HomeMy WebLinkAboutX2018-3382 - Misc)e2p►8- 3382 1431C0140n S4 Ta oaf.\e141 rOA VCS CITY OF NEWPORT BEACH REPORT OF SPECIAL INSPECTION TYPE OF INSPECTION: Epoxy set horizontal rebar dowels DATE: 2/22/2019 OWNER: Scharing REGISTRATION No.: NB0569 PROJECT ADDRESS: 431 Colton, Newport beach CA ARCHITECT: Orange CountyDrafting& Design ENGINEER: TMC Engineers PROJECT TYPE: Residential remodel, addition BUILDING PERMIT: X2018-3382 Observation and verification of the following work: Installation of epoxy set horizontal rebar dowels at new to existing footing connections. (2) #5 horizontal rebar dowels installed T & B w/ min 6" embedment into existing exterior footing at new to existing footing connections at left side exterior of house. See detail 15/S1 (A) (4 locations, 16 dowels total) All work done in accordance with City of Newport Beach Building Department approved construction plans, ICC Evaluation Service Report 2508, ASTM C172/C31, ACI 318-5.6, 5.8, 5.9, 5. 10, and CBC sectionsl903/1704.4. Holes were drilled to the required diameter and embedment depth, holes were blown out at 101 psi, brushed out, and then blown out again at 101 psi prior to epoxy application. All horizontal rebar dowels were inserted into epoxy filled holes and rotated Y turn at time of installation. Simpson epoxy SET -XP was used. No problems noted at time of inspection. Steve Skeffington Deputy Inspector ICBO CERTIFICATIONS: 1030205-10, 20, 30, 40, 49, 50, 51, 55, 60, 89 ICC CERTIFICATIONS: 1030205-B3, 135, 136, C5, C8, E5, M5, P5, R5, CB ACI FIELD TECHNICIAN GRADE 1: 0023995 19386 Highridge Way • Trabuco Canyon • CA 92679 • (949) 228-1261 • steve@coastdevelopmentnet Mt\YllyT O 7F V CITY OF NEWPORT BEACH REPORT OF SPECIAL INSPECTION TYPE OF INSPECTION: Epoxy set horizontal rebar dowels DATE: 2/26/2019 OWNER: Scharing REGISTRATION No.: NB0569 PROJECT ADDRESS: 431 Colton, Newport beach CA ARCHITECT: Orange Count Drafting& Design ENGINEER: TMC Engineers PROJECT TYPE: Residential remodel, addition BUILDING PERMIT: X2018-3382 Observation and verification of the following work: Installation of epoxy set horizontal rebar dowels. #3 horizontal rebar dowels installed 18" oc w/ min 6" embedment into existing exterior footing at new foundation slab on grade to existing exterior footing connections at left side exterior of house. See detail 15/S1 (B) (22 dowels total) #3 horizontal rebar dowels installed 18" oc w/ min 4" embedment holes drilled angled down into existing exterior stem wall footing at new flat work on grade to existing exterior footing connection at side of garage. No detail provided (15 dowels total) All work done in accordance with City of Newport Beach Building Department approved construction plans, ICC Evaluation Service Report 2508, ASTM C172/C31, ACI 318-5.6, 5.8, 5.9, 5.10, and CBC sections1903/1704.4. Holes were drilled to the required diameter and embedment depth, holes were blown out at 99 psi, brushed out, and then blown out again at 99 psi prior to epoxy application. All horizontal rebar dowels were inserted into epoxy filled holes and rotated'/ turn at time of installation. Simpson eox SET -XP was used. No problems noted at time of inspection. Steve Skeffington Deputy Inspector ICBG CERTIFICATIONS: 1030205-10,20,30,40, 49, 50, 51, 55, 60, 89 ICC CERTIFICATIONS: 1030205-B3, B5, B6, C5, C8, E5, M5, P5, R5, CB ACI FIELD TECHNICIAN GRADE 1: 0023995 19386 Hlghridge Way • Trabuco Canyon • CA 92679 • (949) 228.1261 • steve@coastdevelopmentnet Requested Information/Clarification: The building inspector needs clarification on item #4 in the General Requirements section of page #S-1 regarding the site observations requirement. Per Contractor name Tom Higgs as the Client/ Owner representative at Breakwater Builders, Inc. He is very confidence with the work he do as licensed contractor, he will be fully responsible for the work to meet requirements per approved drawings. He requested not require structural observation from engineer at 431 Colton St., NB. I am as Engineer of record agree with his requested and he will take fully responsible for the work unless city inspector not approve for his requested "-�=XWTW Request for Information Page 1 of 1 C/V \It CONTRACTOR CONSTRUCTION COMPANY: REQUEST Breakwater Builders, Inc. FOR INFORMATION RFI REQUESTER: RFI DATE: David Reed — Building Inspector 2/25/19 RFI: 1.0 PROJECT NAME: DESIGN FIRM: 431 Colton TMC Engineers Inc. PROJECT CONST. PROJECT RFIDATE NUMBER: MANAGER: RFI RESPONDER: RESPONDED: Tom Higgs Tien Chu 3/6/19 Requested Information/Clarification: The building inspector needs clarification on item #4 in the General Requirements section of page #S-1 regarding the site observations requirement. Per Contractor name Tom Higgs as the Client/ Owner representative at Breakwater Builders, Inc. He is very confidence with the work he do as licensed contractor, he will be fully responsible for the work to meet requirements per approved drawings. He requested not require structural observation from engineer at 431 Colton St., NB. I am as Engineer of record agree with his requested and he will take fully responsible for the work unless city inspector not approve for his requested "-�=XWTW Request for Information Page 1 of 1 C/V \It