Loading...
HomeMy WebLinkAboutX2018-2441 - Misc63 (o, pe AnJver !` !�` 1''1ss 1►1 Dear City of Newport Beach Building Department, My name is Mr. Chuyen Ngo, I am the CEO of CDA Global Corporation, and the owner of the property located at 63 Cape Andover. I would like to change the contractor of record on my project from MD & Associates to The Michael Salvini Company as of March 27a' 2018. The permit number is X2018-0206. I have attached documents stating that I am the owner of CDA Global Corporation. If you have any questions or need any further information regarding this change, please contact myself int Michael Salvini. m mm®�/ 0 �ommmc Bellrgards .. o m m o o m oc m mm m o m om m �o m��oo mm 0 c0000c 1 om000c ccoaoA c 'ChX�o a Ngo m m hosa.vienbia@gmaii.com (949)878-1806 Mr. Michael Salvini (949) 302-2800 V aGeos Consulting Engineering Geologists X2ovg-M l 63 Cape AnJover FIELD MEMORANDUM Client: Michael Salvini GCZChuyen Ngo Residence Job Address: 63 Cape Andover, Newport Beach Subject: Flag pole footing excavations- addition to existing residence Observations Date: June 15, 2018 Two flag pole footing excavations in conjunction with an addition to the upper level of the existing residence have been constructed into firm, unyielding soils (engineered fill) that consists of medium dense to dense, silty to clayey sand. The approximate locations of observed footing excavations documented within the scope of the field memorandum are shown on the attached portion of the Foundation Plan, Sheet S2.0 by DCA Structural Engineering. (See reverse side.) Conclusions The footing excavations are acceptable, from an engineering geologic viewpoint, for placement of steel and concrete. Recommendations Dimensions and details to be verified by others. As a condition for use of this field memorandum, the property owners and builder shall accept the risk of minor structural and cosmetic cracking between improvements supported by new footings andjlagse supported by the existing foundation. LI M1 No. 1664 CERTIFIED ENGINEERING Notes: LThis memorandum is not intended to verify fo6fMg•-g excavations are clean at the time concrete is poured. steel reinforcing, or that the bottom of the 305 N. Coast Highway, Suite R TEL (949) 494-2721 Laguna Beach, CA 92651 FAX(949) 376-5766 36x6xY4 COL. w/ / 1 a�4 r:n) cea� !,� S No. T664 NI CERTIFIED k ENGINEERING ` OGIST �.._. _ ,_ — _ _77 1 Approximate locations of ob ed fo t Field Memorandum dated Ju" '15,2 8 N GRADE J.C. EA. WAY S3.0 R OF SLAB OVER POR RETARDER 3F Ys" THICK OR ri CAKI Ae%fSRFrAATP ng excavations pertinent to VlaGeos are shown above as highlighted areas.