Loading...
HomeMy WebLinkAboutX2018-3060 - MiscX01 S- 3060 SIGALA INSPECTION SERVICES INC.,9090 Falboc (3w r OFFICE/CELL: (323) 630-9436 8990 KRISTIN DR DOWNEY CA EMAIL: oBice@sigalainspection.com 90240 INSPECTION DATE: 10/05/18 REGISTERED SPECIAUDEPLITY INSPECTOR - CERTIFICATE OF COMPLIANCE PROJECT INFORMATION: Permit#: S2018-0150 Pro Adr3reress: Pool remodel 2020 E Balboa Blvd. Newport Beach CA Owner Name: Address: RInCOn Corp Phone &Fax: 2020 E Balboa Blvd. Newport Beach CA Contractor. Addresa. Orange CO Pools and Spas Phone & Fax: Engineer: Address: Todd Lacher Phone & Fax: TYPE OF INSPECTION Reinforced Concrete ❑ Shotcrete ❑ Gunite ❑ Rebar ❑ Welding ❑ Structural Masonry ❑ Prestress ❑ Anchors Bolts ❑ Dowels m Fineproofing ❑ Post - Tension ❑ Framing ❑ Nailing Insp. ❑ Grading ❑ Others ❑ Quality Control ❑ Cylinders Samples Core Panels Mortar Grout Masonry Prism I HEREBY CERTIFY THAT THE FOLLOWING PORTION OF THE WORK AT ABOVE ADDRESS WHICH REQUIRED SPECIAL/ DEPUTY INSPECTION AND FOR WHICH I WAS EMPLOYED TO INSPECT BY ME AND COMPLY WITH THE APPLICABLE PROVISIONS OF THE BUILDING CODES AND THE APPROVED DRAWINGS: wrc., n✓.. ✓ca..n.r nvn. Observed the placement of: 76 steel dowels #3 rebar with 4" embed. Epoxy used: Simpson epoxy et XP RR#: 25744 EXP: 9-19 NAME.- JOSE T. SIGALA URE OF RE ERE�fi ECTOR NB -0616 TYPELICENSE NUMBER ALL INSPECTIONS ARE BASED ON MINIMUM OF 4 HOURS, ANY INSPECTION OVER 4 HOURS WILL BE CHARGED AS 8 HOURS. ANY INSPECTION EMENDING PAST NOON WILL BE CHARGED AS 8 HOURS. SATURDAY ARE BILLED AS TIME AND A HALF. SUNDEY ARE BILLED AS DOUBLE TIME SITE CONTACT.: C) 0 TORO LVA aAZENIMZFM11 October 4, 2018 OC Pools & Spa 17762 Leafwood Lane Santa Ana, CA 92705 Attention: Mr. Everett Sheely Mi8-S060 KORO Balboa 814 E GEOTECHNICAL ENGINEERING Project No. 17-004.4 Subject: Geotechnical Observation/Probing of Aggregate Base Materials at Bottom of Pool, 2020 East Balboa Boulevard, Newport Beach, California In accordance with your request, a representative of Toro International (TI) has visited the subject site today to observe/probe aggregate base materials place at the bottom of the pool. It is -our understanding that the thickness of the aggregate base materials is about 12 inches. It is our opinion from our observation/probing that the aggregate base materials at the bottom of the pool is adequate for the intended purposes. The compaction of the aggregate base materials is a minimum of 90% relative compaction. If you have any questions regarding this report, please call us. We appreciate the opportunity to be of service. Sincerely, TORO INTERNATIONAL * EXP. 3/37/19 P Hantoro Walujono, GEOECav Principal 1 LEAGUE # 61614 a IRVINE, CA 92602 a TEL. (949) 559-1582 • FAX. (949) 266-8911