Loading...
HomeMy WebLinkAboutX2017-2418 - Misc1®3 Vuy Appendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) 1 am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at /D 3P, W 1-07Z 54 /'�S CiJ y (provide street address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule;' - c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. V_ Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. 4 Yes _ No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 33 i-7�V r p P� t7�t;5 r ti Print Name Signature 7 -rte- Date License Number ,Zyz7/ U 0 Address QN9-,7-5i-9??% Telephone Landscape Design Professional's Stamp (If Appropriate) j7r�yE� p��,�r�as�i?Ccsh-( E-mail Address 34 LANDSGAPE WATERING GUIDELINES SEASONAL FREQUENCY- DAYS BETWEEN WATERINGS SPRING SUMMER FALL WINTER WATER THIS MAR- MAY MAY - OCT OCT - DEC DEC - MAR DEEPLY TREES DROUGHT 4 - 30 DAY 7 -18 DAYS 14 - 30 DAYS 24 - 45 DAY 24:'- 36' PLANTING HIGH WATER 7 -12 DAYS 7 -10 DAYS 7 -12 DAYS 14 - 30 DAY 24:'- 36' USE PLANTS SHRUBS DROUGHT 4 - 30 DAY 7 -18 DAYS 14 - 30 DAYS 24 - 30 DAY 18" - 24' PLANTING HIGH WATER 7 -10 DAYS 5 - 7 DAYS 7 - 10 DAYS 10 -14 DAYS 18" - 24' USE PLANTS GROUND DROUGHT 4 - 30 DAY 7 - 21 DAYS 14 - 30 DAYS 24 - 30 DAY 8" - 12' COVERS PLANTING HIGH WATER 7 -10 DAYS 2 -10 DAYS 7 -10 DAYS 10 -14 DAYS 6- 12' USE PLANT ANNUALS 3 - 7 DAYS 2 - 5 DAYS 3 - 7 DAYS 5-10 DAYS 8" - 10" TURF 3 - 7 DAYS NONE 3 -10 DAYS 7 -14 DAYS 6' -10" THESE GUIDELINES ARE FRO ESTABLISHED PLANTS n YEAR FRO SHRUBS, 3 YEARS FOR TREES). ADDITIONAL WATER IS NEEDED FOR NEW PLANTINGS OR UNUSUALLY HOT OR DRY WEATHER. LESS WATER 15 NEEDED DURING COOL OR RAINY WEATHER DRIP RUN TIMES ARE TYPICALLY 2 HOURS OR MORE FOR EACH WATERING, ALL SPRINKLERS SHOULD SERVER ONLY THE REQUIRED TURF AREAS AND NOT SPRAY ON BUILDINGS, FENCES OR NON-LANDSCAPE AREAS. WATERING SHOULD BE DONE BEFORE SUNRISE TO REDUCE EVAPORATION LOSSES. ALWAYS IRRIGATE THE ENTIRE DEPTH AND WIDTH OF THE ROOT ZONE REGARDLESS OF THE TIME OF YEAR. TWICE A YEAR WATER TWICE AS LONG TO LEACH OUT SALTS AND BUILDUP IN THE SOIL