i AMENDMENT NO. ONE TO
V MAINTENANCE/REPAIR SERVICES AGREEMENT
WITH NATURE'S IMAGE FOR
WEED ABATEMENT SERVICES
THIS AMENDMENT NO. ONE TO MAINTENANCE/REPAIR SERVICES
AGREEMENT ("Amendment No. One") is made and entered into as of this 9th day of
April, 2024 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a
California municipal corporation and charter city ("City"), and NATURE'S IMAGE, INC., a
California corporation ("Contractor"), whose address is 20361 Hermana Circle, Lake
Forest, CA 92630, and is made with reference to the following:
RECITALS
A. On April 23, 2019, City and Contractor entered into a Maintenance/Repair Services
("Agreement") to perform maintenance and/or repair services ("Project").
B. The parties desire to enter into this Amendment No. One to extend the term of the
Agreement to May 1, 2027 and to increase the total compensation.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties
as follows:
1. TERM
Section 1 of the Agreement is amended in its entirety and replaced with the
following: "The term of this Agreement shall commence on the Effective Date, and shall
terminate on May 1, 2027, unless terminated earlier as set forth herein."
2. SERVICES TO BE PERFORMED
Exhibit A to the Agreement shall be replaced in its entirety with the Scope of
Services, attached hereto as Exhibit A and incorporated herein by reference ("Services"
or "Work"). The City may elect to delete certain Services within the Scope of Services at
its sole discretion.
3. COMPENSATION TO CONTRACTOR
Exhibit B to the Agreement shall be supplemented to include the Schedule of
Billing Rates, attached hereto as Exhibit B and incorporated herein by reference. Exhibit
B to the Agreement and Exhibit B to Amendment No. One shall collectively be known as
"Exhibit B."
Section 4.1 of the Agreement is amended in its entirety and replaced with the
following: "City shall pay Contractor for the Services on a time and expense not -to -exceed
basis in accordance with the provisions of this Section and the Schedule of Billing Rates
attached hereto as Exhibit B and incorporated herein by reference. Contractor's
compensation for all Work performed in accordance with this Agreement, including all
reimbursable items and subcontractor fees, shall not exceed Two Million Five Hundred
Thirty Four Thousand Nine Hundred Thirty Three Dollars and 24/100
($2,534,933.24), without prior written authorization from City. Except as otherwise stated
in Section 4.2 of the Agreement, no billing rate changes shall be made during the term of
this Agreement without the prior written approval of City."
The total amended compensation reflects Contractor's additional compensation for
additional Services to be performed in accordance with this Amendment No. One,
including all reimbursable items and subcontractor fees, in an amount not to exceed Five
Hundred Sixty Thousand Dollars and 00/100 ($560,000.00).
4. INTEGRATED CONTRACT
Except as expressly modified herein, all other provisions, terms, and covenants
set forth in the Agreement shall remain unchanged and shall be in full force and effect.
[SIGNATURES ON NEXT PAGE]
NATURE'S IMAGE, INC. Page 2
IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be
executed on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date: Yz i /Z `(
By: ((�;
A r n C. Harp
City Attorney
1
ATTEST:
Date: �, - 1b-. ug�j
LIM
Leilani I. Brow
City Clerk _,,o
1�
Attachments
�;-11-IFOR;A
CITY OF NEWPORT BEACH,
a California municipal corporation
Date: yfS/zoZ�
By:
Will O'Neill
Mayor
CONTRACTOR: NATURE'S IMAGE,
INC., a California corporation
Date:
Signed in Counterpart
By:
Michelle M Caruana
Chief Executive Officer, Chief Financial
Officer, Secretary
[END OF SIGNATURES]
Exhibit A - Scope of Services
Exhibit B - Schedule of Billing Rates
NATURE'S IMAGE, INC. Page 3
IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be
executed on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:
By:
AAsbn C. Harp 3'�s
City Attorney �� y
ATTEST:
Date:
go
Leilani I. Brown
City Clerk
Attachments
CITY OF NEWPORT BEACH,
a California municipal corporation
Date:
By:
Will O'Neill
Mayor
CONTRACTOR: NATURE'S IMAGE,
INC., a California corporation
Date: Ld i l
By: "
Michel M Caruana
Chief Executive Officer, Chief Financial
Officer, Secretary
[END OF SIGNATURES]
Exhibit A — Scope of Services
Exhibit B — Schedule of Billing Rates
NATURE'S IMAGE, INC. Page 3
EXHIBIT A
Scope of Services
NATURE'S IMAGE, INC. Page A-1
EXHIBIT A
SCOPE OF SERVICES
• DESCRIPTION OF PROJECT
o Furnish all labor, equipment, materials, and supervision to provide annual preventative and
as -needed clearance trimming, erosion protection, slope stabilization, hazard reduction,
weed abatement, storm drain clearing, and v-ditch debris removal at various locations
throughout the City of Newport Beach (see attached locations).
• MAINTENANCE STANDARDS
o Contractor shall be responsible for completing one or more of the following types of work
on a per -location basis:
■ Clearance Trimming
• Erosion Protection
■ Hazard Reduction
■ Weed Abatement
o Contractor shall be responsible for completing one or more of the following types of work
on an on -call basis as needed, pursuant to Section 2 of the Agreement:
■ Storm Drain Clearing of debris and vegetation
■ V-Ditch Debris Removal
• Slope Stabilization
o Contractor shall be responsible for completing work in compliance with the following
standards on a per -location basis:
■ Weed Abatement according to 2016 California Fire Code (CFC), Section 304.1.2
• Clearance Trimming according to City of Newport Beach Wildland Urban Interface
Area Standard for Hazard Reduction
o Regardless of which standard applies all cuttings, trimmings, or other debris shall be
removed from lots, streets, parkways, or alleys. Sidewalks, curbs, and gutters shall be
cleaned of debris. All vegetation shall be cut close to the ground with stubble not exceeding
two inches (2"), and if not chopped to a fine dust, it shall be raked and hauled away. No
strips or growth shall be left around the outer edges of property or adjacent to fences,
curbs, or sidewalks. Machine disking of vegetation is not permitted without prior
authorization
• STORM DRAINS AND V-DITCHES
o Remove storm related debris from open drainage channels
o Remove storm related debris from under bridge drainage channels (Fifth at Poppy)
o Install hillside erosion control
o Remove open drainage channel blocking debris and vegetation from Mid Back Bay
(between Back Bay and Jamboree)
o Clear debris from v-ditches and shovel width clearance on both sides of the ditches. (per
foot cost)
o Spray vegetation retardant on both sides of v-ditches
• PREVENTATIVE MAINTENANCE
o Contractor shall provide the City with a preventative maintenance schedule detailing work
standard to be applied at each location and estimated completion date.
o City reserves the right to add or delete locations as deemed necessary. In the event of
adding a location, the City shall provide the Contractor with the location details and request
an annual preventative maintenance cost based on the approved maintenance standard.
The Contractor will provide the annual cost in writing to the Project Administrator. No work
shall be performed on the new location until the cost is approved by the Project
Administrator. If a location is removed from the schedule, the total annual preventative
maintenance cost will be updated to reflect the reduction in service.
o City reserves the right to modify maintenance standards as deemed necessary. In the
event of a modification of the maintenance standard, the City shall provide the Contractor
with the updated maintenance standard. The Contractor may provide a proposed updated
annual cost in writing to the Project Administrator. No work shall be performed based on
the updated maintenance standard until the cost is approved by the Project Administrator.
WORKING HOURS
o Normal working hours shall be between the hours of 7:00 a.m. and 4:30 p.m., Monday
through Thursday, and Fridays 7:00 a.m. to 3:30 p.m.
SUPERVISION OF CONTRACT
o All work shall meet with the approval of the Project Administrator. Any specific problem
area which does not meet the conditions of the specifications set forth herein shall be called
to the attention of the Contractor and if not corrected, payment to the Contractor will not be
made until condition is corrected in a satisfactory manner as set forth in the specifications.
Olt
''i� + ,' � �r �M1 �• �, ( :f t it ..� � +. .. - •, - � - � .
"r., 4''� ' • •�` _ -•,. - v ' _ •: L,� • I ,�' ,, ": ', r ^
~t+��`~ It x � ` - ♦ � .'t � II �{;, I ,'TK'� 1 � }. ,,�.•'�' '` D'. �, \ J , O '-aL/Z �a+J�
flu A
•' Jy �• ' ` r '•� ��,� SE,�g\RD,Ct, ' J ¢,• �EAMl51iGIR�{-i
LA1=iUDE-C-724-?
AL72 P1.IN�+
/ 9Tosw
-� -. A-401
0000000000.di.
Ai:�Yr.�•m-.: :tars- --- - -_
r. PARK CREST DR
k V c r •• 4t.
* C►�j�d a
�I t i
.W. ���ff1SSY"
A
M •1F P4�fi '. 4 'RI �:1 N i
X r� Mjr
7
_ r R N _ r i /,C', y yJ•_ ,,,j .S 1 r ye= k R ..
%Y 1 ! 1 _ - ••f1T� tii7tt W'IE� - 'a • 4 i .�•, • nT . �rC 4
..
aw I
HOLLY
AV
i, i i ti .ii s r T
Owl
PC
�� � � F•I _ 'a �'� � • "- ' • �— ...�• �.'1 'µme -
+ ui
w ° �+` MARGARET DR
' C'-f-._.•i-1777)www•••`���d���111+++sss... .,1;�_ "'ri`. a- .".-�-.._.� - •i.
Holly2315
Lane • • •0• sq. ft. NECaIS
•
Site Number:
- . DiOsion
04, 2019
rP ^w.'L*;,,y.� ` i `'")� ' _.•}i. �' :�y4.� �i• •� r,��� �•�y-�••�:. sti�'' � ;h1'1.a .
11Fi�DpQ ' ••` y HIC 11ANDa�)C'( Y �� ' ; ..4 7, F � /` 2
s
�G gNTjgp �� ` ''u^JCUlN:1.tJ a�r' A�+y 3\INDWARD t' i �-.,�
'Pp �' -f � r � aY� � :-� `�' • � C EWgRD W~� w
SpAyyND
C 'S• Cyr nPVTf U�.,� l��\' T�•�,i,..AGO �
ak , �. `9-/- � . - _ --'J�~ .� �,�1' •� /GALAXY DR �r�
is C A p �i' �I .'I s '~ �'µ•,4K 1: ^�' .
�_ �.\ Sf ! h � r't:A��ft. " rJ y . J {�1�:.p�� j�t5.*�+y,.,,, r �r`� •�. •� •,'
�'BACK•BAY DR •l •� c9J `
a t
-
f ai
�. .� •Q.P 1 '' � , - 1r' ... - A�j L Grp• � � +��
'E Cy � '•ti ��. r, � wJ � } D r '''fit �/
'�. 1 Op! l` Y'rY. f,.. ;� �2 0 'r•.'. •I i ��;i�'�'1�' � - / '� f. ` �.
JL(±�! s/}. w:• lO ._-cr '.l�..s �� � [ y�l� 'O M�Y�/i
_.'+ +' :;i;tS�fi... !� /., � •d i jjS( N (�, 1� U .. t', "T � �i '� � '�, T \/�
i0
WAY \� �. , _ . , •. + •it" i t p,r' ,,
�'. 7.�rlf •��" ,� �• {*RA\'\PS; _ BUNYA S; (4M1ih�:J s
P}3 BIACI(T 0 w�:.i� c isrB
Av
�B.S6iP3iC��
1l „ 1
`{F �1... � �• " •♦ � .✓'. .Y�,}� �� i -\ � r r +r, .� `I'�^ yam¢, •1 �f �'�
/'- �r�..� �. .e • Ch"'r`trj � h �-..���� = �� t.rt.t+'i+"� r!: �-_ �' 4 p' ,��r'�d `',, �-r.i,.l,lrr,f. Ji
�`' r/ f�`. rr _C � I. 1 �,A/` - �`q.�,��- ^,y.i,�J�,fF`iF• �yK '�. �3r � ts..1t/i� f._
-yy ,
Oe
, 1✓r.lif I �_v ri�i� 11 �rf
- �l.+i .•�� •'r-pr Willi ,���' � ' \�}\: �yY{�. MM�r f'\ \ _� •t,l 't'
.aew..,�! .'i`� e . '�. -�! � _ �'1.- `�lJ. � �.�..; �. rho • �, .-': .� .t S�
milli
V.
i:.
-�..� 1� 1 ,� `_ .✓ �l' {. 1 +. F its .�
w''i ''�• h f+ ,' i AV f � -
j
I 4
r
�r
r �1�'
+1
i
J ��
Big Canyon Nature Park Total Area: 2,181,787 sq. ft. •-!�',,, .rq
% Total Acres: 50.09 acres City of NewporI Seach
Site Number: 4 CIS DM ..
February 04, 2019
Wcrd Abc!rmrnlArro M.an Foci mad
IRR .mot t
4 YAP
_ MACgRTHUR BLVD
:l - f +_-. —'—'ram-- _,..�__._._,�...._�---_._,,,..—.._,—.___....—_-..�—.. _ �^. - f---� __-•-` _. � Y.__���+' - -
4"6—
V
Iftjts
�- r
LA VIDA BRINDISI
�' :>.LN - 1:3 i1!'T. '.Y ,—_Yr.3-"'li�� I�U�M�.. ~.J.�"'��'•'���'_' 1 '�"'�tid. . -� .'r-n. — ..
610E 'to A,on.gad
oolun!p SlJ
spnag s,od—N to As!:)Sano 9�C•Q :Saj:)v ID401 8 :aagwnN axis
-1� •bs o9v'vz :oa,b ID4ol (alpp!W) Ally` j:)n9 `1
a1,7. .,,
AN
ii 9 .\•''.,/1 'l .i _ s.3:t � � � wM { .. 1 I t.. , 6 �8 _;: ^i `irMSR� � .-.._._- _._ _ .. _._-
LLL
Vol
yr• �I,; �;i • ,Y' .�..i-'� /-` ..>m,r s,, ..,tea. 1, ^i, •'�f'i"ra. `. s' rr t'
1, w 1 ' ,y� �'•��t �u
u 1 I j
.t I
i`PT Q 4'��•` �S
�. , �;� '• ''lr. �(�� ' � �t• � � .� : + ;� � !. � + _' �., � �a..,-E*•-». } � ', ` fig` �ayl .+
qt
JOB
Q
L'�• 0 �
J
r ..i r � 4 `` I f v-- [. L ,r��j,�;.y,,�,,�r • � �' "''��' _ -`I� u`ir li-, �� ��
I ,- � r' e-- • 1..�'..
,� ,:- "° •< �,i"'j� tipi i a _• �"rIj�yr�9 'l n �•t 1 `�- - '�
i`K—•amjA) f�k WMIw-V�-�14
6 1 OZ 'to Am-qad
—11!-Ia slo
11-9 I-li--N jo AI!D sal:)D 16-9 1 :saA:>V 10401 6 :-ieqwnN GI!S
t Sr6'E69 :DaJV 10401 Allno �Dn� GIPP!W Aaddn
L
Mov
_4,
.'iJR^ 9�: ?'y4�u-•-�.�'�iC.. - �`:V�•r''ti' ,+ ..-.� .-t. ?t' ♦ .l.
N�
A,
wv
A
*"_ {'�t ✓ta,y�` " \ c
-4
toot'
WV
4 j.77i. AL
i4
V"
+�.• !/}C'�^• •�: t+�ls / ..mot �.i�ti�*' .-i �. .. _ +
�,'{{ s
~ /:s • r�'. !. • a?, �. i
_. •. �.� ../ � � 5�.. :4+M �} �1'�"4.`' tom•. + !%��� i- f: ` • /.
\ •a1 jA. _`� ;.lJ►�j�Ji.•r,,°�r ",
h � J4' .�r`. � r Ty' '' r iC' �• .. ' �'a���� '�J� �r(.1ir�`'Jt�• Jr .� 3��••r/+ .�'
'.•r'7� ii 'Q r•:;� ,wry. ;��.,"'� }
i� Y p• + \e �, �+�•: � SA �JI
Ar
`jr .t" r''�"�'� � }r J�.t':• I4 �:�' :��i
NO
�- / t / ,
. r r •\ /J//
,i
. �'.. _ r.i r _ �•��"' , r" -'�;,. ISABEILA TER n� � '-> ,r -
,� }y"�+��t �i - 4, _ y, �� � _mil ■ }� � -^'` - �-. 1 4, � -
��f •�!!C : i! . 11 `•1 +.( �i.� �j� R�VERA TO
t ..�'• . �'/ � �.,. �gR!!!pJ"F r Jl`, i'y``- � f MENpp '
ZA iER ,
lid°' tee.."'' .,�i:•b�
�,,' r \ � • '�'' \ � • .ate � /
r ' µ 1 may' l ..
VVI
1
��'. ' • �,� ._ ' },�'r n . � , � .: �, : ��,- �-.'_,:,._... i • 1, , � SIDE AVE
\ " ... - `•�i��! � 1, - � .�,i, //,// •, ; ; ,�4� c I �a��,q�, r �, D � _ , ,l ,�
r —
- I ��!•� t� ',;, \ _r T�:: � - .� '`dw r� 2 _ ,fir. �. /• � � '°"
-�COAS�T:HW.y ,W �•
N,..` J d . �` r.• rw
"'AlI , './'1 . 6i .: �+.`!'%��\.. �d� t• 4'��f�:....1';�a
�^ + � 'i 'U�..\ - .. .- _ - -. fry .._. -. --�* r -f - •_- _. - _. r.�
ya • ��pS .per C. ;;t ?^�%� t• . - - '
SURREY DR.4.
i . i k+' ..{ ^ •tf � MIS - _
CORTLIMND DR
v _ J11 I IIIII I� lll�1111 lI1Jl .l�
COAST HWY E _7
SHORE fV F�:QO���a1
'; (A' i-,- ;i(L`(��Sf�y' ,v-``GP�.+rc�K ,�a 1 yf�� f ?,: tr. fi l � �� .. t _ � l-� \�yi �•, t' ',� `i_, •
f 'J - j:� ...,! f .ice ,�- :{ •f ii. �rr..rlS�',.
3 \��. � . ,� fit, _ '� �•' i � • c� .!•'� •+ -_ _ ,
,_anr' rit �iYlft ., *.m6bu'r i�r-Ti= - '. ''�.. ►.
Cr t . • t ic: io t�rY � a �. x 4«` � � .4,
h
J•/ f +i•i♦ Qj��,�� ; .�' � +K't >` �.� Fes,,
4-1
• / `- , � -e'er ,��, - `
BAYVIEW WAyyr ?I„ .r , Y Iwo
I
ram-• -- - 4 .r, � ��. �y?C • � � <� � ` � � .,' _
BACK+ BAWnt . �. el'''
PORT�D'R^- �y f
PARKIWEW
BLUFF DR! , y vet• . }
_ °` y � 'y�� �•t11G
j ' j1 :,`"• .f. '�." I -•.-- .I fE r i - - �0 l°� :!t. — •,v vs C
p1EWPORTER Wqit
Jilt
P'n
I ��et �, _ / „ ARCHIBAY OR..
's
0 if
'4' , .�• ; 1 ' " "' '_ 1. �,.•�'vu- ,cf�.,
SEABIDGEOR
}I ^�� , ;°" •=�..��G•'ltftr {�:.t�, � ., _,�,�,as. ,�' _ -.•'�'F-'uscau'ti+_a'�er`'�t
:>:�.''. •+''��:.4�```,�: r,r�, �,;�� ` ,�" :• a".:•- TAM
REE RD- : ,� _ >• _ _ --
�'p
ti� �• rT•�a yf "i•. OP BISHOP
PORT TRINITY PL '�
PORT STANHOP�PP T � 1f � . _ * I •.
1 i. �. n,r�,. � �'� ., .�.K ti il, M�.,.'a k. i TPf�t, r��•
► j F > . i T !/!•' ' �' N+EWfPORTILCS DR E
41,
lei
1 �,'- >.1 + 1 `. • 1, r. � r � t� �, }/ f � y � t / �• "^ _ , r 1�
((�+ i. � �� � * - "� , ` +• �. J_ `.�I .rr'•.� :` ��}.� N �� ��,.
01v
k. f G r ra •r �J 1 %`�` f4T',[ +fie .L y g17 �•t w, ice ' '_
� „TJ._w..` �L �r k,M} r,7�, :{,- 4 � `.i. � /�/,'' l.� _:WI•� �Vt l� U i. _ r.
� A,^ �fyr �.� A t r,.[7 .,fir. �. .Y���! /• `T• ` •4 .��Z { '1 .
�� .Z i �• tlt �`�yRr .*w � r i� - J �.'�• iti � ti' ��' �, ,�''1►! a°' GRESi�61R . �� n,P' I'J.
4r/
f�, �\ �� � 1 � v`{ �� .� ir•7^A-,�,.r!` 1�'T''�� + d •`�,�y•�Y, 1��IiL�� �'� ,t WOR
r 1�' FRWOO��� t�pY y�.•'� r �' " _" �+ 1 � :1;: ,w. Y � �''fP., ,`� � J r y r� I'.
-W A,
Ok
AL
At
jib,
NEGHillside Area Along Coast Highway (North of Back Bay View Park) Tot.] Area: 41,491 sq. ft.
Total Acres: 0.95 acres City of Newport Bea
Site Number: 17 GIS Division
F.b,.o,y 04,2011
- !A—,�., L-6 —.1
may,40
Ot*
ON
0
� _� ` —.tee-•...�..� .�z � �, v. r
. �,. `fit • '$[+ 1 ♦ 1 'dT' f7
•{�.
:aa
t� NF
Jamboree and Bayview Way Total Area: 36,762 sq. ft. Yf
r1 f W P (l :i i'. I .:. �,
Total Acres: 0.84 acres City of Nawport Baa h
Site Number: 19 GISIDNifian
February 04, 201
4.
yol°.� •:
'oleor
�.%
' \mot, I�(. \ �\` �' ; �; ,_ r � .� �: ♦ 1 •` /� .sZ��iy!
• �• � fit,, �\ �,+ _ ,,,�.`.}� -� �jl, ,s ,� +• � - ��
SA, t
r I sty, ;�" ti, � • 1•
ij. Ile
Jamboree Roadside Apron and Bike Trail
Site Number: 21
Y.�o.Anbmrmeninnn •. , ,
,t
r
I
�
5
f
Total Area: 59,317 sq. ft. =7!"i w-rq-, ,„
Total Acres: 1,36 acres City of Newport Be.
GIS Division
February 0.1, 2019
x/
CA
.1k
'k _47 j III, why
'A
p 7._ 1
A 4
Ok�, Iv Ip
-9w E&I
JAI
Ak
d"W
oft
ps
AV
01
Kings Road (1801 & 181 1 Kings Rd)
Site Number: 22
Total Area: 8,516 sq. ft
Total Acres; 0.2 acres
-7
C!" of
N,,p,,, Be Ch
GIS Division
February 04,201
Ar
y \°
N
MARINER$jDR' S i
X It
S
0
Newport Dunes Bike Path
Site Number: 25
4
Total Area: 43,331 sq. ft
Total Acres: 0.99 acres
I
NE
City of Newport B-1,
015 Diviiion
February 04. 2019
-
a-t '�' .',,pry :l tr3n_�`- •' ..
J m•
�' 'E. � s Via,^..: �,: r,3s.li•'er�--,;'r." , , '!` Q- �'�• �
i c..
rr t / -'R ,per• -Zc: ?_.. _ - - - V
'Jr ��''' 1. - ,' _ , COAST r
a;...
1� i R�M�NTPR_Y DR
. T . _ %. '- F T r - T : /-��;..� .,yt;'p' `ff�. •�• ;.� T p.. . �l ,� . i
�y�, ..� e� i � d \�.�P�� •e � �; f L,♦ � Y�� OWN t• ti� r ,�� �.
zq
i pri i
cut
Fork
xyK L,. ty e
P~ r i.; �� . 2 J' �� '\• 1G�� ', y.*f ,L��,� • ov,
Ot ` O •� �\ � '' ils.jL3:�„+�{ :tT �'• r - v —7R`�' k +"Zt.. t�
a { La
i. f f \ . \ ,�"�r. ♦.�%"�"/ /r � 9'f'rGF �. i" �N�1l''�}"• �L`r� ' �A� rL P'_
x e w } +Nt;I f s yip
r .,', e' 1 W A+ON STD..,. -.._ f j t' v •r
f r
f �
CQA'STMHWYfW w; ✓
WAV
- �i� y4r'� �•- J trh .�`�,�- ti-.ti."fT t. 4 ?e?"♦. �'..4,f,e � �� -:a.
�,`� 'may l.Z; 'Q� � „� ','�►' y,� •• �\ •,A � ':
a�
� o
i
W
4
T:I!L N
rip
AV IJ
7�
Ir 1,
6 g.
Spyglass Roadside Total Area: 56,303 scl. ft. M1WPok!
Total Acres; 1.29 acres City of Newport Beo-.¢
S Dion i,_s
Site Number: 31 G1 Division
February4, 2019
W—dAbU1,11e111A,,,_Mapb—k P-d
; . . . . . . ----
IV
JAW
Clp,
University Drive at Irvine Ave Total Area: 14,309 sq. ft. NB1 6: 1 A '
M L w P a A -.ali Ch
Total Acres: 0.33 acres City.f N—p.,t Beem
Site Number: 32 GIS DI ,i—
F.b,..,y 04, 2015
� ��4 .,sy^fti e V ' _' •w �r—� ^w- � �3�y '' � � lOu`��y - - �
- ..•� •%,� �� � S'. sv �; ,irk , �� : ,r �.. s�� 1
j; � V � ��, "a: � - 4• F�L;, i ' .�, ' �� � � � f s .'� ° Gig+
s • - `�, � may_ ',`� � � ,.. j ••� . �
Je
IN GI
it iw„+ D` •'4ft.
(p[1i1 DEFFNp
'•�, ' � :.>�' � r . � ,, ter' �, •-�, .��' t .�� �i�.';, 1
"r •Jr
d �y tT., t• L "14
�i/ ri' r�,% _.f�. •. �.,�:r M15��N �Rw� \ ;�/ .�y.
i
rl r- I
DXt
HEAIKI
al I
61 QZ'VO Aronttiad
1P.09 1,.d--N 1. All:)
E I N'-;,rm!
saj:)D :Saj:)v ID40i
-41 -bs :DQ.JV ID40i
uir)j(] WAOIS
C POON /,tDq jm10 ap!s/,Dq
m
I}�
. . . . . . . . . .
26 M
s _
7"
f ,.• „*•�l' L�Y`ia" kl0irt ?29� C•�'if x� R• �`��� I:, " ..
+!31.t
h i t J sip ORNADq • � �-•-, -
'iP r �i,���k 1f�3', � - � .\�* _� �.�j� f' .a+ � � .H ��•r'4= -�;r-ta.�33 J'�i '� � ti'�` t. � •�. •�'�`
p
I- . i � tY ty iA. ,l r � ..` _r• _ O .3,ti 1 `�V _irs •t ♦'y,c��r �s'��
i •- a �1 � i• l Y OhU�� � ` µ � ` 1 - s i � � \ 'r! i- •• { ~-^+w-1'x �...� _ � ��
• t / � �'� � �1SiA PARR � ` A i f.J'�--,- '`��•
O i ar ^VEDADA _ Q �lo RO
• .;,/ �,`' ` `,, •, `r�l�,i. k',, ,'r 'VISTA^OUI - __ �p.',`��.
' � • �_'s' - . ,may `� �' l srr� �,E,� �`
IA, -- %sue i. �•
��; 5, - i. } are J, r� �!• -� ��1•ti _ G
m
fir l • f ." <' /� � . � y � ,<•d' <
jr
y_. . -
` !�^ M
' ,`.
� �t.� } 1. �'t�s ,� M _ ,P
7 �. a. �5� `fig s ro , •..:ti. � t,.'��� :tt�'f4it „�1L�i��/t�i, , � � .
'�'`i�: '. r � '4 �. '.�"frrr�l, �,�`+s���'`�t£$a���;Dt � o. ���:Q7'�_�,, �rF�
jk�', � ' `1�� a '
• Cf' � � � �' � th �` T�+. .`.`may �� .. / `1 ` 1
as • _ .: -.
:,.- `"� •• �" \ ��.� ,mot -.. � F_ a •�..
love Cr
*7 4.•� 47 "�C t } 0 �� ! �}�, L� � '+w"�,•"'�•/� �4r�„yG♦ - •� � c
41
i
:y41,+ �.
� 7 *0
-11 2
zi
ftft
..v � , � + "� 'ti � � y"•.,":•.fir;,
Q dr 1. �,�'�/'`-i,;,�' '�+� �1 `• �'�
o m� Sao '-� � , � ` • i
_J qL Ih
Morning Canyon Creek Total Area: sq. ft.I„N
Total Acres: acres Ciry of Nawpori Raccii
Storm Drain GISDwision
FeWu.ry 04, 2015
V Buck Gully V-ditch Maintenance
City of Newport Beach
Municipal Operations Depar1mvell
A—rea 2
1
'A-hW 3
/Z: -.:
_;tit
'R5
do
4k-
•
13LIck Gully V-ditch Maintenance
City of Newport Beach
Municipal Operations Department
>
zj
K'
........... •re
774-7
WrO,
2S
\V-
4.
I -k
Lj
LL
v
A,Vo
'IrIZ10 A'7-
/I :nv. P,
K' M
7�w
711
�- - W-akr:.' Buck Gully V-ditch Maintenan
CjjN1 ol Newport I each
*, i _6 '' .• pD`,rf f'� gar ��` y �t •' �
tAR
^' yt�.� -t�3'ti' '' '�,t`�"`��„��-�.� "fR�:�.f- k+ �;^ .±+y .rod-: � � • ,.?*:
�.4 l. tit '• - �, J y.i 1 l {? i , -ii.
L-:
NP
�1f _
u�p k` ,
•��.r a i.�i�:, � t ii � "'7 1 ;" : �i �,+�,9�;���%.$�•� • .
VA
Ow
City of Newport beach
41.4 't" Municipal Operations Department
,� rvc ►s r,
!t' —_\, • � _11.igVMLLRTJn GGcir�+��
, v
,fin `0 : ,• 'I_ �y
lye
,4.ei�►���� �:�, �M�=.,���� -� ;ter. :�; -.
,
I
J ;� � ,��� .�a►0/���J , � •� . �a,` .tit, �`"�
��H=1B1— otms'h
SCHEDULE OF BILLING RATES
NATURE'S IMAGE, INC. Page B-1
natures image
20361 Hermana Circle, Lake Forest, CA 92630
Phone: (949) 680-4400 Fax: (949) 680-4450
March 6, 2024
ATTN: Kevin Pekar
Parks and Trees Superintendent
City of Newport Beach
kpekar(a)newportbeachca.gov
RE: Contract C-8537-1, Weed Abatement Services - 2024 CPI Adjustment to Billing Rates
Per section 4.2 of the contract, Exhibit B (Schedule of Billing Rates) shall be adjusted in proportion to the changes
in the Consumer Price Index, subject to a maximum annual increase of 2.0%. The Consumer Price Index data to
be used shall be from the month that is three (3) months prior to the anniversary date of the agreement. The
effective date of the agreement is April 23rd, thus CPI adjustments will be determined based on the January data.
CPI data for January 2024 supports 2.5% increase for the 12-month percent change, therefore the annual
maximum increase of 2.0% shall be applied to the updated Billing Rates for 2024.
(Source: httr)s://www.bls.gov/regions/west/news-release/consumerpriceindex losangeles.htm#tableA)
Please see the attached updated Billing Rates with the 2.00% increase for 2024. The updated schedule of Billing
Rates shall be applied to all work starting on April 23, 2024 through April 22, 2025.
Sincerely,
Daniel Slinger
Chief Estimator
M: (949) 795-2480
Email: dslinger(a naturesimage.net
Attachments:
Billing Rates- 2024 Update
Natures Image, Inc.
CL# California A & C-27 720513 (DIR # 1000003271), & Arizona A-21 168366
DGS Small Business (SB/SBPW- DGS #15579) & SBA Woman Owned Small Business (#WOSB180914)
CPUC Utility Supplier Diversity Program, Woman Business Enterprise (WBE) #10BS0017
C-8537-1. Weed Abatement Services_
Billinq Rates- 2024 Update
LOCATIONS
Site #
Site Description
Work Type
Standard
Annual Cost
1
19th Street and Balboa Blvd
W
CFC
$2,725.32
2
2315 Holly Lane
W
CFC
$87.35
3
Back Bay Road
C
WUI
$15,824.55
4
Big Canyon Nature Park
H
-
$78,991.68
5
Bonita Canyon and University Bridge
W
CFC
$68.79
6
Bonita Creek Park Service Road
C
WUI
$2,226.33
7
Buck Gully (Lower)
H
$805.80
8
Buck Gully (Middle)
H
$3,628.30
9
Upper Middle Buck Gully
H
$35,166.01
10
Buck Gully (Upper)
H
$1,928.25
11
Cliff Drive Nature Park
W
CFC
$542.66
12
Coast Highway (Roadside east of Pelican Point)
W
CFC
$1,629.07
13
Fernleaf Ramp
W
CFC
$385.43
14
Fletcher Jones Bike Trail
C
WUI
$343.94
15
Harbor Cove Fire Access Road and Trail
C
WUI
$28,922.67
16
Harbor View Nature Park
W
CFC
$14,615.84
17
Hillside Area Along Coast Highway (North of Back Bay View Park)
W
CFC
$1,667.29
18
Iris easement
W
CFC
$307.91
19
Jamboree and Bayview Way
C
WUI
$1,450.01
20
Jamboree and MacArthur
W
CFC
$1,971.93
21
Jamboree Roadside Apron and Bike Trail
W
CFC
$1,196.69
22
Kings Road (1801 &1811 Kings Rd)
W
CFC
$263.14
23
Mariners Drive cul-de-sac
W
CFC
$185.62
24
Mesa Drive (east of Irvine Avenue)
W
CFC
$775.23
25
Newport Dunes bike path
W
CFC
$778.50
26
Newport Dunes Slope (Below Coast Highway)
W
CFC
$2,979.73
27
San Miguel Drive at Big Canyon Reservoir
W
CFC
$1,120.27
28
Santa Ana Ave
E, W
-
$15,920.63
29
South side of Bayside at Carnation and along Fernleaf
W
CFC
$705.35
30
Spyglass Canyon Park
H
-
$11,026.84
31
Spyglass Roadside
W
CFC
$1,149.74
32
University Drive at Irvine Ave
W
CFC
$374.51
33
Valley Acreage (Near Spyglass Canyon Park)
H
$1,823.43
(C) Clearance Trimming, (E) Erosion Protection, (H) Hazard Reduction, (W) Weed Abatement
(CFC) 2016 California Fire Code (CFC), Section 304.1.2, (WUI) City of Newport Beach Wildland Urban Interface Area
Standard for Hazard Reduction
Unit Costs
Labor per hour
$70.97
Per Hour
Debris hauling per yard
$212.91
Per Yard
Clear debris from v-ditches and shovel width clearance on both sides
of the ditches per foot
$1.91
Per Foot
FunctiortCost__.______. __ _ __--
Function
ControlPest
cost
Unit
General Weed Control Post Emergent
$12.56
1,000 Square Feet
Pre-Emergent/turf or planter
Shrub ' .' ..
$21.84
1,000 Square Feet
Pruning
$7.10
10 Linear Feet
Removals
Full Tree PruninglRemovals
$131.03
10 Linear Feet
Pruning
$2,402.12
Day (3-Man Crew)
Removals
Erosion
$2,402.12
Day (3-Man Crew)
Jute Netting
$202.00
1,000 Square Feet
Straw Waddles
$382.15
100 Linear Feet
6mm Poly Sheeting secured w/ stakes and sandbags
$354.86
1,000 Square Feet
Straw Waddles secured w/ stakes
$436.75
100 Linear Feet
Sand Bags
$425.83
100 Linear Feet
natures > a
20361 Hermana Circle
Lake Forest, CA 92630
ATTN: Rich Trevino March 7, 2024
City of Newport Beach
rtrevino@newportbeachca.gov
RE: Weed Abatement Service Contract C-8537-1
Change Order Proposal for Arroyo Park Trail Vegetation Trimming
NI Job #: 2852
CHANGE ORDER No. 73
ITEM DESCRIPTION CITY UNITS
CO 73 Arroyo Park Trail Ve Trimming
Labor 208 HR
Debris Hauling 1S YRD
Total Cost
UNIT ATE I TOTAL I
9.58 $ 14,472.64
8.74 $ 3,548.58
18,021.22
Inclusions:
Natures Image will perform the following work along the Arroyo Park trail: Trim back and remove the
overgrown vegetation on each side of the trail, maintain 4' trail width thrOL ghout the trail.
Exclusions: Additional mobilization, soil grubbing, excavation of roi
removal, trimming above 10' and/or aerial work, nesting bird surveys, sec
dumped trash and debris, rock, biologist, bonds, grubbing, concrete v
erosion control materials or repair of erosion control, fencing removal,
fertilizer, irrigation, irrigation repairs or guarantee, grading, jute nettinc
installation and/or maintenance, photos, plant guarantee, replanting, pla
site maintenance, meetings, mulch, mycorrhizae inoculum, permits, f
reseeding, seed germination guarantee, safety fencing, sediment remov,
fencing, site protection, soil preparation, compaction, decompaction,
pesticide and herbicide spraying, straw blowing, flagging of boundaries, sc
cost of water, water source, water meter, watering, weeding, repair due
neglect/damage by Owner or others, waivers of subrogation and addition,
Notes: Items not specified in this change order are neither implied nor
become an addendum to any contract with the terms set forth in this add
conflicting terms in any other contract documents. Please sign this and n
Inc.
Change Order Price: Good for 30 days Terms:
Thank you for the opportunity to bid.
Sincerely,
NATURES IMAGE, INC.
Shadi Lari Client Signature:
Senior Project Manager Date:
s/stumps, stump grinding, tree
ment removal, removal of illegally
)rk, dust control, electrical work,
-epair, materials and installation,
coir fabric, straw wattles, BMP
t protection, plant establishment,
ant removals, reports, retention,
, machine contouring/grading, silt
oil amendments, soil scarifying,
samples or testing, traffic control,
acts of God, war, vandalism or
insurance endorsements.
icluded. This change order shall
ndum which shall supersede any
:urn document to Natures Image,
30 days
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No. C-8537-1
Natures Image Job 2852
NI Task
Bid Item:
Description
Annual
Cost
Previously
Billed
Current
Billing
Total
Billed
Year 1 -Annual Cost -Subtotal:
$ 212,102.00
$ 178,837.75
$
$ 178,837.75
Year 2 - Annual Cost - Subtotal:
$ 216,344.04
$ 152,438.62
$ $ 152,438.62
Year 3 -Annual Cost -Subotal: $ 21 FI231.31 I S 176.934_17 1 R 4 17R 93d 17
Year 4 - Annual Cost - Subotal: $ 222,595.94 1 $ 172,241.97 1 $ $ 172,241.97
5-01
1
Site 1- 19th Street & Balboa Blvd
$ 2,671.88
$ 2,671.88
$
$ 2,671.88
5-02
2
Site 2 - 2315 Holly Lane
$ 85.64
$ -
$
$ -
5-03
3
Site 3 - Back Bay Road
$ 15,514.26
$ 15,514.26
$
$ 15,514.26
5-04
4
Site 4 - Big Canyon Nature Park
$ 77,442.82
$ 63,646.39
$
$ 63,646.39
5-05
5
Site 5 - Bonita Canyon and University Bridge
$ 67.44
$ 67.44
$
$ 67.44
5-06
6
Site 6 - Bonita Creek Park Service Road
$ 2,182.68
$ 2,182.68
$
$ 2,182.68
5-07
7
Site 7 - Buck Gully (Lower)
$ 790.00
$ 790.00
$
$ 790.00
5-08
8
Site 8 - Buck Gully (Middle)
$ 3,557.16
$ 3,557.16
$
$ 3,557.16
5-09
9
Site 9 - Upper Middle Buck Gully
$ 34,476.48
$ 34,476.48
$
$ 34,476.48
5-10
10
Site 10 - Buck Gully (Upper)
$ 1,890.44
$ 1,890.44
$
$ 1,890.44
5-11
11
Site 11 - Cliff Drive Nature Park
$ 532.02
$ 532.02
$
$ 532.02
5-12
12
Site 12 - Coast Highway (Roadside east of Pelican Point)
$ 1,597.13
$ -
$
$ -
5-13
13
Site 13 - Fernleaf Ramp
$ 377.87
$ -
$
$ -
5-14
14
Site 14 - Fletcher Jones Bike Trail
$ 337.20
$ 337.20
$
$ 337.20
5-15
15
Site 15 - Harbor Cove Fire Access Road
$ 28,355.56
$ 14,177.78
$
$ 14,177.78
5-16
16
Site 16 - Harbor View Nature Park
$ 14,329.25
$ -
$
$ -
5-17
17
Site 17 - Hillside Area - Coast Hwy (N Back Bay View Park)
$ 1,634.60
$ 1,634.60
$
$ 1,634.60
5-18
18
Site 18 - Iris Easement
$ 301.87
$ 301.87
$
$ 301.87
5-19
19
Site 19-Jamboree and Bayview Way
$ 1,421.58
$ 1,421.58
$
$ 1,421.58
5-20
20
Site 20 - Jamboree & MacArthur
$ 1,933.26
$ 3,866.52
$
$ 3,866.52
5-21
21
Site 21-Jamboree Roadside Apron and Bike Trail
$ 1,173.23
$ 1,173.23
$
$ 1,173.23
5-22
22
Site 22 - Kings Road (1801 & 1811 Kings Rd)
$ 257.98
$ 257.98
$
$ 257.98
5-23
23
Site 23 - Mariners Drive cul-de-sac
$ 181.98
$ 181.98
$
$ 181.98
5-24
24
Site 24 - Mesa Drive (east of Irvine Ave)
$ 760.03
$ 760.03
$
$ 760.03
5-25
25
Site 25 - Newport Dunes Bike Path
$ 763.24
$ 763.24
$
$ 763.24
5-26
26
Site 26 - Newport Dunes Slope (Below Coast Highway)
$ 2,921.30
$ 2,921.30
$
$ 2,921.30
5-27
27
Site 27 - San Miguel Drive at Big Canyon Reservoir
$ 1,098.30
$ 1,098.30
$
$ 1,098.30
5-28
28
Site 28 - Santa Ana Ave
$ 15,608.46
$ 15,608.46
$
$ 15,608.46
5-29
29
Site 29 - S Side Bayside @ Carnation Fernleaf
$ 691.52
$ 691.52
$
$ 691.52
5-30
30
Site 30 - Spyglass Canyon Park
$ 10,810.63
$ 10,810.63
$
$ 10,810.63
5-31
31
Site 31 - Spyglass Roadside
$ 1,127.20
$ 1,127.20
$
$ 1,127.20
5-32
32
Site 32 - University Drive at Irvine Ave
$ 367.17
$ 367.17
$
$ 367.17
5-33
33
Site 33 - Valley Acreage (Near Spyglass Canyon Park)
$ 1,787.68
$ 1,787.68
$
$ 1,787.68
Year 5 - Annual Cost - Subotal:
$ 227,047.86
$ 184,617.02
$
$ 184,617.02
Change Orders
CO 04
C04
C044 - Harbor View Nature Park - Saturday Creek Cleanup
$ 8,070.00
$ 8,070.00
$
$ 8,070.00
CO 05
COS
C045 - Site 7, Buck Gully (Lower) Container Plant Installation
$ 3,100.00
$ 3,100.00
$
$ 3,100.00
CO 06
C06
CO#6 - Site 26, Newport Dune Slopes - Hydroseeding
$ 22,274.00
$ 22,274.00
$
$ 22,274.00
CO 07
C07
CO#7 - Site 2S, Newport Dune Bike Path - Sandbag Replacement
$ 3,868.00
$ 3,868.00
$
$ 3,868.00
CO 08
C08
CO#8 - Corona Del Mar State Beach - Hydroseeding
$ 7,458.00
$ 7,458.00
$
$ 7,458.00
CO 09
C09
CO#9 - Corona del Mar State Beach - Sandbag&Slit Fence Replac
$ 4,376.00
$ 4,376.00
$
$ 4,376.00
CO 10
C010
CO#10 - Site 25, Newport Dune Bike Path - Sandbag Installation
$ 1,568.00
$ 1,568.00
$
$ 1,568.00
CO 16
C016
CO#16-Site 3, Back Bay Rd- Follow Up Visit
$ 6,795.75
$ 6,795.75
$
$ 6,795.75
CO 18
C018
CO#18- Follow Up Maintenance Visits Site 28
$ 5,102.50
$ 5,102.50
$
$ 5,102.50
CO 19-1
C019
CO#19 - Follow Up Maintenance Visits Site 9
$ 25,935.00
$ 25,935.00
$
$ 25,935.00
CO 19-2
C019
CO#19 - Follow Up Maintenance Visits Site 10
$ 1,488.50
$ 1,488.50
$
$ 1,488.50
CO 19-3
C019
CO#19 - Follow Up Maintenance Visits Site 13
$ 344.50
$ 344.50
$
$ 344.50
CO 19-4
C019
CO#19 - Follow Up Maintenance Visits Site 29
$ 539.50
$ 539.50
$
$ 539.50
CO 19-5
C019
CO#19 - Follow Up Maintenance Visits Site 30
$ 8,092.50
$ 8,092.50
$
$ 8,092.50
CO 20-1
CO20
CO#20 - Dune Bike Path Sandbag Removal
$ 2,466.36
$ 2.466.36
$
$ 2,466.36
CO 20-2
CO20
CO#20 - CDM State Beach Sandbag Removal
$ 1,644.24
$ 1,644.24
$
$ 1,644.24
CO 21-1
CO21
CO#21-1 - Site 14 Fletcher Jones Bike Trail Follow-up Visit
$ 2,088.45
$ 2,088.45
$
$ 2,088.45
CO 21-2
CO21
CO#21-2 - Site 16 Harbor View Nature Park Follow-up Visit
$ 4,160.33
$ 4,160.33
$
$ 4,160.33
CO 21-3
CO21
CO#21-3 - Site 33 Valley Acreage (Near Spyglass Park) Follow-up
$ 1,375.73
$ 1,375.73
$
$ 1,375.73
CO 22
CO22
- Back Bay Vegetation Trimming
$ 1,657.50
$ 1,657.50
$
$ 1,657.50
CO 23-1
CO23
�CO#22
CO#23 1-Site 18 Iris Easement Follow-up Visit
$ 2,320.50
$ 2,320.50
$
$ 2,320.50
CO 23-2
CO23
CO#23-2 - Site 20 Jamboree & MacArthur Follow-up Visit
$ 15,351.50
$ 15,361.b0
$ -
$ 15,3d1.60
Billing History
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No. C-8537-1
Natures Image Job 2852
CO 25
CO25
CO#25 - Site 16 Harbor View Park Mustard Patch Removal
$ 1,790.10
$ 1,790.10
$
$ 1,790.10
CO 26
CO26
CO#26 - Spyglass Vegatation Removal
$ 4,179.10
$ 4,179.10
$
$ 4,179.10
CO 27
CO27
CO#27 - Site Prep & Hydroseed Newport Dune Bike Path
$ 26,772.80
$ -
$
$ -
CO 28
CO28
CO#28 - Hydroseed Corona Del Mar State Beach Bluff
$ 8,062.40
$ -
$
$ -
CO 29
CO29
CO#29 - Harbor View Nature Park - Cattail Removal
$ 16,707.60
$ 16,707.60
$
$ 16,707.60
CO 30
C030
CO#30- San Joaquin Hills Road Vegetation Trimming
$ 4,213.44
$ 4,213.44
$
$ 4,213.44
CO 31
C031
CO#31- Removal of Dead Trees at Upper Middle Buck Gully
$ 4,213.44
$ 4,213.44
$
$ 4,213.44
CO 32
C032
CO#32 - Baccharis Removal at Back Bay View Park Viewpoints
$ 1,872.64
$ 1,872.64
$
$ 1,872.64
CO 33
C033
CO#33 - Back Bay View Park
$ 16,853.76
$ 16,853.76
$
$ 16,853.76
CO 34
C034
CO#34- Small Areas Harbor View Nature Park
$ 2,273.92
$ 2,273.92
$
$ 2,273.92
CO 35
C035
CO#35 - Cattail Removal Harbor View Nature Park
$ 12,577.89
$ 12,577.89
$
$ 12,577.89
CO 36
C036
CO#36 - Site 9 Upper Middle Buck Gully
$ 735.68
$ 735.68
$
$ 735.68
CO 37
C037
CO#37- Outlet Structure Sediment Removal
$ 32,369.92
$ 25,394.34
$
$ 25,394.34
CO 38
C038
CO#38 - Poppy Ave & Ocean Blvd Veg Trimming
$ 3,745.28
$ 3,745.28
$
$ 3,745.28
CO 41
C041
CO#41 - Veg Trimming at Avon Street Drain
$ 8,769.40
$ 8,769.40
$
$ 8,769.40
CO 42
C042
CO#42- Back Bay View Park Overgrown Vegetation Removal
$ 12,573.44
$ 12,573.44
$
$ 12,573.44
CO 43
C043
C0443- Phase 1- MacArthur & Jamboree Vegetation Removal
$ 24,750.00
$ 24,619.20
$
$ 24,619.20
CO 44
C044
CO#44- Erosion Repair Site Near Mesa Dr.
$ 7,490.00
$ 7,490.00
$
$ 7,490.00
C046
C046
CO#46-Veg Thinning at Sunset Ridge Park
$ 13,645.96
$ 13,645.96
$
$ 13,645.96
CO 47
C047
CO#47- Back Bay View Park Veg Removal Phase 3
$ 13,242.24
$ 13,242.24
$
$ 13,242.24
CO 49
C049
CO#49 - Arroyo Park Trail Vegetation Trimming
$ 16,850.21
$ 16,850.21
$
$ 16,850.21
CO 50
C050
CO#50 - Back Bay Paddle Work
$ 25,582.29
$ 25,582.29
$
$ 25,582.29
CO 51
C051
CO#51 - Thistle Removal Behind Residence on Ocean Birch Dr.
$ 2,728.76
$ 2,728.76
$
$ 2,728.76
CO 52
C052
CO#52 - Big Canyon Catch Basin Vegetation Removal
$ 5,662.17
$ 5,662.17
$
$ 5,662.17
CO 53
C053
CO#53 - Harbor View Park Cattail Removal 2022
$ 28,788.54
$ 28,788.54
$
$ 28,788.54
CO 54
C054
CO#54 -Avon St. Drain Veg Trimming 2022
$ 21,843.66
$ 21,843.66
$
$ 21,843.66
CO 56
C056
CO#S6 - Jamboree & MacArthur Follow-up Visit
$ 8,800.35
$ 8,800.35
$
$ 8,800.35
C057
C057
CO#57-Arroyo Park Trail Vegetation Trimming
$ 21,152.32
$ 21,152.32
$
$ 21,152.32
CO 60
C060
CO#60 - Harbor View Nature Park Veg Trimming Behind Properti
$ 21,693.78
$ 21,693.78
$
$ 21,693.78
CO 61
C061
CO#61- Baccharis Removal at Back Bay View Park Viewpoints 20
$ 2,251.23
$ 2,251.23
$
$ 2,251.23
CO 62
C062
CO#62 - Back Bay Paddle Work - 2023
$ 35,624.96
$ 35,624.96
$
$ 35,624.96
CO 63
C063
CO#63 - Avon St. Drain Veg Trimming - 2023
$ 22,961.40
$ 22,961.40
$
$ 22,961.40
CO 65
C065
C0#65- Back Bay Park View Park Viewpoints Thinning Phase 4
$ 22,265.60
$ 22,265.60
$
$ 22,265.60
CO 66
C066
CO#66- Harbor View Park Cattail Removal 2023
$ 25,675.02
$ 25,675.02
$
$ 25,675.02
CO 67
C067
CO#67- Vista Ridge Rd Vegetation Thinning
$ 16,907.94
$ 16,907.94
$
$ 16,907.94
CO 69-1
C069
CO#69-1 Lower Castaways Park- Veg Thinning/Removal
$ 24,144.26
$ 24,144.26
$
$ 24,144.26
CO 69-2
C069
CO#69-2 Lower Castaways Park- Cleanup Under Eucs
$ 10,854.48
$ 10,854.48
$
$ 10,854.48
CO 70
C070
CO#70 - Back Bay Rd. Vegetation Trimming- Feb 2024
$ 36,320.76
$ 36,320.76
$
$ 36,320.76
CO 71
C071
CO#71 Vista Ridge Rd Flush Cut Stumps & Debris Removal/Clean
$ 5,775.14
$ 5,775.14
$
$ 5,775.14
CO 72
1 C072
ICO#72 - Morro Bay Dr. Emergency Work
$ 926.22
$ 926.22
$
$ 926.22
CO 73
1 C073
1CO473 - Arroyo Park Trail Vegetation Trimming
$ 18,021.22
$ -
$ 18,021.22
$ 18,021.22
Change Order Subtotal
$ 721,776.28
$ 661,813.48
$ 18,021.22
$ 679,834.70
Total Cost
Not to Exceed (Not including Change Orders):
Remaining:
NOTES:
1st Annual Contract Term; 4/23/2019 to 4/30/2020
Full Contract Term: 4/23/2019 to 5/1/2024
Current Contract Term: YR 4 4/23/2022 to 4122/2023
$ 1,818,097.43 $ 1,526,883.01 $ 18,021.22 $ 1,544,904.23
Total Not to Exceed: $1,974,933.24
Budget will be established annually. Each year an annual estimate will be issued against the total contract Not to Exceed.
$ 1,974,933.24
$ 430,029.01
Billing History
natures imiacgre
20361 Hermana Circle
Lake Forest, CA 92630
ATTN: Rich Trevino November 29, 2023
City of Newport Beach
(949)644-3176
rtrevino(d) ngMortbeachcayov
RE: Weed Abatement Service Contract C-8537-1
Change Order Proposal —Harbor View Park Cattail Remo al 023
NI Job #: 2852
CHANGE ORDER No. 66
ITEM
DESCRIPTION
CITY
UNITS
UNIT RATE
TOTAL
CO 66 Harbor View Park Cattail Removal 2023
Labor
288
HR
69.58
$20,039.04
Debris Hauling
27
YRD
208.74
$ 5,635.98
Total Cost
$25,675.02
Inclusions: Natures Image's crews will perform work in the Harbor View NatNatu re Park creek in Phase 1 and
Phase 2 areas (see Attachment 1 — Site Map). Crews will remove Cattail V g tation from three (3) feet on
each side of the center of the creek for a total of six (6) feet of clearance. Cattails will be removed from the
creek and disposed of offsite.
Exclusions: Additional mobilization, tree removal, stump grinding, nesting bird surveys, removal of trash and
debris, rock, biologist, bonds, clearing & grubbing, concrete work, dust control, lectrical work, erosion control
materials or repair of erosion control, fencing removal, repair, materials and installation, fertilizer, irrigation,
irrigation repairs or guarantee, grading, jute netting, coir fabric, straw wattles, BMP installation and/or
maintenance, photos, plant guarantee, replanting, plant protection, plant establishment, site maintenance,
meetings, mulch, mycorrhizae inoculum, permits, plant removals, reports, retention, reseeding, seed
germination guarantee, safety fencing, sediment removal, machine con ou ing/grading, silt fencing, site
protection, soil preparation, compaction, decompaction, soil amendmen s, soil scarifying, pesticide and
herbicide spraying, straw blowing, flagging of boundaries, soil samples or to Airg, traffic control, cost of water,
water source, water meter, watering, weeding, repair due to acts of God, %Aar, vandalism or neglect/damage
by Owner or others, waivers of subrogation and additional insurance endo se ents.
Notes: Items not specified in this change order are neither implied nor irICILded. This change order shall
become an addendum to any contract with the terms set forth in this addeiidL m which shall supersede any
conflicting terms in any other contract documents. Please sign this and reiurr document to Natures Image,
Inc.
Change Order Price: Good for 30 days Terms: Net 30 days
Thank you for the opportunity to bid.
Sincerely,
NATURES IMAGE, INC.
Shadi Lari Client Signature:
Project Manager Date: 7i
Attachments:
Attachment 1 - Site Map
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No. C-8537-1
Natures Image Job 2852
NI Task
Bid Item:
Description
Annual
Cost
Previously
Billed
Current
Billing
Total
Billed
Year 1 -Annual Cost - Subtotal:
$ 212,102.00
$
178,837.75
$
$ 178,837.75
Year 2 -Annual Cost - Subtotal:
$ 216,344.04
$
152,438.62
$ $ 152,438.62
Year 3 - Annual Cost - Subotal: $ 218,231.31 1 $
176,934.17 $ $ 176,934.17
Year 4 - Annual Cost - Subotal: $ 222,595.94 $
172,241.97 $ $ 172,241.97
5-01
1
Site 1 - 19th Street & Balboa Blvd
$ 2,671.88
$
2,671.88
$
$ 2,671.88
5-02
2
Site 2 - 2315 Holly Lane
$ 85.64
$
-
$
$ -
5-03
3
Site 3 - Back Bay Road
$ 15,514.26
$
15,514.26
$
$ 15,514.26
5-04
4
Site 4- Big Canyon Nature Park
$ 77,442.82
$
63,646.39
$
$ 63,646.39
5-05
5
Site 5 - Bonita Canyon and University Bridge
$ 67.44
$
67.44
$
$ 67A4
5-06
6
Site 6 - Bonita Creek Park Service Road
$ 2,182.68
$
2,182.68
$
$ 2,182.68
5-07
7
Site 7 - Buck Gully (Lower)
$ 790.00
$
790.00
$
$ 790.00
5-08
8
Site 8 - Buck Gully (Middle)
$ 3,557.16
$
3,557.16
$
$ 3,557.16
5-09
9
Site 9 - Upper Middle Buck Gully
$ 34,476.48
$
34,476.48
$
$ 34,476.48
5-10
10
Site 10 - Buck Gully (Upper)
$ 1,890.44
$
1,890.44
$
$ 1,890.44
5-11
11
Site 11- Cliff Drive Nature Park
$ 532.02
$
532.02
$
$ 532.02
5-12
12
Site 12 - Coast Highway (Roadside east of Pelican Point)
$ 1,597.13
$
-
$
$ -
5-13
13
Site 13 - Fernleaf Ramp
$ 377.87
$
-
$
$ -
5-14
14
Site 14 - Fletcher Jones Bike Trail
$ 337.20
$
337.20
$
$ 337.20
5-15
15
Site 15 - Harbor Cove Fire Access Road
$ 28,355.56
$
14,177.78
$
$ 14,177.78
5-16
16
Site 16 - Harbor View Nature Park
$ 14,329.25
$
-
$
$ -
5-17
17
Site 17 - Hillside Area - Coast Hwy (N Back Bay View Park)
$ 1,634.60
$
1,634.60
$
$ 1,634.60
5-18
18
Site 18 - Iris Easement
$ 301.87
$
301.87
$
$ 301.87
5-19
19
Site 19 -Jamboree and Bayview Way
$ 1,421.58
$
1,421.58
$
$ 1,421.58
5-20
20
Site 20- Jamboree &MacArthur
$ 1,933.26
$
3,866.52
$
$ 3,866.52
5-21
21
Site 21 -Jamboree Roadside Apron and Bike Trail
$ 1,173.23
$
1,173.23
$
$ 1,173.23
5-22
22
Site 22 - Kings Road (1801 & 1811 Kings Rd)
$ 257.98
$
257.98
$
j $ 257.98
5-23
23
Site 23 - Mariners Drive cul-de-sac
$ 181.98
$
181.98
$
$ 181.98
5-24
24
ISIte 24 - Mesa Drive (east of Irvine Ave)
$ 760.03
$
760.03
$
$ 760.03
5-25
25
Site 25 - Newport Dunes Bike Path
$ 763.24
$
763.24
$
$ 763.24
5-26
26
Site 26 - Newport Dunes Slope (Below Coast Highway)
$ 2,921.30
$
2,921.30
$
$ 2,921.30
5-27
27
Site 27 -San Miguel Drive at Big Canyon Reservoir
$ 1,098.30
$
1,098.30
$
$ 1,098.30
5-28
28
Site 28 - Santa Ana Ave
$ 15,608.46
$
15,608.46
$
$ 15,608.46
5-29
29
Site 29 - S Side Bayside @ Carnation Fernleaf
$ 691.52
$
691.52
$
I $ 691.52
5-30
30
Site 30 - Spyglass Canyon Park
$ 10,810.63
$
10,810.63
$
$ 10,810.63
5-31
31
Site 31- Spyglass Roadside
$ 1,127.20
$
1,127.20
$
$ 1,127.20
5-32
32
ISite 32 - University Drive at Irvine Ave
$ 367.17
$
367.17
$
$ 367.17
5-33
33
ISite 33 - Valley Acreage (Near Spyglass Canyon Park)
$ 1,787.68
$
1,787.68
$
$ 1,787.68
Year 5 - Annual Cost - Subotal:
$ 227,047.86
$
184,617.02
$
$ 184,617.02
Change Orders
CO 04
C04
CO#4 - Harbor View Nature Park - Saturday Creek Cleanup
$ 8,070.00
$
8,070.00
$
$ 8,070.00
CO 05
C05
CO#5 - Site 7, Buck Gully (Lower) Container Plant Installation
$ 3,100.00
$
3,100.00
$
$ 3,100.00
CO 06
C06
CO#6 - Site 26, Newport Dune Slopes - Hydroseeding
$ 22.274.00
$
22,274.00
$
$ 22,274.00
CO 07
C07
CO#7 - Site 25, Newport Dune Bike Path - Sandbag Replacement
$ 3,868.00
$
3,868.00
$
$ 3,868.00
CO 08
C08
CO#8 - Corona Del Mar State Beach - Hydroseeding
$ 7,458,00
$
7,458.00
$
$ 7,458.00
CO 09
C09
CO#9 - Corona del Mar State Beach - Sandbag&Slit Fence Replac
$ 4,376.00
$
4,376.00
$
$ 4,376.00
CO 10
C0lo
CO#10- Site 25, Newport Dune Bike Path - Sandbag Installation
$ 1,568.00
$
1,568.00
$
$ 1,568.00
CO 16
C016
CO#16- Site 3, Back Bay Rd- Follow Up Visit
$ 6,795.75
$
6,795.75
$
$ 6,795.75
CO 18
C018
CO#18 - Follow Up Maintenance Visits Site 28
$ 5,102.50
$
5,102.50
$
$ 5,102.50
CO 19-1
C019
CO#19 - Follow Up Maintenance Visits Site 9
$ 25,935.00
$
25,935.00
$
$ 25,935.00
CO 19-2
C019
CO#19 - Follow Up Maintenance Visits Site 10
$ 1,488.50
$
1,488.50
$
$ 1,488.50
CO 19-3
C019
CO#19 - Follow Up Maintenance Visits Site 13
$ 344.50
$
344.50
$
$ 344.50
CO 19-4
C019
CO#19 - Follow Up Maintenance Visits Site 29
$ 539.50
$
539.50
$
$ 539.50
CO 19-5
C019
CO#19 - Follow Up Maintenance Visits Site 30
$ 8,092.50
$
8,092.50
$
$ 8,092.50
CO 20-1
CO20
C0420 - Dune Bike Path Sandbag Removal
$ 2,466.36
$
2,466.36
$
$ 2,466.36
CO20-2
CO20
CO#20-CDM State Beach Sandbag Removal
$ 1,644.24
$
1.644.24
$
$ 1,644.24
CO 21-1
CO21
C0421-1 - Site 14 Fletcher Jones Bike Trail Follow-up Visit
$ 2,088.45
$
2.088.45
$
$ 2,088.45
CO 21-2
CO21
CO#21-2 - Site 16 Harbor View Nature Park Follow-up Visit
$ 4,160.33
$
4,160.33
$
$ 4,160.33
CO21-3
CO21
CO#21-3 - Site 33 Valley Acreage (Near Spyglass Park) Follow-up'$
1,375.73
$
1.375.73
$
$ 1,375.73
CO 22
CO22
CO#22 - Back Bay Vegetation Trimming
$ 1,657.50
$
1,657.50
$
$ 1,657.50
CO 23-1
CO23
CO#23-1 - Site 18 Iris Easement Follow-up Visit
$ 2,320.50
$
2,320.50
$
$ 2,320.50
CO 23-2
CO23
C0423-2 - Site 20 Jamboree & MacArthur Follow-up Visit
$ 15,381.60
$
15,381.60
$
$ 15,381.60
Billing History
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No. C-8537-1
Natures Image Job 2852
CO 25
CO 26
CO25
CO26
CO#25 - Site 16 Harbor View Park Mustard Patch Removal
CO#26 - Spyglass Vegatation Removal
$ 1,790.10
$ 4,179.10
$1
$1
1,790.10
4,179.10
$
$
$ 1,790,10
$ 4,179.10
CO 27
CO27
CO#27 - Site Prep & Hydroseed Newport Dune Bike Path
$ 26,772.80
$
-
$
$ _
CO 28
CO28
CO#28 - Hydroseed Corona Del Mar State Beach Bluff
$ 8,062.40
$
-
$
$ _
CO 29
CO29
CO#29 - Harbor View Nature Park - Cattail Removal
$ 16,707.60
$1
16,707.60
$
$ 16.707.60
CO 30
C030
CO#30 - San Joaquin Hills Road Vegetation Trimming
$ 4,213.44
$1
4,213.44
$
$ 4,213.44
CO 31
C031
CO#31 - Removal of Dead Trees at Upper Middle Buck Gully
$ 4,213.44
$1
4,213.44
$
$ 4,213.44
CO 32
C032
CO#32 - Baccharis Removal at Back Bay View Park Viewpoints
$ 1,872.64
$1
1,872.64
$
$ 1,872.64
CO 33
C033
CO#33 - Back Bay View Park
$ 16,853.76
$1
16,853.76
$
$ 16,853.76
CO 34
C034
CO#34 -Small Areas Harbor View Nature Park
$ 2,273.92
$
2,273.92
$
$ 2,273.92
CO 35
C035
CO#35 - Cattail Removal Harbor View Nature Park
$ 12,577.89
$1
12,577.89
$
$ 12,577.89
CO 36
C036
CO#36 - Site 9 Upper Middle Buck Gully
$ 735.68
$1
735.68
$
$ 735.68
CO 37
C037
CO#37- Outlet Structure Sediment Removal
$ 32,369.92
$1
25,394.34
1 $
$ 25,394.34
CO 38
C038
CO#38 - Poppy Ave & Ocean Blvd Veg Trimming
$ 3,745.28
$1
3,745.28
$
$ 3,745.28
CO 41
C041
60#41 -Veg Trimming at Avon Street Drain
$ 8,769.40
$
8,769.40
$
$ 8,769.40
CO 42
C042
CO#42- Back Bay View Park Overgrown Vegetation Removal
$ 12,573.44
$
12,573.44
$
$ 12,573.44
CO 43
C043
CO#43- Phase 1- MacArthur & Jamboree Vegetation Removal
$ 24,750.00
$1
24.619.20
$
$ 24,619.20
CO 44
C044
CO#44- Erosion Repair Site Near Mesa Dr.
$ 7,490.00
$
7,490.00
$ -
$ 7,490.00
CO 46
C046
CO#46- Veg Thinning at Sunset Ridge Park
$ 13,645.96
$
13,645.96
$
$ 13,645.96
CO 47
C047
CO#47- Back Bay View Park Veg Removal Phase 3
$ 13,242.24
$
13,242.24
$
$ 13,242.24
CO 49
C049
CO#49 - Arroyo Park Trail Vegetation Trimming
$ 16,850.21
$
16,850.21
$
$ 16,850.21
CO 50
0050
CO#50 - Back Bay Paddle Work
$ 25,582.29
$
25,582.29
$
$ 25,582.29
CO 51
C051
CO#51-Thistle Removal Behind Residence on Ocean Birch Dr.
$ 2,728.76
$
2,728.76
$
$ 2,728.76
CO 52
C052
C0#52 - Big Canyon Catch Basin Vegetation Removal
$ 5,662.17
$
5,662.17
$
$ 5,662,17
CO 53
C053
CO#53 - Harbor View Park Cattail Removal 2022
$ 28,788.54
$1
28,788.54
$
$ 28,788.54
CO54
COS4
CO#S4-Avon St. Drain Veg Trimming2022
$ 21,843.66
$1
21,843.66
$
$ 21,843.66
CO 56
C056
CO#56 - Jamboree & MacArthur Follow-up Visit
$ 8,800.35
$
8,800.35
$
$ 8.800.35
CO 57
C057
CO#57 - Arroyo Park Trail Vegetation Trimming
$ 21,152.32
$
21,152.32
$
$ 21,152.32
CO 60
C060
C0460- Harbor View Nature Park Veg Trimming Behind Properti
$ 21,693.78
$
21,693.78
$
$ 21,693.78
CO 61
C061
CO#61- Baccharis Removal at Back Bay View Park Viewpoints 20
$ 2,251.23
$
2,251.23
$
$ 2,251.23
CO 62
C062
CO#62 - Back Bay Paddle Work - 2023
$ 35,624.96
$
35,624.96
$
$ 35,624.96
CO 63
C063
CO#63 - Avon St. Drain Veg Trimming - 2023
$ 22,961.40
$
22,961.40
$
$ 22,961.40
CO 65
C065
C0465- Back Bay Park View Park Viewpoints Thinning Phase 4
$ 22,265.60
$
22,265.60
$
$ 22,265.60
CO 66
C066
CO#66- Harbor View Park Cattail Removal 2023
$ 25,675.02
$
-
$ 25,675.02
$ 25,675.02
CO 67
C067
CO#67- Vista Ridge Rd Vegetation Thinning
$ 16,907.94
$
$ -
$ -
CO 69-1
0069
CO#69-1 Lower Castaways Park- Veg Thinning/Removal
$ 24,144.26
$
$
$
CO 69-2
C069
CO#69-2 Lower Castaways Park- Cleanup Under Eucs
$ 10,854.48
$
$
$
CO 70
C070 JCO#70
- Back Bay Rd. Vegetation Trimming- Feb 2024
$ 36,320.76
$
$
$ -
Change Order Subtotal
$ 697,053.70
$
541,209.66
$ 25,675.02
$ 566,884.68
Total Cost
Not to Exceed (Not including Change Orders):
Remaining:
NOTES:
1st Annual Contract Term: 4/23/2019 to 4/30/2020
Full Contract Term: 4/23/2019 to 5/1/2024
Current Contract Term: YR 4 4/23/2022 to 4/22/2023
$ 1,793,374.85 $ h,406,279.19 $ 25,675.02 $ 1,431,954.21
Total Not to Exceed: $1,974,933.24
Budget will be established annually. Each year an annual estimate will be issued against the total
Not to Exceed.
$ 1,974,933.24
$ 542,979.03
Billing History
natures inii
20361 Herrnana Circle
Lake Forest, CA 92630
ATTN: Daniel Tovar January 10, 2024
City of Newport Beach
(949)644-3176
dtovar(cDnewportbeachca ov
RE: Weed Abatement Service Contract C-8537-1
Change Order Proposal for Vista Ridge Rd Vegetation Thinnir
NI Job #: 2852
CHANGE ORDER No. 67
ITEM
DESCRIPTION
CITY
UNITS
UNIT RATE
TOTAL
CO 67- Vista Ridge Rd Vegetation Thinning
Labor
192
HR
$139.58
$13,359.36
Debris Hauling
17
YRD
$
08.74
$3,548.58
Total Cost
$16,907.94
Inclusions: Natures Image, Inc. will perform the following scope along the northwest
Length x 8' in from the curb):
• Brush and small shrubs within 8' buffer will be cut to near ground level and re
place.
• Trees/large shrubs within 8' buffer will be limbed up.
• Any dead vegetation or pampas grass near the edge of the 8' buffer will be re
• The tree behind sign CP004 must be removed. Tree stump will be left in plac
Exclusions: Additional mobilization, stump grinding, stump/root removal, grubbing,
trash and debris, rock, biologist, bonds, grubbing, concrete work, dust control, electric
or repair of erosion control, fencing removal, repair, materials and installation, fertilia
guarantee, grading, jute netting, coir fabric, straw wattles, BMP installation and/or main
replanting, plant protection, plant establishment, site maintenance, meetings, mulch
plant removals, reports, retention, reseeding, seed germination guarantee, safety fen
contouring/grading, silt fencing, site protection, soil preparation, compaction, deco
scarifying, pesticide and herbicide spraying, straw blowing, flagging of boundaries, soil
cost of water, water source, water meter, watering, weeding, repair due to acts of God,
by Owner or others, waivers of subrogation and additional insurance endorsements.
of Vista Ridge Rd (2370'
Cut stumps will be left in
;sting bird surveys, removal of
work, erosion control materials
irrigation, irrigation repairs or
lance, photos, plant guarantee,
nycorrhizae inoculum, permits,
ig, sediment removal, machine
)action, soil amendments, soil
imples or testing, traffic control,
r, vandalism or neglect/damage
Notes: Items not specified in this change order are neither implied nor included. Thi change order shall become an
addendum to any contract with the terms set forth in this addendum which shall super ede any conflicting terms in any
other contract documents. Please sign this and return document to Natures Image, Inc.
Change Order Price: Good for 30 days
Thank you for the opportunity to bid.
Sincerely,
NATURES IMAGE, INC.
Shadi Lari Client
Senior Project Manager Date:
Terms: Net 4 days
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No. C-8537-1
Natures Image Job 2852
NI Task
Bid Item:
Description
Annual
Cost
Previously
Billed
Current
Billing
Total
Billed
Year 1 -Annual Cost -Subtotal;
$ 212102.00
$ 178,837.75
$
$ 178,837.75
Year 2 - Annual Cost - Subtotal:
$ 216,344.04
$ 152,438.62
$ $ 152,438.62
Year 3 - Annual Cost - Subotal: $ 218,231.31 1 $
176,934.17 $ $ 176,934.17
Year 4 - Annual Cost - Subotal: $ 222,595.94 $
172,241.97 $ $ 172,241.97
5-01
1
Site 1 - 19th Street & Balboa Blvd
$ 2,671.88
$
2,671.88
$
$ 2,671.88
5-02
2
Site 2 - 2315 Holly Lane
$ 85.64
$
-
$
$ -
5-03
3
Site 3 - Back Bay Road
$ 15,514.26
$
15,514.26
$
$ 15,514.26
5-04
4
Site 4 - Big Canyon Nature Park
$ 77,442.82
$1
63,646.39
$
$ 63,646.39
5-05
5
Site 5 - Bonita Canyon and University Bridge
$ 67.44
$1
67.44
$
$ 67.44
5-06
6
Site 6 - Bonita Creek Park Service Road
$ 2,182.68
$1
2,182.68
$
$ 2,182.68
5-07
7
Site 7 - Buck Gully (Lower)
$ 790.00
$1
790.00
$
$ 790.00
5-08
8
Site 8 - Buck Gully (Middle)
$ 3,557.16
$1
3,557.16
$
$ 3,557.16
5-09
9
Site 9 - Upper Middle Buck Gully
$ 34,476.48
$1
34.476.48
$
$ 34,476.48
5-10
10
Site 10 - Buck Gully (Upper)
$ 1,890.44
$1
1,890.44
$
$ 1,890.44
5-11
11
Site 11- Cliff Drive Nature Park
$ 532.02
$1
532.02
$
$ 532.02
5-12
12
Site 12 - Coast Highway (Roadside east of Pelican Point)
$ 1,597.13
$
-
$
$ -
5-13
13
Site 13 - Fernleaf Ramp
$ 377.87
$
-
$
$ -
5-14
14
Site 14 - Fletcher Jones Bike Trail
$ 337.20
$
337.20
$
$ 337.20
5-15
is
Site 15 - Harbor Cove Fire Access Road
$ 28,355.56
$
14,177.78
$
$ 14,177.78
5-16
16
Site 16 - Harbor View Nature Park
$ 14,329. 5
_$
-
$
$ -
5-17
17
Site 17 - Hillside Area - Coast Hwy IN Back Bay View Park)
$ 1,634.60
$
1,634.60
$
$ 1,634.60
5-18
18
Site 18 - Iris Easement
$ 301.87
$1
301,87
$
$ 301.87
5-19
19
Site 19 -Jamboree and Bayview Way
$ 1,421.58
$1
1,421.58
$
$ 1,421.58
5-20
20
Site 20-Jamboree&MacArthur
$ 1,933.26
$
3,866.52
$
$ 3,866.52
5-21
21
Site 21- Jamboree Roadside Apron and Bike Trail
$ 1,173.23
$
1,173.23
$
$ 1.173.23
5-22
22
Site 22 - Kings Road (1801 & 1811 Kings Rd)
$ 257.98
$
257.98
$
$ 257.98
5-23
23
Site 23 - Mariners Drive cul-de-sac
$ 181.98
$
181.98
$
$ 181.98
5-24
24
Site 24 - Mesa Drive (east of Irvine Ave)
$ 760.03
$
760.03
$
$ 760.03
5-25
25
Site 25 - Newport Dunes Bike Path
$ 763.24
$
763.24
$
$ 763.24
5-26
26
Site 26 - Newport Dunes Slope (Below Coast Highway)
$ 2,921.30
$
2,921.30
$
$ 2,921.30
5-27
27
Site 27 - San Miguel Drive at Big Canyon Reservoir
$ 1,098.30
$
1,098.30
$
$ 1,098.30
5-28
28
Site 28 - Santa Ana Ave
$ 15,608.46
$
15,608.46
$
$ 15,608.46
5-29
29
Site 29 - S Side Bayside @ Carnation Fernleaf
$ 691.52
$
691.52
$
$ 691.52
5-30
30
Site 30 - Spyglass Canyon Park
$ 10,810.63
$
10,810.63
$
$ 10,810.63
5-31
31
Site31-SpyglassRoadside
$ 1,127.20
$
1,127.20
$
$ 1,127.20
5-32
32 ISite
32 - University Drive at Irvine Ave
$ 367.17
$
367.17
$
$ 367.17
5-33
33
Site 33 - Valley Acreage (Near Spyglass Canyon Park)
$ 1,787.68
$
1,787.68
$
$ 1,787.68
Year 5 - Annual Cost - Subotal:
$ 227,047.86 1
$
184,617.02 1
$
$ 184,617.02
Change Orders
CO 04
CO4
CO#4 - Harbor View Nature Park - Saturday Creek Cleanup
$ 8,070.00
$
8,070.00
$
$ 8,070.00
CO 05
COS
CO#5 - Site 7, Buck Gully (Lower) Container Plant Installation
$ 3,100,00
$
3,100.00
$
$ 3,100.00
CO 06
CO6
CO#6 - Site 26, Newport Dune Slopes - Hydroseeding
$ 22,274.00
$
22,274.00
$
$ 22,274.00
CO 07
CO7
CO#7 - Site 25, Newport Dune Bike Path - Sandbag Replacement
$ 3,868.00
$
3,868.00
$
$ 3,868.00
CO 08
COS
CO#8 - Corona Del Mar State Beach - Hydroseeding
$ 7,458.00
$
7,458.00
$
$ 7,458.00
CO 09
CO9
CO#9 - Corona del Mar State Beach - Sandbag&Slit Fence Replac
$ 4,376.00
$
4,376.00
$
$ 4,376.00
CO 10
CO10
CO#10 - Site 25, Newport Dune Bike Path - Sandbag Installation
$ 1,568.00
$
1,568.00
$
$ 1,568.00
CO 16
CO16
CO#16- Site 3, Back Bay Rd- Follow Up Visit
$ 6,795.75
$
6,795.75
$
$ 6,795.75
CO 18
CO18
CO#18 - Follow Up Maintenance Visits Site 28
$ 5,102.50
$
5,102,50
$
$ 5,102.50
CO 19-1
CO19
CO#19 - Fallow Up Maintenance Visits Site 9
$ 25,935.00
$
25,935.00
$
$ 25,935.00
CO 19-2
CO19
CO#19 - Follow Up Maintenance Visits Site 10
$ 1,488.50
$
1.488.50
$
$ 1,488.50
CO 19-3
CO19
CO#19 - Follow Up Maintenance Visits Site 13
$ 344.50
$
344.50
$
$ 344.50
CO 19-4
CO19
CO#19 - Follow Up Maintenance Visits Site 29
$ 539.50
$
539.50
$
$ 539.50
CO 19-5
CO19
CO#19 - Follow Up Maintenance Visits Site 30
$ 8,092.50
$
8,092.50
$
$ 8,092.50
CO 20-1
CO20
CO#20- Dune Bike Path Sandbag Removal
$ 2,466.36
$
2,466.36
$
$ 2,466.36
CO 20-2
CO20
CO#20-CDM State Beach Sandbag Removal
$ 1,644.24
$
1,644.24
$
$ 1,644.24
CO 21-1
CO21
CO#21-1 - Site 14 Fletcher Jones Bike Trail Follow-up Visit
$ 2,088.45
$
2,088.45
$
$ 2,088.45
CO 21-2
CO21
CO#21-2 - Site 16 Harbor View Nature Park Follow-up Visit
$ 4,160.33
$
4,160.33
$
$ 4,160.33
CO 21-3
CO21
CO#21-3 - Site 33 Valley Acreage (Near Spyglass Park) Follow-up
$ 1,375.73
$
1,375.73
$
$ 1,375.73
CO 22
CO22
CO#22 - Back Bay Vegetation Trimming
$ 1,657.50
$
1,657,50
$
$ 1,657.50
CO 23-1
CO23
CO#23-1 - Site 18 Iris Easement Follow-up Visit
$ 2,320.50
$
2,320.50
$
$ 2,320.50
CO 23-2 1
CO23
C0423-2 - Site 20 Jamboree & MacArthur Follow-up Visit
$ 15,381.60
$
15,381.60
$
$ 15,381.60
Billing History
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No. C-8537-1
Natures Image Job 2852
CO25
CO25
CO#25-Site 16 Harbor View Park Mustard Patch Removal
$ 1,790.10
$
1,790.10
$
$ 1,790.10
CO 26
CO26
CO#26 - Spyglass Vegatation Removal
$ 4,179.10
$
4,179.10
$
$ 4,179.10
CO 27
CO27
CO#27 - Site Prep & Hydroseed Newport Dune Bike Path
$ 26,772.80
$
$
$ -
CO 28
CO28
CO#28 - Hydroseed Corona Del Mar State Beach Bluff
$ 8,062.40
$
$
$ -
CO 29
CO29
CO#29 - Harbor View Nature Park - Cattail Removal
$ 16,707.60
$
16,707.60
$
$ 16,707.60
CO 30
C030
CO#30 - San Joaquin Hills Road Vegetation Trimming
$ 4,213.44
$
4,213.44
$
$ 4,213.44
CO 31
C031
CO#31 - Removal of Dead Trees at Upper Middle Buck Gully
$ 4,213.44
$1
4,213.44
$
$ 4,213.44
CO 32
1 C032
CO#32 - Baccharis Removal at Back Bay View Park Viewpoints
$ 1,872.64
$
1,872.64
$
$ 1,872,64
CO 33
C033
CO#33 - Back Bay View Park
$ 16,853.76
$
16,853.76
$
$ 16,853.76
CO 34
C034
CO#34 - Small Areas Harbor View Nature Park
$ 2,273.92
$
2,273.92
$
$ 2,273.92
CO 35
C035
CO#35 - Cattail Removal Harbor View Nature Park
$ 12,577.89
$
12,577.89
$
$ 12,577.89
CO 36
C036
CO#36 - Site 9 Upper Middle Buck Gully
$ 735.68
$
735.68
$
$ 735.68
CO 37
C037
CO#37- Outlet Structure Sediment Removal
$ 32,369.92
$
25,394.34
$
$ 25,394.34
CO 38
C038
CO#38 - Poppy Ave & Ocean Blvd Veg Trimming
$ 3,745.28
$1
3,745.28
$
$ 3,745.28
CO 41
C041
CO#41- Veg Trimming at Avon Street Drain
$ 8,769.40
$1
8,769.40
$
$ 8,769.40
CO 42
C042
CO#42- Back Bay View Park Overgrown Vegetation Removal
$ 12,573.44
$
12,573.44
$
$ 12,573.44
CO 43
C043
CO#43- Phase 1- MacArthur & Jamboree Vegetation Removal
$ 24,750.00
$
24,619.20
$
$ 24,619.20
CO 44
C044
CO#44- Erosion Repair Site Near Mesa Dr.
$ 7,490.00
$
7,490.00
$
$ 7,490.00
CO 46
C046
CO#46- Veg Thinning at Sunset Ridge Park
$ 13,645.96
$
13,645.96
$
$ 13,645.96
CO 47
C047
CO#47- Back Bay View Park Veg Removal Phase 3
$ 13,242.24
$
13,242.24
$
$ 13,242.24
CO 49
C049
CO#49 - Arroyo Park Trail Vegetation Trimming
$ 16,850.21
$
16,850.21
$
$ 16,850.21
CO 50
C050
CO#50 - Back Bay Paddle Work
$ 25,582.29
$1
25,582.29
$
$ 25,582.29
CO 51
C051
CO#51 -Thistle Removal Behind Residence on Ocean Birch Dr.
$ 2,728.76
$
2,728.76
$
$ 2,728.76
CO 52
C052
CO#52 - Big Canyon Catch Basin Vegetation Removal
$ 5,662.17
$
5,662.17
$
$ 5,662.17
CO 53
C053
CO#S3 - Harbor View Park Cattail Removal 2022
$ 28,788.54
$
28,788.54
$
$ 28,788.54
C054
C054
CO#54-Avon St. Drain Veg Trimming2022
$ 21,843.66
$
21,843.66
$
$ 21,843.66
CO 56
C056
CO#56-Jamboree & MacArthur Follow-up Visit
$ 8,800.35
$
8,800.35
$
$ 8,800.35
C057
C057
CO#57-Arroyo Park Trail Vegetation Trimming
$ 21,152.32
$
21,152.32
$
$ 21,152.32
CO 60
C060
CO#60- Harbor View Nature Park Veg Trimming Behind Properth
$ 21,693.78
$1
21,693.78
$
$ 21,693.78
CO 61
C061
CO#61- Baccharis Removal at Back Bay View Park Viewpoints 20
$ 2,251.23
$
2,251.23
$
$ 2,251.23
CO 62
C062
CO#62 - Back Bay Paddle Work - 2023
$ 35,624.96
$
35,624.96
$
$ 35,624.96
CO 63
C063
CO#63 - Avon St. Drain Veg Trimming - 2023
$ 22,961.40
$
22,961.40
$
$ 22,961.40
CO 65
C065
CO#65- Back Bay Park View Park Viewpoints Thinning Phase 4
$ 22,265.60
$
22,265.60
$
$ 22,265.60
CO 66
C066
CO#66- Harbor View Park Cattail Removal 2023
$ 25,675.02
$
25,675.02
$
$ 25,675.02
CO 67
C067
CO#67- Vista Ridge Rd Vegetation Thinning
$ 16,907.94
$
-
$ 16,907.94
$ 16,907.94
CO 69-1
C069
CO#69-1 Lower Castaways Park- Veg Thinning/Removal
$ 24,144.26
$
$ -
$
CO 69-2
C069
CO#69-2 Lower Castaways Park- Cleanup Under Eucs
$ 10,854.48
$
$
$
CO 70
C070
CO#70 - Back Bay Rd. Vegetation Trimming- Feb 2024
$ 36,320.76
$
$
$ -
Change Order Subtotal
$ 697,053.70
$
566,884.68
$ 16,907.94
$ 583,792.62
Total Cost
Not to Exceed (Not including Change Orders):
Remaining:
NOTES:
1st Annual Contract Term: 4/23/2019 to 4/30/2020
Full Contract Term: 4/23/2019 to 5/1/2024
Current Contract Term: YR 4 4/23/2022 to 4/22/2023
$ 1,793,374.85 $11,431,954.21 $ 16,907.94 $ 1,448,862.15
Total Not to Exceed: $1,974,933.24
Budget will be established annually. Each year an annual estimate will be issued against the total
Not to Exceed.
1,974, 933.24
526,071.09
Billing History
natures image
20361 Hermana Circle
Lake Forest, CA 92630
ATTN: Rich Trevino January 19, 2024
City of Newport Beach
(949) 644-3176
rtrevino@newportbeach.gov
RE: Weed Abatement Service Contract C-8537-1
Change Order Proposal for Lower Castaways Park Yard
NI Job #: 2852
CHANGE ORDER No. 69
ietation Reduction
Item
Description
Qty
Unit
Unit Cot
Subtotal
Total
CO 69-1
Lower Castaways Park- Veg Thinning/Removal
Labor
272
HR
$69.58
$18,925,76
Debris Hauling
25
YRD
$208.74
$5,218.50
$24,144.26
CO 69-2
Lower Castaways Park- Cleanup Under Eucs
(Optional)
Labor
120
HR
$69.58
$8,349.60
Debris Hauling
12
YRD
$208.74
$2,504.88
$10,854.48
Grand Total -CO 69-1 & CO 69-2 optional
$34,998.74
Inclusions: Natures Image, Inc. will perform the following scope at the Lower Castawa s Park Maintenance Yard (located at
Dover Rd. and PCH):
CO 69-1) Lower Castaways Park- Veg Thinning/Removal
• 20%d reduction Arundo (giant reed) patch and limb up acacia located directly ad scent.
• Remove the following vegetation: cattails inside the drain outlet, acacia and fen iel by the fence and near sidewalk
on both sides of the yard entrance, eucalyptus root suckers/sprouts and voluntE er palms along located along the
fence line.
• Trim Ice plant by thedrain outlet.
CO 69-2) Lower Castaways Park- Cleanup Under Eucs (Optional)
• Cleanup/removal of fallen debris/dead branches located under eucalyptus tree in the southeast corner of the yard.
Prior to Natures Image conducting cleanup work, the City may choose to prune trees in this area and leave debris for
Natures Image to remove.
City shall vacate homeless/transient population prior to the start of work. Natures Image
material/waste and/or items that may contain hazardous materials/waste.
Exclusions: Additional mobilization, stump grinding, stump/root removal, grubbin5
homeless/encampments, rock, biologist, bonds, grubbing, concrete work, dust control, el(
or repair of erosion control, fencing removal, repair, materials and installation, fertilizer, irr
grading, jute netting, coir fabric, straw wattles, BMP installation and/or maintenance, phc
protection, plant establishment, site maintenance, meetings, mulch, mycorrhizae inocul
retention, reseeding, seed germination guarantee, safety fencing, sediment removal, me
site protection, soil preparation, compaction, decompaction, soil amendments, soil scarif7
straw blowing, flagging of boundaries, soil samples or testing, traffic control, cost of water
weeding, repair due to acts of God, war, vandalism or neglect/damage by Owner or others
insurance endorsements.
Notes: Items not specified in this change order are neither implied nor included. This cha
to any contract with the terms set forth In this addendum which shall supersede any c
documents. Please sign this and return document to Natures image, Inc.
Change Order Price: Good for 30 days Terms: Ne
Thank you for the opportunity to bid,
Sincerely,
Shad! Lari
Senior Project Manager
not remove or relocate hazardous
nesting bird surveys, removal of
;trical work, erosion control materials
cation, irrigation repairs or guarantee,
as, plant guarantee, replanting, plant
m, permits, plant removals, reports,
hine contouring/grading, silt fencing,
ng, pesticide and herbicide sprays ng,
water source, water meter, watering,
waivers of subrogation and additional
order shall become an addendum
cting terms in any other contract
30 days
City of Newport Bea h Approval:
[Please indicate if approval includes optiAn I item CO 69-2]
Client Signature:
Date: / _; -? c, 2— V
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No. C-8537-1
Natures Image Job 2852
NI Task
Bid Item:
Description
Annual
Cost
Previously
Billed
Current
Billing
Total
Billed
Year 1 - Annual Cost - Subtotal:
$ 212,102.00
$
178,8 77.75
$
$ 178,837.75
Year 2 - Annual Cost - Subtotal:
$ 216,344.04
$
152,438.62
$ $ 152,438.62
Year 3 - Annual Cost - Subotal: $ 218,231.31 $
176,934,17 $ $ 176,934.17
Year 4 . Annual Cost - Subotal: $ 222,595.94 $
172,241.97 $ $ 172,241.97
5-01
1
Site 1 - 19th Street & Balboa Blvd
$ 2,671.88
$
2,671.88
$
$ 2,671.88
5-02
2
Site 2 - 2315 Holly Lane
$ 85.64
$
-
$
$ -
5-03
3
Site 3 - Back Bay Road
$ 15,514.26
$
15,514.26
$
$ 15,514.26
5-04
4
Site 4 - Big Canyon Nature Park
$ 77,442.82
$
63,646.39
$
$ 63,646.39
5-05
5
Site 5 - Bonita Canyon and University Bridge
$ 67.44
$
67.44
$
$ 67.44
5-06
6
Site 6 - Bonita Creek Park Service Road
$ 2,182.68
$
2,182.68
$
$ 2,182.68
5-07
7
Site 7 - Buck Gully (Lower)
$ 790.00
$
790.00
$
$ 790.00
5-08
8
Site 8 - Buck Gully (Middle)
$ 3,557.16
$
3,557.16
$
$ 3,557.16
5-09
9
Site 9 - Upper Middle Buck Gully
$ 34,476.48
$
34,476.48
$
$ 34,476,48
5-10
10
Site 10 - Buck Gully (Upper)
$ 1,890.44
$
1,890.44
$
$ 1,890.44
5-11
11
Site 11 - Cliff Drive Nature Park
$ 532.02
$
532.02
$
$ 532.02
5-12
1 12
Site 12 - Coast Highway (Roadside east of Pelican Point)
$ 1,597.13
$
-
$
$ -
5-13
13
Site 13 - Fernleaf Ramp
$ 377.87
$
-
$
$ -
5-14
14
Site 14 - Fletcher Jones Bike Trail
$ 337.20
$
337.20
$
$ 337.20
5-15
15
Site 15 - Harbor Cove Fire Access Road
$ 28,355.56
$
14,177.78
$
$ 14,177.78
5-16
16
Site 16 - Harbor View Nature Park
$ 14,329.25
$
-
$
$ -
5-17
17
Site 17 - Hillside Area - Coast Hwy (N Back Bay View Park)
$ 1,634.60
$
1,634.60
$
$ 1,634.60
5-18
18
Site 18 - Iris Easement
$ 301.87
$
301.87
$
$ 301.87
5-19
19
Site 19-Jamboree and Bayview Way
$ 1,421.58
$
1,421.58
$
$ 1,421.58
5-20
20
Site 20 - Jamboree & MacArthur
$ 1,933.26
$
3,866.52
$
$ 3,866.52
5-21
21
Site 21 - Jamboree Roadside Apron and Bike Trail
$ 1,173.23
$
1,173.23
$
$ 1,173.23
5-22
22
Site 22 - Kings Road (1801 & 1811 Kings Rd)
$ 257.98
$
257.98
$
$ 257.98
5-23
23
Site 23 - Mariners Drive cul-de-sac
$ 181.98
$
181.98
$
$ 181.98
5-24
24
Site 24 - Mesa Drive (east of Irvine Ave)
$ 760.03
$
760.03
$
$ 760.03
5-25
25
Site 25 - Newport Dunes Bike Path
$ 763.24
$
763.24
$
$ 763.24
5-26
26
Site 26 - Newport Dunes Slope (Below Coast Highway)
$ 2,921.30
$
2,921.30
$
$ 2,921.30
5-27
27
Site 27 - San Miguel Drive at Big Canyon Reservoir
$ 1,098.30
$
1,098.30
$
$ 1,098.30
5-28
28
Site 28 - Santa Ana Ave
$ 15,608.46
$
15,608.46
$
$ 15,608.46
5-29
29
Site 29 - S Side Bayside @ Carnation Fernleaf
$ 691.52
$
691.52
$
$ 691.52
5-30
30
Site 30 - Spyglass Canyon Park
$ 10,810.63
$
10,810.63
$
$ 10,810.63
5-31
31
Site 31 - Spyglass Roadside
$ 1,127.20
$
1,127.20
$
$ 1,127.20
5-32
32
Site 32 - University Drive at Irvine Ave
$ 367.17
$
367.17
$
$ 367.17
5-33
33
Site 33 -Valley Acreage (Near Spyglass Canyon Park)
$ 1,787.68
$
1,787.68
$
$ 1,787.68
Year 5 - Annual Cost - Subotal:
$ 227,047.86
$
184,617.02
$
$ 184,617.02
Change Orders
CO 04
C04
CO#4 - Harbor View Nature Park - Saturday Creek Cleanup
$ 8,070.00
$
8,070.00
$
$ 8,070.00
CO 05
C05
CO#5 - Site 7, Buck Gully (Lower) Container Plant Installation
$ 3,100.00
$
3,100.00
$
$ 3,100.00
CO 06
C06
CO#6 - Site 26, Newport Dune Slopes - Hydroseeding
$ 22,274.00
$
22,274.00
$
$ 22,274.00
CO 07
C07
CO#7 - Site 25, Newport Dune Bike Path - Sandbag Replacement
$ 3,868.00
$
3,868.00
$
$ 3,868.00
CO 08
C08
CO#8 - Corona Del Mar State Beach - Hydroseeding
$ 7,458.00
$
7,458.00
$
$ 7,458.00
CO 09
C09
CO#9 - Corona del Mar State Beach - Sandbag&Slit Fence Replac
$ 4,376.00
$
4,376.00
$
$ 4,376.00
CO 10
C010
CO#10-Site 25, Newport Dune Bike Path -Sandbag Installation
$ 1,568.00
$
1,568.00
$
$ 1,568.00
CO 16
C016
CO#16- Site 3, Back Bay Rd- Follow Up Visit
$ 6,795.75
$
6,795.75
$
$ 6,795.75
CO 18
C018
CO#18 - Follow Up Maintenance Visits Site 28
$ 5,102.50
$
5,102.50
$
$ 5,102.50
CO 19-1
C019
CO#19 - Follow Up Maintenance Visits Site 9
$ 25,935.00
$
25,935.00
$
$ 25,935.00
CO 19-2
C019
CO#19 - Follow Up Maintenance Visits Site 10
$ 1,488.50
$
1,488.50
$
$ 1,488.50
CO 19-3
C019
CO#19 - Follow Up Maintenance Visits Site 13
$ 344.50
$
344.50
$
$ 344.50
CO 19-4
C019
CO#19 - Follow Up Maintenance Visits Site 29
$ 539.50
$
539.50
$
$ 539.50
CO 19-5
C019
CO#19 - Follow Up Maintenance Visits Site 30
$ 8,092.50
$
8,092.50
$
$ 8,092.50
CO 20-1
CO20
CO#20 - Dune Bike Path Sandbag Removal
$ 2,466.36
$
2,466.36
$
$ 2,466.36
CO 20-2
CO20
CO#20 - CDM State Beach Sandbag Removal
$ 1,644.24
$
1,644,24
$
$ 1,644.24
CO 21-1
CO21
CO#21-1- Site 14 Fletcher Jones Bike Trail Follow-up Visit
$ 2,088.45
$
2,088.45
$
$ 2,088.45
CO 21-2
CO21
CO#21-2 - Site 16 Harbor View Nature Park Follow-up Visit
$ 4,160.33
$
4,160.33
$
$ 4,160.33
CO 21-3
CO21
CO#21-3 - Site 33 Valley Acreage (Near Spyglass Park) Follow-up
$ 1,375.73
$
1,375.73
$
$ 1,375.73
CO 22
CO22
CO#22 - Back Bay Vegetation Trimming
$ 1,657.50
$
1,657,50
$
$ 1,657.50
CO 23-1
CO23
CO#23-1 - Site 18 Iris Easement Follow-up Visit
$ 2,320.50
$
2,320.50
$
$ 2,320.50
CO 23-2
CO23
CO#23-2 - Site 20 Jamboree & MacArthur Follow-up Visit
$ 16,381.60
$
15,381.60
$
$ 15,381.60
Billing History
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No. C-8537-1
Natures Image Job 2852
CO 25
CO25
CO#25 - Site 16 Harbor View Park Mustard Patch Removal
$ 1,790.10
$
1,790.10
$
$ 1,790.10
CO26
CO26
CO#26- Spyglass VegatationRemoval
$ 4,179.10
$
4,179.10
$
$ 4,179,10
CO 27
CO27
CO#27 - Site Prep & Hydroseed Newport Dune Bike Path
$ 26,772.80
$
-
$
$ -
CO 28
CO28
CO#28 - Hydroseed Corona Del Mar State Beach Bluff
$ 8,062.40
$
-
$
$ -
CO 29
CO29
CO#29 - Harbor View Nature Park- Cattail Removal
$ 16,707.60
$
16,707.60
$
$ 16,707.60
CO 30
C030
C0430 - San Joaquin Hills Road Vegetation Trimming
$ 4,213.44
$
4,213.44
$
$ 4,213.44
CO 31
C031
CO#31 - Removal of Dead Trees at Upper Middle Buck Gully
$ 4,213.44
$
4,213.44
$
$ 4,213.44
CO 32
C032
CO#32 - Baccharis Removal at Back Bay View Park Viewpoints
$ 1,872.64
$
1.872.64
$
$ 1,872.64
CO 33
C033
CO#33 -Back Bay View Park
$ 16,853.76
$
16,853.76
$
$ 16,853.76
CO 34
C034
CO#34 - Small Areas Harbor View Nature Park
$ 2,273.92
$
2,273.92
$
$ 2,273.92
CO 35
C035
CO#3S - Cattail Removal Harbor View Nature Park
$ 12,577.89
$
12,577.89
$
$ 12,577.89
CO 36
C036
CO#36 - Site 9 Upper Middle Buck Gully
$ 735.68
$
735.68
$
$ 735.68
CO 37
C037
CO#37- Outlet Structure Sediment Removal
$ 32,369.92
$
25,394.34
$
$ 25,394.34
CO 38
C038
CO#38 - Poppy Ave & Ocean Blvd Veg Trimming
$ 3,745.28
$
3,745.28
$
$ 3,745.28
CO 41
C041
CO#41 - Veg Trimming at Avon Street Drain
$ 8,769.40
$
8,769.40
$
$ 8,769.40
CO 42
C042
CO#42- Back Bay View Park Overgrown Vegetation Removal
$ 12,573.44
$
12,573.44
$
$ 12,573.44
CO 43
C043
CO#43- Phase 1- MacArthur & Jamboree Vegetation Removal
$ 24,750.00
$
24,619.20
$
$ 24,619.20
CO 44
C044
CO#44- Erosion Repair Site Near Mesa Dr.
$ 7,490.00
$
7,490.00
$
$ 7,490.00
CO 46
C046
CO#46- Veg Thinning at Sunset Ridge Park
$ 13,645.96
$
13,645.96
$
$ 13,645.96
CO 47
C047
CO#47- Back Bay View Park Veg Removal Phase 3
$ 13,242.24
$
13,242.24
$
$ 13,242.24
CO 49
C049
CO#49 -Arroyo Park Trail Vegetation Trimming
$ 16,850.21
$
16,850.21
$
$ 16,850.21
CO 50
C050
CO#50 - Back Bay Paddle Work
$ 25,582.29
$
25,582.29
$
$ 25,582.29
CO 51
C051
CO#51 - Thistle Removal Behind Residence on Ocean Birch Dr.
$ 2,728.76
$
2,728.76
$
$ 2,728.76
CO 52
C052
CO#52 - Big Canyon Catch Basin Vegetation Removal
$ 5,662.17
$
5,662.17
$
$ 5,662.17
CO 53
C053
CO#53 - Harbor View Park Cattail Removal 2022
$ 28,788.54
$
28,788.54
$
$ 28,788.54
C054
C054
CO#54-Avon St. Drain Veg Trimming2022
$ 21,843.66
$
21,843.66
$
$ 21,843.66
CO 56
C056
CO#56 - Jamboree & MacArthur Follow-up Visit
$ 8,800.35
$
8,800.35
$
$ 8,800.35
C057
C057
CO#57-Arroyo Park Trail Vegetation Trimming
$ 21,152.32
$
21,152.32
$
$ 21,152.32
CO 60
C060
CO#60- Harbor View Nature Park Veg Trimming Behind Properti
$ 21,693.78
$
21,693.78
$
$ 21,693.78
CO 61
C061
CO#61 - Baccharis Removal at Back Bay View Park Viewpoints 20
$ 2,251.23
$
2.251.23
$
$ 2,251.23
CO 62
C062
CO#62 - Back Bay Paddle Work - 2023
$ 35,624.96
$
35,624.96
$
$ 35,624.96
CO63
C063
CO#63-Avon St. Drain Veg Trimming-2023
$ 22,961.40
$
22,961.40
$
$ 22,961.40
CO 65
C065
CO#65- Back Bay Park View Park Viewpoints Thinning Phase 4
$ 22,265.60
$
22,265.60
$
$ 22,265.60
CO 66
C066
CO#66- Harbor View Park Cattail Removal 2023
$ 25,675.02
$
25,675.02
$
$ 25,675.02
CO 67
C067
CO#67- Vista Ridge Rd Vegetation Thinning
$ 16,907.94
$
16,907.94
$
$ 16,907.94
CO 69-1
C069
CO#69-1 Lower Castaways Park- Veg Thinning/Removal
$ 24,144.26
$
-
$ 24,144.26
$ 24,144.26
CO 69-2
C069
CO#69-2 Lower Castaways Park- Cleanup Under Eucs
$ 10,854.48
$
$ 10,854.48
$ 10,854.48
CO 70
C070
CO#70 - Back Bay Rd. Vegetation Trimming- Feb 2024
$ 36,320.76
$
$ -
$
Change Order Subtotal
$ 697,053.70
$
583,792.62
$ 34,998.74
$ 618,791.36
Total Cost
Not to Exceed (Not including Change Orders):
Remaining:
NOTES:
1st Annual Contract Term: 4/23/2019 to 4/30/2020
Full Contract Term: 4/23/2019 to 5/1/2024
Current Contract Term: YR 4 4/23/2022 to 4/22/2023
$ 1,793,374.85 $ �1,448,862.15 $ 34,998.74 $ 1,483,860.89
Total Not to Exceed: $1,974,933.24
Budget will be established annually. Each year an annual estimate will be issued against the total
Not to Exceed.
$ 1,974,933.24
$ 491,072.35
Billing History
20361 Hermana Circle
Lake Forrest, CA 92630
October 17, 2023
ATTN: Rich Trevino
City of Newport Beach
(949) 644-3176
rtrevinoaa,newportbeachca.gov
RE: Weed Abatement Service Contract C-8537-1
Change Order Proposal for Back Bay Park View Park Vi
NI Job #: 2852
CHANGE ORDER No. 65
ints Tinning Phase 4
ITEM
DESCRIPTION
QTY
UNITS
UNIT RATE
TOTAL
CO 65- Back Bay Park View Park Viewpoints Tinning Phase 4
Labor
248
HR
$69.58
$17,255.84
Debris Hauling
24
YRD
$208.74
$5,009.76
Total Cost
1 $22,265.60
Inclusions: Natures Image, Inc. will perform the following scope within the area she
Attachment 1 -Site Map:
• From the trail to the light post (yellow line on Attachment 1- Site Map): mea
15' in everything must be removed- save Opuntias and trim down purple sa
not out first patches of purple sage by the trail). Anything beyond 15' must t
reduction.
• All vegetation will be removed from the Area within the yellow polygon.
• Clear the vegetation by the fence to create a maintenance footpath and ren
vegetation on the other side of the fence.
• In all areas the following plants must be saved: Native trees, opuntia, black
Exclusions: Additional mobilization, stump grinding, stump/root removal, grubbing
trash and debris, rock, biologist, bonds, clearing & grubbing, concrete work, dust con
materials or repair of erosion control, fencing removal, repair, materials and install
repairs or guarantee, grading, jute netting, coir fabric, straw wattles, BMP installation
guarantee, replanting, plant protection, plant establishment, site maintenance, meeti
permits, plant removals, reports, retention, reseeding, seed germination guarantee,
machine contouring/grading, silt fencing, site protection, soil preparation, compactior
soil scarifying, pesticide and herbicide spraying, straw blowing, flagging of bounda.
control, cost of water, water source, water meter, watering, weeding, repair due
neglect/damage by Owner or others, waivers of subrogation and additional insurance
in the red polvclon on
firing from the edge of sidewalk
=s to the ground level (Note: do
thinned by approximately 30%
we a 3' wide s'ction of
nd purple sage; deer grass.
nesting bird surveys, removal of
ol, electrical work, erosion control
tion, fertilizer, irrigation, irrigation
)nd/or maintenance, photos, plant
gs, mulch, mycorrhizae inoculum,
iefety fencing, sediment removal,
decompaction„ soil amendments,
as, soil sample or testing, traffic
> acts of God, war, vandalism or
endorsements.
Notes: Items not specified in this change order are neither implied nor included. T is change order shall become an
addendum to any contract with the terms set forth in this addendum which shall supersede any conflicting terms in any
other contract documents. Please sign this and return document to Natures Image, Iric.
Change Order Price: Good for 30 days Terms: Nei 30 days
Thank you for the opportunity to bid.
Sincerely,
NATURES IMAGE, INC.
Shadi Lari
Project Manager
Attachments:
Attachment 1- Site Map
Client Signatu
Altaclimenl ]- Site Map
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No, C-8537-1
Natures Image Job 2852
NI Task
Bid Item:
Description
Annual
Cost
reviously
Billed
urrent
Billing
Total
Billed
Year 1 - Annual Cost - Subtotal:
$ 212,102.00
$
178,837.75
$
$ 178,837.75
Year 2 - Annual Cost - Subtotal:
$ 216,344.04
$
152,438.62
$
$ 152,438.62
Year 3 -Annual Cost -Subotal: $ 218,231.31 $
176,934.17 $
$ 176,934.17
Year 4 - Annual Cost - Subotal: $ 222,595.94 $
172,241.97 $
$ 172,241.97
5-01
1
Site 1- 19th Street & Balboa Blvd
$ 2,671.88
$
2,671.88
$
$ 2,671.88
5-02
2
Site 2 - 2315 Holly Lane
$ 85.64
$
-
$
$ -
5-03
3
Site 3 - Back Bay Road
$ 15,514.26
$
15,514.26
$
$ 15,514.26
5-04
4
Site 4 - Big Canyon Nature Park
$ 77,442.82
$
63,646.39
$
$ 63,646.39
5-05
5
Site 5 - Bonita Canyon and University Bridge
$ 67.44
$
67.44
$
$ 67.44
5-06
6
Site 6 - Bonita Creek Park Service Road
$ 2,182.68
$
2,182.68
$
$ 2,182.68
5-07
7
Site 7 - Buck Gully (Lower)
$ 790.00
$
790.00
$
$ 790.00
5-08
8
Site 8 - Buck Gully (Middle)
$ 3,557.16
$
3,557.16
$
$ 3,557.16
5-09
9
Site 9 - Upper Middle Buck Gully
$ 34,476.48
$
34,476.48
$
$ 34,476.48
5-10
10
Site 10 - Buck Gully (Upper)
$ 1,890.44
$
1,890,44
$
$ 1,890.44
5-11
it
Site 11 - Cliff Drive Nature Park
$ 532.02
$
532.02
$
$ 532.02
5-12
12
Site 12 - Coast Highway (Roadside east of Pelican Point)
$ 1,597.13
$
-
$
$ -
5-13
13
Site 13 - Fernleaf Ramp
$ 377.87
$
-
$
$ -
5-14
14
Site 14 - Fletcher Jones Bike Trail
$ 337.20
$
337.20
$
$ 337.20
5-15
15
Site 15 - Harbor Cove Fire Access Road
$ 28,355.56
$
14,177.78
$
$ 14,177.78
5-16
16
Site 16 - Harbor View Nature Park
$ 14,329.25
$
-
$
$
5-17
17
Site 17 - Hillside Area - Coast Hwy (N Back Bay View Park)
$ 1,634.60
$
1,634.60
$
$ 1,634.60
5-18
18
Site 18 - Iris Easement
$ 301.87
$
301.87
$
$ 301.87
5-19
19
Site 19 - Jamboree and Bayview Way
$ 1,421.58
$
1,421.58
$
$ 1,421.58
5-20
20
Site 20 - Jamboree & MacArthur
$ 1,933.26
$
3,866.52
$
$ 3,866.52
5-21
21
Site 21- Jamboree Roadside Apron and Bike Trail
$ 1,173.23
$
1,173.23
$
$ 1,173.23
5-22
22
Site 22 - Kings Road (1801 & 1811 Kings Rd)
$ 257.98
$
257.98
$
$ 257.98
5-23
23
Site 23 - Mariners Drive cul-de-sac
$ 181.98
$
181.98
$
$ 181.98
5-24
24
Site 24 - Mesa Drive (east of Irvine Ave)
$ 760.03
$
760.03
$
$ 760.03
5-25
25
Site 25 - Newport Dunes Bike Path
$ 763.24
$
763.24
$
$ 763.24
5-26
26
Site 26 - Newport Dunes Slope (Below Coast Highway)
$ 2,921.30
$
2,921.30
$
$ 2,921.30
5-27
27
Site 27 - San Miguel Drive at Big Canyon Reservoir
$ 1,098.30
$
1,098.30
$
$ 1,098.30
5-28
28
Site 28 - Santa Ana Ave
$ 15,608.46
$
15,608.46
$
$ 15,608.46
5-29
29
Site 29 - S Side Bayside @ Carnation Fernleaf
$ 691.52
$
691.52
$
$ 691.52
5-30
30
Site 30 - Spyglass Canyon Park
$ 10,810.63
$
10,810.63
$
$ 10,810.63
5-31
31
ISite 31 - Spyglass Roadside
$ 1,127.20
$
1,127.20
$
$ 1,127.20
5-32
1 32
ISite 32 - University Drive at Irvine Ave
$ 367.17
$
317.17
$
$ 367.17
5-33
33
Site 33 - Valley Acreage (Near Spyglass Canyon Park)
$ 1,787.68
$
1,787.68
$
$ 1,787.68
Year 5 - Annual Cost - Subotal:
$ 227,047.86
$
184,617.02
$
$ 184,617.02
Change Orders
CO 04
C04
C044 - Harbor View Nature Park - Saturday Creek Cleanup
$ 8,070.00
$ 8,070.00
$
$ 8,070.00
CO 05
C05
CO#5 - Site 7, Buck Gully (Lower) Container Plant Installation
$ 3,100.00
$ 3,100.00
$
$ 3,100.00
CO 06
C06
CO#6 - Site 26, Newport Dune Slopes - Hydroseeding
$ 22,274.00
$ 22,274.00
$
$ 22,274.00
CO 07
C07
COO - Site 25, Newport Dune Bike Path - Sandbag Replacement
$ 3,868.00
$ 31868.00
$
$ 3,868.00
CO 08
C08
CO#8 - Corona Del Mar State Beach - Hydroseeding
$ 7,458.00
$ 7,458.00
$
$ 7,458.00
CO 09
C09
CO#9 - Corona del Mar State Beach - Sandbag&Slit Fence Replac
$ 4,376.00
$ 4,376.00
$
$ 4,376,00
CO 10
C010
CO#10 - Site 25, Newport Dune Bike Path - Sandbag Installation
$ 1,568.00
$1 1,568.00
$
$ 1,568.00
CO 16
C016
CO#16- Site 3, Back Bay Rd- Follow Up Visit
$ 6,795.75
$ 6,795.75
$
$ 6,795.75
CO 18
C018
CO#18 - Follow Up Maintenance Visits Site 28
$ 5,102.50
$ 5,102.50
$
$ 5,102.50
CO 19-1
C019
CO#19 - Follow Up Maintenance Visits Site 9
$ 25,935.00
$ 25,935.00
$
$ 25,935.00
CO 19-2
C019
CO#19 - Follow Up Maintenance Visits Site 10
$ 1,488.50
$ 1.488.50
$
$ 1,488.50
CO 19-3
CO 19
CO#19 - Follow Up Maintenance Visits Site 13
$ 344.50
$ 344.50
$
$ 344.50
CO 19-4
C019
CO#19 - Follow Up Maintenance Visits Site 29
$ 539.50
$ 539.50
$
$ 539.50
CO 19-5
C019
CO#19 - Follow Up Maintenance Visits Site 30
$ 8,092.50
$1 8,092.50
$
$ 8,092.50
CO 20-1
CO20
CO#20 - Dune Bike Path Sandbag Removal
$ 2,466.36
$1 2,466.36
$
$ 2,466.36
CO 20-2
CO20
CO#20 - CDM State Beach Sandbag Removal
$ 1,644.24
$ 1,644.24
$
$ 1,644.24
CO 21-1
CO21
CO#21-1 - Site 14 Fletcher Jones Bike Trail Follow-up Visit
$ 2,088.45
$ 2,088.45
$
$ 2,088.45
CO 21-2
CO21
CO#21-2 - Site 16 Harbor View Nature Park Follow-up Visit
$ 4,160.33
$ 4,160.33
$
$ 4,160.33
CO 21-3
CO21
CO#21-3 - Site 33 Valley Acreage (Near Spyglass Park) Follow-up
$ 1,375.73
$ 1,375.73
$
$ 1,375.73
CO 22
CO22
CO#22 - Back Bay Vegetation Trimming
$ 1.657.50
$ 1.657.50
$
$ 1,657.50
CO 23-1
CO23
C0423-1- Site 18 Iris Easement Follow-up Visit
$ 2,320.50
$ 2,320.50
$
$ 2,320.50
CO 23-2
CO23
CO#23-2 - Site 20 Jamboree & MacArthur Follow-up Visit
$ 15,381.50
$ 15,381.60
$
$ 15,381.60
Billing History
City of Newport Beach
Maintenance/Repair Services Agreement
Contract No. C-8537-1
Natures Image Job 2852
CO 25
CO25
CO#2S - Site 16 Harbor View Park Mustard Patch Removal
$ 1,790.10
$
1,790.10
$
$
1,790.10
GO26
CO26
CO#26- Spyglass VegatationRemoval
$ 4,179.10
$
4,179.10
$
$
4,179.10
CO 27
CO27
CO#27 - Site Prep & Hydroseed Newport Dune Bike Path
$ 26,772.80
$
$
$
-
CO 28
CO28
CO#28 - Hydroseed Corona Del Mar State Beach Bluff
$ 8,062.40
$
$
$
-
CO 29
CO29
CO#29 - Harbor View Nature Park - Cattail Removal
$ 16,707:60
$
16,707.60
$
$
16,707.60
CO 30
C030
CO#30 -San Joaquin Hills Road Vegetation Trimming
$ 4,213.44
$
4,213.44
$
$
4,213.44
CO 31
C031
CO#31- Removal of Dead Trees at Upper Middle Buck Gully
$ 4,213.44
$
4,213.44
$
$
4,213.44
CO 32
C032
CO#32 - Baccharis Removal at Back Bay View Park Viewpoints
$ 1,872.64
$
1,872.64
$
$
1,872.64
CO 33
C033
CO#33 - Back Bay View Park
$ 16,853.76
$
16,853.76
$
$
16,853.76
CO 34
C034
CO#34 - Small Areas Harbor View Nature Park
$ 2,273.92
$
2,273.92
$
$
2,273.92
CO 35
C035
CO#35 - Cattail Removal Harbor View Nature Park
$ 12,577.89
$
12,577.89
$
$
12,577.89
CO 36
C036
CO#36 - Site 9 Upper Middle Buck Gully
$ 735.68
$
735.68
$
$
735.68
CO 37
C037
CO#37- Outlet Structure Sediment Removal
$ 32,369.92
$
25,394.34
$
$
25,394.34
CO 38
C038
CO#38 - Poppy Ave & Ocean Blvd Veg Trimming
$ 3,745.28
$
3,745.28
$
$
3,745.28
CO 41
C041
CO#41 - Veg Trimming at Avon Street Drain
$ 8.769.40
$
8,769.40
$
$
8,769.40
CO 42
C042
CO#42- Back Bay View Park Overgrown Vegetation Removal
$ 12,573.44
$
12,573.44
$
$
12,573.44
CO 43
C043
CO#43- Phase 1- MacArthur & Jamboree Vegetation Removal
$ 24,750.00
$
24,619.20
$
$
24,619.20
CO 44
C044
CO#44- Erosion Repair Site Near Mesa Dr.
$ 7,490.00
$
7,490.00
$
$
7,490.00
CO 46
C046
CO#46- Veg Thinning at Sunset Ridge Park
$ 13,645.96
$
13,645.96
$
$
13,645.96
CO 47
C047
CO#47- Back Bay View Park Veg Removal Phase 3
$ 13,242.24
$
13,242.24
$
$
13,242.24
CO 49
C049
CO#49 - Arroyo Park Trail Vegetation Trimming
$ 16,850.21
$
16,850.21
$
$
16,850.21
CO 50
C050
CO#50 - Back Bay Paddle Work
$ 25,582.29
$
25,582.29
$
$
25,582.29
CO 51
C051
CO#51 -Thistle Removal Behind Residence on Ocean Birch Dr.
$ 2,728.76
$
2,728.76
$
$
2,728.76
CO 52
C052
CO#52 - Big Canyon Catch Basin Vegetation Removal
$ 5,662.17
$
5,662.17
$
$
5,662.17
CO 53
C053
C0453 - Harbor View Park Cattail Removal 2022
$ 28,788.54
$
28,788.54
$
$
28,788.54
C0 54
C054
CO#54- Avon St. Drain Veg Trimming 2022
$ 21.843.66
$
21,843.66
$
$
21,843.66
CO 56
C056
CO#56 - Jamboree & MacArthur Follow-up Visit
$ 8,800.35
$
8,800.35
$
$
8,800.35
CO 57
C057
CO#57 - Arroyo Park Trail Vegetation Trimming
$ 21,152.32
$
21,152.32
$
$
21,152.32
CO 60
C060
CO#60 - Harbor View Nature Park Veg Trimming Behind Properti
$ 21,693.78
$
21,693.78
$
$
21,693.78
CO 61
C061
CO#61 - Baccharis Removal at Back Bay View Park Viewpoints 20
$ 2,251.23
$
2,251.23
$
$
2,251.23
CO 62
C062
CO#62 - Back Bay Paddle Work - 2023
$ 35,624.96
$
35,624.96
$
$
35,624.96
C063
C063
CO#63-Avon St. Drain Veg Trimming-2023
$ 22,961.40
$
22,961A0
$
$
22,961.40
CO 65
C065
CO#65- Back Bay Park View Park Viewpoints Thinning Phase 4
$ 22,265.60
$
-
$
22,265.60
$
22,265.60
Change Order Subtotal
$ 583,151.24
$
518,944.06
$
22,265.60
$
518,944.06
Total Cost $ 1,679,472.39 $
Not to Exceed (Not including Change Orders):
Remaining:
NOTES:
1 st Annual Contract Term: 4/23/2019 to 4/30/2020
Full Contract Term: 4/23/2019 to 5/1/2024
Current Contract Term: YR 4 4/23/2022 to 4/22/2023
Total Not to Exceed: $1,974,933.24
Budget will be established annually. Each year an annual estimate will be issued against the total co
Billing History
,384,013.59 $
itract Not to Excee
22,265.60
.
$ 1,384,013.59
$ 1,974,933.24
$ 590,919.65
CITY OF NEWPORT BEACH
rn
Attn: Andrew J. Fox
Nature's Image, Inc.
20361 Hermana Circle
Lake Forest, CA 92630
100 Civic Center Dr.
Newport Beach, California 92660
949 644-3011 1 949 646-5204 FAX
newportbeachca.gov/pulchmorks
March 23, 2022
RE: Notification of 2022 CPI Adjustment to Billing Rates for contract C-8537-1, Weed Abatement
Services.
Per section 4.2 of the contract, Exhibit B (Schedule of Billing Rates) shall be adjusted in proportion
to the changes in the Consumer Price Index, subject to a maximum annual increase of 2.0%. The
Consumer Price Index data to be used shall be from the month that is three (3) months prior to the
anniversary date of the agreement. The effective date of the agreement is April 23, thus CPI
adjustments will be determined based on the January data.
The updated schedule of billing rates shall be applied to all work completed on or after the
anniversary of the effective date April 23. A breakdown of the CPI adjustment is detailed below.
Applied CPI
CPI Increase
Percentage (if CPI is
Total CPI Increase
PI Data
020k19269.468
from Prior Year
over the 2.0%
from 2019 Billing
maximum)
Rates
N/A
N/A
N/A
2020
277.755
3.08%
2.00%
2.00%
2021
280.178
0.87%
N/A
2.87%
2022
301.209
7.51 %
2.00%
4.87%
Please see the attached updated Billing Rates with the 2.00% increase. The new rates will become
effective April 23, 2022.
Thank you,
Kevin Pekar/
Parks and Trees Superintendent
Micah Martin
Deputy Director of Public Works
Municipal Operations Division
Public Works D—WOW epartment
2022 Billing Rates
LOCATIONS
Site #
Site Description
Work Type
Standard
Annual Cost
1
19th Street and Balboa Blvd
W
CFC
$2,619.49
2
2315 Holly Lane
W
CFC
$83.96
3
Back Bay Road
C
WUI
$15,210.05
4
Big Canyon Nature Park
H
-
$75,924.34
5
Bonita Canyon and University Bridge
W
CFC
$66.12
6
Bonita Creek Park Service Road
C
WUI
$2,139.88
7
Buck Gully (Lower)
H
-
$774.51
8
Buck Gully (Middle)
H
-
$3,487.41
9
Upper Middle Buck Gully
H
$33,800.47
10
Buck Gully (Upper)
H
-
$1,853.37
11
Cliff Drive Nature Park
W
CFC
$521.59
12
Coast Highway (Roadside east of
Pelican Point)
W
CFC
$1,565.82
13
Fernleaf Ramp
W
CFC
$370.47
14
Fletcher Jones Bike Trail
C
WUl
$330.58
15
Harbor Cove Fire Access Road and
Trail
C
WUI
$27,799.57
16
Harbor View Nature Park
W
CFC
$14,048.29
17
Hillside Area Along Coast Highway
(North of Back Bay View Park)
W
CFC
$1,602.55
18
Iris easement
W
CFC
$295.95
19
Jamboree and Bayview Way
C
WUI
$1,393.70
20
Jamboree and MacArthur
W
CFC
$1,895.35
21
Jamboree Roadside Apron and Bike
Trail
W
CFC
$1,150.23
LOCATIONS
Site ##
Site Description
Work Type
Standard
Annual Cost
22
Kings Road (1801 &1811 Kings Rd)
W
CFC
$252.92
23
Mariners Drive cul-de-sac
W
CFC
$178.41
24
Mesa Drive (east of Irvine Avenue)
W
CFC
$745.13
25
Newport Dunes bike path
W
CFC
$748.28
26
Newport Dunes Slope (Below Coast
W
CFC
$2 864 02
Highway)
27
San Miguel Drive at Big Canyon
W
CFC
$1,076.76
Reservoir
28
Santa Ana Ave
E, W
-
$15,302.41
29
South side of Bayside at Carnation and
W
CFC
$677.96
along Fernleaf
30
Spyglass Canyon Park
H
-
$10,598.66
31
Spyglass Roadside
W
CFC
$1,105.10
32
University Drive at Irvine Ave
W
CFC
$359.97
33
Valley Acreage (Near Spyglass
H
-
$1,752.62
Canyon Park)
(C) Clearance Trimming, (E) Erosion Protection, (H) Hazard Reduction, (W) Weed Abatement
(CFC) 2016 California Fire Code (CFC), Section 304.1.2, (WUI) City of Newport Beach Wildland Urban Interface
Area Standard for Hazard Reduction
Unit Costs
Labor per hour
$ 68.22 Per Hour
Debris hauling per yard
$ 204.65 Per Yard
Clear debris from v-ditches and shovel width clearance
on both sides of the ditches per foot
$ 1.84 Per Foot
Function Cost
Function
Pest Control
General Weed Control Post Emergent
Cost
$12.07
Unit
1,000 Square Feet
Pre-Emergent/turf or planter
Shrub PruninglRemovals
Pruning
$20.99
$6.82
1,000 Square Feet
10 Linear Feet
Removals
Full Tree ■ runinglRemovals
Pruning
$125.94
$2,308.85
10 Linear Feet
Day (3-Man Crew)
Removals
Planting Standard Material
1 Gal. Shrub
$2,308.85
$16.79
Day (3-Man Crew)
Each
5 Gal. Shrub
$47.23
Each
15. Gal Shrub
$183.66
Each
15. Gal Tree
$262.37
Each
24 in. Box Tree
$577.21
Each
36 in. Box Tree
$1,574.21
Each
64 Count Flat Groundcover
$62.97
Flat
16 Count 4 in. Flat Annual Color
$41.98
Flat
Turf - Seed and Top Dress
$0.16
1,000 Square Feet
Turf - Sod
$1.05
1,000 Square Feet
Hand -spread and rake in City Supplied Seed
$38.83
1,000 Square Feet
Hydroseed - Standard Coastal Sage Scrub Mix
Erosion
Jute Netting
$94.45
$194.15
1,000 Square Feet
Min. 0.5 Acre
1,000 Square Feet
Straw Waddles
$367.32
100 Linear Feet
6mm Poly Sheeting secured wl stakes and sandbags
$341.08
1,000 Square Feet
Straw Waddles secured wl stakes
$419.79
100 Linear Feet
Sand Bags
$409.30
100 Linear Feet
_1
Op MAINTENANCE/REPAIR SERVICES AGREEMENT
WITH NATURE'S IMAGE, INC. FOR
V WEED ABATEMENT SERVICES
THIS MAINTENANCE/REPAIR SERVICES AGREEMENT ("Agreement") is made
and entered into as of this 23rd day of April, 2019 ("Effective Date"), by and between the
CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"),
and Nature's Image, Inc., a California corporation ("Contractor"), whose address is 20361
Hermana Circle Lake Forest, CA 92630, and is made with reference to the following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to carry on its business as it is now being
conducted under the statutes of the State of California and the Charter of City.
B. City desires to engage Contractor to perform maintenance and/or repair services
for City ("Project").
C. Contractor possesses the skill, experience, ability, background, certification and
knowledge to provide the maintenance and/or repair services described in this
Agreement.
D. Contractor has examined the location of all proposed work, carefully reviewed and
evaluated the specifications set forth by City for the Project, is familiar with all
conditions relevant to the performance of services, and has committed to perform
all work required for the compensation specified in this Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties
as follows:
TERM
The term of this Agreement shall commence on the Effective Date, and shall
terminate on May 1, 2024, unless terminated earlier as set forth herein.
2. SERVICES TO BE PERFORMED
2.1 Contractor shall diligently perform all the services described in the Scope of
Services attached hereto as Exhibit A and incorporated herein by reference ("Services"
or "Work"). As a material inducement to City entering into this Agreement, Contractor
represents and warrants that Contractor is a provider of first class work and Contractor is
experienced in performing the Work contemplated herein and, in light of such status and
experience, Contractor covenants that it shall follow community professional standards
with the ordinary degree of skill and care that would be used by other reasonably
competent practitioners of the same discipline under similar circumstances, in performing
the Work required hereunder, and that all materials will be of good quality.
2.2 Contractor shall perform all Work required to be performed, and shall
provide and furnish all the labor, materials, necessary tools, expendable equipment and
all utility and transportation services necessary for the Project.
2.3 Contractor shall perform the on-call services described in the Scope of
Services attached hereto as Exhibit A and incorporated herein by reference ("Services"
or "Work"). Upon written request from the Project Administrator as defined herein,
Contractor shall provide a letter proposal for Services requested by the City (hereinafter
referred to as the "Letter Proposal"). The Letter Proposal shall include the following:
2.3.1 A detailed description of the Services to be provided;
2.3.2 The position of each person to be assigned to perform the Services,
and the name of the individuals to be assigned, if available;
and
2.3.3 The estimated number of hours and cost to complete the Services;
2.3.4 The time needed to finish the specific project.
2.4 No Services shall be provided until the Project Administrator has provided
written acceptance of the Letter Proposal. Once authorized to proceed, Contractor shall
diligently perform the duties in the approved Letter Proposal.
3. TIME OF PERFORMANCE
3.1 Time is of the essence in the performance of Services under this Agreement
and Contractor shall perform the Services in accordance with the schedule included in
Exhibit A. In the absence of a specific schedule, the Services shall be performed to
completion in a diligent and timely manner. The failure by Contractor to strictly adhere to
the schedule set forth in Exhibit A, if any, or perform the Services in a diligent and timely
manner may result in termination of this Agreement by City.
3.2 Notwithstanding the foregoing, Contractor shall not be responsible for
delays due to causes beyond Contractor's reasonable control. However, in the case of
any such delay in the Services to be provided for the Project, each party hereby agrees
to provide notice within two (2) calendar days of the occurrence causing the delay to the
other party so that all delays can be addressed.
3.3 Contractor shall submit all requests for extensions of time for performance
in writing to the Project Administrator as defined herein, not later than two (2) calendar
days after the start of the condition that purportedly causes a delay. The Project
Administrator shall review all such requests and may grant reasonable time extensions
for unforeseeable delays that are beyond Contractor's control.
3.4 For all time periods not specifically set forth herein, Contractor shall respond
in the most expedient and appropriate manner under the circumstances, by fax, hand -
delivery or mail.
Nature's Image, Inc. Page 2
4. COMPENSATION TO CONTRACTOR
4.1 City shall pay Contractor for the Services on a time and expense not -to -
exceed basis in accordance with the provisions of this Section and the Schedule of Billing
Rates attached hereto as Exhibit B and incorporated herein by reference. Except as
otherwise provided herein, no rate changes shall be made during the term of this
Agreement without the prior written approval of City. Contractor's compensation for all
Services performed in accordance with this Agreement, including all reimbursable items,
shall not exceed One Million Nine Hundred Seventy Four Thousand Nine Hundred
Thirty Three Dollars and 24/100 ($1,974,933.24), without prior written amendment to
the Agreement.
4.2 Upon the first anniversary of the Effective Date and upon each anniversary
of the Effective Date thereafter, the billing rates set forth in Exhibit B ("Billing Rates") shall
be adjusted in proportion to changes in the Consumer Price Index, subject to the
maximum adjustment set forth below. Such adjustment shall be made by multiplying the
Billing Rates in Exhibit B by a fraction, the numerator of which is the value of the
Consumer Price Index for the calendar month three (3) months preceding the calendar
month for which such adjustment is to be made, and the denominator of which is the value
of the Consumer Price Index for the same calendar month immediately prior to Effective
Date. The Consumer Price Index to be used in such calculation is the "Consumer Price
Index, All Items, 1982-84=100 for All Urban Consumers (CPI -U)", for the Los Angeles -
Riverside -Orange County Metropolitan Area, published by the United States Department
of Labor, Bureau of Labor Statistics. If both an official index and one or more unofficial
indices are published, the official index shall be used. If said Consumer Price Index is no
longer published at the adjustment date, it shall be constructed by conversion tables
included in such new index. In no event, however, shall the amount payable under this
Agreement be reduced below the Billing Rates in effect immediately preceding such
adjustment. The maximum adjustment increase to the Billing Rates, for any year where
an adjustment is made pursuant to this Section, shall not exceed the Consumer Price
Index or 2.0% of the Billing Rates in effect immediately preceding such adjustment,
whichever is less.
4.3 Contractor shall submit monthly invoices to City describing the Work
performed the preceding month. Contractor's bills shall include the name and/or
classification of employee who performed the Work, a brief description of the Services
performed and/or the specific task in the Scope of Services to which it relates, the date
the Services were performed, the number of hours spent on all Work billed on an hourly
basis, and a description of any reimbursable expenditures. City shall pay Contractor no
later than thirty (30) calendar days after approval of the monthly invoice by City staff.
4.4 City shall reimburse Contractor only for those costs or expenses specifically
identified in Exhibit B to this Agreement, or specifically approved in writing in advance by
City.
4.5 Contractor shall not receive any compensation for Extra Work performed
without the prior written authorization of City. As used herein, "Extra Work" means any
Nature's Image, Inc. Page 3
Work that is determined by City to be necessary for the proper completion of the Project,
but which is not included within the Scope of Services and which the parties did not
reasonably anticipate would be necessary at the execution of this Agreement.
Compensation for any authorized Extra Work shall be paid in accordance with Exhibit B.
5. PROJECT MANAGER
5.1 Contractor shall designate a Project Manager, who shall coordinate all
phases of the Project. This Project Manager shall be available to City at all reasonable
times during the Agreement term. Contractor has designated Andrew J. Fox to be its
Project Manager. Contractor shall not remove or reassign the Project Manager or any
personnel listed in Exhibit A or assign any new or replacement personnel to the Project
without the prior written consent of City. City's approval shall not be unreasonably
withheld with respect to the removal or assignment of non -key personnel.
5.2 Contractor, at the sole discretion of City, shall remove from the Project any
of its personnel assigned to the performance of Services upon written request of City.
Contractor warrants that it will continuously furnish the necessary personnel to complete
the Project on a timely basis as contemplated by this Agreement.
6. ADMINISTRATION
This Agreement will be administered by the Public Works. City's Deputy Director
of Public Works, Municipal Operations Division or designee shall be the Project
Administrator and shall have the authority to act for City under this Agreement. The
Project Administrator shall represent City in all matters pertaining to the Services to be
rendered pursuant to this Agreement.
7. CITY'S RESPONSIBILITIES
To assist Contractor in the execution of its responsibilities under this Agreement,
City agrees to provide access to and upon request of Contractor, one copy of all existing
relevant information on file at City. City will provide all such materials in a timely manner
so as not to cause delays in Contractor's Work schedule.
8. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE
8.1 Contractor shall use only the standard materials described in Exhibit A in
performing Services under this Agreement. Any deviation from the materials described
in Exhibit A shall not be installed or utilized unless approved in advance and in writing by
the Project Administrator.
8.2 All of the Services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel required to perform
the Services required by this Agreement, and that it will perform all Services in a manner
commensurate with community professional standards and with the ordinary degree of
skill and care that would be used by other reasonably competent practitioners of the same
discipline under similar circumstances. All Services shall be performed by qualified and
Nature's Image, Inc. Page 4
experienced personnel who are not employed by City. By delivery of completed Work,
Contractor certifies that the Work conforms to the requirements of this Agreement, all
applicable federal, state and local laws and legally recognized professional standards.
8.3 Contractor represents and warrants to City that it has, shall obtain and shall
keep in full force and effect during the term hereof, at its sole cost and expense, all
licenses, permits, qualifications, insurance and approvals of whatsoever nature that is
legally required of Contractor to practice its profession. Contractor shall maintain a City
of Newport Beach business license during the term of this Agreement.
8.4 Contractor shall not be responsible for delay, nor shall Contractor be
responsible for damages or be in default or deemed to be in default by reason of strikes,
lockouts, accidents, acts of God, or the failure of City to furnish timely information or to
approve or disapprove Contractor's Work promptly, or delay or faulty performance by City,
contractors, or governmental agencies.
9. RESPONSIBILITY FOR DAMAGES OR INJURY
9.1 City and all officers, employees and representatives thereof shall not be
responsible in any manner for any loss or damage to any of the materials or other things
used or employed in performing the Project or for injury to or death of any person as a
result of Contractor's performance of the Services required hereunder; or for damage to
property from any cause arising from the performance of the Project by Contractor, or its
subcontractors, or its workers, or anyone employed by either of them.
9.2 Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from defects,
obstructions or from any cause arising from Contractor's Work on the Project, or the Work
of any subcontractor or supplier selected by Contractor.
9.3 To the fullest extent permitted by law, Contractor shall indemnify, defend
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees (collectively, the "Indemnified Parties") from and against any
and all claims (including, without limitation, claims for bodily injury, death or damage to
property), demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including, without limitation,
attorneys' fees, disbursements and court costs) of every kind and nature whatsoever
(individually, a Claim; collectively, "Claims"), which may arise from or in any manner relate
(directly or indirectly) to any breach of the terms and conditions of this Agreement, any
Work performed or Services provided under this Agreement including, without limitation,
defects in workmanship or materials or Contractor's presence or activities conducted on
the Project (including the negligent and/or willful acts, errors and/or omissions of
Contractor, its principals, officers, agents, employees, vendors, suppliers, consultants,
subcontractors, anyone employed directly or indirectly by any of them or for whose acts
they may be liable or any or all of them).
Nature's Image, Inc. Page 5
9.4 Notwithstanding the foregoing, nothing herein shall be construed to require
Contractor to indemnify the Indemnified Parties from any Claim arising from the sole
negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall
be construed as authorizing any award of attorneys' fees in any action on or to enforce
the terms of this Agreement. This indemnity shall apply to all claims and liability
regardless of whether any insurance policies are applicable. The policy limits do not act
as a limitation upon the amount of indemnification to be provided by Contractor.
9.5 Contractor shall perform all Work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their original condition
and former usefulness as soon as possible, and to protect public and private property.
Contractor shall be liable for any private or public property damaged during the
performance of the Work by Contractor or its agents.
9.6 To the extent authorized by law, as much of the money due Contractor
under and by virtue of the Agreement as shall be considered necessary by City may be
retained by it until disposition has been made of such suits or claims for damages as
aforesaid.
9.7 The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
10. INDEPENDENT CONTRACTOR
It is understood that City retains Contractor on an independent contractor basis
and Contractor is not an agent or employee of City. The manner and means of conducting
the Work are under the control of Contractor, except to the extent they are limited by
statute, rule or regulation and the expressed terms of this Agreement. No civil service
status or other right of employment shall accrue to Contractor or its employees. Nothing
in this Agreement shall be deemed to constitute approval for Contractor or any of
Contractor's employees or agents, to be the agents or employees of City. Contractor
shall have the responsibility for and control over the means of performing the Work,
provided that Contractor is in compliance with the terms of this Agreement. Anything in
this Agreement that may appear to give City the right to direct Contractor as to the details
of the performance of the Work or to exercise a measure of control over Contractor shall
mean only that Contractor shall follow the desires of City with respect to the results of the
Services.
11. COOPERATION
Contractor agrees to work closely and cooperate fully with City's designated
Project Administrator and any other agencies that may have jurisdiction or interest in the
Work to be performed. City agrees to cooperate with Contractor on the Project.
Nature's Image, Inc. Page 6
12. CITY POLICY
Contractor shall discuss and review all matters relating to policy and Project
direction with City's Project Administrator in advance of all critical decision points in order
to ensure the Project proceeds in a manner consistent with City goals and policies.
13. PROGRESS
Contractor is responsible for keeping the Project Administrator informed on a
regular basis regarding the status and progress of the Project, activities performed and
planned, and any meetings that have been scheduled or are desired.
14. INSURANCE
Without limiting Contractor's indemnification of City, and prior to commencement
of Work, Contractor shall obtain, provide and maintain at its own expense during the term
of this Agreement or for other periods as specified in this Agreement, policies of insurance
of the type, amounts, terms and conditions described in the Insurance Requirements
attached hereto as Exhibit C, and incorporated herein by reference.
15. LABOR AND PREVAILING WAGE REQUIREMENT
15.1 Contractor shall comply with all applicable provisions of State and Federal
law including, applicable provisions of California Labor Code, and the Federal Fair Labor
Standards Act.
15.2 Whenever Contractor has knowledge that any actual or potential labor
dispute is delaying or threatens to delay the timely performance of this Agreement,
Contractor shall immediately give notice to City, including all relevant information.
15.3 This agreement shall be paid in accordance with Section 1770 of the
California State Labor Code and in accordance with the tenus of the Southern California
Master Labor Agreement, which has established a prevailing rate of per diem wages to
be paid in the performance of this agreement. The Director of Industrial Relations has
ascertained the general prevailing rate of per diem wages in the locality in which the work
is to be performed for each craft, classification, or type of workman or mechanic needed
to execute the agreement. A copy of said determination is available by calling the
prevailing wage hotline number (415) 703-4774, and requesting one from the Department
of Industrial Relations. All parties to the agreement shall be governed by all provisions of
the California Labor Code Relating to prevailing wage rates (Sections 1770-7981,
inclusive).
16. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS
Except as specifically authorized under this Agreement, the Services to be
provided under this Agreement shall not be assigned, transferred contracted or
subcontracted out without the prior written approval of City. Any of the following shall be
construed as an assignment: The sale, assignment, transfer or other disposition of any
Nature's Image, Inc. Page 7
of the issued and outstanding capital stock of Contractor, or of the interest of any general
partner or joint venturer or syndicate member or cotenant if Contractor is a partnership or
joint -venture or syndicate or cotenancy, which shall result in changing the control of
Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five
percent (25%) or more of the assets of the corporation, partnership or joint -venture.
17. SUBCONTRACTING
The subcontractors authorized by City, if any, to perform Work on this Project are
identified in Exhibit A. Contractor shall be fully responsible to City for all acts and
omissions of any subcontractor. Nothing in this Agreement shall create any contractual
relationship between City and any subcontractor nor shall it create any obligation on the
part of City to pay or to see to the payment of any monies due to any such subcontractor
other than as otherwise required by law. City is an intended beneficiary of any Work
performed by the subcontractor for purposes of establishing a duty of care between the
subcontractor and City. Except as specifically authorized herein, the Services to be
provided under this Agreement shall not be otherwise assigned, transferred, contracted
or subcontracted out without the prior written approval of City.
18. OWNERSHIP OF DOCUMENTS
Each and every report, draft, map, record, plan, document and other writing
produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor,
its officers, employees, agents and subcontractors, in the course of implementing this
Agreement, shall become the exclusive property of City, and City shall have the sole right
to use such materials in its discretion without further compensation to Contractor or any
other party. Contractor shall, at Contractor's expense, provide such Documents to City
upon prior written request.
19. CONFIDENTIALITY
All Documents, including drafts, preliminary drawings or plans, notes and
communications that result from the Services in this Agreement, shall be kept confidential
unless City expressly authorizes in writing the release of information.
20. RECORDS
Contractor shall keep records and invoices in connection with the Services to be
performed under this Agreement. Contractor shall maintain complete and accurate
records with respect to the costs incurred under this Agreement and any Services,
expenditures and disbursements charged to City, for a minimum period of three (3) years,
or for any longer period required by law, from the date of final payment to Contractor
under this Agreement. All such records and invoices shall be clearly identifiable.
Contractor shall allow a representative of City to examine, audit and make transcripts or
copies of such records and invoices during regular business hours. Contractor shall allow
inspection of all Work, data, Documents, proceedings and activities related to the
Agreement for a period of three (3) years from the date of final payment to Contractor
under this Agreement.
Nature's Image, Inc. Page 8
21. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction of
the dispute with respect to such payment. Such withholding shall not be deemed to
constitute a failure to pay according to the terms of this Agreement. Contractor shall not
discontinue Work as a result of such withholding. Contractor shall have an immediate
right to appeal to the City Manager or his/her designee with respect to such disputed
sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of
return that City earned on its investments during the time period, from the date of
withholding of any amounts found to have been improperly withheld.
22. CITY'S RIGHT TO EMPLOY OTHER CONTRACTORS
City reserves the right to employ other contractors in connection with the Project.
23. CONFLICTS OF INTEREST
23.1 Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act") and/or Government Code §§ 1090 et
seq., which (1) require such persons to disclose any financial interest that may
foreseeably be materially affected by the Work performed under this Agreement, and (2)
prohibit such persons from making, or participating in making, decisions that will
foreseeably financially affect such interest.
23.2 If subject to the Act and/or Government Code §§ 1090 et seq., Contractor
shall conform to all requirements therein. Failure to do so constitutes a material breach
and is grounds for immediate termination of this Agreement by City. Contractor shall
indemnify and hold harmless City for any and all claims for damages resulting from
Contractor's violation of this Section.
24. NOTICES
24.1 All notices, demands, requests or approvals, including any change in
mailing address, to be given under the terms of this Agreement shall be given in writing,
and conclusively shall be deemed served when delivered personally, or on the third
business day after the deposit thereof in the United States mail, postage prepaid, first-
class mail, addressed as hereinafter provided.
24.2 All notices, demands, requests or approvals from Contractor to City shall be
addressed to City at:
Attn: Deputy Director of Public Works, Municipal Operations Division
Public Works
City of Newport Beach
100 Civic Center Drive
PO Box 1768
Newport Beach, CA 92658
Nature's Image, Inc. Page 9
24.3 All notices, demands, requests or approvals from City to Contractor shall be
addressed to Contractor at:
Attn: Andrew J. Fox
Nature's Image, Inc.
20361 Hermana Circle
Lake Forest, CA 92630
25. CLAIMS
25.1 Unless a shorter time is specified elsewhere in this Agreement, before
making its final request for payment under this Agreement, Contractor shall submit to City,
in writing, all claims for compensation under or arising out of this Agreement. Contractor's
acceptance of the final payment shall constitute a waiver of all claims for compensation
under or arising out of this Agreement except those previously made in writing and
identified by Contractor in writing as unsettled at the time of its final request for payment.
Contractor and City expressly agree that in addition to any claims filing requirements set
forth in the Agreement, Contractor shall be required to file any claim Contractor may have
against City in strict conformance with the Government Claims Act (Government Code
sections 900 et seq.).
25.2 To the extent that Contractor's claim is a "Claim" as defined in Public
Contract Code section 9204 or any successor statute thereto, the Parties agree to follow
the dispute resolution process set forth therein. Any part of such "Claim" remaining in
dispute after completion of the dispute resolution process provided for in Public Contract
Code section 9204 or any successor statute thereto shall be subject to the Government
Claims Act requirements requiring Contractor/Consultant to file a claim in strict
conformance with the Government Claims Act. To the extent that Contractor's claim is
not a "Claim" as defined in Public Contract Code section 9204 or any successor statute
thereto, Contractor shall be required to file such claim with the City in strict conformance
with the Government Claims Act (Government Code sections 900 et seq.).
26. TERMINATION
26.1 In the event that either party fails or refuses to perform any of the provisions
of this Agreement at the time and in the manner required, that party shall be deemed in
default in the performance of this Agreement. If such default is not cured within a period
of two (2) calendar days, or if more than two (2) calendar days are reasonably required
to cure the default and the defaulting party fails to give adequate assurance of due
performance within two (2) calendar days after receipt of written notice of default,
specifying the nature of such default and the steps necessary to cure such default, and
thereafter diligently take steps to cure the default, the non -defaulting party may terminate
the Agreement forthwith by giving to the defaulting party written notice thereof.
26.2 Notwithstanding the above provisions, City shall have the right, at its sole
and absolute discretion and without cause, of terminating this Agreement at any time by
giving no less than seven (7) calendar days' prior written notice to Contractor. In the
Nature's Image, Inc. Page 10
event of termination under this Section, City shall pay Contractor for Services
satisfactorily performed and costs incurred up to the effective date of termination for which
Contractor has not been previously paid. On the effective date of termination, Contractor
shall deliver to City all reports, Documents and other information developed or
accumulated in the performance of this Agreement, whether in draft or final form.
27. LABOR
27.1 Contractor shall conform with all applicable provisions of state and federal
law including, but not limited to, applicable provisions of the federal Fair Labor Standards
Act ("FLSA") (29 USCA § 201, et seq.).
27.2 Whenever Contractor has knowledge that any actual or potential labor
dispute is delaying or threatens to delay the timely performance of this Agreement,
Contractor shall immediately give written notice to City, and provide all relevant
information.
27.3 Contractor represents that all persons working under this Agreement are
verified to be U.S. citizens or persons legally authorized to work in the United States.
27.4 To the fullest extent permitted by law, Contractor shall indemnify, defend,
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees from loss or damage, including but not limited to attorneys'
fees, and other costs of defense by reason of actual or alleged violations of any applicable
federal, state and local labor laws or law, rules, and/or regulations. This obligation shall
survive the expiration and/or termination of the Agreement.
28. STANDARD PROVISIONS
28.1 Recitals. City and Contractor acknowledge that the above Recitals are true
and correct and are hereby incorporated by reference.
28.2 Compliance with all Laws. Contractor shall, at its own cost and expense,
comply with all statutes, ordinances, regulations and requirements of all governmental
entities, including federal, state, county or municipal, whether now in force or hereinafter
enacted. In addition, all Work prepared by Contractor shall conform to applicable City,
county, state and federal laws, rules, regulations and permit requirements and be subject
to approval of the Project Administrator and City.
28.3 Waiver. A waiver by either party of any breach, of any term, covenant or
condition contained herein shall not be deemed to be a waiver of any subsequent breach
of the same or any other term, covenant or condition contained herein, whether of the
same or a different character.
28.4 Integrated Contract. This Agreement represents the full and complete
understanding of every kind or nature whatsoever between the parties hereto, and all
preliminary negotiations and agreements of whatsoever kind or nature are merged herein.
No verbal agreement or implied covenant shall be held to vary the provisions herein.
Nature's Image, Inc. Page 11
28.5 Conflicts or Inconsistencies. In the event there are any conflicts or
inconsistencies between this Agreement and the Scope of Services or any other
attachments attached hereto, the terms of this Agreement shall govern.
28.6 Interpretation. The terms of this Agreement shall be construed in
accordance with the meaning of the language used and shall not be construed for or
against either party by reason of the authorship of the Agreement or any other rule of
construction which might otherwise apply.
28.7 Amendments. This Agreement may be modified or amended only by a
written document executed by both Contractor and City and approved as to form by the
City Attorney.
28.8 Severability. If any term or portion of this Agreement is held to be invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions of this Agreement shall continue in full force and effect.
28.9 Controlling Law and Venue. The laws of the State of California shall govern
this Agreement and all matters relating to it and any action brought relating to this
Agreement shall be adjudicated in a court of competent jurisdiction in the County of
Orange, State of California.
28.10 Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religious creed, color, national origin,
ancestry, physical handicap, medical condition, marital status, sex, sexual orientation,
age or any other impermissible basis under law.
28.11 No Attorneys' Fees. In the event of any dispute or legal action arising under
this Agreement, the prevailing party shall not be entitled to attorneys' fees.
28.12 Counterparts. This Agreement may be executed in two (2) or more
counterparts, each of which shall be deemed an original and all of which together shall
constitute one (1) and the same instrument.
[SIGNATURES ON NEXT PAGE]
Nature's Image, Inc. Page 12
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed
on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date: +$ q
By:
por: Aaron C. Harp CP..kq
City Attorney
CITY OF NEWPORT BEACH,
a California municipal cor or.
op
Date: % • I
d\ A �_
By:
Diane B. Dixon
Mayor
ATTEST: CONTRACTOR: Nature's Image, Inc., a
Date: bA ` California corporation
Date:
C ru
By: By:
Leii I. 'Brown lanAndrew J. F„
City Clerk Executive Vice Pr sident
Date: Tj- Zq- [9
By:
AL_
Miche le Caruana
Secretary
[END OF SIGNATURES]
Attachments: Exhibit A — Scope of Services
Exhibit B — Schedule of Billing Rates
Exhibit C — Insurance Requirements
Nature's Image, Inc. Page 13
EXHIBIT
SCOPE OF SERVICES
Nature's Image, Inc. Page A-1
EXHIBIT A
SCOPE OF SERVICES
• DESCRIPTION OF PROJECT
o Furnish all labor, equipment, materials, and supervision to provide annual preventative and
as -needed clearance trimming, erosion protection, slope stabilization, slope restoration,
planting, hazard reduction, weed abatement, storm drain clearing, and v -ditch debris
removal at various locations throughout the City of Newport Beach (locations attached).
• MAINTENANCE STANDARDS
o Contractor shall be responsible for completing one or more of the following types of work
on a per -location basis:
■ Clearance Trimming
■ Erosion Protection
■ Hazard Reduction
■ Weed Abatement
o Contractor shall be responsible for completing one or more of the following types of work
on a per -location basis as needed, pursuant to Section 2 of this Agreement:
■ Storm Drain Clearing of debris and vegetation
■ V -Ditch Debris Removal
• Slope Stablization
■ Slope Restoration
■ Planting
o Contractor shall be responsible for completing work in compliance with the following
standards on a per -location basis:
■ Weed Abatement according to 2016 California Fire Code (CFC), Section 304.1.2
■ Clearance Trimming according to City of Newport Beach Wildland Urban Interface
Area Standard for Hazard Reduction
o All cuttings, trimmings, or other debris shall be removed from lots, streets, parkways, or
alleys. Sidewalks, curbs, and gutters shall be cleaned of debris. All vegetation shall be cut
close to the ground with stubble not exceeding two inches (2"), and if not chopped to a fine
dust, it shall be raked and hauled away. No strips or growth shall be left around the outer
edges of property or adjacent to fences, curbs, or sidewalks. Machine disking of vegetation
is not permitted without prior authorization.
• STORM DRAINS AND V -DITCHES
o Remove storm related debris from open drainage channels
o Remove storm related debris from under bridge drainage channels (Fifth at Poppy)
o Hand dig up to 36 drainage channels along the bay side of Back Bay Rd and clear
associated vegetative growth, ranging from three to four feet wide, one foot deep, and
possibly up to a couple hundred feet long
o Install hillside erosion control
o Remove open drainage channel blocking debris and vegetation from Mid Back Bay
(between Back Bay and Jamboree)
o Clear debris from v -ditches and shovel width clearance on both sides of the ditches. (per
foot cost)
o Spray vegetation retardant on both sides of v -ditches
• PREVENTATIVE MAINTENANCE (WEED ABATEMENT)
o Contractor shall provide the City with a preventative maintenance schedule detailing work
standard to be applied at each location and estimated completion date.
o City reserves the right to add or delete locations as deemed necessary. In the event of
adding a location, the City shall provide the Contractor with the location details and request
an annual preventative maintenance cost based on the approved maintenance standard.
The Contractor will provide the annual cost in writing to the Project Administrator. No work
shall be performed on the new location until the cost is approved by the Project
Administrator. If a location is removed from the schedule, the total annual preventative
maintenance cost will be updated to reflect the reduction in service.
o City reserves the right to modify maintenance standards as deemed necessary. In the
event of a modification of the maintenance standard, the City shall provide the Contractor
with the updated maintenance standard. The Contractor may provide a proposed updated
annual cost in writing to the Project Administrator. No work shall be performed based on
the updated maintenance standard until the cost is approved by the Project Administrator.
• WORKING HOURS
o Normal working hours shall be between the hours of 7:00 a.m. and 4:30 p.m., Monday
through Thursday, and Fridays 7:00 a.m. to 3:30 p.m.
• SUPERVISION OF CONTRACT
o All work shall meet with the approval of the Project Administrator. Any specific problem
area which does not meet the conditions of the specifications set forth herein shall be called
to the attention of the Contractor and if not corrected, payment to the Contractor will not be
made until condition is corrected in a satisfactory manner as set forth in the specifications.
tCh t Y
'y�„�
t � �
Yl
. 7CLL t � �•
bo OG—�00 OO �j OO 'O O C=oO`oga'" Q = d
SUNDANCE DR:y
it
Rl WA
. , a,, A ELO CT
F �- *1 ��
��ND
' W ER
FFF' A '�,► F'i �Sdi 1 a `' -�' �+iti? t' - a`. 0 �.. �- •'^�,C1�,_
TI j 19
SURi4�. p.
SO
BAL iimaA.�a��5��1 P
f �
e�
T � E
n r ,
r
wk
0 dGVN
-�a.' � �.: .'y'�• ,./� ••(��i "�;� `PLP• '�
X'
�]1.'1i
-+
��,r- Y•a" i .� \'�. -�`. :� '� . 1+ %% Stitt. ,y � �V ; t ' +m d :j
ti
1w � 9�!.^'�h��.-.� '?y�«, � �l r7i{.• '`4 + r �^ i P J - 1 �a ,fir � + .N h1 _ ��
TO
3- ;7'
s t�
�rr� •,fid
tea• l /, f y?sA` _j'•
:" I bbd dlSinibdW i'
�•iw f!� !1fir �•' /" j' Y � 3 a:.
*St frw Fes.. ��Y �`.Jd ��vj i U+, si-.r.-_. ..;-'•A � � v�a.�.�S �"t 4i..
� < r
Ye
XI
� F- ,fi f '_ y �• .V. '.. �6f , 1 \' i rO I 6':F:.
743
A`%i',_
•' �' �\�1 w� In "f 5i' ' ,,:? `y� \ F^
J
�t,Aj-L
//„ Ss4.x�4er?ryOR^^11y4 �,`' a lr
tij ' o i � r -• � - " Q- �
1f O� 0o
OOQ Zx'Y QST 3.,
7! rIF i 3
( y ,,, � �s� s .(" �; ♦ RUEtFOlVTAIN��'� .'`' .� j
'�. r `�?Ms'Y`'"r � nag - - ' - � •���'
jlgMBOREE
a .,. - .
"oma a:
oo
AQ
• 4 �� \� l if , a '- �.��k � •��,�1
'a,• I.J. � "" �i tea_• ".`�_ '-�' �•si �i "� ��f•1
.FAQ �~
x 1 14.11,
g
J f }
� LILAC
�
Hill :1
,
Zx
AL
e_ I
n r�
J W
tt i_
anv�Hlano��°o �._
r '
t i ,
{ MORNING CANYON RD ~
3AV'4NOJ3S + t s* ~ 0 k
S321J98G)HS
ell,
I
.�_ COAST HW-
i A
Alt
IF
� r
7
• �) �" Q bsey - ', � `,i / .t(,/..r• .,P"f Jac-Y"�.`,. -
- \� r� �� Y -irk �.'-Q, :L ! � �ig•� � -.rte ,v+ � .�[�Q /� y P" �l•Y ,
4w, -�S♦AND�7LE,�lD4R� '�� �'iY � ` � V '
v� r
�• . �-�aa,'" .a� ; . c- . s I •, _ �� � `` �� sir I � �'"� �.
e
I'4�GER
6-1
Al' I
j'+
s .� Irw P:_\,t�+/nA � _ � • .. f � ,t,1. �.� ^SEAB_RE���"� �sy� �.•- > .
FFO.
.72
J �
v
A04
�7 LU
xi
10
IN
tv
�.
J"_ ♦ ,� r 1, 1 rf�"'' z is � �
�" : ESE �,r-�,.,..� .,�~"" ,�. �.a � - ; � -��- � • '
� Ory r ' j i r � �°�',.���'�,s �'`� •' ��� ����� "�'C- a
•. b�' � '� � ,' ' i � � .: ; � Ott,
1 c
��'&�� ,.mow / �/ `�. ti '_�t •.fi.
+ ( r W,
- j
Fl! lll� JIM
tLU
jjj
�. I froti t.
I
+ } •
'w.� >'s � r•;. fid" ,,:
:r
oila
Lu
ci 110, MAIO
Own
`Y4 Divi' - 4= 4-'� . •
_
t - w
FY'x •,
F.
i'tiv �pZ::9 q4 icra.,� � + � � '� .. I ~ L=-'.'.'�..'-•- � � � u
t
oe
"i 4OWT r•- �_,
jj
t v
'PIP
]AV 3d021I0111H'
loa
mL.M. and
4r,
—A
L
V'J,
oom 90100
owl
�N
Al
Vol
AW. -
77 -1
1. 4V
9 VIVINO ON—
mmm
Ak
+ � � �\�Oa ti ;� l ,�'�. 7yS'� ^ r F % Opp• / %' 'f'`f.��� •� ��i k-� '•'
a L
ov-
At
a .ice ` �•
,, � ,f ` ��` ; ;r '� , . �� '' _ a' :� �, "• � jar r.
roo
i`C', i^ �•'�hj��L Ww�"�
,..�
�.,. ' -_. �' 1}'.;• -�-•X- 1 // . = l v�'L +y. � . � � -tit,
46
o
Yip
IN
• �� w r r � .r� � �� r
�7bIle
9
ILI
Od��
ob
4LAr
} Q
r
-�
Ai
p' �� toy+�r! i• �~ y�Y�-; 1?��+r ,3 ��,�f,''-r`'� Y ��� 'a�� tjjl �t� ''����
ow
7-4
0
T',
i 0> f
�. Rn
1 `��Y�+ . `M.-,�•,.t-.._ rte. 'rl�t --- 4 _. V t ,.� r .�•. .r,` r� ■ �
Y.
:
- a
4
PCO —, .i, ;ii�'� •E1_, _� \,` `` �' `' -
✓• �� , 4�. � i'� y _wr�_. Wer! / - '
ii
- g � � � � q '� - ` I � �. r . J � fir ,P` r., :',� -�'Y� •
9 a"n. �,` ,4j `�• of , ., :i t•. d�
� A.' '^"�` �I ,� � � �, -,' 1, Q,, °'r• y ' . �''t'. yi` '�
Lj
tO
,T + , � � ;i,,0.. .y 3 Y � •�
r
i► r
J\ <` �� ,... 4�. ! 4 l � \•v ri .. ' � ® AAA �• -
!1781
dA",
r
�.-
�
• a .� w '- �„ • � r
l�.• ill: a ., \-. � ~y�.,. �ti 'i
P
•" HOPI ��.• d� �i y.•! t J J .;� •. �i�� r ,d:4 �`��'Y.• � �C�.
W
IN
`ate ,.,� �i �' '� /` %•+ �' s '�, ,a-a. ` ern � � �r � ` dib �, �
.sem• rrr��.4,iI - ) "ate
xN
SN
440
Ott
IX
.411
jw
�a`` Y Y� �' • FSG y " r V':, � v "
4 n
M1
CRESTWOJD DR v S
,d , t k i ap \ • r `v( s e
C. � � t ``� r #�.. . , •�. acv V r (.-� ice,._ ,. f t J
t'
try,. �� IT ��' '+', ��2 '� t� �# _, "d �•- ` 4 � � � ��
k
iv
I
CN
Cf,
`Q R� try _+1
.010
00
No c
% aG 3001a'Iv
4,
r -r
i. #
U3
-*,At
Ln
P,
Cl)
cit
411
NORTH STAR LN
s'
�K�, �• 4 v f -
a Q
✓y - -� v' � ;'i.A(f vQi � - - ,� < . �74�'�' h �i�'i:_i�liu"esd:_:.+��' 31 j-: '. •.Seo66l�..
ZJ
7-1
..
11 � �k ["' .4• $ :�'
/;\� S•?� �O r`A _ 14(
'ilk
♦ r r � ij .� �� , �\ \ a`��� aOy
IF
•� , � / - �°` �" �/� �' ��,•��� � ' 1. •
��. r •�'" 2 � h /fid - gyp. ,�7� � � Z
EXHIBIT B
SCHEDULE OF BILLING RATES
Nature's Image, Inc. Page B-1
EXHIBIT B
BILLING RATES
LOCATIONS
Site #
Site Description
Work Type
Standard
Annual Cost
1
19th Street and Balboa Blvd
W
CFC
$ 2,496.00
2
2315 Holly Lane
W
CFC
$ 80.00
3
Back Bay Road
C
WUI
$ 14,493.00
4
Big Canyon Nature Park
H
-
$ 72,345.00
5
Bonita Canyon and University Bridge
W
CFC
$ 63.00
6
Bonita Creek Park Service Road
C
WUI
$ 2,039.00
7
Buck Gully (Lower)
H
-
$ 738.00
8
Buck Gully (Middle)
H
-
$ 3,323.00
9
Upper Middle Buck Gully
H
-
$ 32,207.00
10
Buck Gully (Upper)
H
-
$ 1,766.00
11
Cliff Drive Nature Park
W
CFC
$ 497.00
12
Coast Highway (Roadside east of
Pelican Point)
W
CFC
$ 1,492.00
13
Fernleaf Ramp
W
CFC
$ 353.00
14
Fletcher Jones Bike Trail
C
WUI
$ 315.00
15
Harbor Cove Fire Access Road and
Trail
C
WUI
$ 26,489.00
16
Harbor View Nature Park
W
CFC
$ 13,386.00
17
Hillside Area Along Coast Highway
(North of Back Bay View Park)
W
CFC
$ 1,527.00
18
Iris easement
W
CFC
$ 282.00
19
Jamboree and Bayview Way
C
WUI
$ 1,328.00
20
Jamboree and MacArthur
W
CFC
$ 1,806.00
LOCATIONS
Site #
Site Description
Work Type
Standard
Annual Cost
21
Jamboree Roadside Apron and Bike
Trail
W
CFC
$ 1,096.00
22
Kings Road (1801 &1811 Kings Rd)
W
CFC
$ 241.00
23
Mariners Drive cul-de-sac
W
CFC
$ 170.00
24
Mesa Drive (east of Irvine Avenue)
W
CFC
$ 710.00
25
Newport Dunes bike path
W
CFC
$ 713.00
26
Newport Dunes Slope (Below Coast
Highway)
W
CFC
$ 2,729.00
27
San Miguel Drive at Big Canyon
Reservoir
W
CFC
$ 1,026.00
28
Santa Ana Ave
E, W
-
$ 14,581.00
29
South side of Bayside at Carnation and
along Fernleaf
W
CFC
$ 646.00
30
Spyglass Canyon Park
H
-
$ 10,099.00
31
Spyglass Roadside
W
CFC
$ 1,053.00
32
University Drive at Irvine Ave
W
CFC
$ 343.00
33
Valley Acreage (Near Spyglass
Canyon Park)
H
-
$ 1,670.00
(C) Clearance Trimming, (E) Erosion Protection, (H) Hazard Reduction, (W) Weed Abatement
(CFC) 2016 California Fire Code (CFC), Section 304.1.2, (WUI) City of Newport Beach Wildland Urban Interface
Area Standard for Hazard Reduction
Unit Costs
Labor per hour
$ 65.00 Per Hour
Debris hauling per yard
$ 195.00 Per Yard
Clear debris from v -ditches and shovel width clearance
on both sides of the ditches per foot
$ 1.75 Per Foot
Function Cost
Function
'-st Control
Cost
Unit
General Weed Control Post Emergent
$ 11.50
1,000 Square Feet
Pre-Emergent/turf or planter
Shrub
Pruning
$ 20.00
1,000 S uare Feet
$ 6.50
10 Linear Feet
Removals
Full Tree PruninglRemovals
$ 120.00
10 Linear Feet
Pruning
$ 2,200.00
Da 3 -Man Crew
Removals
Planting
$ 2,200.00
Da 3 -Man Crew
Standard
1 Gal. Shrub
$ 16.00
Each
5 Gal. Shrub
$ 45.00
Each
15. Gal Shrub
$ 175.00
Each
15. Gal Tree
$ 250.00
Each
24 in. Box Tree
$ 550.00
Each
36 in. Box Tree
$ 1,500.00
Each
64 Count Flat Groundcover
$ 60.00
Flat
16 Count 4 in. Flat Annual Color
$ 40.00
Flat
Turf - Seed and Top Dress
$ 0.15
1,000 Square Feet
Turf- Sod
$ 1.00
1,000 Square Feet
Hand -spread and rake in City Supplied Seed
$ 37.00
1,000 Square Feet
H droseed - Standard Coastal Sage Scrub Mix
Erosion
Jute Netting
$ 90.00
1,000 Square Feet
Min. 0.5 Acre
$ 185.00
1,000 Square Feet
Straw Waddles
$ 350.00
100 Linear Feet
6mm Poly Sheeting secured w/ stakes and sandbags
$ 325.00
1,000 Square Feet
Straw Waddles secured w/ stakes
$ 400.00
100 Linear Feet
Sand Bas
$ 390.00
100 Linear Feet
x:1:11 -3I go]
INSURANCE REQUIREMENTS — MAINTENANCE/REPAIRMANITORIAL SERVICES
1. Provision of Insurance. Without limiting Contractor's indemnification of City, and
prior to commencement of Work, Contractor shall obtain, provide and maintain at
its own expense during the term of this Agreement, policies of insurance of the
type and amounts described below and in a form satisfactory to City. Contractor
agrees to provide insurance in accordance with requirements set forth here. If
Contractor uses existing coverage to comply and that coverage does not meet
these requirements, Contractor agrees to amend, supplement or endorse the
existing coverage.
2. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders'
Rating of A- (or higher) and Financial Size Category Class VII (or larger) in
accordance with the latest edition of Best's Key Rating Guide, unless otherwise
approved by the City's Risk Manager.
3. Coverage Requirements.
A. Workers' Compensation Insurance. Contractor shall maintain Workers'
Compensation Insurance, statutory limits, and Employer's Liability
Insurance with limits of at least one million dollars ($1,000,000) each
accident for bodily injury by accident and each employee for bodily injury by
disease in accordance with the laws of the State of California, Section 3700
of the Labor Code.
Contractor shall submit to City, along with the certificate of insurance, a
Waiver of Subrogation endorsement in favor of City, its City Council,
boards and commissions, officers, agents, volunteers and employees.
B. General Liability Insurance. Contractor shall maintain commercial general
liability insurance and, if necessary, umbrella liability insurance, with
coverage at least as broad as provided by Insurance Services Office form
CG 00 01, in an amount not less than one million dollars ($1,000,000) per
occurrence, two million dollars ($2,000,000) general aggregate. The policy
shall cover liability arising from premises, operations, products -completed
operations, personal and advertising injury, and liability assumed under an
insured contract (including the tort liability of another assumed in a business
contract).
C. Automobile Liability Insurance. Contractor shall maintain automobile
insurance at least as broad as Insurance Services Office form CA 00 01
covering bodily injury and property damage for all activities of Contractor
arising out of or in connection with Work to be performed under this
Agreement, including coverage for any owned, hired, non -owned or rented
Nature's Image, Inc. Page C-1
vehicles, in an amount not less than one million dollars ($1,000,000)
combined single limit each accident.
4. Other Insurance Requirements. The policies are to contain, or be endorsed to
contain, the following provisions.-
A.
rovisions:
A. Waiver of Subrogation. All insurance coverage maintained or procured
pursuant to this Agreement shall be endorsed to waive subrogation against
City, its City Council, boards and commissions, officers, agents, volunteers
and employees or shall specifically allow Contractor or others providing
insurance evidence in compliance with these requirements to waive their
right of recovery prior to a loss. Contractor hereby waives its own right of
recovery against City, and shall require similar written express waivers from
each of its subcontractors.
B. Additional Insured Status. All liability policies including general liability,
products and completed operations, excess liability, pollution liability, and
automobile liability, if required, shall provide or be endorsed to provide that
City, its City Council, boards and commissions, officers, agents, volunteers
and employees shall be included as insureds under such policies.
C. Primary and Non Contributory. All liability coverage shall apply on a primary
basis and shall not require contribution from any insurance or self-insurance
maintained by City.
D. Notice of Cancellation. All policies shall provide City with thirty (30)
calendar days notice of cancellation (except for nonpayment for which ten
(10) calendar days notice is required) or nonrenewal of coverage for each
required coverage.
5. Additional Agreements Between the Parties. The parties hereby agree to the
following:
A. Evidence of Insurance. Contractor shall provide certificates of insurance to
City as evidence of the insurance coverage required herein, along with a
waiver of subrogation endorsement for workers' compensation and other
endorsements as specified herein for each coverage. Insurance certificates
and endorsement must be approved by City's Risk Manager prior to
commencement of performance. Current certification of insurance shall be
kept on file with City at all times during the term of this Agreement. City
reserves the right to require complete, certified copies of all required
insurance policies, at any time.
B. City's Right to Revise Requirements. City reserves the right at any time
during the term of the Agreement to change the amounts and types of
insurance required by giving Contractor sixty (60) calendar days advance
written notice of such change. If such change results in substantial
Nature's Image, Inc. Page C-2
additional cost to Contractor, City and Contractor may renegotiate
Contractor's compensation.
C. Right to Review Subcontracts. Contractor agrees that upon request, all
agreements with subcontractors or others with whom Contractor enters into
contracts with on behalf of City will be submitted to City for review. Failure
of City to request copies of such agreements will not impose any liability on
City, or its employees. Contractor shall require and verify that all
subcontractors maintain insurance meeting all the requirements stated
herein, and Contractor shall ensure that City is an additional insured on
insurance required from subcontractors. For CGL coverage,
subcontractors shall provide coverage with a format at least as broad as CG
20 38 04 13.
D. Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of City to inform
Contractor of non-compliance with any requirement imposes no additional
obligations on City nor does it waive any rights hereunder.
E. Requirements not Limiting. Requirements of specific coverage features or
limits contained in this Section are not intended as a limitation on coverage,
limits or other requirements, or a waiver of any coverage normally provided
by any insurance. Specific reference to a given coverage feature is for
purposes of clarification only as it pertains to a given issue and is not
intended by any party or insured to be all inclusive, or to the exclusion of
other coverage, or a waiver of any type. If the Contractor maintains higher
limits than the minimums shown above, the City requires and shall be
entitled to coverage for higher limits maintained by the Contractor. Any
available insurance proceeds in excess of the specified minimum limits of
insurance and coverage shall be available to the City.
F. Self-insured Retentions. Any self-insured retentions must be declared to
and approved by City. City reserves the right to require that self-insured
retentions be eliminated, lowered, or replaced by a deductible. Self-
insurance will not be considered to comply with these requirements unless
approved by City.
G. City Remedies for Non -Compliance. If Contractor or any subcontractor fails
to provide and maintain insurance as required herein, then City shall have
the right but not the obligation, to purchase such insurance, to terminate this
Agreement, or to suspend Contractor's right to proceed until proper
evidence of insurance is provided. Any amounts paid by City shall, at City's
sole option, be deducted from amounts payable to Contractor or reimbursed
by Contractor upon demand.
H. Timely Notice of Claims. Contractor shall give City prompt and timely notice
of claims made or suits instituted that arise out of or result from Contractor's
Nature's Image, Inc. Page C-3
performance under this Agreement, and that involve or may involve
coverage under any of the required liability policies. City assumes no
obligation or liability by such notice, but has the right (but not the duty) to
monitor the handling of any such claim or claims if they are likely to involve
City.
Contractor's Insurance. Contractor shall also procure and maintain, at its
own cost and expense, any additional kinds of insurance, which in its own
judgment may be necessary for its proper protection and prosecution of the
Work.
Nature's Image, Inc. Page C-4
CERTIFICATE OF INSURANCE
CHECKLIST
City of Newport Beach
This checklist is comprised of requirements as outlined by the City of Newport Beach. *
Date Received: 4/12/19 Dept./Contact Received From: Morgan
Date Completed: 4/22/19 Sent to: Morgan By: Jan
Company/Person required to have certificate: Natures Image, Inc.
Type of contract: Other
I. GENERAL LIABILITY
EFFECTIVE/EXPIRATION DATE: 7/1/18 — 7/1/19
A.
INSURANCE COMPANY: Travelers Indemnity Company of CT
B.
AM BEST RATING (A-: VII or greater): A++ / XV
INSURANCE COMPANY: Travelers Property Casualty Company
C.
ADMITTED Company (Must be California Admitted):
B.
Is Company admitted in California?
® Yes ❑ No
D.
LIMITS (Must be $1 M or greater): What is limit provided?
$1M/$2M
E.
ADDITIONAL INSURED ENDORSEMENT — please attach
® Yes ❑ No
F.
PRODUCTS AND COMPLETED OPERATIONS (Must
Is Company admitted in California?
include): Is it included? (completed Operations status does
❑ No
D.
not apply to Waste Haulers or Recreation)
® Yes ❑ No
G.
ADDITIONAL INSURED FOR PRODUCTS AND
UM, $2M min for Waste Haulers): What is limits provided?
COMPLETED OPERATIONS ENDORSEMENT (completed
E
Operations status does not apply to Waste Haulers)
® Yes ❑ No
H.
ADDITIONAL INSURED WORDING TO INCLUDE (The City
(What is limits provided?)
N/A
its officers, officials, employees and volunteers): Is it
F.
included?
® Yes ❑ No
I.
PRIMARY & NON-CONTRIBUTORY WORDING (Must be
G.
PRIMARY & NON-CONTRIBUTORY WORDING:
included): Is it included?
® Yes ❑ No
J.
CAUTION! (Confirm that loss or liability of the named insured
HIRED AND NON -OWNED AUTO ONLY:
® N/A
is not limited solely by their negligence) Does endorsement
❑ No
I.
include "solely by negligence" wording?
❑ Yes ® No
K.
ELECTED SCMAF COVERAGE (RECREATION ONLY):
® N/A ❑ Yes ❑ No
L.
NOTICE OF CANCELLATION:
❑ N/A ® Yes ❑ No
II. AUTOMOBILE LIABILITY
EFFECTIVE/EXPIRATION DATE: 7/1/18 — 7/1/19
A.
INSURANCE COMPANY: Travelers Property Casualty Company
of America
B.
AM BEST RATING (A- : VII or greater) A++ / XV
C.
ADMITTED COMPANY (Must be California Admitted):
Is Company admitted in California?
® Yes
❑ No
D.
LIMITS - If Employees (Must be $1M min. BI & PD and $500,000
UM, $2M min for Waste Haulers): What is limits provided?
$1,000,000
E
LIMITS Waiver of Auto Insurance / Proof of coverage (if individual)
(What is limits provided?)
N/A
F.
ADDITIONAL INSURED WORDING:
❑ N/A
® Yes
❑ No
G.
PRIMARY & NON-CONTRIBUTORY WORDING:
❑ N/A
® Yes
❑ No
H.
HIRED AND NON -OWNED AUTO ONLY:
® N/A
❑ Yes
❑ No
I.
NOTICE OF CANCELLATION:
❑ N/A
® Yes
❑ No
III. WORKERS' COMPENSATION
EFFECTIVE/EXPIRATION DATE: 7/1/18 — 7/1/19
A.
INSURANCE COMPANY: Insurance Company of the West
B.
AM BEST RATING (A-: VII or greater): A / XII
C.
ADMITTED Company (Must be California Admitted):
® Yes
[]No
D.
WORKERS' COMPENSATION LIMIT: Statutory
® Yes
❑ No
E.
EMPLOYERS' LIABILITY LIMIT (Must be $1M or greater)
$1,000,000
F.
WAIVER OF SUBROGATION (To include): Is it included?
® Yes
❑ No
G.
SIGNED WORKERS' COMPENSATION EXEMPTION FORM:
® N/A ❑ Yes
❑ No
H.
NOTICE OF CANCELLATION:
❑ N/A ® Yes
❑ No
ADDITIONAL COVERAGE'S THAT MAYBE REQUIRED
IV. PROFESSIONAL LIABILITY
V POLLUTION LIABILITY
V BUILDERS RISK
HAVE ALL ABOVE REQUIREMENTS BEEN MET?
IF NO, WHICH ITEMS NEED TO BE COMPLETED?
Agent or Arrant insurance Services
Broker of record for the City of Newport Beach
4/22/19
Date
® N/A ❑ Yes ❑ No
® N/A ❑ Yes ❑ No
® N/A ❑ Yes ❑ No
® Yes ❑ No
RISK MANAGEMENT APPROVAL REQUIRED (Non -admitted carrier rated less than
Self Insured Retention or Deductible greater than $ ) ❑ N/A ❑ Yes ❑ No
Reason for Risk Management approval/exception/waiver:
Approved:
Risk Management
* Subject to the terms of the contract.
Date