month immediately prior to Effective
Date. The Consumer Price Index to be used in such calculation is the "Consumer Price
Index, All Items, 1982-84=100 for All Urban Consumers (CPI -U)", for the Los Angeles -
Riverside -Orange County Metropolitan Area, published by the United States Department
of Labor, Bureau of Labor Statistics. If both an official index and one or more unofficial
indices are published, the official index shall be used. If said Consumer Price Index is no
longer published at the adjustment date, it shall be constructed by conversion tables
included in such new index. In no event, however, shall the amount payable under this
Agreement be reduced below the Billing Rates in effect immediately preceding such
adjustment. The maximum adjustment increase to the Billing Rates, for any year where
an adjustment is made pursuant to this Section, shall not exceed the Consumer Price
Index or 2.0% of the Billing Rates in effect immediately preceding such adjustment,
whichever is less.
4.3 Contractor shall submit monthly invoices to City describing the Work
performed the preceding month. Contractor's bills shall include the name and/or
classification of employee who performed the Work, a brief description of the Services
performed and/or the specific task in the Scope of Services to which it relates, the date
the Services were performed, the number of hours spent on all Work billed on an hourly
basis, and a description of any reimbursable expenditures. City shall pay Contractor no
later than thirty (30) calendar days after approval of the monthly invoice by City staff.
4.4 City shall reimburse Contractor only for those costs or expenses specifically
identified in Exhibit B to this Agreement and the Letter Proposal, or specifically approved
in writing in advance by City.
4.5 Contractor shall not receive any compensation for Extra Work performed
without the prior written authorization of City. As used herein, "Extra Work" means any
Work that is determined by City to be necessary for the proper completion of the Project,
but which is not included within the Scope of Services and which the parties did not
reasonably anticipate would be necessary at the execution of this Agreement.
Compensation for any authorized Extra Work shall be paid in accordance with Exhibit B
and the Letter Proposal.
5. PROJECT MANAGER
5.1 Contractor shall designate a Project Manager, who shall coordinate all
phases of the Project. This Project Manager shall be available to City at all reasonable
times during the Agreement term. Contractor has designated Don Nicholas to be its
Project Manager. Contractor shall not remove or reassign the Project Manager or any
personnel listed in Exhibit A or assign any new or replacement personnel to the Project
without the prior written consent of City. City's approval shall not be unreasonably
withheld with respect to the removal or assignment of non -key personnel.
5.2 Contractor, at the sole discretion of City, shall remove from the Project any
of its personnel assigned to the performance of Services upon written request of City.
Statewide Traffic Safety and Signs, Inc. Page 3
Contractor warrants that it will continuously furnish the necessary personnel to complete
the Project on a timely basis as contemplated by this Agreement.
6. ADMINISTRATION
This Agreement will be administered by the Municipal Operations Department.
City's Field Maintenance Manager or designee shall be the Project Administrator and
shall have the authority to act for City under this Agreement. The Project Administrator
shall represent City in all matters pertaining to the Services to be rendered pursuant to
this Agreement.
7. CITY'S RESPONSIBILITIES
To assist Contractor in the execution of its responsibilities under this Agreement,
City agrees to provide access to and upon request of Contractor, one copy of all existing
relevant information on file at City. City will provide all such materials in a timely manner
so as not to cause delays in Contractor's Work schedule.
8. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE
8.1 Contractor shall use only the standard materials described in Exhibit A in
performing Services under this Agreement. Any deviation from the materials described
in Exhibit A shall not be installed or utilized unless approved in advance and in writing by
the Project Administrator.
8.2 All of the Services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel required to perform
the Services required by this Agreement, and that it will perform all Services in a manner
commensurate with community professional standards and with the ordinary degree of
skill and care that would be used by other reasonably competent practitioners of the same
discipline under similar circumstances. All Services shall be performed by qualified and
experienced personnel who are not employed by City. By delivery of completed Work,
Contractor certifies that the Work conforms to the requirements of this Agreement, all
applicable federal, state and local laws and legally recognized professional standards.
8.3 Contractor represents and warrants to City that it has, shall obtain and shall
keep in full force and effect during the term hereof, at its sole cost and expense, all
licenses, permits, qualifications, insurance and approvals of whatsoever nature that is
legally required of Contractor to practice its profession. Contractor shall maintain a City
of Newport Beach business license during the term of this Agreement.
8.4 Contractor shall not be responsible for delay, nor shall Contractor be
responsible for damages or be in default or deemed to be in default by reason of strikes,
lockouts, accidents, acts of God, or the failure of City to furnish timely information or to
approve or disapprove Contractor's Work promptly, or delay or faulty performance by City,
contractors, or governmental agencies.
Statewide Traffic Safety and Signs, Inc. Page 4
9. RESPONSIBILITY FOR DAMAGES OR INJURY
9.1 City and all officers, employees and representatives thereof and all persons
and entities owning or otherwise in legal control of the property upon which Contractor
performs the Project and/or Services shall not be responsible in any manner for any loss
or damage to any of the materials or other things used or employed in performing the
Project or for injury to or death of any person as a result of Contractor's performance of
the Services required hereunder; or for damage to property from any cause arising from
the performance of the Project and/or Services by Contractor, or its subcontractors, or its
workers, or anyone employed by either of them.
9.2 Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from defects,
obstructions or from any cause arising from Contractor's Work on the Project and/or
Services, or the Work of any subcontractor or supplier selected by Contractor.
9.3 To the fullest extent permitted by law, Contractor shall indemnify, defend
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, employees, and any person or entity owning or otherwise in legal control of
the property upon which Contractor performs the Project and/or Services contemplated
by this Agreement (collectively, the "Indemnified Parties") from and against any and all
claims (including, without limitation, claims for bodily injury, death or damage to property),
demands, obligations, damages, actions, causes of action, suits, losses, judgments,
fines, penalties, liabilities, costs and expenses (including, without limitation, attorneys'
fees, disbursements and court costs) of every kind and nature whatsoever (individually,
a Claim; collectively, "Claims"), which may arise from or in any manner relate (directly or
indirectly) to any breach of the terms and conditions of this Agreement, any Work
performed or Services provided under this Agreement including, without limitation,
defects in workmanship or materials or Contractor's presence or activities conducted on
the Project (including the negligent and/or willful acts, errors and/or omissions of
Contractor, its principals, officers, agents, employees, vendors, suppliers, consultants,
subcontractors, anyone employed directly or indirectly by any of them or for whose acts
they may be liable or any or all of them).
9.4 Notwithstanding the foregoing, nothing herein shall be construed to require
Contractor to indemnify the Indemnified Parties from any Claim arising from the sole
negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall
be construed as authorizing any award of attorneys' fees in any action on or to enforce
the terms of this Agreement. This indemnity shall apply to all claims and liability
regardless of whether any insurance policies are applicable. The policy limits do not act
as a limitation upon the amount of indemnification to be provided by Contractor.
9.5 Contractor shall perform all Work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their original condition
and former usefulness as soon as possible, and to protect public and private property.
Contractor shall be liable for any private or public property damaged during the
performance of the Work by Contractor or its agents.
Statewide Traffic Safety and Signs, Inc. Page 5
9.6 To the extent authorized by law, as much of the money due Contractor
under and by virtue of the Agreement as shall be considered necessary by City may be
retained by it until disposition has been made of such suits or claims for damages as
aforesaid.
9.7 The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
10. INDEPENDENT CONTRACTOR
It is understood that City retains Contractor on an independent contractor basis
and Contractor is not an agent or employee of City. The manner and means of conducting
the Work are under the control of Contractor, except to the extent they are limited by
statute, rule or regulation and the expressed terms of this Agreement. No civil service
status or other right of employment shall accrue to Contractor or its employees. Nothing
in this Agreement shall be deemed to constitute approval for Contractor or any of
Contractor's employees or agents, to be the agents or employees of City. Contractor
shall have the responsibility for and control over the means of performing the Work,
provided that Contractor is in compliance with the terms of this Agreement. Anything in
this Agreement that may appear to give City the right to direct Contractor as to the details
of the performance of the Work or to exercise a measure of control over Contractor shall
mean only that Contractor shall follow the desires of City with respect to the results of the
Services.
Contractor agrees to work closely and cooperate fully with City's designated
Project Administrator and any other agencies that may have jurisdiction or interest in the
Work to be performed. City agrees to cooperate with Contractor on the Project.
12. CITY POLICY
Contractor shall discuss and review all matters relating to policy and Project
direction with City's Project Administrator in advance of all critical decision points in order
to ensure the Project proceeds in a manner consistent with City goals and policies.
13. PROGRESS
Contractor is responsible for keeping the Project Administrator informed on a
regular basis regarding the status and progress of the Project, activities performed and
planned, and any meetings that have been scheduled or are desired.
14. INSURANCE
Without limiting Contractor's indemnification of City, and prior to commencement
of Work, Contractor shall obtain, provide and maintain at its own expense during the term
of this Agreement orfor other periods as specified in this Agreement, policies of insurance
of the type, amounts, terms and conditions described in the Insurance Requirements
attached hereto as Exhibit C, and incorporated herein by reference.
Statewide Traffic Safety and Signs, Inc. Page 6
15. PREVAILING WAGES
Pursuant to the applicable provisions of the Labor Code of the State of California,
not less than the general prevailing rate of per diem wages including legal holidays and
overtime Work for each craft or type of workman needed to execute the Work
contemplated under the Agreement shall be paid to all workmen employed on the Work
to be done according to the Agreement by the Contractor and any subcontractor. In
accordance with the California Labor Code (Sections 1770 et seq.), the Director of
Industrial Relations has ascertained the general prevailing rate of per diem wages in the
locality in which the Work is to be performed for each craft, classification, or type of
workman or mechanic needed to execute the Agreement. A copy of said determination
is available by calling the prevailing wage hotline number (415) 703-4774, and requesting
one from the Department of Industrial Relations. The Contractor is required to obtain the
wage determinations from the Department of Industrial Relations and post at the job site
the prevailing rate or per diem wages. It shall be the obligation of the Contractor or any
subcontractor under him/her to comply with all State of California labor laws, rules and
regulations and the parties agree that the City shall not be liable for any violation thereof.
16. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS
Except as specifically authorized under this Agreement, the Services to be
provided under this Agreement shall not be assigned, transferred contracted or
subcontracted out without the prior written approval of City. Any of the following shall be
construed as an assignment: The sale, assignment, transfer or other disposition of any
of the issued and outstanding capital stock of Contractor, or of the interest of any general
partner or joint venturer or syndicate member or cotenant if Contractor is a partnership or
joint -venture or syndicate or cotenancy, which shall result in changing the control of
Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five
percent (25%) or more of the assets of the corporation, partnership or joint -venture.
17. SUBCONTRACTING
The subcontractors authorized by City, if any, to perform Work on this Project are
identified in Exhibit A and the Letter Proposal. Contractor shall be fully responsible to
City for all acts and omissions of any subcontractor. Nothing in this Agreement shall
create any contractual relationship between City and any subcontractor nor shall it create
any obligation on the part of City to pay or to see to the payment of any monies due to
any such subcontractor other than as otherwise required by law. City is an intended
beneficiary of any Work performed by the subcontractor for purposes of establishing a
duty of care between the subcontractor and City. Except as specifically authorized herein,
the Services to be provided under this Agreement shall not be otherwise assigned,
transferred, contracted or subcontracted out without the prior written approval of City.
18. OWNERSHIP OF DOCUMENTS
Each and every report, draft, map, record, plan, document and other writing
produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor,
its officers, employees, agents and subcontractors, in the course of implementing this
Agreement, shall become the exclusive property of City, and City shall have the sole right
Statewide Traffic Safety and Signs, Inc. Page 7
to use such materials in its discretion without further compensation to Contractor or any
other party. Contractor shall, at Contractor's expense, provide such Documents to City
upon priorwritten request.
19. CONFIDENTIALITY
All Documents, including drafts, preliminary drawings or plans, notes and
communications that result from the Services in this Agreement, shall be kept confidential
unless City expressly authorizes in writing the release of information.
20. RECORDS
Contractor shall keep records and invoices in connection with the Services to be
performed under this Agreement. Contractor shall maintain complete and accurate
records with respect to the costs incurred under this Agreement and any Services,
expenditures and disbursements charged to City, fora minimum period of three (3) years,
or for any longer period required by law, from the date of final payment to Contractor
under this Agreement. All such records and invoices shall be clearly identifiable.
Contractor shall allow a representative of City to examine, audit and make transcripts or
copies of such records and invoices during regular business hours. Contractor shall allow
inspection of all Work, data, Documents, proceedings and activities related to the
Agreement for a period of three (3) years from the date of final payment to Contractor
under this Agreement.
21. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction of
the dispute with respect to such payment. Such withholding shall not be deemed to
constitute a failure to pay according to the terms of this Agreement. Contractor shall not
discontinue Work as a result of such withholding. Contractor shall have an immediate
right to appeal to the City Manager or his/her designee with respect to such disputed
sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of
return that City earned on its investments during the time period, from the date of
withholding of any amounts found to have been improperly withheld.
22. CITY'S RIGHT TO EMPLOY OTHER CONTRACTORS
City reserves the right to employ other contractors in connection with the Project.
23. CONFLICTS OF INTEREST
23.1 Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act"), which (1) requires such persons to
disclose any financial interest that may foreseeably be materially affected by the Work
performed under this Agreement, and (2) prohibits such persons from making, or
participating in making, decisions that will foreseeably financially affect such interest.
23.2 If subject to the Act, Contractor shall conform to all requirements of the Act.
Failure to do so constitutes a material breach and is grounds for immediate termination
Statewide Traffic Safety and Signs, Inc. Page 8
of this Agreement by City. Contractor shall indemnify and hold harmless City for any and
all claims for damages resulting from Contractor's violation of this Section.
24. NOTICES
24.1 All notices, demands, requests or approvals, including any change in
mailing address, to be given under the terms of this Agreement shall be given in writing,
and conclusively shall be deemed served when delivered personally, or on the third
business day after the deposit thereof in the United States mail, postage prepaid, first-
class mail, addressed as hereinafter provided.
24.2 All notices, demands, requests or approvals from Contractor to City shall be
addressed to City at:
Attn: Field Maintenance Manager
Municipal Operations Department
City of Newport Beach
100 Civic Center Drive
PO Box 1768
Newport Beach, CA 92658
24.3 All notices, demands, requests or approvals from City to Contractor shall be
addressed to Contractor at:
Attn: Don Nicholas
Statewide Traffic Safety and Signs, Inc.
522 Lindon Lane
Nipomo, CA 93444
25. CLAIMS
Unless a shorter time is specified elsewhere in this Agreement, before making its
final request for payment under this Agreement, Contractor shall submit to City, in writing,
all claims for compensation under or arising out of this Agreement. Contractor's
acceptance of the final payment shall constitute a waiver of all claims for compensation
under or arising out of this Agreement except those previously made in writing and
identified by Contractor in writing as unsettled at the time of its final request for payment.
Contractor and City expressly agree that in addition to any claims filing requirements set
forth in the Agreement, Contractor shall be required to file any claim Contractor may have
against City in strict conformance with the Government Claims Act (Government Code
sections 900 et seq.).
26. TERMINATION
26.1 In the event that either party fails or refuses to perform any of the provisions
of this Agreement at the time and in the manner required, that party shall be deemed in
default in the performance of this Agreement. If such default is not cured within a period
of two (2) calendar days, or if more than two (2) calendar days are reasonably required
to cure the default and the defaulting party fails to give adequate assurance of due
performance within two (2) calendar days after receipt of written notice of default,
Statewide Traffic Safety and Signs, Inc. Page 9
specifying the nature of such default and the steps necessary to cure such default, and
thereafter diligently take steps to cure the default, the non -defaulting party may terminate
the Agreement forthwith by giving to the defaulting party written notice thereof.
26.2 Notwithstanding the above provisions, City shall have the right, at its sole
and absolute discretion and without cause, of terminating this Agreement at any time by
giving no less than seven (7) calendar days' prior written notice to Contractor. In the
event of termination under this Section, City shall pay Contractor for Services
satisfactorily performed and costs incurred up to the effective date of termination for which
Contractor has not been previously paid. On the effective date of termination, Contractor
shall deliver to City all reports, Documents and other information developed or
accumulated in the performance of this Agreement, whether in draft or final form.
27. LABOR
27.1 Contractor shall conform with all applicable provisions of state and federal
law including, but not limited to, applicable provisions of the federal Fair Labor Standards
Act ("FLSA") (29 USCA § 201, et seq.).
27.2 Whenever Contractor has knowledge that any actual or potential labor
dispute is delaying or threatens to delay the timely performance of this Agreement,
Contractor shall immediately give written notice to City, and provide all relevant
information.
27.3 Contractor represents that all persons working under this Agreement are
verified to be U.S. citizens or persons legally authorized to work in the United States.
27.4 To the fullest extent permitted by law, Contractor shall indemnify, defend,
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees from loss or damage, including but not limited to attorneys'
fees, and other costs of defense by reason of actual or alleged violations of any applicable
federal, state and local labor laws or law, rules, and/or regulations. This obligation shall
survive the expiration and/or termination of the Agreement.
28. STANDARD PROVISIONS
28.1 Recitals. City and Contractor acknowledge that the above Recitals are true
and correct and are hereby incorporated by reference.
28.2 Compliance with all Laws. Contractor shall, at its own cost and expense,
comply with all statutes, ordinances, regulations and requirements of all governmental
entities, including federal, state, county or municipal, whether now in force or hereinafter
enacted. In addition, all Work prepared by Contractor shall conform to applicable City,
county, state and federal laws, rules, regulations and permit requirements and be subject
to approval of the Project Administrator and City.
28.3 Waiver. A waiver by either party of any breach, of any term, covenant or
condition contained herein shall not be deemed to be a waiver of any subsequent breach
of the same or any other term, covenant or condition contained herein, whether of the
same or a different character.
Statewide Traffic Safety and Signs, Inc. Page 10
28.4 Integrated Contract. This Agreement represents the full and complete
understanding of every kind or nature whatsoever between the parties hereto, and all
preliminary negotiations and agreements of whatsoever kind or nature are merged herein.
No verbal agreement or implied covenant shall be held to vary the provisions herein.
28.5 Conflicts or Inconsistencies. In the event there are any conflicts or
inconsistencies between this Agreement and the Scope of Services or any other
attachments attached hereto, the terms of this Agreement shall govern.
28.6 Interpretation. The terms of this Agreement shall be construed in
accordance with the meaning of the language used and shall not be construed for or
against either party by reason of the authorship of the Agreement or any other rule of
construction which might otherwise apply.
28.7 Amendments. This Agreement may be modified or amended only by a
written document executed by both Contractor and City and approved as to form by the
City Attorney.
28.8 Severability. If any term or portion of this Agreement is held to be invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions of this Agreement shall continue in full force and effect.
28.9 Controlling Law and Venue. The laws of the State of California shall govern
this Agreement and all matters relating to it and any action brought relating to this
Agreement shall be adjudicated in a court of competent jurisdiction in the County of
Orange, State of California.
28.10 Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religious creed, color, national origin,
ancestry, physical handicap, medical condition, marital status, sex, sexual orientation,
age or any other impermissible basis under law.
28.11 No Attorneys' Fees. In the event of any dispute or legal action arising under
this Agreement, the prevailing party shall not be entitled to attorneys' fees.
28.12 Counterparts. This Agreement may be executed in two (2) or more
counterparts, each of which shall be deemed an original and all of which together shall
constitute one (1) and the same instrument.
[SIGNATURES ON NEXT PAGE]
Statewide Traffic Safety and Signs, Inc. Page 11
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed
on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY' OFFICE
Date:
By:
Aaron C. Harp C�'M oflell 1-�
City Attorney
ATTEST:
Date:
B y —LL gg
gA'.� •
Crty _ o/
CITY OF NEWPORT BEACH,
a CalifoMlmllur� nicipal corporation
Date:
By:
Michael Pisani
Director, Municipal Operations
Department — General Services
CONTRACTOR: Statewide Traffic
Safety and Signs, Inc., a Delaware
corporation
Date: if
By: V'Z�
Don Nicholas
President
Date: %1 \) � \--)
By: L,
Martin Breen
Chief Financial Officer
[END OF SIGNATURES]
Attachments: Exhibit A — Scope of Services
Exhibit B — Schedule of Billing Rates
Exhibit C — Insurance Requirements
Statewide Traffic Safety and Signs, Inc. Page 12
EXHIBIT A
SCOPE OF SERVICES
Contractor shall provide safe and continuous passage for all road users, including
pedestrian, bicycle, and vehicular traffic at all times. All warning lights, signs, flares,
barricades, delineators, detours and other facilities for the sole convenience and direction
of public traffic shall be furnished and maintained by the Contractor. All traffic control
shall conform to, and be placed in accordance with the latest edition of the California
Manual on Uniform Traffic Control Devices (CA MUTCD). Flashing arrow boards shall
be furnished and maintained by the Contractor, and be on all vehicles during any lane
closure.
A minimum of one (1) 10 -foot wide travel lane in each direction shall remain open
on local and secondary roadways. On arterial roadways, a minimum of two (2) travel
lanes in each direction shall remain open. All left -turn pockets shall be maintained
whenever feasible.
Lane closures on arterial roadways shall be limited to 9:00 a.m. to 3:00 p.m., unless
an emergency exists and such a closure is necessary to safeguard the traveling public.
Separation between travel lanes, channelization, and delineation of the maintenance area
shall be accomplished by the use of delineators and/or cones spaced per the CA MUTCD.
Contractor's staff on stand-by must be available in case of need for lane closures.
Each vehicle used to place and remove components of a traffic control system on
multi -lane highways shall be equipped with a flashing arrow board, which shall be in
operation when the vehicle is being used for placing, maintaining or removing said
components. Flashing arrow boards shall be in place before implementing lane
closure(s). When maintenance is complete, all traffic control signs, barricades,
delineators, etc., shall be immediately removed from the site.
The following is a list of traffic control services that may be required based on the
type and location of construction/maintenance work:
For lower -speed roadways (posted or observed speed of 40 mph or less)
and considering the above conditions, all traffic control shall conform to, and
be placed in accordance with latest edition of the Work Area Traffic Control
Handbook (WATCH) without the explicit need for traffic control plans.
However, under the discretion of the City Traffic Engineer, the Contractor
may be required to prepare and provide traffic control plans in adherence
with the CA MUTCD and by a California Registered Professional Civil
Engineer (See Note 1).
For higher -speed roadways (posted or observed speed of 45 mph or more),
all traffic control shall conform to, and be placed in accordance with the CA
Statewide Traffic Safety and Signs, Inc. Page A-1
MUTCD. In addition, the Contractor shall prepare and provide traffic control
plans by a California Registered Professional Civil Engineer (See Note 1).
• Rental of traffic control devices including, but not limited to, barricades,
signs, message boards, lights, and temporary chain link fencing.
Note 1: Under the discretion of the City Traffic Engineer, traffic control
plans may be elevated to be prepared and provided by a California
Registered Professional Traffic Engineer.
SERVICES OUTSIDE NORMAL WORKING HOURS
• Contractor shall provide telephone numbers for after-hours, weekend, and
holiday service.
• Contractor shall provide 24-hour service as evidenced in a Letter Proposal
accepted by City.
Statewide Traffic Safety and Signs, Inc. Page A-2
EXHIBIT B
SCHEDULE OF BILLING RATES
Lighted Sign - Trailers
WEEKDAY
SATURDAY
SUNDAY
FAS
$40.00
$125.00
$300.00
CMS
$150.00
$400.00
$1000.00
Radar Trailer
$60.00
$200.00
$500.00
Portable Lighting
$125.00
$125.00
$125.00
Light Tower 4-1000 watt lights)
$80.00
$220.00
$600.00
Non Glare 36" Light with stand balloon
$40.00
$125.00
$300.00
Non Glare 36" Light hitch mount (balloon)
$40.00
$125.00
$300.00
Generator, 3 kw no light)
$20.00
$75.00
$200.00
Light Tower, 4k non -glare balloon
N/A
N/A
N/A
Barricades
Type I -.EG
$0.50
$2.00
$6.00
Type II - EG
$0.75
$3.00
$9.00
Type 1 w/Li ht
$0.85
$3.50
$10.00
ADA Barricade
$5.00
$14.00
$35.00
Type III EG 4'
$2.75
$11.00
$33.00
Type III w/ 1 light
$3.10
$12.40
$37.20
Type III w/ 2 lights
$3.45
$13.80
$41.40
Barricade Light LED
$0.35
$1.40
$4.20
Parade Barricade, 8'
$5.00
$20.00
$50.00
Ped Barricade bike rack
$5.00
$20.00
$50.00
Traffic Control Boards
Message Boards
$150.00
$400.00
$1000.00
Arrow Boards
$40.00
$125.00
$300.00
Additional Labor
WEEKDAY
SATURDAY
SUNDAY
Traffic Control ler/Flagger
$75.00
$90.00
$110.00
Yard/Drive Time Labor
$35.00
$50.00
$65.00
Install or Removal Mobilizations
Small Pickup Truck
$125.00
$125.00
$125.00
Medium 12-16' Stake bed
$150.00
$150.00
$150.00
Large 24" Stake bed
$200.00
$200.00
$200.00
Pickup/Delivery Charge
$75.00
$125.00
$175.00
Statewide Traffic Safety and Signs, Inc. Page B-1
EXHIBIT C
INSURANCE REQUIREMENTS — MAINTENANCE/REPAIR/JANITORIAL SERVICES
1. Provision of Insurance. Without limiting Contractor's indemnification of City, and
prior to commencement of Work, Contractor shall obtain, provide and maintain at
its own expense during the term of this Agreement, policies of insurance of the
type and amounts described below and in a form satisfactory to City. Contractor
agrees to provide insurance in accordance with requirements set forth here. If
Contractor uses existing coverage to comply and that coverage does not meet
these requirements, Contractor agrees to amend, supplement or endorse the
existing coverage.
2. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders'
Rating of A- (or higher) and Financial Size Category Class VII (or larger) in
accordance with the latest edition of Best's Key Rating Guide, unless otherwise
approved by the City's Risk Manager.
3. Coverage Requirements.
A. Workers' Compensation Insurance. Contractor shall maintain Workers'
Compensation Insurance, statutory limits, and Employer's Liability
Insurance with limits of at least one million dollars ($1,000,000) each
accident for bodily injury by accident and each employee for bodily injury by
disease in accordance with the laws of the State of California, Section 3700
of the Labor Code.
Contractor shall submit to City, along with the certificate of insurance, a
Waiver of Subrogation endorsement in favor of City, its City Council,
boards and commissions, officers, agents, volunteers, employees, and
any person or entity owning or otherwise in legal control of the property
upon which Contractor performs the Project and/or Services
contemplated by this Agreement.
B. General Liability Insurance. Contractor shall maintain commercial general
liability insurance and, if necessary, umbrella liability insurance, with
coverage at least as broad as provided by Insurance Services Office form
CG 00 01, in an amount not less than one million dollars ($1,000,000) per
occurrence, two million dollars ($2,000,000) general aggregate. The policy
shall cover liability arising from premises, operations, products -completed
operations, personal and advertising injury, and liability assumed under an
insured contract (including the tort liability of another assumed in a business
contract).
C. Automobile Liability Insurance. Contractor shall maintain automobile
insurance at least as broad as Insurance Services Office form CA 00 01
Statewide Traffic Safety and Signs, Inc. Page C-1
covering bodily injury and property damage for all activities of Contractor
arising out of or in connection with Work to be performed under this
Agreement, including coverage for any owned, hired, non -owned or rented
vehicles, in an amount not less than one million dollars ($1,000,000)
combined single limit each accident.
4. Other Insurance Requirements. The policies are to contain, or be endorsed to
contain, the following provisions:
A. Waiver of Subrogation. All insurance coverage maintained or procured
pursuant to this Agreement shall be endorsed to waive subrogation against
City, its City Council, boards and commissions, officers, agents, volunteers,
employees, and any person or entity owning or otherwise in legal control of
the property upon which Contractor performs the Project and/or Services
contemplated by this Agreement or shall specifically allow Contractor or
others providing insurance evidence in compliance with these requirements
to waive their right of recovery prior to a loss. Contractor hereby waives its
own right of recovery against City, and shall require similar written express
waivers from each of its subcontractors.
B. Additional Insured Status. All liability policies including general liability,
products and completed operations, excess liability, pollution liability, and
automobile liability, if required, shall provide or be endorsed to provide that
City, its City Council, boards and commissions, officers, agents, volunteers,
employees, and any person or entity owning or otherwise in legal control of
the property upon which Contractor performs the Project and/or Services
contemplated by this Agreement shall be included as insureds under such
policies.
C. Primary and Non Contributory. All liability coverage shall apply on a primary
basis and shall not require contribution from any insurance or self-insurance
maintained by City.
D. Notice of Cancellation. All policies shall provide City with thirty (30)
calendar days notice of cancellation (except for nonpayment for which ten
(10) calendar days notice is required) or nonrenewal of coverage for each
required coverage.
5. Additional Agreements Between the Parties. The parties hereby agree to the
following:
A. Evidence of Insurance. Contractor shall provide certificates of insurance to
City as evidence of the insurance coverage required herein, along with a
waiver of subrogation endorsement for workers' compensation and other
endorsements as specified herein for each coverage. Insurance certificates
and endorsement must be approved by City's Risk Manager prior to
commencement of performance. Current certification of insurance shall be
Statewide Traffic Safety and Signs, Inc. Page C-2
kept on file with City at all times during the term of this Agreement. City
reserves the right to require complete, certified copies of all required
insurance policies, at any time.
B. City's Right to Revise Requirements. City reserves the right at any time
during the term of the Agreement to change the amounts and types of
insurance required by giving Contractor sixty (60) calendar days advance
written notice of such change. If such change results in substantial
additional cost to Contractor, City and Contractor may renegotiate
Contractor's compensation.
C. Right to Review Subcontracts. Contractor agrees that upon request, all
agreements with subcontractors or others with whom Contractor enters into
contracts with on behalf of City will be submitted to City for review. Failure
of City to request copies of such agreements will not impose any liability on
City, or its employees. Contractor shall require and verify that all
subcontractors maintain insurance meeting all the requirements stated
herein, and Contractor shall ensure that City is an additional insured on
insurance required from subcontractors. For CGL coverage,
subcontractors shall provide coverage with a format at least as broad as CG
20 38 04 13.
D. Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of City to inform
Contractor of non-compliance with any requirement imposes no additional
obligations on City nor does it waive any rights hereunder.
E. Requirements not Limiting. Requirements of specific coverage features or
limits contained in this Section are not intended as a limitation on coverage,
limits or other requirements, or a waiver of any coverage normally provided
by any insurance. Specific reference to a given coverage feature is for
purposes of clarification only as it pertains to a given issue and is not
intended by any party or insured to be all inclusive, or to the exclusion of
other coverage, or a waiver of any type. If the Contractor maintains higher
limits than the minimums shown above, the City requires and shall be
entitled to coverage for higher limits maintained by the Contractor. Any
available insurance proceeds in excess of the specified minimum limits of
insurance and coverage shall be available to the City.
F. Self-insured Retentions. Any self-insured retentions must be declared to
and approved by City. City reserves the right to require that self-insured
retentions be eliminated, lowered, or replaced by a deductible. Self-
insurance will not be considered to comply with these requirements unless
approved by City.
G. City Remedies for Non -Compliance. If Contractor or any subcontractor fails
to provide and maintain insurance as required herein, then City shall have
Statewide Traffic Safety and Signs, Inc. Page C-3
the right but not the obligation, to purchase such insurance, to terminate this
Agreement, or to suspend Contractor's right to proceed until proper
evidence of insurance is provided. Any amounts paid by City shall, at City's
sole option, be deducted from amounts payable to Contractor or reimbursed
by Contractor upon demand.
H. Timely Notice of Claims. Contractor shall give City prompt and timely notice
of claims made or suits instituted that arise out of or result from Contractor's
performance under this Contract, and that involve or may involve coverage
under any of the required liability policies. City assumes no obligation or
liability by such notice, but has the right (but not the duty) to monitor the
handling of any such claim or claims if they are likely to involve City.
Contractor's Insurance. Contractor shall also procure and maintain, at its
own cost and expense, any additional kinds of insurance, which in its own
judgment may be necessary for its proper protection and prosecution of the
Work.
Statewide Traffic Safety and Signs, Inc. Page C-4
CERTIFICATE OF INSURANCE
CHECKLIST
City of Newport Beach
This checklist is comprised of requirements as outlined by the City of Newport Beach. *
Date Received: 8/25/17 Dept./Contact Received From:
Date Completed: 8/28/17 Sent to:
Company/Person required to have certificate:
Type of contract:
Joan
Statewide Traffic
Joan
By: Jan
Safety and Siens. Inc.
All Other
I. GENERAL LIABILITY
EFFECTIVE/EXPI RATION DATE: 8/11/17 - 8/11/18
A.
INSURANCE COMPANY: Zurich American Insurance Company
B.
AM BEST RATING (A-: VII or greater): A+/ XV
C.
ADMITTED Company (Must be California Admitted):
Is Company admitted in California?
® Yes ❑ No
D.
LIMITS (Must be $1 M or greater): What is limit provided?
$1M/$2M+$10M Umb
E.
ADDITIONAL INSURED ENDORSEMENT— please attach
® Yes ❑ No
F.
PRODUCTS AND COMPLETED OPERATIONS (Must
include): Is it included? (completed Operations status does
N/A
F.
not apply to Waste Haulers or Recreation)
® Yes ❑ No
G.
ADDITIONAL INSURED FOR PRODUCTS AND
® N/A ❑ Yes ❑ No
G.
COMPLETED OPERATIONS ENDORSEMENT (completed
❑ N/A ❑ Yes ® No
H.
Operations status does not apply to Waste Haulers)
® Yes ❑ No
H.
ADDITIONAL INSURED WORDING TO INCLUDE (The City
its officers, officials, employees and volunteers): Is it
included?
® Yes ❑ No
I.
PRIMARY & NON-CONTRIBUTORY WORDING (Must be
included): Is it included?
® Yes ❑ No
J.
CAUTION! (Confirm that loss or liability of the named insured
is not limited solely by their negligence) Does endorsement
include "solely by negligence" wording?
❑ Yes ® No
K.
ELECTED SCMAF COVERAGE (RECREATION ONLY):
® N/A ❑ Yes ❑ No
L.
NOTICE OF CANCELLATION:
❑ N/A ® Yes ❑ No
IL AUTOMOBILE LIABILITY
EFFECTIVE/EXPIRATION DATE: 8/11/17-8/11/18
A.
INSURANCE COMPANY: Zurich American Insurance Company
B.
AM BEST RATING (A-: VII or greater) A+/ XV
C.
ADMITTED COMPANY (Must be California Admitted):
Is Company admitted in California?
® Yes ❑ No
D.
LIMITS - If Employees (Must be $1 M min. BI & PD and $500,000
UM, $2M min for Waste Haulers): What is limits provided?
$1,000,000
E
LIMITS Waiver of Auto Insurance / Proof of coverage (if individual)
(What is limits provided?)
N/A
F.
PRIMARY & NON-CONTRIBUTORY WORDING (For Waste
Haulers only):
® N/A ❑ Yes ❑ No
G.
HIRED AND NON -OWNED AUTO ONLY:
❑ N/A ❑ Yes ® No
H.
NOTICE OF CANCELLATION:
❑ N/A 0 Yes ❑ No
III. WORKERS' COMPENSATION
EFFECTIVE/EXPIRATION DATE: 8/11/16-8/11/17
A.
INSURANCE COMPANY: American Zurich Insurance Company
B.
AM BEST RATING (A-: VII or greater): A+/ XV
C.
ADMITTED Company (Must be California Admitted):
® Yes
❑ No
D.
WORKERS' COMPENSATION LIMIT: Statutory
® Yes
❑ No
E.
EMPLOYERS' LIABILITY LIMIT (Must be $1 M or greater)
$1,000,000
F.
WAIVER OF SUBROGATION (To include): Is it included?
® Yes
❑ No
G.
SIGNED WORKERS' COMPENSATION EXEMPTION FORM:
E N/A ❑ Yes
❑ No
H.
NOTICE OF CANCELLATION:
❑ N/A ® Yes
❑ No
ADDITIONAL COVERAGE'S THAT MAYBE REQUIRED
W. PROFESSIONAL LIABILITY
® N/A ❑ Yes ❑ No
V POLLUTION LIABILITY
® N/A ❑ Yes ❑ No
V BUILDERS RISK
® N/A ❑ Yes ❑ No
HAVE ALL ABOVE REQUIREMENTS BEEN MET? ® Yes ❑ No
IF NO, WHICH ITEMS NEED TO BE COMPLETED?
Approved:
8/28/17
Agent of Alliant Insurance Services Date
Broker of record for the City of Newport Beach
RISK MANAGEMENT APPROVAL REQUIRED (Non -admitted carrier rated less than
Self Insured Retention or Deductible greater than $ ) ❑ N/A ❑ Yes ❑ No
Reason for Risk Management approval/exception/waiver:
Approved:
Risk Management
* Subject to the terms of the contract.
Date