HomeMy WebLinkAboutC-7212-1 - Contract for the Improvement of Public Work Police Facility Exterior Stairs Replacementi CITY CLEERX N r CONTRACT FOR THE IMPROVEMENT OF PUBLIC WORK v POLICE FACILITY EXTERIOR STAIRS REPLACEMENT WITH TL VETERANS CONSTRUCTION, INC. THIS CONTRACT FOR THE IMPROVEMENT OF PUBLIC WORK ("Contract') is made and entered into as of this 30th day of November, 2017 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and TL Veterans Construction, Inc., a California corporation ("Contractor"), whose principal place of business is 18345 Sierra Highway, Unit 7, Santa Clarita, CA 91351, and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City desires to engage Contractor to remove a set of existing reinforced concrete stairs, widen a landing opening, remove an existing lighting fixture, construct a new replacement set of reinforced concrete stairs, install a set of new handrails, construct a Portland Cement Concrete curb access ramp, and completing other related necessary items to complete the work in place, as more fully described in the Contract Documents ("Project'). C. City has solicited and received a proposal from Contractor and desires to retain Contractor to render services under the terms and conditions set forth in this Contract. D. Contractor has examined the location of all proposed work, carefully reviewed and evaluated the specifications set forth by City for the Project, and is familiar with all conditions relevant to the performance of services and has committed to perform all work required for the price specified in this Contract over a period of 12 Working days commencing upon issuance of the "Notice to Proceed". NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Contract shall commence on the Effective Date and shall terminate on June 30, 2018, unless terminated earlier as provided for herein. 2. SCOPE OF WORK 2.1. Contract Documents. The complete Contract for the Project includes all of the following documents: Request for Proposals/Bids, attached hereto as Exhibit A; Proposal, attached hereto as Exhibit B; Insurance Requirements, attached hereto as Exhibit C; Labor and Materials Payment Bond attached hereto as Exhibit D; Faithful Performance Bond, attached hereto as Exhibit E; all Project Permits; the Standard Special Provisions and Standard Drawings; Plans and Special Provisions for Contract No. 7212-1; Standard Specifications for Public Works Construction (current adopted edition and all supplements); and this Contract, and all modifications and amendments thereto (collectively the "Contract Documents"). Exhibits A, B, C, D and E, and all other named Contract Documents, are incorporated herein by reference. The Contract Documents comprise the sole agreement between the parties as to the subject matter therein. Any representations or agreements not specifically contained in the Contract Documents are null and void. Any amendments must be made in writing, and signed by both parties in the manner specified in the Contract Documents. 2.2. Scope of Work. Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services required for the Project as identified in the Contract Documents ("Work" or "Services"). 2.3. All of the Work to be performed and materials to be furnished shall be in strict accordance with the provisions of the Contract Documents. Contractor is required to perform all activities, at no extra cost to City, which are reasonably inferable from the Contract Documents as being necessary to produce the intended results. 3. TIME OF PERFORMANCE 3.1. Time is of the essence in the performance of Work under this Contract and Contractor shall complete the Work within 12 Working days from the date of issuance of the "Notice to Proceed." Failure to complete the Work in the time allotted may result in termination of the Contract by City and assessment of damages as outlined in Section 3.2. 3.2. The parties agree that it is extremely difficult and impractical to determine and fix the actual damages that City will sustain should Contractor fail to complete the Project within the time allowed. Should Contractor fail to complete the Work called for in this Contract within 12 Working days from the date of issuance of the Notice to Proceed, Contractor agrees to the deduction of liquidated damages in the sum of One Thousand Dollars ($1,000.00) for each calendar day beyond the date scheduled for completion. 4. COMPENSATION 4.1. As full compensation for the performance and completion of the Project as required by the Contract Documents, City shall pay to Contractor and Contractor accepts as full payment the sum of Fifty Three Thousand Two Hundred Dollars and 00/100 ($53,200.00), less any money deducted pursuant to Section 3.2. Contractor shall not receive any additional compensation unless approved in writing in advance by City's Project Administrator as defined herein. City shall make full payment to Contractor no later than thirty (30) calendar days after acceptance of the Work by City. 4.2. This compensation includes: TL Veterans Construction, Inc. Page 2 4.2.1. Any loss or damage arising from the nature of the Work; 4.2.2. Any loss or damage arising from any unforeseen difficulties or obstructions in the performance of the Work; and 4.2.3. Any expense incurred as a result of any suspension or discontinuance of the Work, but excludes any loss resulting from earthquakes of a magnitude in excess of 3.5 on the Richter Scale and tidal waves, including tsunamis, and which loss or expense occurs prior to acceptance of the Work by City. 5. PROJECT MANAGER Contractor shall designate a Project Manager, who shall coordinate all phases of the Project. This Project Manager shall be available to City at all reasonable times during the term of the Contract. Contractor has designated Harrison Gregory Lee to be its Project Manager. Contractor shall not remove or reassign the Project Manager without the prior written consent of City. City's approval shall not be unreasonably withheld. 6. ADMINISTRATION This Contract shall be administered by the Public Works Department. City's Public Works Director, or designee, shall be the Project Administrator and shall have the authority to act for City under this Contract. The Project Administrator or designee shall represent City in all matters pertaining to the Services to be rendered pursuant to this Contract. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE 7.1. Contractor shall use only the standard materials and equipment as described in the Contract Documents in performing Work under this Contract. Any deviation from the materials or equipment described in the Contract Documents shall not be utilized unless approved in advance by the Project Administrator. 7.2. Contractor shall comply with the terms and conditions of the Contract Documents. 7.3. All of the Work shall be performed by Contractor or under Contractor's supervision. Contractor represents that it possesses the personnel required to perform the Services required by this Contract, and that it will perform all Work in a manner commensurate with community professional standards and with the ordinary degree of skill and care that would be used by other reasonably competent practitioners of the same discipline under similar circumstances. 7.4. All Services shall be performed by qualified and experienced personnel who are not employed by City, nor have any contractual relationship with City. By delivery of completed Work, Contractor certifies that the Work conforms to the requirements of this Contract, all applicable federal, state and local laws, and legally recognized professional standards. TL Veterans Construction, Inc. Page 3 7.5. Contractor represents and warrants to City that it has, shall obtain, and shall keep in full force and effect during the term hereof, at its sole cost and expense, all licenses, permits, qualifications, insurance and approvals of whatsoever nature that is legally required of Contractor to practice its profession. Contractor shall maintain a City of Newport Beach business license during the term of this Contract. 7.6. Contractor shall not be responsible for delay, nor shall Contractor be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, acts of God, or the failure of City to furnish timely information or to approve or disapprove Contractor's Work promptly, or delay or faulty performance by City, contractors, or governmental agencies. 8. CHANGE ORDERS 8.1. This Contract may be amended or modified only by mutual written agreement of the parties. 8.2. The Contractor shall only commence work covered by a change order after the change order is executed and notification to proceed has been provided by the City. 8.3. There shall be no change in the Contractor's members of the project team, as listed in the approved proposal, which is a part of this contract without prior written approval by the City. 9. RESPONSIBILITY FOR DAMAGES OR INJURY 9.1. City and its elected or appointed officers, agents, officials, employees and volunteers shall not be responsible in any manner for any loss or damage to any of the materials or other things used or employed in performing the Project or for injury to or death of any person as a result of Contractor's performance of the Work required hereunder, or for damage to property from any cause arising from the performance of the Project by Contractor, or its subcontractors, or its workers, or anyone employed by either of them. 9.2. Contractor shall be responsible for any liability imposed by law and for injuries to or death of any person or damage to property resulting from defects, obstructions or from any cause arising from Contractor's Work on the Project, or the Work of any subcontractor or supplier selected by Contractor. 9.3. To the fullest extent permitted by law, Contractor shall indemnify, defend and hold harmless City, its elected or appointed officers, agents, officials, employees and volunteers (collectively, the "Indemnified Parties") from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorneys' fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim; collectively, "Claims"), which may arise from or in any manner relate (directly or indirectly) to any breach of the terms and conditions of this Contract, any Work performed or Services provided under this Contract including, without limitation, defects in TL Veterans Construction, Inc. Page 4 workmanship or materials or Contractor's presence or activities conducted on the Project (including the negligent, reckless, and/or willful acts, errors and/or omissions of Contractor, its principals, officers, agents, employees, vendors, suppliers, subconsultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable for any or all of them). 9.4. Notwithstanding the foregoing, nothing herein shall be construed to require Contractor to indemnify the Indemnified Parties from any Claim arising from the sole negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of attorneys' fees in any action on or to enforce the terms of this Contract. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. 9.5. Contractor shall perform all Work in a manner to minimize public inconvenience and possible hazard, to restore other work areas to their original condition and former usefulness as soon as possible, and to protect public and private property. Contractor shall be liable for any private or public property damaged during the performance of the Project Work. 9.6. To the extent authorized by law, as much of the money due Contractor under and by virtue of the Contract as shall be considered necessary by City may be retained by it until disposition has been made of such suits or claims for damages as aforesaid. 9.7. Nothing in this Section or any other portion of the Contract Documents shall be construed as authorizing any award of attorneys' fees in any action to enforce the terms of this Contract, except to the extent provided for above. 9.8. The rights and obligations set forth in this Section shall survive the termination of this Contract. 10. INDEPENDENT CONTRACTOR City has retained Contractor as an independent contractor and neither Contractor nor its employees are to be considered employees of City. The manner and means of conducting the Work are under the control of Contractor, except to the extent they are limited by statute, rule or regulation and the express terms of this Contract. No civil service status or other right of employment shall accrue to Contractor or its employees. Contractor shall have the responsibility for and control over the means of performing the Work, provided that Contractor is in compliance with the terms of this Contract. Anything in this Contract that may appear to give City the right to direct Contractor as to the details of the performance or to exercise a measure of control over Contractor shall mean only that Contractor shall follow the desires of City with respect to the results of the Work. TL Veterans Construction, Inc. Page 5 11. COOPERATION Contractor agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or interest in the Work to be performed. City agrees to cooperate with Contractor on the Project. 12. CITY POLICY Contractor shall discuss and review all matters relating to policy and Project direction with City's Project Administrator in advance of all critical decision points in order to ensure the Project proceeds in a manner consistent with City goals and policies. 13. PROGRESS Contractor is responsible for keeping the Project Administrator and/or designee informed on a regular basis regarding the status and progress of the Project, activities performed and planned, and any meetings have been scheduled or are desired. 14. BONDING 14.1. Contractor shall obtain, provide and maintain at its own expense during the term of this Contract both of the following: (1) a Faithful Performance Bond in the amount of one hundred percent (100°/x) of the total amount to be paid Contractor as set forth in this Contract in the form attached as Exhibit E and incorporated herein by reference; and (2) a Labor and Materials Payment Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in this Contract and in the form attached as Exhibit D and incorporated herein by reference. 14.2. The Faithful Performance Bond and Labor and Materials Payment Bond shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570, and (3) assigned a Policyholders' Rating A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property - Casualty. 14.3. Contractor shall deliver, concurrently with execution of this Contract, the Faithful Performance Bond and Labor and Materials Payment Bond, and a certified copy of the "Certificate of Authority" of the Insurer or Surety issued by the Insurance Commissioner, which authorizes the Insurer or Surety to transact surety insurance in the State of California. 15. INSURANCE Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract or for other periods as specified in this Contract, policies of insurance of the type, amounts, terms and conditions described in the Insurance Requirements attached hereto as Exhibit C and incorporated herein by reference. TL Veterans Construction, Inc. Page 6 16. PREVAILING WAGES 16.1. Pursuant to the applicable provisions of the Labor Code of the State of California, not less than the general prevailing rate of per diem wages including legal holidays and overtime Work for each craft or type of workman needed to execute the Work contemplated under the Contract shall be paid to all workmen employed on the Work to be done according to the Contract by the Contractor and any subcontractor. In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the Work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the Contract. A copy of said determination is available by calling the prevailing wage hotline number (415) 703-4774 and requesting one from the Department of Industrial Relations. The Contractor is required to obtain the wage determinations from the Department of Industrial Relations and post at the job site the prevailing rate or per diem wages. It shall be the obligation of the Contractor or any subcontractor under him/her to comply with all State of California labor laws, rules and regulations, and the parties agree that the City shall not be liable for any violation thereof. 17. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS Except as specifically authorized under this Contract, the Work to be performed under this Contract shall not be assigned, transferred contracted or subcontracted out without the prior written approval of City. Any of the following shall be construed as an assignment: The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor, or of the interest of any general partner or joint venturer or syndicate member or co -tenant if Contractor is a partnership or joint -venture or syndicate or co -tenancy, which shall result in changing the control of Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five percent (25%) or more of the assets of the corporation, partnership orjoint-venture. 18. SUBCONTRACTING The subcontractors authorized by City, if any, to perform the Work on this Project are identified in the Proposal attached as Exhibit B. Contractor shall be fully responsible to City for all acts and omissions of any subcontractors. Nothing in this Contract shall create any contractual relationship between City and subcontractor, nor shall it create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. City is an intended beneficiary of any Work performed by the subcontractor for purposes of establishing a duty of care between the subcontractor and City. Except as specifically authorized herein, the Work to be performed under this Contract shall not be otherwise assigned, transferred, contracted or subcontracted out without the prior written approval of City. 19. OWNERSHIP OF DOCUMENTS 19.1. Each and every report, draft, map, record, plan, document and other writing produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor, its officers, employees, agents and subcontractors, in the course of implementing this Contract, shall become the exclusive property of City, and City shall have the sole right TL Veterans Construction, Inc. Page 7 to use such materials in its discretion without further compensation to Contractor or any other party. Contractor shall, at Contractor's expense, provide such Documents to City upon prior written request. 19.2. Documents, including drawings and specifications, prepared by Contractor pursuant to this Contract, are not intended or represented to be suitable for reuse by City or others on any other project. Any use of completed Documents for other projects and any use of incomplete Documents without specific written authorization from Contractor will be at City's sole risk and without liability to Contractor. Further, any and all liability arising out of changes made to Contractor's deliverables under this Contract by City or persons other than Contractor is waived against Contractor and City assumes full responsibility for such changes unless City has given Contractor prior notice and has received from Contractor written consent for such changes. 20. RECORDS Contractor shall keep records and invoices in connection with the Work to be performed under this Contract. Contractor shall maintain complete and accurate records with respect to the costs incurred under this Contract and any Services, expenditures and disbursements charged to City, for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor under this Contract. All such records and invoices shall be clearly identifiable. Contractor shall allow a representative of City to examine, audit and make transcripts or copies of such records and invoices during regular business hours. Contractor shall allow inspection of all Work, documents, proceedings and activities related to the Contract for a period of three (3) years from the date of final payment to Contractor under this Contract. 21. WITHHOLDINGS City may withhold payment to Contractor of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Contract. Contractor shall not discontinue Work as a result of such withholding. Contractor shall have an immediate right to appeal to the City Manager or designee with respect to such disputed sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of return that City earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld. 22. CONFLICTS OF INTEREST 22.1. Contractor or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act"), which (1) requires such persons to disclose any financial interest that may foreseeably be materially affected by the Work performed under this Contract, and (2) prohibits such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. 22.2. If subject to the Act, Contractor shall conform to all requirements of the Act. Failure to do so constitutes a material breach and is grounds for immediate termination TL Veterans Construction, Inc. Page 8 of this Contract by City. Contractor shall indemnify and hold harmless City for any and all claims for damages resulting from Contractor's violation of this Section. 23. NOTICES 23.1. All notices, demands, requests or approvals to be given under the terms of this Contract shall be given in writing, to City by Contractor and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first-class mail, addressed as hereinafter provided. 23.2. All notices, demands, requests or approvals from Contractor to City shall be addressed to City at: Attn: Public Works Director Public Works Department City of Newport Beach 100 Civic Center Drive PO Box 1768 Newport Beach, CA 92658 23.3. All notices, demands, requests or approvals from City to Contractor shall be addressed to Contractor at: Attn: Theodore Gregory Lee TL Veterans Construction, Inc. 18345 Sierra Highway, Unit 7 Santa Clarita, CA 91351 24. NOTICE OF CLAIMS Unless a shorter time is specified elsewhere in this Contract, before making its final request for payment under the Contract Documents, Contractor shall submit to City, in writing, all claims for compensation under or arising out of this Contract. Contractor's acceptance of the final payment shall constitute a waiver of all claims for compensation under or arising out of this Contract, except those previously made in writing and identified by Contractor in writing as unsettled at the time of its final request for payment. Contractor and City expressly agree that in addition to all claims filing requirements set forth in the Contract and Contract Documents, Contractor shall be required to file any claim Contractor may have against City in strict conformance with the Government Claims Act (Govt. Code §§ 900 et seq.). 25. TERMINATION 25.1. In the event that either party fails or refuses to perform any of the provisions of this Contract at the time and in the manner required, that party shall be deemed in default in the performance of this Contract. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due TL Veterans Construction, Inc. Page 9 performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, the non -defaulting party may terminate the Contract forthwith by giving to the defaulting party written notice thereof. 25.2. Notwithstanding the above provisions, City shall have the right, at its sole discretion and without cause, of terminating this Contract at any time by giving seven (7) calendar days prior written notice to Contractor. In the event of termination under this Section, City shall pay Contractor for Services satisfactorily performed and costs incurred up to the effective date of termination for which Contractor has not been previously paid. On the effective date of termination, Contractor shall deliver to City all materials purchased in performance of this Contract. 26. EFFECT OF CONTRACTOR'S EXECUTION Execution of this Contract and all other Contract Documents by Contractor is a representation that Contractor has visited the Project Site as defined by the Contract Documents, has become familiar with the local conditions under which the Work is to be performed, and has correlated all relevant observations with the requirements of the Contract Documents. 27. STANDARD PROVISIONS 27.1. Recitals. City and Contractor acknowledge that the above Recitals are true and correct and are hereby incorporated by reference into this Contract. 27.2. Compliance with all Laws. Contractor shall at its own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. In addition, all Work prepared by Contractor shall conform to applicable City, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator and City. 27.3. Waiver. A waiver by either party of any breach, of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition contained herein, whether of the same or a different character. 27.4. Integrated Contract. This Contract represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. 27.5. Conflicts or Inconsistencies. In the event there are any conflicts or inconsistencies between this Contract and any other attachments attached hereto, the terms of this Contract shall govern. 27.6. Interpretation. The terms of this Contract shall be construed in accordance with the meaning of the language used and shall not be construed for or against either TL Veterans Construction, Inc. Page 10 party by reason of the authorship of the Contract or any other rule of construction which might otherwise apply. 27.7. Amendments. This Contract may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 27.8. Severability. If any term or portion of this Contract is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Contract shall continue in full force and effect. 27.9. Controlling Law and Venue. The laws of the State of California shall govern this Contract and all matters relating to it and any action brought relating to this Contract shall be adjudicated in a court of competent jurisdiction in the County of Orange, State of California. 27.10. Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, sexual orientation, age or any other impermissible basis under law. 27.11. No Attorney's Fees. In the event of any dispute or legal action arising under this Contractor, the prevailing party shall not be entitled to attorneys' fees. 27.12. Counterparts. This Contract may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which together shall constitute one and the same instrument. [SIGNATURES ON NEXT PAGE] TL Veterans Construction, Inc. Page 11 IN WITNESS WHEREOF, the parties have caused this Contract to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTQ Il'S OFFICE Date: l p! j By: Aaron C. Harp n.alal City Attorney ami ATTEST: �� Date: I D- B y: ac 0 mi Leilani 1. Brown City Clerk Attachments: CITY OF NEWPORT BEACH, a California municipal corporation Date: 1 �,, i - , / _ By:/�� o Dave A Webb Public Works Director CONTRACTOR: TL Veterans Construction, Inc., a California corporation Signed in Counterpart By: Theodore Gregory Lee Chief Executive Officer/ Secretary [END OF SIGNATURES] Exf�iUit A — Request for Proposals/Bids Exhibit B — Proposal Exhibit C — Insurance Requirements Exhibit D — Labor and Materials Payment Bond Exhibit E — Faithful Performance Bond TL Veterans Construction, Inc. Page 12 IN WITNESS WHEREOF, the parties have caused this Contract to be executed on the dates written below. APPROVED AS TO FORM: CITY ATT �I 'S OFFICE Date: o By: _ Aaron C. Harp n•91a1 City Attorney AMI ATTEST: Date: CITY OF NEWPORT BEACH, a California municipal corporation Date: By: Dave A Webb Public Works Director CONTRACTOR: TL Veterans Construction, Inc., a California corporation Date: /2 — 0 6 — 20/% By: Leilani I. Brown Theodore Gregory Lee City Clerk Chief Executive Officer/ Secretary [END OF SIGNATURES] Attachments: Exhibit A — Request for Proposals/Bids Exhibit B — Proposal Exhibit C — Insurance Requirements Exhibit D — Labor and Materials Payment Bond Exhibit E — Faithful Performance Bond TL Veterans Construction, Inc. Page 12 EXHIBIT A REQUEST FOR PROPOSALS/BIDS TL Veterans Construction, Inc. Page A-1 CITY OF NEWPORT BEACH NOTICE INVITING BIDS All written bids shall be submitted to the City of Newport Beach Office of the Public Works Director At Newport Beach City Hall 100 Civic Center Drive, Bay 2-D Newport Beach, CA 92660 By 9:00 AM on the 3rd day of November, 2017, at which time such bids shall be opened and read for POLICE FACILITY EXTERIOR STAIRS REPLACEMENT Contract No. TBD $ 58,000 — 63,000 Engineer's Estimate App/roved by Mark Vukojevic City Engineer A PRE-BID JOB WALK AND THE PLANS AND SPECIFICATIONS MAY BE ARRANGED BY CONTACTING THE PROJECT MANAGER, Fong Tse, AT 949-644-3321 Weekend Job Walks Are Available To Accommodate the Contractors Schedule Contractor License Classification required for this project: "B" CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT PROPOSAL POLICE FACILITY EXTERIOR STAIRS REPLACEMENT CONTRACT NO. TBD To The Honorable City Council City of Newport Beach 100 Civic Center Drive Newport Beach, California 92660 Gentlemen: PR1of2 The undersigned declares that he has carefully examined the location of the work, has examined the Plans and Special Provisions, and hereby proposes to furnish all materials except that material supplied by the City and shall perform all work required to complete Contract No. TBD in accordance with the Plans and Special Provisions, and will take in full payment therefore the following unit prices for the work, complete in place, to wit: ITEM QUANTITY ITEM DESCRIPTION AND UNIT UNIT TOTAL AND UNIT PRICE WRITTEN IN WORDS PRICE PRICE 1. Lump Sum Mobilization and Demobilization Dollars and Cents $ Per Lump Sum 2. Lump Sum Remove Existing Stairs and Landing Dollars and Cents Per Lump Sum 3. Lump Sum Cut and Refinish Barrier Wall @ Dollars and Cents $ Per Lump Sum PR2of2 I I tM UUAN IITY ITEM DESCRIPTION AND UNIT UNIT TOTAL AND UNIT PRICE WRITTEN IN WORDS PRICE PRICE 4. Lump Sum Modify Storage Room Existing Lighting @ Dollars and Cents $ Per Lump Sum 5. Lump Sum Construct New Concrete Stairs and Landings @ Dollars and Per Lump Sum 6. Lump Sum Handrailing Per Lump Sum 7. Lump Sum Construct 75 SF Curb Access Ramp Dollars and Cents Dollars and Cents Per Lump Sum 8. 5 Days Early Completion Incentive @ One Thousand Dollars and Zero Cents Per Work Day Completed Early TOTAL PRICE: Date Bidder's Telephone and Fax Numbers Bidder's License No(s)/Classifications Bidder's email address: 1j E $ 5.000.00 lars and _Cents $ Total Price (Figures) Bidder Bidder's Authorized Signature and Title Bidder's Address CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT SPECIAL PROVISIONS POLICE FACILITY EXTERIOR STAIRS REPLACEM CONTRACT NO. TBD INTRODUCTION All work necessary for the completion of this contract shall be done in accordance with (1) these Special Provisions; (2) the Drawings; (3) the City's Standard Special Provisions and Standard Drawings for Public Works Construction, (2004 Edition), including Supplements; and (4) Standard Specifications for Public Works Construction (2009 Edition), including supplements. Copies of the Standard Specifications for Public Works Construction may be purchased at the Building News Bookstore (www.bnibooks.com). The following Special Provisions supplement or modify the Standard Specifications for Public Works Construction as referenced and stated hereinafter: PART 1 - GENERAL PROVISIONS SECTION 2 - SCOPE AND CONTROL OF THE WORK 2-6 WORK TO BE DONE Add to this Section, "The majority of the work necessary for the completion of this contract consists of removing a set of existing reinforced concrete stairs, widening a landing opening, removing an existing lighting fixture, constructing a new replacement set of reinforced concrete stairs, installing a set of new handrails, constructing a PCC curb access ramp, and completing other related necessary items to complete the work in place." 2-6.1 Work Location - 870 Santa Barbara Drive. 3-3 EXTRA WORK 3-3.2 Payment SECTION 3 - CHANGES IN WORK SP1of7 3-3.2.3 Markup Replace this Section with the following: "(a) Work by Contractor. The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profits: 1) Labor ............................................ 15 2) Materials ....................................... 15 3) Equipment Rental ........................... 15 4) Other Items and Expenditures ........... 15 To the sum of the costs and markups provided for in this subsection, one (1) percent shall be added for compensation for bonding. (b) Work by Subcontractor. When all or any part of the extra work is performed by a Subcontractor, the markup established in 3-3.2.3(a) shall be applied to the Subcontractor's actual cost (prior to any markups) of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor. SECTION 4 - CONTROL OF MATERIALS 4-1 MATERIALS AND WORKMANSHIP 4-1.3 Inspection Requirements 4-1.3.4 Inspection and Testing All material and articles furnished by the Contractor shall be subject to thorough inspections and no material or article shall be used in the work until it has been inspected and accepted by the Engineer. The Contractor shall furnish the Engineer full information as to the progress of the work in its various parts and shall give the Engineer timely (48 -hours minimum) notice of the Contractor's readiness for inspection. Submittals are required for all construction material." SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK Add to this Section: The time of completion as specified in Section 6-7, shall commence on the date of the Notice to Proceed. 6-1.1 Construction Schedule No work shall begin until a Notice to Proceed has been issued, a pre -construction meeting has been conducted, and a schedule of work has been approved by the Engineer. The Contractor shall submit a construction schedule to the Engineer for 64SP010 approval a minimum of five working days prior to the pre -construction meeting. Schedule may be bar chart or CPM style. The Engineer will review the Schedule and may require the Contractor to modify the Schedule to conform to the requirements of the Contract Documents. If work falls behind the approved schedule, the Contractor shall be prohibited from starting additional work until Contractor has exerted extra effort to meet the original schedule and has demonstrated their ability to maintain the approved schedule in the future. Such stoppages of work shall in no way relieve the Contractor from the overall time of completion requirement, nor shall it be construed as the basis for payment of extra work because additional personnel and equipment were required on the job." 6-7 TIME OF COMPLETION 6-7.1 General Add to this Section: "The City intends to issue the Notice To Proceed on or before November 13, 2017. The Contractor shall complete all work under Contract within 12 consecutive working days thereafter." 6-7.2 Working Days Revise 3) to read: "any City holiday, defined as January 1st (New Year's Day), the third Monday in January (Martin Luther King Day), the third Monday in February (President's Day), the last Monday in May (Memorial Day), July 4t^, the first Monday in September (Labor Day), November 11th (Veterans Day), the fourth Thursday and Friday in November (Thanksgiving and Friday after), December 24th, (Christmas Eve), December 25th (Christmas), and December 31st (New Year's Eve). If the holiday falls on a Sunday, the following Monday will be considered the holiday. If the holiday falls on a Saturday, the Friday before will be considered the holiday." 6-7.4 Working Hours Normal working hours are from 7:00 AM to 6:00 PM Monday through Saturday. 6-9 LIQUIDATED DAMAGES Revise sentence three to read: "For each consecutive calendar day after the time specified in Section 6-7-1 for completion of the work, the Contractor shall pay to the City or have withheld from moneys due it, the daily sum of $1,000.00. The intent of this section is to emphasize to the Contractor the importance of prosecuting the work in an orderly, preplanned, and continuous sequence so as to minimize inconvenience to the City's operations." SP3of7 SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 7-5 PERMITS Replace this Section with "A City Building Permit is not required." 7-7 COOPERATION AND COLLATERAL WORK Add to this Section: "The Police Facility is on 24-7 operation and will need continuous access to their facilities to respond to incidents in the field. The contractor at all times shall be prepared to temporarily cease operation in short notice to give City access to retrieve the equipment, tools, and/or materials stored inside the building." 7-8.4 Storage of Equipment and Materials 7-8.4.3 Storage of Equipment and Materials in Public Streets Delete the first paragraph and add the following: The City will make available three (3) parking spaces within the Police Facility front parking lot to the Contractor for onloading and offloading construction materials and equipment. If desired, the Contractor may enclose his storage area(s) with a minimum 6 -foot high chain linked fence. The storage area(s) shall contain all of the contractor's materials, supplies, equipment, machinery, toilets, workbenches, etc. Prior to move -in, the Contractor shall take photos of the laydown area. The Contractor shall restore the laydown area to its pre -construction condition. The Engineer may require new base and pavement if the pavement condition has been compromised during construction. 7-8.5 Temporary Light, Power and Water. Add to this Section: "The Contractor will have gratis use of the City's water and power at the work site." 7-8.6 Water Pollution Control Add to this Section, "All water used during the work containing mud, silt or other deleterious material due to the construction of this project shall be treated by filtration or retention in settling basin(s) sufficient to prevent such material from migrating into any catch basin, Newport Harbor, the beach, or the ocean. The Contractor shall also comply with the Construction Runoff Guidance Manual which is available for review at the Public Works Department or can be found on the City's website at www.newportbeachca.gov/publicworks and clicking on permits, then selecting the link Construction Runoff Guidance Manual. Additional information can be found at www.cleanwaternewport.com." 7-8.6.2 Best Management Practices (BMPs) Add to this Section: The Contractor shall be responsible for containing any wastewater or storm water runoff from the project site including, but not limited to the following: 69lMM a. No placement of construction materials where they could enter storm drain system, which includes gutters that lead to catch basins. b. Checking construction vehicles for fluid leaks. c. Providing a controlled area for cleaning or rinse -down activities. d. Monitoring construction activities. e. Minimizing usage of water when saw -cutting and vacuum the residue. f. Providing measures to capture or vacuum -up water contaminated with construction debris. g. Removing any construction related debris on a daily basis. h. Protecting work areas from erosion. The City of Newport Beach will monitor the adjacent storm drains and streets for compliance. Failure of the Contractor to follow BMP will result in immediate cleanup by City and back -charging the Contractor for all costs plus 15 percent. The Contractor may also receive a separate Administrative Citation per Section 14.36.030A23 of the City's Municipal Code. 7-10 PUBLIC CONVENIENCE AND SAFETY 7-10.1 Traffic and Access Add to this Section: "Since the Police Facility operates continuously, the Contractor shall expect and plan for vehicle and pedestrian traffic around his work at all times." 7-10.4 Safety 7-10.4.1 Safety Orders Add to this Section: The Contractor shall be solely and completely responsible for conditions of the job -site, including the safety of all persons and property during performance of the work. The Contractor shall fully comply with all State, Federal and other laws, rules, regulations, and orders relating to the safety of the public and workers. The right of the Engineer or the City's Representative to conduct construction review or observation of the Contractor's performance shall not include review or observation of the adequacy of the Contractor's safety measures in, on, or near the construction site." 7-15 CONTRACTOR'S LICENSES At the time of City Council contract award and until completion of work, the Contractor shall possess a valid General Building Contractor "B" License issued by the State of California. From the start until work completion, the Contractor and all Sub -contractors shall possess a valid Business License issued by the City of Newport Beach. SECTION 9 - MEASUREMENT AND PAYMENT SP5of7 9-3 PAYMENT 9-3.1 General Revise paragraph two to read: The unit and lump sum prices bid for each item of work shown on the Proposal shall include full compensation for furnishing the labor, materials, tools, equipment, and doing all the work, including restoring all existing improvements, to complete the item of work in place and no other compensation will be allowed thereafter. Payment for incidental items of work not separately listed shall be included in the prices shown for the bid items included within the Proposal: Item No. 1 Mobilization and Demobilization: Work under this Item shall include providing bonds, insurance and financing, preparing BMPs, construction schedule, Schedule of Values, site cleanup, at least one (1) portable toilet, and all other related work as required by the Contract Documents and these Special Provisions. Item No. 2 Remove Existing Stairs and Landing: Work under this Item shall include all of the costs of equipment, tools, materials, and labor to remove and dispose of the existing reinforced concrete stairs and landings. The cost of maintaining the existing barrier walls in place shall have been included in the bid. Item No. 3 Cut and Refinish Barrier Wall: Work under this Item shall include all of the costs of equipment, tools, materials, and labor to sawcut, remove, dispose, patch back, smoothen, bevel, and refinish the reinforced concrete barrier wall. Item No. 4 Modify Storage Room Existing Lighting: Work under this Item shall include all of the costs of equipment, tools, materials, and labor to disconnect and remove a set of wall mounted fluorescent shop lights in the storage room under the stairs. The cost of rewiring the remaining shop lights so they will remain functional shall have been included in the bid. Item No. 5 Construct New Concrete Stairs and Landings: Work under this Item shall include all of the costs of equipment, tools, materials, and labor to shore, form, dowel, reinforce, grade, and broom finish the new improvements. The cost of furnishing and installing the safety strips and refinishing the existing walls along with the both sides of the new stairs to match the adjoining finishes shall have been included in the bid. Item No. 6 Handrailing: Work under this Item shall include all of the costs of equipment, tools, materials, and labor to remove and dispose of the existing handrailing and furnish and install the new railings as shown on the drawings. The cost of patching and refinishing the holes where the existing railings were removed from shall have been included in the bid. Item No. 7 Construct 75 SF Curb Access Ramp: Although not shown on the Plans, work under this Item shall include all of the costs of equipment, tools, materials, and labor to remove and dispose of the existing interfering concrete panels and curb, compact subgrade to minimum 90% relative compaction, and construct a new concrete 611-i.5i1 curb access ramp approximate ten feet away from the stairs. The cost of grooving and truncated domes per City Standard Drawings shall have been included in the bid. Item No. 8 Early Completion Incentive: For each Monday through Friday work day that all of the required improvements have been completed to the Engineer's satisfaction in advance of the twelve (12) working days specified under Section 6-7.1, the City shall pay the Contract a daily sum of $1,000.00 up to a maximum of $5,000.00. 9-3.2 Partial and Final Payment. Delete the third paragraph and replace with the following: "From each progress estimate, five (5) percent will be retained by the Agency, and the remainder less the amount of all previous payments will be paid." Add to this Section: "Partial payments for mobilization and traffic control shall be made in accordance with Section 10264 of the California Public Contract Code." SP7of7 EXHIBIT B PROPOSAL TL Veterans Construction, Inc. Page B-1 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT PROPOSAL POLICE FACILITY EXTERIOR STAIRS REPLACEMENT CONTRACT NO. TBD To The Honorable City Council City of Newport Beach 100 Civic Center Drive Newport Beach, California 92660 Gentlemen: PR1of2 The undersigned declares that he has carefully examined the location of the work, has examined the Plans and Special Provisions, and hereby proposes to furnish all materials except that material supplied by the City and shall perform all work required to complete Contract No. TBD in accordance with the Plans and Special Provisions, and will take in full payment therefore the following unit prices for the work, complete in place, to wit: ITEM QUANTITY ITEM DESCRIPTION AND UNIT UNIT TOTAL AND UNIT PRICE WRITTEN IN WORDS PRICE PRICE Lump Sum Mobilization and Demobilization Q@ THREE THOUSAND EIGHT HUNDRED FIFTY Dollars and ZERO Cents $ 3,850.00 Per Lump Sum 2. Lump Sum Remove Existing Stairs and Landing @ SEVEN THOUSAND TWO HUNDRED FIFTY Dollars and ZERO Cents $ 7.250.00 Per Lump Sum 3. Lump Sum Cut and Refinish Barrier Wall @ TWO THOUSAND SIX HUNDRED FIFTY Dollars and ZERO Cents $ 2,850.00 Per Lump Sum PR2of2 ITEM QUANTITY ITEM DESCRIPTION AND UNIT UNIT TOTAL AND UNIT PRICE WRITTEN IN WORDS PRICE PRICE 4. Lump Sum Modify Storage Room Existing Lighting @ SEVEN HUNDRED FIFTY Dollars and ZERO Cents $ 750.00 Per Lump Sum 5. Lump Sum Construct New Concrete Stairs and Landings @ TWENTY-ONE THOUSAND NINE HUNDRED FIFTY Dollars and ZERO Cents $ 21,950.00 Per Lump Sum 6. Lump Sum Handrailing @ FOUR THOUSAND NINE HUNDRED FIFTY Dollars and ZERO Cents $ 4.950.00 Per Lump Sum 7. Lump Sum Construct 75 SF Curb Access Ramp @ SIX THOUSAND EIGHT HUNDRED Dollars and ZERO Cents $ 6,800.00 Per Lump Sum 8. 5 Days Early Completion Incentive @ One Thousand Dollars and Zero Cents $ 5.000.00 Per Work Day Completed Early TOTAL PRICE: FIFTY-THREE THOUSAND TWO HUNDRED Dollars and ZEROCents $ 53.200.00 Total Price (Figures) 11-01-2012 Date (661) 299-67821(661) 299-6784 Bidder's Telephone and Fax Numbers 1000483 / B & C-33 Bidder's License No(s)/Classifications Bidder's email address: theodore.lee@tiveterans.com TL VETERANS CONSTRUCTION, INC. Bidder —-� � PRESIDENT Bidder's Authorized Signature and Title 18345 SIERRA HIGHWAY UNIT 7 SANTA CLARITA CA 91351 Bidder's Address EXHIBIT C INSURANCE REQUIREMENTS — PUBLIC WORKS AND CONSTRUCTION 1. Provision of Insurance. Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract, policies of insurance of the type and amounts described below and in a form satisfactory to City. Contractor agrees to provide insurance in accordance with requirements set forth here. If Contractor uses existing coverage to comply and that coverage does not meet these requirements, Contractor agrees to amend, supplement or endorse the existing coverage. 2. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 3. Coverage Requirements. A. Workers' Compensation Insurance. Contractor shall maintain Workers' Compensation Insurance providing statutory benefits and Employer's Liability Insurance with limits of at least one million dollars ($1,000,000) each employee for bodily injury by accident and each employee for bodily injury by disease in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with California law for all of the subcontractor's employees. The insurer issuing the Workers' Compensation insurance shall amend its policy by endorsement to waive all rights of subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers. Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its elected or appointed officers, agents, officials, employees and volunteers. B. General Liability Insurance. Contractor shall maintain commercial general liability insurance, and if necessary umbrella liability insurance, with coverage at least as broad as provided by Insurance Services Office form CG 00 01, in an amount not less than one million dollars ($1,000,000) per occurrence, two million dollars ($2,000,000) general aggregate and two million dollars ($2,000,000) completed operations aggregate. The policy shall cover liability arising from premises, operations, products -completed operations, personal and advertising injury, and liability assumed under an insured contract (including the tort liability of another assumed in a business contract). C. Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 TL Veterans Construction, Inc. Page C-1 covering bodily injury and property damage for all activities of Contractor arising out of or in connection with Work to be performed under this Contract, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit for each accident. D. Builder's Risk Insurance. For Contracts with property exposures during construction, Contractor shall maintain Builders Risk insurance or an installation floater as directed by City, covering damages to the Work for "all risk" or special causes of loss form with limits equal to 100% of the completed value of contract, with coverage to continue until final acceptance of the Work by City. At the discretion of City, the requirement for such coverage may include additional protection for Earthquake and/or Flood. City shall be included as an insured on such policy, and Contractor shall provide City with a copy of the policy. 4. Other Insurance Requirements. The policies are to contain, or be endorsed to contain, the following provisions: A. Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this Contract shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these requirements to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors. B. Additional Insured Status. All liability policies including general liability, products and completed operations, excess liability, pollution liability, and automobile liability, if required, shall provide or be endorsed to provide that City, its elected or appointed officers, agents, officials, employees and volunteers shall be included as additional insureds under such policies. C. Primary and Non Contributory. Contractor's insurance coverage shall be primary insurance and/or the primary source of recovery with respect to City, its elected or appointed officers, agents, officials, employees and volunteers. Any insurance or self-insurance maintained by City shall be excess of Contractor's insurance and shall not contribute with it. D. Notice of Cancellation. All policies shall provide City with thirty (30) calendar days notice of cancellation or nonrenewal of coverage (except for nonpayment for which ten (10) calendar days notice is required) for each required coverage except Builders Risk Insurance, which shall contain an endorsement with said required notices. TL Veterans Construction, Inc. Page C-2 5. Additional Agreements Between the Parties. The parties hereby agree to the following: A. Evidence of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation and other endorsements as specified herein for each coverage. All of the executed documents referenced in this Contract must be returned to City within ten (10) regular City business days after the date on the "Notification of Award". Insurance certificates and endorsements must be approved by City's Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Contract. City reserves the right to require complete, certified copies of all required insurance policies, at any time. B. City's Right to Revise Requirements. The City reserves the right at any time during the term of the Contract to change the amounts and types of insurance required by giving Contractor ninety (90) calendar days advance written notice of such change. If such change results in substantial additional cost to Contractor, City and Contractor may renegotiate Contractor's compensation. C. Right to Review Subcontracts. Contractor agrees that upon request, all agreements with subcontractors or others with whom Contractor enters into contracts with on behalf of City will be submitted to City for review. Failure of City to request copies of such agreements will not impose any liability on City, or its employees. Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format at least as broad as CG 20 38 04 13. D. Enforcement of Contract Provisions. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of non-compliance with any requirement imposes no additional obligations on City nor does it waive any rights hereunder. E. Requirements not Limiting. Requirements of specific coverage features or limits contained in this Exhibit A are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for higher limits maintained by the Contractor. Any available TL Veterans Construction, Inc. Page C-3 proceeds in excess of specified minimum limits of insurance and coverage shall be available to the City. F. Self -Insured Retentions. Contractor agrees not to self -insure or to use any self-insured retentions on any portion of the insurance required herein and further agrees that it will not allow any indemnifying party to self -insure its obligations to City. If Contractor's existing coverage includes a self-insured retention, the self-insured retention must be declared to City. City may review options with Contractor, which may include reduction or elimination of the self- insured retention, substitution of other coverage, or other solutions. Contractor agrees to be responsible for payment of any deductibles on their policies. G. City Remedies for Non Compliance. If Contractor or any subcontractor fails to provide and maintain insurance as required herein, then City shall have the right but not the obligation, to purchase such insurance, to terminate this Contract, or to suspend Contractor's right to proceed until proper evidence of insurance is provided. Any amounts paid by City shall, at City's sole option, be deducted from amounts payable to Contractor or reimbursed by Contractor upon demand. H. Timely Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor's performance under this Contract, and that involve or may involve coverage under any of the required liability policies. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. I. Coverage not Limited. All insurance coverage and limits provided by Contractor and available or applicable to this Contract are intended to apply to the full extent of the policies. Nothing contained in this Contract or any other agreement relating to City or its operations limits the application of such insurance coverage. Coverage Renewal. Contractor will renew the coverage required here annually as long as Contractor continues to provide any Work under this or any other Contract or agreement with City. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Contract have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contractor's insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specifications applicable to the renewing or new coverage must be provided to City with five (5) calendar days of the expiration of the coverages. TL Veterans Construction, Inc. Page C-4 CERTIFICATE OF INSURANCE CHECKLIST City of Newport Beach This checklist is comprised of requirements as outlined by the City of Newport Beach. * Date Received: 12/5/17 Dept./Contact Received From: Raymund Date Completed: 12/7/17 Sent to: Raymund By: Jan Company/Person required to have certificate: T L Veterans Construction — Exterior Stairs Replacement Type of contract: 1. GENERAL LIABILITY EFFECTIVE/EXPIRATION DATE: 8/5/17 — 8/5/18 A. INSURANCE COMPANY: U.S. Specialty Insurance Company B. AM BEST RATING (A-: VII or greater): A++/ XV C. ADMITTED Company (Must be California Admitted): Is Company admitted in California? ® Yes ❑ No D. LIMITS (Must be $1 M or greater): What is limit provided? $1M/$2M E. ADDITIONAL INSURED ENDORSEMENT — please attach ® Yes ❑ No F. PRODUCTS AND COMPLETED OPERATIONS (Must (What is limits provided?) include): Is it included? (completed Operations status does F. PRIMARY & NON-CONTRIBUTORY WORDING (For Waste not apply to Waste Haulers or Recreation) ® Yes ❑ No G. ADDITIONAL INSURED FOR PRODUCTS AND G. HIRED AND NON -OWNED AUTO ONLY: COMPLETED OPERATIONS ENDORSEMENT (completed H. NOTICE OF CANCELLATION: Operations status does not apply to Waste Haulers) ® Yes ❑ No H. ADDITIONAL INSURED WORDING TO INCLUDE (The City its officers, officials, employees and volunteers): Is it included? ® Yes ❑ No I. PRIMARY & NON-CONTRIBUTORY WORDING (Must be included): Is it included? ® Yes ❑ No J. CAUTION! (Confirm that loss or liability of the named insured is not limited solely by their negligence) Does endorsement include "solely by negligence' wording? ❑ Yes ®No K. ELECTED SCMAF COVERAGE (RECREATION ONLY): ® N/A ❑ Yes ❑ No L. NOTICE OF CANCELLATION: ❑ N/A ® Yes ❑ No II. AUTOMOBILE LIABILITY EFFECTIVE/EXPIRATION DATE: 3/6/17 - 3/6/18 A. INSURANCE COMPANY: United Financial Casualty Company B. AM BEST RATING (A-: VII or greater) A+/ XI C. ADMITTED COMPANY (Must be California Admitted): Is Company admitted in California? ® Yes ❑ No D. LIMITS - If Employees (Must be $1 M min. BI & PD and $500,000 UM, $2M min for Waste Haulers): What is limits provided? $1,500,000 E, LIMITS Waiver of Auto Insurance / Proof of coverage (if individual) (What is limits provided?) N/A F. PRIMARY & NON-CONTRIBUTORY WORDING (For Waste Haulers only): ❑ N/A ® Yes ❑ No G. HIRED AND NON -OWNED AUTO ONLY: ❑ N/A ❑ Yes ® No H. NOTICE OF CANCELLATION: ❑ N/A ® Yes ❑ No III. WORKERS' COMPENSATION EFFECTIVE/EXPIRATION DATE: 4/4/17 -4/4/18 A. INSURANCE COMPANY: State Compensation Insurance Fund B. AM BEST RATING (A-: VII or greater): Not Rated C. ADMITTED Company (Must be California Admitted): ® Yes ❑ No D. WORKERS' COMPENSATION LIMIT: Statutory N Yes ❑ No E. EMPLOYERS' LIABILITY LIMIT (Must be $1M or greater) $1,000,000 F. WAIVER OF SUBROGATION (To include): Is it included? N Yes ❑ No G. SIGNED WORKERS' COMPENSATION EXEMPTION FORM: N N/A ❑ Yes ❑ No H. NOTICE OF CANCELLATION: ❑ N/A N Yes ❑ No ADDITIONAL COVERAGE'S THAT MAYBE REQUIRED IV. PROFESSIONAL LIABILITY V POLLUTION LIABILITY N N/A ❑ Yes [-]No N N/A ❑ Yes ❑ No V BUILDERS RISK 11/15/17-11/15/18 AMERICAN ZURICH INSURANCE COMPANY Rated: A+/XV, Admitted ❑ N/A N Yes ❑ No HAVE ALL ABOVE REQUIREMENTS BEEN MET? IF NO, WHICH ITEMS NEED TO BE COMPLETED? N Yes ❑ No Agent ofAlliant Insurance Services Date Broker of record for the City of Newport Beach RISK MANAGEMENT APPROVAL REQUIRED (Non -admitted carrier rated less than _ Self Insured Retention or Deductible greater than $ ) ❑ N/A ❑ Yes ❑ No Reason for Risk Management approval/exception/waiver: Approved: Risk Management * Subject to the terms of the contract. Date EXECUTED IN 1 ORIGINAL COUNTERPART EXHIBIT D CITY OF NEWPORT BEACH BOND NO. 602-115199-2 LABOR AND MATERIALS PAYMENT BOND WHEREAS, the City of Newport Beach, State of California, has awarded to TL Veterans Construction, Inc., hereinafter designated as the "Principal," a contract for the Improvement of Police Facility Exterior Stairs Replacement located at 870 Santa Barbara Dr, Newport Beach, CA 92660, in the City of Newport Beach, in strict conformity with the Contract on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Contract and the terms thereof require the furnishing of a bond, providing that if Principal or any of Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the Work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth. NOW, THEREFORE, We the undersigned Principal, and, UNITED STATES FIRE INSURANCE COMPANY duly authorized to transact business under the laws of the State of California, as Surety, (referred to herein as "Surety") are held and firmly bound unto the City of Newport Beach, in the sum of Fifty Three Thousand Two Hundred Dollars ($53,200.00) lawful money of the United States of America, said sum being equal to 100% of the estimated amount payable by the City of Newport Beach under the terms of the Contract; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the Principal's subcontractors, fail to pay for any materials, provisions, or other supplies, implements or machinery used in, upon, for, or about the performance of the Work contracted to be done, or for any other work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, or for any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, then the Surety will pay for the same, in an amount not exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as required by the provisions of Section 9554 of the Civil Code of the State of California. The Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9100 of the California Civil Code so as to give a right of action to them or their assigns in any suit brought upon this Bond, as required by and in accordance with the provisions of Sections 9500 et seq. of the Civil Code of the State of California. TL Veterans Construction, Inca Page D-1 And Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Contract or to the Work to be performed thereunder shall in any wise affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions to the terms of the Contract or to the Work or to the specifications. In the event that any principal above named executed this Bond as an individual, it is agreed that the death of any such principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the above named Principal and Surety, on the 5TH day of DECEMBER —,20 17 , TL VETERANS CONSTRUCTION, INC. Name of Contractor (Principal) UNITED STATES FIRE INSURANCE COMPANY Name of Surety 305 MADISON AVE. MORRISTOWN, NJ 07962 Address of Surety 973-490-6600 Telephone APPROVED AS TO FORM: CITY ATT ORN Y' OFFICE Date: 1a N Aaron 'C. Harp G 111 City Attorney airrrA Authorized Signature/Title Authorized Agent Signature KEVIN VEGA, ATTORNEY -in -FACT Print Name and Title NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BEA TTA CHED TL Veterans Construction, Inc. Page D-2 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Los Angeles On 06 — f -z before me, Jessica Anne Marie Carino (insert name and title of the officer) personally appeared who proved to me on the basis of satisfactory evidence to be the person(O—whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/therxecuted the same in his/lber/thfiir authorized capacity(ies), and that by his/slgnature(a)-6-n the instrument the persons r the entity upon behalf of which the person( acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraphistrue and correct. WITNESS my hand and official seal. C+ JESSICA ANNE MARIE CARING x Commission # 2076BGB 6, Notary Pubiic - California z Los Angelcs County SinatUr My Comm. Eypues Aug 5 20161, 9 (Seal) PO W ER OF ATTORNEY UNITED STATES FIRE INSURANCE COMPANY PRINCIPAL OFFICE- MORRISTOWN, NEW JERSEY 04594432918 KNOW ALL MEN BY THESE PRESEN'T'S: That United Slates Fire Insurance Company, a corporation duly organized and existing under the laws or the slate or Del aware, has made, constituted and appointed, and does hereby make, constitute and appoint: P11111P E. Vega, Kevin Vega, Britian Christiansen, Myrna Smith each, its true and lawful Attorney(s)-In-Faet, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver: Any and all bonds and undertakings of surety and other documents that the ordinary course of surety business may require, and to bind United Slates Fire Insurance Company thereby as fully and to the same extent as If such bonds or undertakings had been duly executed and acknowledged by the regularly elected officers of United Sates Fire Insurance Company at its principal office, in amounts or penalties not exceeding: Seven Million, Five Hundred 'Thousand Dollars ($7,500,000). This Power of Attorney limits the act of thuse named therein to the bonds and undertakings specifically named therein, and they have no authority to bind United Sates Fire Insurance Company except in the mariner and to the extent therein stated. ']'his Power oh Attorney revokes all previous Powers of Attorney issued on behallbfthe Attorneys -In -Fact named above and expires on January 31, 2018. This Power of Attorney is granted pursuant to Article IV of the By -Laws of United States Fire Insurance Company as now in full force and effect, and consistent with Article III lhereol; which Articles provide, in pertinent part: Article IV, Execution of Instruments - Except as the Board of Directors may authorize by resolution, the Chairman of the Board, President, any Vice -President, any Assistant Vice President, the Secretary, or any Assistant Secretary shall have power on behalf of the Corporation: (a) to execute, alfix the corporate seal manually or by facsimile to, acknowledge, verify and deliver any contracts, obligations, instruments and documents whatsoever in connection with its business including, without limiting the foregoing, any bonds, guarantees, undertakings, recognizances, powers of attorney or revocations of any powers of attorney, stipulations, policies of insurance, deeds, leases, mortgages, releases, satisfactions and agency agreements; (b) to appoint, in writing, one or more persons for any or all of the purposes mentioned in the preceding paragraph (a), including affixing the seal of the Corporation. Article III, Officers, Section 3.11, Facsimile Signatures. The signature of any officer authorized by the Corporation to sign any bonds, guarantees, undertakings, recognizances, stipulations, powers of attorney or revocations of any powers of attorney and policies of insurance issued by the Corporation may be printed, facsimile, lithographed or otherwise produced. In addition, irand as authorized by the Board of Directors, dividend warrants or checks, or other numerous instruments similar to one another in form, may be signed by the facsimile signature or signatures, lithographed or otherwise produced, of such officer or officers of the Corporation as from time to time may be authorized to sign such instruments on behalf or the Corporation. The Corporation may continue to use for the purposes herein stated the facsimile signature orany person or persons who shall have been such officer or officers ot'the Corporation, notwithstanding the fact that he may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WHEREOF, United States Fire Insurance Company has caused these presents to be signed and attested by its appropriate ulficer and its corporate seal hereunto affixed this I0"' day of March, 2016. UNITEUSTATFS FIRE. INRI TRA NCE COMPANY Anthony R. Slimowiez, Senior Vice President State ol'New Jersey) County or Morris ) On this 10°i day of March 2016, before me, a Notary public of the State of New Jersey, came the above named officer of United States Fire Insurance Company, to me personally known Lobe the individual and ulficer described herein, and acknowledged that he executed the foregoing instrument and affixed the seal ol'United Stales Fire Insurance Company thereto by the authority orhis office. [/ SOMA SCA LA .�.I Bu_•�-a / JILL -l. C•:_. NO'T'ARY PUBLIC OF NEW JERSEY Sonia Scala (Notary Public) MY COMMISSION EXPIIIES3/25/2019 1, the undersigned o0icer ol'United Slates Fire Insurance Company, a Delaware corporation, do hereby certify that the original Power ol'Attorney ol'which the foregoing is a full, true and correct copy is still in Ibrec and effect and has not been revoked. IN WITNESS WIJEREOF, I have hereunto set my hand and affixed the corporate seal of United States Fire Insurance Company or, the5th day or Dec. 2017 UNITED STATES FIRE INSURANCE COMPANY J Al Wright, Senior Vice President CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of LOS ANGELES On 12/05/2017 Date before me, PHILIP VEGA, NOTARY PUBLIC Here Insert Name and Title of the Officer personally appeared KEVIN VEGA Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the personK whose names) is/are subscribed to the within instrument and acknowledged to me that he/sloe/fhey executed the same in his/hew-/their authorized capacity(les), and that by his/her/the* signatures) on the instrument the person(8), or the entity upon behalf of which the person(* acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. 0LOS PHILIP VEGA CoMM.#2152121 Signature NOAAY PUBLIC•CALIFORNIAN AXOELEB COUNTY j My COMM. EIP. MAY 3420 Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Document Date: Signer(s) Other Than Named Above: Capacity(les) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 02014 National Notary Association • www.NationalNotary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5907 EXECUTED IN 1 ORIGINAL COUNTERPART EXHIBIT E CITY OF NEWPORT BEACH BOND NO. 602-115199-2 FAITHFUL PERFORMANCE BOND The premium charges on this Bond is $ 1,596.00 , being at the rate of $ 30.00 PER thousand of the Contract price. WHEREAS, the City of Newport Beach, State of California, has awarded to TL Veterans Construction, Inc., hereinafter designated as the "Principal," a contract for the Improvement of Police Facility Exterior Stairs Replacement located at 870 Santa Barbara Dr, Newport Beach, CA 92660 in the City of Newport Beach, in strict conformity with the Contract on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein bythis reference. WHEREAS, Principal has executed or is about to execute the Contract and the terms thereof require the furnishing of a Bond for the faithful performance of the Contract. NOW, THEREFORE, we, the Principal, and UNITED STATES FIRE INSURANCE COMPANY , duly authorized to transact business under the laws of the State of California as Surety (hereinafter "Surety"), are held and firmly bound unto the City of Newport Beach, in the sum of Fifty Three Thousand Two Hundred Dollars ($53,200.00) lawful money of the United States of America, said sum being equal to 100% of the estimated amount of the Contract, to be paid to the City of Newport Beach, its successors, and assigns; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the Principal's heirs, executors, administrators, successors, or assigns, fail to abide by, and well and truly keep and perforin any or all the Work, covenants, conditions, and agreements in the Contract Documents and any alteration thereof made as therein provided on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to its true intent and meaning, or fails to indemnify, defend, and save harmless the City of Newport Beach, its officers, employees and agents, as therein stipulated, then, Surety will faithfully perform the same, in an amount not exceeding the sum specified in this Bond; otherwise this obligation shall become null and void. As a part of the obligation secured hereby, and in addition to the face amount specified in this Performance Bond, there shall be included costs and reasonable expenses and fees, including reasonable attorneys fees, incurred by the City, only in the event the City is required to bring an action in law or equity against Surety to enforce the obligations of this Bond. TL Veterans Construction, Inc. Page E-1 Surety, for value received, stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Contract or to the Work to be performed thereunder shall in any way affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions of the Contract or to the Work or to the specifications. This Faithful Performance Bond shall be extended and maintained by the Principal in full force and effect for one (1) year following the date of formal acceptance of the Project by the City. In the event that the Principal executed this bond as an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named, on the 5TH day of DECEMBER , 2017 . TL VETERANS CONSTRUCTION, INC. Name of Contractor (Principal) UNITED STATES FIRE INSURANCE COMPANY Name of Surety 305 MADSION AVE. MORRISTOWN, NJ 07962 Address of Surety 973-490-6600 Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: rJ Authorized ignatureffitle Authorized Agent Signature KEVIN VEGA, ATTORNEY -in -FACT Print Name and Title NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED TL Veterans Construction, Inc. Page E-2 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Los Angeles ) On d -o , — (-:P— before me, Jessica Anne Marie Carino (insert name and title of the officer) personally appeared Th mocio rim L P who proved to me on the basis of satisfactory evidence to be the person( whose name(,$)is/are-- subscribed to the within instrument and acknowledged to me that he/semexecuted the same in hist thorized capacity(sj and that by his/hef/fhe/1r signatu er pw(fin the instrument the person , or the entity upon behalf of which the person(s)zted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. JBSICA ANNE MANE CARIND Ir t-{, Commission # 2076868 �i fJctary PWlic - California z A Los Angeles County -• ' My Comm. Expires Aug 5 2016,_ $igl9ature (Seal) ;•� POWER OF ATTORNEY UNITED STATES FIRE INSURANCE COMPANY PRINCIPAL OFFICE - MORRISTOWN, NEW JERSEY 04594432918 KNOW ALL MEN BY THESE PRESENTS: That United States Fire Insurance Company, a corporation duly organized and existing under the laws of the state of Delaware, has made, constituted and appointed, and does hereby make, constitute and appoint: Philip E. Vega, Kevin Vega, Bruton Christiansen, Myrna Smith each, its true and lawful Attorney(s)-In-Fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver: Any and all bonds and undertakings of surety and other documents that the ordinary course of surety business may require, and to bind United States Fire Insurance Company thereby as fully and to the same extent ms if such bonds or undertakings had been duly executed and acknowledged by the regularly elected ollicers of United States Fire Insurance Company at its principal ollice, in amounts or penalties not exceeding: Seven Million, Five Hundred Thousand Dollars ($7,500,000). This Power of Atturney limits the act or those named therein to the bonds and undertakings specifically named therein, and they have no authority to bind United States Fire Insurance Company except in the manner and to the extent therein stated. ']'his Power ol'Attorney revokes all previous Powers orAttorney issued on behalf of the Attorneys -In -Fact named above and expires on January 31, 2018. This Power or Attorney is granted pursuant to Article IV of' the By -Laws of United States Fire Insurance Company as now in full force and effect, and consistent with Article III thereof, which Articles provide, in pertinent part: Article IV, Execution of Instruments - Except as the Board of Directors may authorize by resolution, the Chairman of the Board, President, any Vice -President, any Assistant Vice President, the Secretary, or any Assistant Secretary shall have power on behalf orthe Corporation: (a) to execute, aflix the corporate seal manually or by facsimile to, acknowledge, verify and deliver any contracts, obligations, instruments and documents whatsoever in connection with its business including, without limiting the foregoing, any bonds, guarantees, undertakings, recognizances, powers of attorney or revocations of any powers of attorney, stipulations, policies of insurance, deeds, leases, mortgages, releases, satisfactions and agency agreements; (b) to appoint, in writing, one or more persons for any or all of the purposes mentioned in the preceding paragraph (a), including affixing the seal orthe Corporation. Article [It, 011icers, Section 3.11, Facsimile Signatures. The signature of any ollicer authorized by the Corporation to sign any bonds, guarantees, undertakings, recognizances, stipulations, powers of attorney or revocations of any powers of attorney and policies of insurance issued by the Corporation may be printed, facsimile, lithographed or otherwise produced. In addition, if and as authorized by the Board of Directors, dividend warrants or checks, or other numerous instruments similar to one another in form, may be signed by the facsimile signature or signatures, lithographed or otherwise produced, of such officer or officers of the Corporation as from time to time may be authorized to sign such instruments on behalfor the Corporation. The Corporation may continue to use for the purposes herein stated the facsimile signature orally person or persons who shall have been such officer or officers of the Corporation, notwithstanding the fact that he may have ceased to be such at the time when such instruments shall be issued. IN WI'T'NESS WHEREOF, United Stales Fire Insurance Company has caused these presents to be signed and attested by its appropriate officer and its corporate seal hereunto affixed this 10°i clay orMarch, 2016. UNITED STA'T'ES Fl RR, INSI TRANCE COMPANY Anthony R. Slimowicz, Senior Vice President State orNew Jersey) County or Morris ) On this 101' day of March 2016, before tine, a Notary public of the State or New Jersey, came the above named officer or United Shoes Fire Insurance Company, to tine personally known Lobe the individual and ollicer described herein, and acknowledged that he executed the foregoing instrmnent and affixed the seal ol'United States Fire Insurance Company thereto by the authority of his ollice. /J SOMASCALA ,il 14!1_: i'.CZ— NO'T'ARY PUBLIC OF NEW JERSEY Sonia Scala (Notary Public) MY COMMISSION EXPIRES 3/25/2019 I, the undersigned ollicer of Uniled States Fire Insurance Company, a Delaware corporation, do hereby certify that the original Power of Attorney of which the Ibregoing is a full, true and correct copy is still in Ponce and ellbct and has not been revoked. IN WITNESS WHEREOF, I have hereunto set my hand and aflixed the corporate seal of United States Fire Insurance Company on fill day of Dec. 20'17 UNITEDSTATES FIRE INSURANCE COMPANY Al Wright, Senior Vice President CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of LOS ANGELES On 12/05/2017 before me, PHILIP VEGA, NOTARY PUBLIC Date Here Insert Name and Title of the Officer personally appeared KEVIN VEGA Name(s) of Signers) who proved to me on the basis of satisfactory evidence to be the persont whose nameN is/ar.0 subscribed to the within instrument and acknowledged to me that he/s1;2/they executed the same in his/herAheir authorized capacity(les)r and that by his/h*F/bieha signature(e) on the instrument the person(S), or the entity upon behalf of which the personN acted, executed the instrument. >� PHILIP VEGA ' COMM,# 2152121 1�pp N NOTARY PUBLIC AL FORNIA y! \ L0t AMO.... COONYY / +< MY COMM. EAP. MAY 31, 2020 " Place Notary Seal Above certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official Signature Signah&44tary Public OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(les) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney In Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: ©2014 National Notary Association • www.NationalNotary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5907