Loading...
HomeMy WebLinkAboutX2017-0446 - MiscCITY OF NEWPORT BEACH COAUgUNTTY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www newoortbeachca cov (949) 644-3200 Bay Ove 1 6 PRE -GRADE MEETING AGREEMENT DATE: JOB ADDRESS: 1. The grading plan check number for this site is and correspondence. and will be referred to in al r ports, certifications 2. STOP ORDERS Whenever any work is being done contrary to the provisions of the City Codes, the Chief Building Official or his authorized representative may order the work stopped by notice in writing served on any Persons engaged In the doing or causing such work to be done and any such persons shall forthwith stop such work until authorized by the Chief Building Official to proceed with the work. 3. The stamped set of approved plans shall be on the job site at all times. 4. NOTIFICATION OF NONCOMPLIANCE If, in the course of fulfilling their responsibilities, the civil engineer, surveyor, the soils engineer, the engineering geologist or the testing agent finds that the work is not being done in conformance with the approved grading plans, the discrepancies shall be reported immediately in writing to the person in charge of the grading work and to the Building Division. Recommendations for corrective measures, if necessary, shall be submitted to the Building Division for approval. S. When import or export of materials is required, haul routes to and from the she shall be approved by the City Traffic Engineer and hauling procedures shall be in accordance with Chapter 15 of the Newport Beach Municipal Code (NBMC). Contractor shall use Best Management Practices (BMP's) to insure that all water quality issues are addressed. 6. Between October 1 and April 30, erosion control BMP measures shall be in place. During the remainder of the year dry season wind erosion BMP's (dust control) shall be implemented. Sediment control BMP's shall be installed and maintained at all operational storm drain inlets internal to the project BMP's to control off-site stormwater from construction activities shall be sediment tracking shall be implemented and maintained. Appropriate BMP's to prevent contamination of and the ability to deploy BMP's to prote t all exposed portions Implemented. site ewithin 48 -hours triggered" he Nati nalaWeather Service forecasts a 50% or greater chance of rain. 7. All fills shall be compacted throughout to a minimum of 90 percent compaction as determined by ASTM test method 1557 and approved by the soils engineer. Compaction tests shall be performed according to the Preliminary soils report. 8. All trench (including interior and exterior utility trenches) and retaining wall backfill shall be compacted throughout to a minimum of 90 percent relative compaction and approved by the soils engineer. 9. Whenever work on which required inspection/testing is covered by additional work without first being inspected/tested, the Chief Building Official shall require by written notice that the work be exposed for examination. The work of exposing and recovering shall not entail or be subject to expense to the City of Newport Beach and will be the sole expense of the Permittee. 10. Landscaping of all slopes and pads shall be in accordance with 15.10.130 of the NBMC. 11. Approved drainage provisions shall be used to protect adjoining properties during the grading operation. 12. The permittee or his agent shall notify the Building Division when the grading operation is ready for each of the following inspections: p Y 9 y radio a pRE GRADE MEETING When the permittee is read to begin work, but not less than two days before an grading or brushing Is started. b. RAINAGE DEVICE INSPECTION After forming of terrace drains, down drains or after placement of pipe in D subdrains, but before any concrete or filter material is placed. --- e rough e report shall be d. t - Building Dnspector at foulndat9onln Piet on or sooner based onhas been completed, hthe Buildinglnspector's discretion. provided to res and other ve -- --- devices e coNmplet d and the as-gradedtp an, professional alpprova s a d theerequired ports haven submitted.- been ected and 13. All footing eer or Eng steering Geolog stdWritten approval sl hall be submitted to approved to the Buildinginspeet er,e Geotechnical Engi 14. Prior to the start of grading, all permanent property comer monuments shall be in place. Prior to any foundation inspections, proof of recordation of the "comer record" or "record of survey" with the County of Orange shall be provided. 15. The undersigned acknowledge a copy of the above and agree to comply with the Grading Code of the City of Newport Beach, the recommendations of the project soils report and any special requirements of the permit gned and ped by 16. reGord and submitted itted to he building inspectorne and . A Strutt ural Observation cate Form must Report may berrequi the surveyor of 17. All parties listed below must be present for the pregrade meeting unless approved by the building inspector. DESIGN CIVILENGR.:•7�` 1, OWNERICONTRACTOR: ��n. - 'D+f rrBy�,:A 2 ` Z fv BY: y �c.pfttltess: ` Address: _ Telephone: Telephone: Jra r nrte-f �.1- TSLifiiICflt- larA1%j{t)tZst GEOLOGIST.: GEOTECHNICAL ENGINEER: �Q By. By: CORS`Y C Cptt t NGi - ZGO W CC)�{^yIJW�AiTIi Aum- ftuc 'h `I i33 Address: �21� W �0 1—��- Address: tZtt Telephone: e\Z(Telephone: t COORDINATOR: GRADING CONTR.:��'� 5 By: By, ~ati� 'Z,t7�jf S i'4441 St R,p�—OAddress: Address: Telephone: Telephone: PHONE NEWPORT BEACH REPRESENTATIVE: INSPECTION REQUESTS: (949) 6443255 ruction Hours: Nw orBaC Monday through Friday: S 00 a.m. to 6600 p. m. Saturdays: No work on Sundays and Holidays Frnms\pmgmdemeetmgagmement &72 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 TEMPORARY POWER RELEASE APPLICATION (Inspection/Administrative Fee) COMMERCIAL: $188.00 RESIDENTIAL: NO FEE PROJECT: OWNER'S NAME: �Wk M1 V'tS ;0\% VNJLc,I PHONE NO: 1 . JOB ADDRESS: L) �1�_. �t % _ f4\PC BUILDING PERMIT NO.(s):____Xa017 Request is hereby made for the release of electrical on subject project only for the purpose of testing equipment and/or mechanical systems prior to building permit final approval. I agree that no building or structure shall be used or occupied until the Building inspector has issued a building permit final approval or Certificate of Occupancy. Moving in furniture, staging, showing for sale, or any use other than construction, shall be considered use or occupancy and a violation of this agreement (CBC 111.1). Furthermore, it is not our intent to use or occupy this building until all City regulations and conditions concerning this building have been complied with, and it is understood and agreed that the City of Newport Beach is hereby authorized to order disconnect of service without notification for any violation of the above conditions prior to final approval or Certificate of Occupancy. OWNER or TENANT SIGNATURE,. "Vtlr �/GtCII PRINT name of owner or tenant: CONTRACTOR SIGNATURE: PRINT name of contractor DATE:Vdl �9 PHONE #:.W"V-�Ii,l DATE: 3/d ] /111 PHONE#:yg'.i31"4rq_ (for office use only APPROVED BY: L% /� Building Inspector Date Forms\TEMPORARY POWER RELEASE APPLICATION. 09/13/2018 CITY OF NEWPORT BEACH Community Development Department I Building Division 100 Civic Center Dr.1 P.O. Box 1768 1 Newport Beach, CA 92658 www.newaortbeachca.gov 1 (949) 644-3200 CALGREEN DOCUMENTATION COMPLIANCE CERTIFICATION ADDRESS: t�{a� �i. f �r.A PERMIT NO.: X�ol� • ©44i� THIS FORM SHALL BE COMPLETED AND SIGNED PRIOR TO REQUEST FOR FINAL BUILDING INSPECTION. ONE COPY OF THIS FORM SHALL BE SUBMITTED TO THE BUILDING INSPECTOR AT FINAL INSPECTION AND ONE SHALL BE PROVIDED TO THE BUILDING OWNER AS PART OF THE CAL GREEN CERTIFICATION PACKAGE. The following section shall be completed by a person with overall responsibility for the planning and design portion of the project. REQUIRED DOCUMENTATIONS PROVIDED TO THE PROPERTY OWNER(S) N( Franchise Hauler for Construction/Demolition Waste (65% min. reuse of nonhazardous waste) AVOC Contents Limitation ,IJ/ Formaldehyde Emissions Limitation [� T-24 Energy Certificate of Installations (Env., QII, Lighting, Photovoltaic, Mach., Plumb.) T-24 Energy Certificate of Verifications or Acceptance ( Env., QII, Lighting, Photovoltaic, Mach., Plumb., HERS) Operations and Maintenance Manual MOISTURE CONTENT OF BUILDING MATERIAL (RESIDENTIAL CONSTRUCTION ONLY) Jell I certify that the moisture content of the wall and floor framing is less than 19 percent as determined in accordance with Section 4.505.3 of CAL Green prior to being enclosed. DECLARATION STATEMENT • 1 certify under penalty of perjury, under the laws of the State of California, the information provided is true and correct. • I certify that the installed measures, materials, components, or manufactured devices identified on this certificate conform to all applicable codes and regulations, and the installation is consistent with the plans and specifications approved by the enforcing agency. Responsible Person's Name: Respo le Person's Signature: Date Signed: P ition/Title: Forms\CALGreen Documentation Compliance Cert Form 1-2017 From CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 CIVIL ENGINEER'S CERTIFICATION FORM Forkert Engineering & Surveying, Inc. 22311 Brookhurst St, Ste 203 Huntington Beach, CA 92646 ATTENTION: GRADING ENGINEER, BUILDING DIVISION Date: July 12, 2019 GPC No.: 0311-2017 Tract/Subdivision/Lot No.: Rough: _Final: x Project Names: 1401 E Bay Ave Owner/Developer: Kent Valley Type of Project: _Tract: _ Drainage _ Commercial x Other Industrial Yardage for Project: 2 Cut: _ Borrow: 31 Fill: _ Export: Notes: Notes: I hereby approve the grading for this project in accordance with my responsibilities under the City Grading Code. I have inspected the project and hereby certify that all areas exhibit positive surface flow to public ways or City approved drainage devices. The grading has been completed: '?t in conformance with, with the following changes to the approved grading plan. Description of Changes �yOF !� Company: Forkert Engineering & Surveying, Inc. 0. � * EXP. IName: I v''4��, (print),9� C, OF License No.: RCE 58627 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 BUILDING HEIGHT CERTIFICATION Project Street Address: 1401 East Bay Avenue, Newport Beach, CA Building Permit Number(s): As the surveyor of record for the project at the above address, I hereby certify that I have reviewed the City of Newport Beach approved plan and original topographic survey and based the elevations listed below on those plans. Elevations shall include an allowance for roofing material thickness if not yet installed. Provide each critical ridge and flat roof, or roof deck railing elevations indicated on the approved plans. Use the format below on the back of this form if additional space is necessary or further explanation is needed. Provide original copy to the inspector before roof framing inspection. All elevation points are based on: O NAVD88 O NGVD29 O Assumed Please provide the following elevation information for the highest roof ridges, flat roofs, or parapets/guardrails. Additional elevation points may be requested by the Building Inspector. RIDGES (3:12 slope or greater) A Approved elevation point of ridge is 'V7 • q8 and actual elevation point is 3%.76 ,,Approved elevation point of ridge is 3'I • q and actual elevation point is 3i. b7— Approved elevation point of ridge is 3-7 • A3 and actual elevation point is 3'7 .59 Q Approved elevation point of ridge is 3i •'k+ and actual elevation point is 37.7b Approved elevation point of ridge is 37 .314 and actual elevation point is 37. 13 ( Approved elevation point of ridge is and actual elevation point is Approved elevation point of ridge is and actual elevation point is FLAT ROOFS, PARAPETS AND GUARDRAILS Approved elevation point of flat roof or parapet is 32.91 and actual elevation point is 32.8 ( Approved elevation point of flat roof or parapet is and actual elevation point is Approved elevation point of flat roof or parapet is and actual elevation point is Approved elevation point of flat roof or parapet is and actual elevation point is Approved elevation point of flat roof or parapet is and actual elevation point is I certify that the above height measurements are correct and the above project: WIS in compliance with the City -approved plans. OIS NOT in compliance with the City -approved plans (Provide explanation). 'lNe describe any deviation from the City -approved plans on the back of this form. J W : Vboco Surveyor or Civil Engineer's* signature and (Wet stamp and signature required) * License number of 33965 or lower No. h516 9 Forms\Building Height Certification 11/02/16�4j aF OF CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.00v1(949)644-3200 SETBACKS AND TOP OF SLAB/FLOOR ELEVATION CERTIFICATE The purpose of this certificate is to insure that the structure is located properly on site per the approved drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings. After the top of slab/floor elevation is verified to match the elevation specified on the approved drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to verify that it is equal or less than the dimension shown on building sections and elevations. This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys. The survey must be done after the concrete forms are in place or preferable after the concrete slab is poured or raised floor is built, but prior to starting wall framing. Engineer/Surveyor's Name Paul D. Craft License # P.L.S. 8516 Engineer/Surveyor's Address 8512 Oxley Circle, Huntington Beach, CA 92646 Job Address 1401 Bay Avenue East Newport Beach, CA Setbacks: Sketch a site plan and specify surveyed setbacks (use back page). * Top of slab/floor elevation: 9- SO ' 7-b 10 OF r-ORMS * If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the elevations. Use same datum used in the survey of record. I certify that the setbacks are 0, are not ❑, per City approved plans. Describe any deviations from plans: I certify that top of slab/floor elevation(s) is 0, is not ❑, per City approved drawings. Describe any deviations from plans: 4 Da 3o" 1060 FomsSetbacksandTopofSlabElevationCert. i71 ,n$nx naa® m 1NST.N0.261OOOO52555OO.R. ' I I —I 90.90' NOOVtl00'E 30. 19090' IO.fi6'L a I[ I o C ----rA-�__-----_ ___ I 12 � v �-{ rr Cmv �@5 m 59, o s 5E m Iz a mIa Im gi o _ p v C E ,p III 19590 ® /NST. NO.2O19OOOa95S 0.R. x oovo'oo' E I ' III I � 19s.9o' ± /I v o I I an ---------r-31110•-im----mT-- �� Is•Is•ia ® "` I x o00000' E 1569]' &, - 3 m Z mo8�8�ti ~ P_pp: c =e i'4AI y $ ;Rs A=sh m umxD9m .. o � mAi3 S o S8go 8888°InCA 1•'f NNNYy °$c 'g3� pf _o /mom v 0 m -- IN2O• �.. mi3o N oo'0000' E 90.00' (90)) i looao'(loo') 56.92' 1 ° En , i N U , j O m I /usaoy (u57_ - >nl i _ - _ : )3669'/ _ ° "G^ STREET N fiA515 Of BEMINGS � 6 •p z o [31o9o'n t' 'xo a m o8._ 0000* 3NNS„qB F oI = Pma E �FoaO�� px O d 8� z m '.-.9 O _ z "N^ STREET m A-F`a�'=^gr 7=° - x0onoao'E 11600' (11-- 0 G9�� ^F m� = wwa� �ww�A� Ao ;z Nr� S5.5 oG a o ' m i K 9_ s2 ON i yav3 � =m c 9 p moowz.E am vR t v, amA po°aG`�.>eew: U1 c A m8.9' ^ o�` m'sG =$Aw G'm •^� �a x ��mo W Q. y�m� oq ems $ a�z�&� u=`G„ bA °pynS m Rey C8o�R o� A oio� m 3i � R, R�: o8m "^, z xmem 8a WYE,A ^2'.$m go” $q° >. m a 8 z"` �o v� OAR a^ ° Rg SFR o= mfmz4 y m m �9 oiE3 y ur y,o m 4 � I I x CGGo'W' E 199.50' II99.30' RP) ` 'R "F" STREET,,,,, 01= 10500' 6985' � N ootl0o0' F 292.45 � 9091 M CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 CONTRACTOR/PROPERTY OWNER SELF -CERTIFICATION DECLARATION FOR PLUMBING FIXTURE REPLACEMENT ProjectAddress: J W1 't9/ Ci 4`Xt4� Pvw Date: as1,�9 Permit The following is to be completed by the California licensed contractor or owner, participating in the City of Newport Beach Self -Certification Program. Please type or print. Installer's Name: �\ t ww&Lt� License No (if applicable) L w,3 _ Installer's Mailing Address: tiAtWlOJM QF &� rhhone # (required): 78-W `1 Installer's Email: lOF-AN Installer I certify that the installation is in compliance with applicable code requirements. I further affirm that I have reviewed and understand the requirements of the applicable 2013 California Green Code and Newport Beach Municipal Code (NBMC) Section 301.1.1 and that all self -certification reports submitted will be based on the code requirements contained therein. I declare that all plumbing fixtures subject to the NBMC 301.1.1 has been replaced meeting the low flow requirements: Kitchen faucets: 1.5 gal/minute at 60 psi Shower heads: 2.0 gal/minute at 80 psi Water closet: 1.28 gal/flush Faucets: maximum flow rate of 1.5 gal/minute at 60 psi, and minimum 0.8 gal/minute at 20 psi Mwyiq Installer's Signature Date Property Owner (Required) As the property owner of the project address noted above, I have read, understand and agree to participate in the Plumbing Fixture Replacement Self -Certification Program. I further understand that by participating in this program, the plumbing system will not be inspected by a City of Newport Beach Building Inspector during construction or after installation unless requested. The Building Division may request and reserves the right to verify code compliance after the installation is coplete. M UAZI_� V0 Property Owner's Signature Date &ALA Print me Email This form must be completed and returned to the City of Newport Beach, Building Division, for a final approval of the combination permit. Please return this form to the Building Division by mail or fax. Please mail to: City of Newport Beach Phone: (949) 718-1888 Community Development Department Fax #: (949) 644-3250 Building Division P. O. Box 1768 Newport Beach, CA 92658 Forms\Contractor-OwnerSelf-CertDeclaration-Plumbing Fixture Replacement 08/11/16 August 5,2019 Dear Mr. Cullen. The residential elevator installed at 1401 E Day Ave, Newport Beach, CA 926.60, was built according to ASME A] 7.1 codes by the manufacturer and installed by McKinley Elevator Corporation, a-Statt-licensed conveyance company, in accordance with ASME 5.3 2004. Attached are copies of both our state, contractor's;license and out certificate as a State -licensed installer of conveyanem, If you have any questionsregarding this elevator, I may be contacted at (949) 261-9244 or sincerely, 17611 Arniatrqhg ^vaTjLm 555 Fultdn Streft, Suite 202 Irvine, OallfomjoaP(314 Sen Frw-41sc�4., Colfformla 194102 1 94"&i-9244 415/8e6ffiS1951 FAX 84914 65,9076 www.mckinleyelevet(3t,.corn PAX 415/62a.9954 X09 Bay Aare I - CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.Gov (949) 644-3200 Structural Observation Report Project Address: 1401 E. BAY. AVE, NEWPORT BEACH.CA ReportDate: 07-30-18 CNB Inspector Name: CNB Permit#: Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #. Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: FADY HAKIM FADYHAKIM@FMHENGINEERIN.COM 949-245-8000 C-75736 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED check applicable boxes FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ALL VISIBLE FRAMING MEMEBRS SHEAR WALLS 07-30-18 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck AND HARDWARES ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood ❑ Other: ❑ Other: ❑ Other: ❑Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: NO DEFICIENCIES ❑ REPORT CONTINUED ON ATTACHED PAGES. ® FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. 1, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of th§Vstructural systems by the City of Newport Beach, Building Division. mss, 07-30-18 Funne\SwnnmlebxcrvmionRcporl&Insvuclions J I AMY OF S I KUG I URAL VeBEKVEK RV GnTNORIZFn FMPI nVFFe nF TNF rM 69 NFWPnPT RFAVA CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.gov 1 (949) 644-3200 Structural Observation Report Project Address: 1401 E. BAY. AVE, ReportDate: 04-30-18 CNB Inspector Name: CNB Permit NEWPORT BEACH.CA DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete Building Owner Name: Owners Mailing Address (if different from site); Owners Telephone M CNB Plan Check#: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: FADY HAKIM FADYHAKIM@FMHENGINEERIN.COM 949-245-8000 C-75736 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED check applicable boxes FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete EXTERIOR SHEAR WALLS 04-30-18 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood ❑ Other. ❑ Other. ❑ Other: ❑ Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: NO DEFICIENCIES ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. 1 declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance the structural systems by the City of Newport Beach, Building Division. /%/I 04-30-18 OBSERVATION Eom�.i5t,uuweloMrn�iionRcq�N&Josuvctiora STAMP OF STRUCTURAL OBSERVER OF THE CIN OF NEWPORT BEACH. CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 ( Newport Beach, CA 92658-8915 www.newoortbeachca.00v 1(949)644-3200 Structural Observation Report ProjeclAddress: 1401 E. BAY. AVE, NEWPORT BEACH.CA Report Date: 04-16-18 CNB Inspector Name: CNB Permit #: Building Owner Name: Owners Mailing Address (if different from site); Owners Telephone A CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: FADY HAKIM FADYHAKIM@FMHENGINEERIN.COM 949-245-8000 C-75736 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check aoolicable hoxewl FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED 0 Conventional Footin s & Slab 0 Concrete ❑ Steel 0 Concrete ROOF SHEATHING 04-16-18 ❑ Mat Foundation, Prestressed Concrete 0 Masonry 0 Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams 0 Wood or Marl Shear Panels ❑ Masonry ❑Wood ❑ Other: ❑ Other: 0 Other: 0 Other: 0 ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. 0 OBSERVED DEFICIENCIES AND COMMENTS: NO DEFICIENCIES ❑ REPORT CONTINUED ON ATTACHED PAGES. 0 FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the hest of my knowledge 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final accept a of the structural systems by the City of Newport Beach, Building Division. 04-16-18 Fo,,,,slo„R�,o &Na,r nwm b I AMI' OF SI KUC I UKAL OBSERVER BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 wwvv.newa beachcaaov1 (949) 644-3200 Structural Observation Report Project Address: 1401 E. BAY. AVE, ReportDa(e: 03-14-18 CNB Inspector Name: CNB Permit #: NEWPORT BEACH.CA DATE OBSERVED ❑ Conventional Footings & Slab 0 Concrete Building Owner Name: Owner's Mailing Address (If different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License! Reg. M. FADY HAKIM FADYHAKIM@FMHENGINEERIN.COM 949-245-8000 C-75736 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roo INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab 0 Concrete I7 Steel 11 Concrete SECOND FLOOR SHEATHING 03-14-18 El Mat Foundation, Prestressed Concrete 0 Masonry D Concrete ❑ Steel Deck 0 Caissons, Piles, Grade Beams 11 Wood or Manuf. Shear Panels 0 Masonry ❑ Wood 0 Other: - 0 Other: ❑ Other: ❑ Other: 0 ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. 0 OBSERVED DEFICIENCIES AND COMMENTS: NO DEFICIENCIES COLD JOINT AT ERECTION PADS OK. ❑ REPORT CONTINUED ON ATTACHED PAGES. 0 FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance gone structural systems by the City of Newport Beach, Building Division. // /1,. - Finn,.c%S,rnnurnlebwmliunRi oO&in:m,eibn. 03-14-18 J I AMr Ur s i nuu i UKAL UOat-rcvrn FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH Ev, (4t SEW PART. CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newi)ortbeachca.gov 1 (949) 644-3200 Structural Observation Report Project Address: 1401 E. BAY. AVE, NEWPORT BEACH.CA ReportDate: 03-01-18 CNB Inspector Name: CNB Permit#: Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone M ONE Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: $O Telephone M SO License / Reg. #: FADY HAKIM ADYHAKIM@FMHENGINEERIN.COM 949-245-8000 C-75736 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED D Conventional Footin s & Slab D Concrete ❑ Steel D Concrete FIRST FLOOR SHEATHING 03-01-18 ❑ Mat Foundation, Prestressed Concrete D Masonry D Concrete D Steel Deck ❑ Caissons, Piles, Grade Beams D Wood or Manuf. Shear Panels D Masonry D Wood D Other: D Other: D Other: D Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: NO DEFICIENCIES COLD JOINT AT ERECTION PADS OK. ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; I understand that II deficiencies which I have documented must be corrected, prior to final acceptan of the structural systems by the City of Newport Beach, Building Division. 03-01-18 'omn\StmnwWOMvrvamnitclron&ln9nictlomn STAMP OF STRUCTURAL OBSERVER AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT REACH CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.00v1(949)644-3200 Structural Observation Report Project Address: 1401 E. BAY. AVE, NEWPORT BEACH.CA ReportDate: 02-20-18 CNB Inspector Name: CNB Permit #: Building Owner Name: Owners Meiling Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone M SO License / Reg. #: FADY HAKIM FADYHAKIM@FMHENGINEERIN.COM 949-245-8000 C-75736 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab D Concrete D Steel ❑ Concrete GARAGE SLAB REINFORCEMENT 02-20-18 t7 Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck D Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood 0 Other: ❑ Other: ❑ Other: ❑ Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: NO DEFICIENCIES COLD JOINT AT ERECTION PADS OK. ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be In responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and Is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure Is In general conformance with the approved construction documents; 3. 1 understand that alljeficlencies which I have documented must be corrected, prior to final acceptance g%th� structural systems by the City of Newport Beach, Building ision. ,/ Div 02-20-18 FosmslSlmooralObsennllonRgonAlnsimmlop] s STAMP OF STRUCTURAL OBSERVER BY AHTHORIZEn EMPLOYEES OF THE COY OF NEWPORT BEACH CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 Structural Observation Report Project Address: 1401 E. BAY. AVE, ReportDate: 02-13-18 CNB Inspector Name: CNB Permit#: NEWPORT BEACH.CA DATE Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License I Reg. #: FADY HAKIM FADYHAKIM@FMHENGINEERIN.COM 949-245-8000 C-75736 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS INDICATE LOCATION(S) DATE (Floor/Roof) OBSERVED OBSERVED ❑ Conventional ❑ Concrete ❑ Steel ❑ Concrete FOUNDATION DIMENSION Footings & Slab & SLAB REINFORCEMENT 02-13-18 ❑ Mat Foundation, ❑ Masonry ❑ Concrete ❑ Steel Deck ANCHOR BOLTS Prestressed Concrete LOCATION & HOLDOWNS ❑ Caissons, Piles, ❑ Wood or Manuf. ❑ Masonry ❑ Wood Grade Beams I Shear Panels ❑ Other: ❑Other: 11 Other: ❑Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: NO DEFICIENCIES COLD JOINT AT ERECTION PADS OK. 0 77 5 e ✓1 Liee k Amrlza d I3Q L r5 4,f.4 Ti'n.0 ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptancethe structural systems by the City of Newport Beach, Building Division. SAI 02-13-18 5I AMP OF b I RUU I URAL OBSERVER DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION RY AUTHORIZED EMPI OYFFS of THE Crry nF NFwanRT RFArH CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.00v (949) 644-3200 Structural Observation Report Project Address: 1401 E. BAY. AVE, NEWPORT BEACH.CA Report Date: 01-31-18 CNB Inspector Name: CNB Permit#: Building Owner Name: Owners Mailing Address (if different from site); Owners Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License I Reg. #: FAIRY HAKIM FADYHAKIM@FMHENGINEERIN.COM 949-245-8000 C-75736 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED check applicable boxes FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Convenfional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ERECTION PADS FOR STEEL COLUMN 01-31-18 Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck - ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels 0 Masonry ❑ Wood ❑ Other. ❑ Other. ❑ Other: ❑ Other. ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: NO DEFICIENCIES COLD JOINT AT ERECTION PADS OK. D REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected_ I declare that the following statements are true to the best of my knowledge: t. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. 1, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that alVeficencies which I have documented must be corrected, prior to final acceptance gyth structural systems by the City of Newport Beach, Building Division. F.. 01-31-18 S TAMP OF STRUCTURAL OBSERVER uu o r nu nv ernunorsen.. nvr ce n �. rm ne ..�..,,..,.......... CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov (949) 644-3200 Structural Observation Report Project Address: 1401 E. BAY. AVE, NEWPORT BEA H.CA Report pate: 01-31-18 CNB Inspector Name: CNB Permit #: Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check A Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: FADY HAKIM FADYHAKIM@FMHENGINEERIN.COM 949-245-8000 C-75736 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check apolicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ERECTION PADS FOR STEEL COLUMN 01-31-18 ))" Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels O Masonry ❑ Wood ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: NO DEFICIENCIES COLD JOINT AT ERECTION PADS OK. ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with thea proved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. 1, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all,0efficiencies which I have documented must be corrected, prior to finalacceplancey>�th� structural systems by the City of Newport Beach, Building Division. // ///lr� 01-31-18 Fmm�3in,nnraH)b.cnaicnl4y+nn.4lnanm,inn. byI:ViIi41;Y41I:irLNII. l filSWL1-14W14:11 BY AHTHORIZFn EMPLOYEES OF THF CITY OF NEWPORT REACH CITY OF NEWPORT BEACH v n COMMUNITY DEVELOPMENT DEPARTMENT > BUILDING DIVISION rrLrFaiRy�A 100 Civic Center Drive Q.P.O. Box 1768 ( Newport Beach, CA 92658 www.newoortbeachca oov (949) 644-3200 SPECIAL INSPECTION REPORT Project Address: Permit Number:- Inspection umberInspection Type (s): Inspection Date (s): ; ( )Periodic (.) Continuous Describe Inspection, Indu$mg locatlonw- • : k +- ListTests Made: A ' J Total h7 action Time Each Day, Date: t Hours: I IJst Ali Items Requiring Correction {Inclutle Previously listed Uncorrected Items): ' 1eie oeK or my Knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above. Special Inspector Slgriatare: Date: Print Fust Names ' Newport Beach Registration No.: SpecfaunsneLtOnae:Jo(( 8-2435 I COAST GEOTECHNICAL INC. 1200W. Commonwealth Ave., Fullerton, CA 92833 -Ph: (714)870-1211 -Fax: (714)870-1222 -Email: coastgeotec@sbcglobal.net INV. Daily Observation Report HRS. W.O. Date Client - Address tM Footings 0 Key Way 0 Grading 0 Swim Pool 0 Trench 0 Other Test Elev. Moisture Dry % Test Soil No. Location or Content Density Relative Type Type Depth % P.c.f. Compaction Acceptable 0 Unacceptable Page of Received By: By: Project Status Effective: 08/09/2019 05:58 AA0 1 ll-Ohid b CaICERTS, Ir 1 of HERS Provider: CaICERTS Inc. Energy Standards Code Year: 2016 Project Name: 17017 The Valley Residence Project Type: New Construction SFR ■ Address: 1401 E BAY AVE r City / State / Zip: Newport Beach / CA / 92658 r L Enforcement Agency: City of Newport Beach ■ Permit Number: X2017-0446 Easy to Verify @ calcerts.com HERS VERIFIABLE MEASURES: COMPLETE OVERALL STATUS: COMPLETE F;�,���;�F cafe tlf om fiance t,wiv W�2 {..t3 ,l6Sa fia`!.ix \n. m.M1ie.'iduum�alT1'de`6 `kbi(3FN uvuV s..tie2�� rt.S.,.mi, �efn.. 2 _3�. Certificate Type: Compliance Registered Form: CF1R-PRF-01- Registered Date: 01/26/2017 12:16 Registration Number:. 217-PO10017023A-000-000-0000000-0000 na r ''w�,. s ✓ �, S stdrtlj ). im1 �e3 x�a a Vie. !�, artX: ge"g," x "^ P µ'pi'1 ��PIP Qua , 'tel ka�YSi3 •-.. A Y um v.d .., v3Yr,:,, w .'Jua® ,,. Ylry nKSY: Tn <� a z:"'aht�Ytiry\a`f�%r`d: „fid_ �u V.i+.ih ^�{ r. CF1R-SRA-01 06/03/2019 217-P010017023A-RO1001A (Solar Ready Area) 14:10 Shaun M Culler (Patterson Custom Homes) tlfInssoDo'Ai© rt tpr Rj rinall ton ifregpiF d Form ', uSY ieg�ste?ed s#afRegYatinn NumGdr^1; ' TQ CF2R-ENV-01-E 06/03/2019 217-P010017023A-000-001-E01001A-0000 (Fenestration Installation) 14:46 Shaun M Culler f (Patterson Custom Homes) CF2R-ENV-03-E 06/03/2019 217-P010017023A-000-001-E03001A-0000 (Insulation Installation) 14:46 Shaun M Culler (Patterson Custom Homes) CF2R-ENV-21-H 217-P010017023A-000-001-E21001B-0000 (QII-AIS-Batt, Loose Fill, 04/46/2019 Shaun M Culler and SPF) (Patterson Custom Homes) CF2R-ENV-22-H 06/03/2019 217-P010017023A-000-001-E22001A-0000 (QII-Air Infiltration Sealing) 14:46 Shaun M Culler (Patterson Custom Homes) CF2R-ENV-23-H 06/03/2019 217-P010017023A-000-001-E23001B-0000 (QII-Installation) 14:46 Shaun M Culler (Patterson Custom Homes) CF2R-LTG-01-E 06/03/2019 217-P010017023A-000-001-LO1001A-0000 (Lighting) 14:46 Shaun M Culler (Patterson Custom Homes) CF2R-MCH-01-E 06/03/2019 217-P010017023A-000-001-M01001A-0000 (Space Conditioning 14:46 Shaun M Culler Systems, Ducts and Fans) (Patterson Custom Homes) HERS Provider: CaICERTS Inc. .. (Project Status Report CaICERTS, Inc Effective: 08/09/2019 05:58 2 of 3 System 1 CF2R-MCH-20-H 06/03/2019 ShaunOM 017023A-000-001-M20002A-0000 (Duct Leakage) 14:46 (Patterson Custom Homes) System 2 CF2R-MCH-20-H 06/03/2019 OM 3A-000-001-M20003A-0000 (Duct Leakage) 14:46 ShaunCuller (Patterson Custom Homes) CF2R-MCH-21-H 217-P010017023A-000-001-M21002A-0000 System 1 (Ducts Located In 04/46/2019 Shaun M Culler Conditioned Space) (Patterson Custom Homes) CF2R-MCH-21-H 0603 217-PO10017023A-000-001-M21003A-0000 System 2 (Ducts Located In 4/46/2019 Shaun M Culler Conditioned Space) (Patterson Custom Homes) CF2R-MCH-23-H 06/03/2019 I0017023A-000-001-M23002A-0000 OM System 1 (Airflow) 14:46 ShaunCuller (Patterson Custom Homes) System 2 CF2R-MCH-23-H 06/03/2019 217-PShaunO1 Culler3A-000-001-M23003A-0000 (Airtlow) 14:46 (Patterson Custom Homes) System 1 CF2R-MCH-22-H 06/03/2019 Shaun O1001 023A-000-001-M22002A-0000 (Fan Efficacy) 14:46 (Patterson Custom Homes) System 2 CF2R-MCH-22-H 06/03/2019 217-PShaunOM Culler 3A-000-001-M22003A-0000 (Fan Efficacy) 14:46 (Patterson Custom Homes) CF2R-MCH-25-H 06/03/2019 O3A-000-001-M25002A-0000 217-PShaun System 1 (Refrigerant Charge) 14:46 M Culler 4 (Patterson Custom Homes) CF2R-MCH-25-H 06/03/2019 217-P010017023A-000-001-M25003A-0000 System 2 (Refrigerant Charge) 14:46 Shaun M Culler (Patterson Custom Homes) CF2R-MCH-27-H 06/03/2019 217-PO10017023A-000-001-M27001A-0000 (IAQ and MV) 14:46 ' Shaun MCuller(Patterson Custom Homes) CF2R-PLB-02-E 06/03/2019 217-P010017023A-000-001-BO2004A-0000 (SD HWS Distribution) 14:46 Shaun M Culler (Patterson Custom Homes) �CFtBR IIVPDRMAT N G�rt�fr cafes afiUeri$�cst�on jDocumentsitlYe Verifrcat�on of F�ERS°Measures): System( Form?' Regxsteyed Registration Number' Date CF3R-ENV-21-H 217-PO10017023A-000-001-E21001B-E21A� (QII-AIS-Batt, Loose Fill, 4/51/2019 Shane Vercruysse and SPF) (Energy Calc Services, Inc) CF3R-ENV-22-H 06/03/2019 217-PO10017023A-000-001-E22001A-E22A (QII-Air Infiltration Sealing) 14:51 Shane Vercruysse (Energy Calc Services, Inc) CF3R-ENV-23-H 06/03/2019 217-PO10017023A-000-001-E23001B-E23A (QII-Installation) 14:51 Shane Vercruysse (Energy Calc Services, Inc) System 1 CF3R-MCH-20-H 06/03/2019 217-PO10017023A-000-001-M20002A-M20A Shane Vercruysse (Duct Leakage) 14:51 (Energy Calc Services, Inc) CF3R-MCH-20-H 06/03/2019 System 2 (Duct Leakage) 14:51 ShaneO10017023A-000-001-M20003A-M20A Vercruysse 4 (Energy Calc Services, Inc) System 1 CF3R-MCH-21-H 06/03/2019 Shane 100/7023Vercruyss000-001-M21002A-M21A (Ducts In Cond Space) 14:51 (Energy Calc Services, Inc) System 2 CF3R-MCH-21-H06/03/2019 217-PShaneOVerOcruysseA 000-001-M21003A-M21A -j (Ducts In Cond Space) 14:51 (Energy Calc Services, Inc) System 1 CF3R-MCH-23-H 06/03/2019 Shane217-POI0017023A 000-001-M23002A-M237 Veruysse (Airflow) 14:51 (Energy Calc Services, Inc) HERS Provider: CaICERTS Inc. A , . , LProject Status Report CaICERTS, Inc Effective: 08/09/2019 05:58 3 of 3 System 2 CF3R-MCH-23-H 06/03/2019 ShaneO10017023A 000-001-M23003A-M23A Vercruysse(Energy (Airflow) 14:51 Calc Services, Inc) System 1 CF3R-MCH-22-H Efficacy) 06/03/2019 ShaneOVecru023 000-001-M22002A-M22A yss(Energy (Fan 14:51 Calc Services, Inc) System 2 CF3R-MCH-22-H 06/03/2019 217-PO10017023A-000-001-M22003A-M22A Shane Vercruysse (Fan Efficacy) 14:51 (Energy Calc Services, Inc) System 1 CF3R-MCH-25-H 06/03/2019 217-P010017023A-000-001-M25002A-M25A Shane Vercruysse (Refrigerant Charge) 14:51 (Energy Calc Services, Inc) System 2 CF3R-MCH-25-H 06/03/2019 217-PO10017023A-000-001-M25003A-M25A Shane Vercruysse ( (Refrigerant Charge) 14:51 (Energy Calc Services, Inc) CF3R-MCH-27-H06/03/2019 217-PO10017023A-000-001-M27001A-M27A (IAQ and MV) 14:51 Shane Vercruysse (Energy Calc Services, Inc) HERS Provider: CaICERTS Inc. CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive f P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1(949) 644-3200 FIRE SPRINKLER NEPA 13D SYSTEM ROUGH INSPECTION CHECKLIST YES NO 9. Riser Construction and Location Approval a. Drain valve ❑ b. Backflow device (single check) c. Bell activation device d. Inspector's test valve El e. Riser sized per approved plans 2. Pressure Test a. System tested at operating pressure for 2 hours F b. Pressure gauge installed 3. Sprinkler Heads shall not be installed in the fittings Prior to the fittings being cemented in place (temporary test plugs) a. Installation and spacing of temporary test plugs D 4. Piping a. Material installed per plan b. Hangers per codes/prevent upward movement c. All CPVC piping shall be installed by persons who have been certified by the manufacturer for installation of CPVC piping El d. Piping protected from damage F 5. Bell a. Wiring installed per code F1 b. Boxes installed at proper locations n NOTE: CPVC plastic pipe in the garage shall not be exposed. Sprinklers that are listed as "Quick Response" or "Residential' must be used. CORRECTIONS AND NOTES: FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED: PERMIT* X704- 6M BY: DATE: 7 T-7?- Forms\Nre Sprinkler NFPA 130 System- Rough inspection Checklist 05/12/2015 ��wP°Rr CITY OF NEWPORT BEACH p4 d, F COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION °+4mo4a�° 100 Civic Center Drive I P.O. Box 1768 [ Newport. Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 FIRE SPRINKLER NFPA 13D SYSTEM FINAL CHECKLIST (RESIDENTIAL) YES--NO- iter meter proper Size _---- -__- 4 ❑ 2. Fire sprinkler system installed per the approved plans 11 ❑ 3. All construction covers removed from sprinkler heads E I ❑ 4. Cover plates are NOT to be installed, but shall be available on the jobsite E I ❑ 5. All tape and paint removed from sprinkler heads E I ❑ 6. Finish trim installed around sprinkler heads ❑ 7. Proper signage posted at all required locations ❑ 8. Flow test conducted and bell tested ❑ 9. Location of inspector's testing valve In approved location ❑ SYSTEMS: 10. Clearances around sprinkler heads and riser - no obstructions I ❑ 11. Operating pressure gauge installed at riser showing proper water pressure 4 ❑ 12. Back flow preventer installed 13. System installed per manufacturers specifications C 0 FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED: PERMIT##: �A70 0735 BY: �� DATE: 7- 16 -( g Forms\ Fire Sprinkler NFPA 13D System- FINAL Checklist RESIDENnAL 05/12/2015 I � N 0. 00' 00" E 190.99 ___.... F z0 -U DIST. TO SEAWALL 21 12 _ PATIO SLOPE PER CIVIL 31 I F.Y.S.B 24 I B7B EXISTING RESIDENCE (NOTAPART) 14.33'T.W. B.78 N.G. V IN 84-1314' - GREAT ROOM ;a®aa-- STAIRS K- - 14 1131 A II A I u A A d o - b _____ ___ — — — 8.71' .L 11.13' 1022' i21 fi 7.57 ZIb F.S. 7.7565. 7 84'-13/4'-- _ —N 00 00'00" W 190.99' 38 in Iva I [ — SIDEWALK ENCROACHMENT PERMIT REQ'D FOR ANY WORK PROPOSED IN THE PUBLIC R.O.W. SAND (E.)NOT q PART M1-7-0446 ENC FOR RV^v of cauF°. O IO ui DINING M I _ —i—'� 'ui r 4 L KITCHEN 3 9.00' T.O.S. :'-ice o D, NOTE: MINIMUM e' RAISED CURB AROUND BLDG. FOOTPRINT (9.6 TC) TO BE WATERPROOFED AS A W PREVENTATIVE MEASURE FOR WATER INRLTRATIDN. REF. TO COASTAL HAZARDOUS `. 14.33' T.W. - ANALYIS AND SHEET 8.1.., > ELEV GREAT ROOM ;a®aa-- STAIRS K- - 14 1131 A II A I u A A d o - b _____ ___ — — — 8.71' .L 11.13' 1022' i21 fi 7.57 ZIb F.S. 7.7565. 7 84'-13/4'-- _ —N 00 00'00" W 190.99' 38 in Iva I [ — SIDEWALK ENCROACHMENT PERMIT REQ'D FOR ANY WORK PROPOSED IN THE PUBLIC R.O.W. SAND (E.)NOT q PART M1-7-0446 ENC FOR RV^v of cauF°. Wu GANTRY R O IO ui APPROZCARL'T— . _ _ VER. W/OWNER&G.CRBG.C. _ —i—'� 'ui ' LL :'-ice o D, 1 ' W 4 `. 14.33' T.W. - z 5 0 > ELEV 32 R43 FO.F. I.0.. . 4 a —.V — '.0 A_m — _ — i 20 CLR. TRASH PAEA)[ 9 17 5-0112' c ivs.B. } 200 ' a CUR. o T�G,B; UIP 34 M W _ PWDR. ' Lu II 15 29 29 10 W Ili CUR. Wu GANTRY R O IO ui APPROZCARL'T— . _ _ VER. W/OWNER&G.CRBG.C. _ —i—'� 'ui :'-ice 1 ' W `. z 5 0 > ELEV 32 FO.F. I.0.. . 4 a J s 2 -CAR GARAGE c ivs.B. } 200 ' a CUR. o T�G,B; UIP 34 M W PWDR. 5'.BL4° Ili CUR. o d o y H+ LL 11 N m T ------- ---- 21 O / ((E) APPROACH CONDITIONS-PROTECTIN PLACE) H ------ FSTREET _- 5 -0112 23 / I 22 n ARCHITECTURAL SITE PLAN L_' 3/16" = 1'-0^ I a � A-5.0 A-5.1 A5.1 ROOF DECK PLATE t ROOF PLATE 9 2 6 7 A-3.0 HIGH ROOF PLATE A-3.0 HIGH ROOF PLATE - N 7 1 10 8 8 1n -F 3� 12 _- _ .CERT37 R 5, - 3794' _ - ^� F PLATE _ _ .. } .. __ — HT - - ._.. T_CeRT -' _ _. n n V 37.34-- i'-3" • .. 3. ui 2'-3112" -- -. ��_��� - � 33.10' I I M1 ! � HIGH ROOF PLATE - - -- 33.10' 3297 7:12 -_ -_ -_ _ .-...+0'-10219/25Fi'.__ 7 HT CERT. RE ___-�___ _ _ 7:12 7:12_ 37.98' .._.. ��j 32.97 CER . RE D ...___ _- - _- .... 3:12------- - 3 12 _ _ G HT. CERT. REQD. CERT ftE - 6 \ H �� - -- - 3.12_HIGH ROOF PLATE 9 3 I _ .A-3.0 ---_-_ - N _. A-3.0 -- --0'-3/4" i6 -----1'-9" 3'-312" 2 AD-1 DECK PLATE - _ �� 37.94' �%f Fi 9'12 - - vn - 1%MIN -_-. --__ ri CERT. REa'D. __-. 3 2 CERT REtl'D. _ — - - - — _- LAND) — — M 37 VIEW DECK N e'-112^ 37.95' I 1N/ REF. THIRD FLCCR PLON TA-2.0 -,_ - _ `` Qk RT. REa'n. 812 3'-372° i HIGH ROOF PLATE -._----- � - -----3:12- 3 12 1 - - ❑ 1'-5518 - �N \ �` A i 1P 2 6 7:12 D.i 34.4 I 1 9 34.45' I ( _-__3795 A3.07:12 MASTER --- - -- —.. T..,ERT: REQD: --3�i2 r i1 3151' — BALCONY (G ya (S' r-37re^ _.... _ - _- - - - _- `t ` ROOF PLATE s P - - AD 1 I` ----- -f— - 37.93'-_ X1.51' L 3 _HT.CERTRE _ Ci , 32.9T N 5:12 5:12 HT CERT. REa'D r1'-9" 3'-312" AD-4 3 i� r — — — A 3.0 . CERT. REQD. 1 N -3. _ _.. 1111I__IIIILLA 21: 4 1 T r ,17? 1 - -- m 7:12 � 7:12 _ —. — td L / -11] N n- _ J 6 7 2 6 1 7 9 ROOF DECK PLATE. A-3.0 n A-3.0 ROOFPLATE 1 3 2 A-5.0 A-5.1 A-5.1 )(201.7-OWG