Loading...
HomeMy WebLinkAboutX2019-3702 - Permit Application(�w"� EnBlneerlsE-mai6Address. �'� 3r. i olw.- �- Contractor's�E-mail Address 'r�rn CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 RESIDENTIAL ELECTRICAL, MECHANICAL AND PLUMBING SUBMITTAL QUESTIONNAIRE Job Address: The above -proposed project may need electrical, mechanical or plumbing plans for plan check. These questions are directed to the new work requested for the applicable permit requested not what exists. In order for this to be accurately determined and to eliminate confusion or delays in the permitting please complete or have the design professional complete the questions below. If the answer to a question below is "YES," an electrical, mechanical or plumbing plan check is required. To expedite permit process, please submit an application, plans (2 sets) and be prepared to pay plan check fees. NOTE: The Chief Building Official may make exceptions for minor work, additions, and alterations. —" NO YES 1. Is the electrical service 600 amps or larger? ❑ 2. Is there a solar photovoltaic or non- "onventional system? ❑ 3. Is there an electrical standby gene ator or fuel cell? ❑ MECHANICAL 1. Does conditioned space excee 7,000 square feet? ❑ 2. Does project include a base nt or subterranean garage which requires mechanical ventilation in lieu of natural ntilation? ❑ 3. Does project include encl ed standby generator system w/ mechanical exhaust venting? [ ❑ PLUMBING 1. Does project include a ydronic heating system? [i,/ ❑ 2. Does project include sump pump located inside structure to lift water discharge to grade level? �1y ❑ 3. Does project includ a sewage ejector system? �Ll ❑ 4. Does project inclu a hot water boiler exceeding 120 gallon capacity or 400,000 B.T.U. input? 0 ❑ 5. Does project incl de a natural gas system exceeding 750,000 B.T.U.? [� ❑ 6. Does project in ude a natural gas system w/ pressure exceeding 14 inch water column F/2" psi] �/ (Medium pres2re or greater)? L� ❑ 7. Does project' elude a vehicle compressed natural gas [CNG] fueling system? �J ❑ 8. Does proje include a Graywater system or Cistern rainwater harvesting system? ❑ 9. Does proj ct include an alternate plumbing method or material which requires submittal of an alternate method and materials request? ❑ I certify that the above information is true and correct. Signature: Date: Print Name: Phone #: Eomu\ RESIDENTIAL EMP Submittal Questionnaire 9-15