Loading...
HomeMy WebLinkAboutX2019-3232 - Permit Application1 x2Ulgi - Z-2z-,�z Print Form Worksheet for Combo Building & Solar Permit Application �a°° Comm'I fx Residential City of Newport Beach - Building Division U NOTE: PLAN CHECK FEES DUE AT TIME OF SUBMITTAL jXBuilding fx Grading IZDrainage rElec RMach fle CuvdCut !,�) Cu ill (�(_ , j/q Project Address (Not mailing address) r Flood j-' Fire r- LHigq a /A Floor Suite No 428 ACACIAQN / �- Description of Work R -3/U Const Type VB -SPK 7 r t �, , -�f�lvl\M/n 1r # Stories � ) # Units (if Res)f 1 New/Add SF 3,143 Remodel SFF— Gara a/NNew/Add 385 9 � Valuation a 700000 Material/Labor ' OWNER'S NAME Last �— First DEVCO HOMES LLC Owner's Address Owner's E-mail Address 1000 QUAIL, #260 devcohomes@cox.net City NEWPORT BEACH State ca Zip 92660 TelephoneF_ APPLICANT'S NAME Last TEALE First MARK Applicant's Address Applicant's E-mail Address 2900 BRISTOL ST., BLDG A, SUITE 203 mteale@tealearchitecture.com City COSTA MESA State CA Zip 92626 Telephone (949) 975-0123 ARCHITECT/DESIGNER'S NAME Last TEALE First MARK Lic. No. 22162 Architect/Designees Address Architect/Designer's E-mail Address City I State F_ ZipF Telephone— ENGINEER'S NAME Last HAKIM First FFAQY Lic. No.[C-C75736 Engineer's Address Engineer's E-mail Address 410 GODDARD, SUITE 200, FADYHAKIM@FMHENGINEERING,COM City IRVINE State CA Zip 92618 Telephone310-422-1536 CONTRACTOR'S NAME/COMPANY DEVCO HOMES LLC Lic. No, # 773220 Class Contractor's Address Contractor's E-mail Address 1000 QUAIL, #260 devcohomes@cox.net City State F_ Zip 92660 Telephone[— SETS S REAR �� SETBACKS FRONT 1 PERMIT NO. SE S EFT �� jJ� SETBACKS RIGHT PLAN CHECK NO. OLS DEVELOPMENT NO PLAN CHECK FEES $ CITY OF NEWPORT BEACH ,f COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION > 100 Civic Center Drive I P.O. Box 1768 j Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 RESIDENTIAL ELECTRICAL, MECHANICAL AND PLUMBING SUBMITTAL QUESTIONNAIRE Job Address: The above -proposed project may need electrical, mechanical or plumbing plans for plan check. These questions are directed to the new work requested for the applicable permit requested not what exists. In order for this to be accurately determined and to eliminate confusion or delays in the permitting please complete or have the design professional complete the questions below. If the answer to a question below is "YES," an electrical, mechanical or plumbing plan check is required. To expedite permit process, please submit an application, plans (2 sets) and be prepared to pay plan check fees. NOTE: The Chief Building Official may make exceptions for minor work, additions, and alterations 1. Is the electrical service 600 amps or larger? ❑ 2. Is there a solar photovoltaic or non -conventional system? ❑ 3. Is there an electrical standby generator or fuel cell? ❑ MECHANICAL 1. Does conditioned space exceed 7,000 square feet? X ❑ 2. Does project include a basement or subterranean garage which requires mechanical ventilation in lieu of natural ventilation? X ❑ 3. Does project include enclosed standby generator system w/ mechanical exhaust venting? ❑ PLUMBING 1. Does project include a hydronic heating system? ❑ 2. Does project include a sump pump located inside structure to lift water discharge to grade level? ® ❑ 3. Does project include a sewage ejector system? ❑ 4. Does project include hot water boiler exceeding 120 gallon capacity or 400,000 B.T.U. input? ❑ 5. Does project include a natural gas system exceeding 750,000 B.T.U.? A ❑ 6. Does project include a natural gas system w/ pressure exceeding 14 inch water column [%" psi] (Medium pressure or greater)? ❑ 7. Does project include a vehicle compressed natural gas [CNG] fueling system? ❑ 8. Does project include a Graywater system or Cistern rain water harvesting system? ❑ 9. Does project include an alternate plumbing method or material which requires submittal of an alternate method and materials request? ❑ I certify that the above information is true and correct. Signature: Date: Print Name: IfthC/C 22�_701 Phone#: Fom,a RESIDE:NTIALE�lIPSubmiaol Questiommiry 9.15