HomeMy WebLinkAboutC-7818-1 - Traffic Signal Rehabilitation Program FY 2019-2020CITY OF NEWPORT BEACH 100 Civic Center Drive Newport Beach, California 92660 949-644-3005 1 949-644-3039 FAx newportbeachca.gov November 16, 2022 Crosstown Electrical & Data, Inc. Attn: David P. Heermance 5454 Diaz Street Irwindale. CA 91706 Subject: Traffic Signal Rehabilitation Program FY2019-2020 — C-7818-1 Dear Mr. Heermance: On November 16, 2021, the City Council of Newport Beach accepted the work for the subject project and authorized the City Clerk to file a Notice of Completion, to release the Labor & Materials Bond 65 days after the Notice of Completion had been recorded in accordance with applicable portions of the Civil Code, and to release the Faithful Performance Bond one year after Council acceptance. The Notice of Completion was recorded by the Orange County Recorder on November 17, 2021, Reference No. 2021000705535. The Surety for the contract is Fidelity and Deposit Company of Maryland and the bond number is 7663358. Enclosed is the Faithful Performance Bond. Sincerely, amaf wow Leilani I. Brown, MMC City Clerk Enclosure THE FINAL PREMIUM IS PREDICATED ON THE FINAL CONTRACT AMOUNT T ')ond was issued in two (2) onyinal counterparts FolfwaIL1ri=3 CITY OF NEWPORT BEACH BOND NO.7663358 FAITHFUL PERFORMANCE BOND The premium charges on this Bond is $ 7,648.00 , being at the rate of $11.001$8.81 / $7.69 thousand of the Contract price. WHEREAS, the City of Newport Beach, State of California, has awarded to CROSSTOWN ELECTRICAL & DATA, INC. hereinafter designated as the "Principal," a contract for: the work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at three intersections, installation of CCTV equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, installation/modification of concrete curb access ramps and sidewalk panels, installation/modification of signage, striping, and curb markings, and other items shown on, but not limited to plan T-6050-S, in the City of Newport Beach, in strict conformity with the Contract on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Contract and the terms thereof require the furnishing of a Bond for the faithful performance of the Contract. NOW, THEREFORE, we, the Principal, and Fidelity and Deposit Company of Maryland , duly authorized to transact business under the laws of the State of California as Surety (hereinafter "Surety"), are held and firmly bound unto the City of Newport Beach, in the sum of Eight Hundred Ninety Three Thousand Two Hundred Forty Four Dollars ($893,244.00) lawful money of the United States of America, said sum being equal to 100% of the estimated amount of the Contract, to be paid to the City of Newport Beach, its successors, and assigns; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the Principal's heirs, executors, administrators, successors, or assigns, fail to abide by, and well and truly keep and perform any or all the Work, covenants, conditions, and agreements in the Contract Documents and any alteration thereof made as therein provided on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to its true intent and meaning, or fails to indemnify, defend, and save harmless the City of Newport Beach, its officers, employees and agents, as therein stipulated, then, Surety will faithfully perform the same, in an amount not exceeding the sum specified in this Bond; otherwise this obligation shall become null and void. As a part of the obligation secured hereby, and in addition to the face amount specified in this Performance Bond, there shall be included costs and reasonable Crosstown Electrical & Data, Inc. Page B-1 expenses and fees, including reasonable attorneys' fees, incurred by City, only in the event City is required to bring an action in law or equity against Surety to enforce the obligations of this Bond. Surety, for value received, stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Contract or to the Work to be performed thereunder shall in any way affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions of the Contract or to the Work or to the specifications. This Faithful Performance Bond shall be extended and maintained by the Principal in full force and effect for one (1) year following the date of formal acceptance of the Project by City. In the event that the Principal executed this bond as an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named, on the 27th day of Apr .2020 . 2 Z�i= Crosstown Electrical & Data, Inc. xo Name of Contractor (Principal) Auth Izeq ignature itl Fidelity and Deposit Company of Maryland Name of Surety Authorized Agent Signature 777 South Figueroa Street, Suite 3900, Los Angeles, CA 90017 Dwight Reilly, Attorney -In -Fact Address of Surety Print Name and Title (213)270-0600 Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: By: 1Ql Karon C. Hafp p5o��f City Attorney NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED Crosstown Electrical & Data, Inc. Page B-2 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of (_co R!2= e,l C$ } ss. On I"I ku Wt7 120 2e before me, Shrdec, (Srru , Notary Public, personally appeared j�; L IC/ /ice/ InCcnCG who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. SHALEA BERRY WITNESS my hand and official seal. Notary Public - California = 7'ia.. Los Angeles County > �xie,. _sj7- Commission p 2281272 lWJ� My Comm. Expires Mar 1E. 2C2l .a»�s Signature (seal) ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange ) ss. On April 27th 2020 before me, Melissa Ann Vaccaro Notary Public, personally appeared Dwight Reilly proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNES my han and offici I seal MeussA ArvN vnccARo LC-O!\L� COMM. #2241394 M x \ _ ':�° Notary Publlc-California p Signature Melissa Ann Vaccar0 s?,°. h ORANGE COUNTY LL (seal) My Contra. Expires May 12, 2022 Crosstown Electrical & Data, Inc. Page B-3 Bond No. 7663358 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Daniel HUCKABAY, Dwight REILLY, Arturo AYALA, Shannon ROZELLE OSTROM, Frank MORONES, Ben STONG, Michael D. STONG and R. NAPPI, all of Orange, California, EACH its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surely, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 15th day of January, A.D. 2020. si8(`"uyM,t l Iwe $ Ina ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Robert D. Murray Vice President By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this 15th day of January, A.D. 2020, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposelh and sailh, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Constance A. Dunn, Notary Public My Commission Expires: July 9,2023 lanuary 24, 2022 Crosstown Electrical & Data, Inc. Attn: David P. Heermance 5454 Diaz Street Irwindale, CA 91706 100 Civi,- Conter Drive Newport Beach, California 92660 949..644 3005 1949-644-3039 rax importbeachca.gov Subject: Traffic Signal Rehabilitation Program FY2019-2020 - C-7818-1 Dear Mr. Heermance: On November 16, 2021 the City Council of Newport Beach accepted the work for the subject project and authorized the Citv Clerk to file a Notice of Completion, to release the Labor & Materials Bond 65 days after the Notice of Completion had been recorded in accordance with applicable portions of the Civil Code, and to release the Faithful Performance Bond one year after Council acceptance. The Notice of Completion was recorded by the Orange County Recorder on November 17, 2021, Reference No. 2021000705535. The Surety for the bond is Fidelity and Deposit Company of Maryland and the bond number is 7663358. Enclosed is the Labor & Materials Payment Bond. Sincerelv, Leilani L Brown, MMC City Clerk Enclosure THE FINAL PREMIUM IS Th' gond was issued in two (2) PREDICATED ON THE or., A counterparts FINAL CONTRACT AMOUNT EXHIBIT A CITY OF NEWPORT BEACH BOND NO. 7663358 LABOR AND MATERIALS PAYMENT BOND WHEREAS, the City of Newport Beach, State of California, has awarded to CROSSTOWN ELECTRICAL & DATA, INC. hereinafter designated as the "Principal," a contract for: the work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at three intersections, installation of CCN equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, installation/modification of concrete curb access ramps and sidewalk panels, installation/modification of signage, striping, and curb markings, and other items shown on, but not limited to plan T -6050-S, in the City of Newport Beach, in strict conformity with the Contract on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Contract and the terms thereof require the furnishing of a bond, providing that if Principal or any of Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the Work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth. NOW, THEREFORE, We the undersigned Principal, and, Fidelity and Deposit Company of Maryland duly authorized to transact business under the laws of the State of California, as Surety, (referred to herein as "Surety") are held and firmly bound unto the City of Newport Beach, in the sum of Eight Hundred Ninety Three Thousand Two Hundred Forty Four Dollars ($893,244.00) lawful money of the United States of America, said sum being equal to 100% of the estimated amount payable by the City of Newport Beach under the terms of the Contract; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the Principal's subcontractors, fail to pay for any materials, provisions, or other supplies, implements or machinery used in, upon, for, or about the performance of the Work contracted to be done, or for any other work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, or for any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, then the Surety will pay for the same, in an amount not exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as required by the provisions of Section 9554 of the Civil Code of the State of California. Crosstown Electrical & Data, Inc. Page A I The Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9100 of the California Civil Code so as to give a right of action to them or their assigns in any suit brought upon this Bond, as required by and in accordance with the provisions of Sections 9500 at seq. of the Civil Code of the State of California. And Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Contract or to the Work to be performed thereunder shall in any wise affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions to the terms of the Contract or to the Work or to the specifications. In the event that any principal above named executed this Bond as an individual, it is agreed that the death of any such principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the above named Principal and Surety, on the 27th day of April , 2020 . Crosstown Electrical & Data Inc. Name of Contractor (Principal) Fidelity and Deposit Company of Maryland Name of Surety 777 South Figueroa Street, Suite 3900 Los Angeles CA 90017 Address of Surety (213)270-0600 Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: .r' B ._ Y AA ro�fp1 _ v City Attorney , Authorized Signature/Title Authorized Agent Signature Dwight Reilly, Attorney -in -Fact Print Name and Title NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED Crosstown Electrical & Data, Inc. Page A-2 ACKNOWLEDGMENT A notary public or other officer completing this certificate verges only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of qng,>.�� S }ss. �[ On P1c�u Liter J 20 20 before me,-hc,le& ve"V-9 Notary Public, personally appeared 5 V i /fit �2i17G 9!_C who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature ACKNOWLEDGMENT A notary public or other officer completing this certificate verges only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. SHALEA BERRY NoUry Public -California x Los Angeles County Commission k 2287 My Comm. Expires Mr ' >. (seal) State of California County of Orange }ss. On April 27th , 2020 before me, Melissa Ann Vaccaro Notary Public, personally appeared Dwight Reilly proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature Melissa Ann Vaccaro MEI-SS ANN VACCARO COMM 02241304 M 16T , Notary Public, -Cal if in nla Kme ORANGE COUN IY LL (seal) My Comm Expires May 12,2022 Crosstown Electrical & Data, Inc. Page A-3 Bond No. 7667758 ZURICH AMERICAN INSURANCE COMPANY COLONIAL, AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Caws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Daniel HUCKABAY, Dwight REILLY, Arturo AYALA, Shaunna ROZELLE OSTROM, Frank MORONES, Ben STONG, Michael D. STONG and R. NAPPI, all of Orange, California, EACH its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf As surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 15th day of January, A.D. 2020. spina SSA(.s - u �So A'1"PEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND BY: Robert D. ilfurray Vice President J BY: Down E. Brown Secretary State of Maryland County of Baltimore On this ISIh day of January, A.D. 2020, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and Who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such obiter were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. I NITS I'INIONY WH 1,RIi0I', I have hereunto set aty hand and affixed my Official Seal the day and year first above written. Constance A. Dunn, Notary Public Nly Commission Expires: July 9,21ID EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attomeys-in-fact with authority to execute bonds, ,policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attomey-in-fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE 1, the undersigned, Secretary of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By - Laws of the Companies is still in force. - This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney... Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the I Oth day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 27th day of April , 2020 By: Brian M. Hodges Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT INFORMATION TO: Zurich Surety Claims 1299 Zurich Way Schaumburg, IL 60196-1056 www.reportsfclaims(azurichna.com 800-626-4577 Batch 12450970 Confirmation RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: City Clerk City of Newport Beach 100 Civic Center Drive Newport Beach, CA 92660 Page 2 of 3 Recorded in Official Records, Orange County Hugh Nguyen, Clerk -Recorder II IIIIIIII IIIIIIIIII Ill I11ILII' 11 lllllllll llllI'll IIIlllll NO FEE w$ R 0 0 1 3 3 3 8 8 7 1$ w 202100070553512:12 pm 11117121 90 PP2A N12 1 0.00 0.00 0.00 0.00 0.00 0.00 0.000.000.00 0.00 "Exempt from recording fees pursuant to Government Code Section 27383" NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN that the City of Newport Beach, 100 Civic Center Drive, Newport Beach, California, 92660, as Owner, and Crosstown Electrical & Data Inc., Irwindale, California, as Contractor, entered into a Contract on March 24, 2020. Said Contract set forth certain improvements, as follows: Traffic Signal Rehabilitation Program FY 2019-2020 - C-7818-1 Work on said Contract was completed, and was found to be acce table on November 16. 2021, by the City Council. Title to said property is vested in th wner and the Surety for said Contract is Fidelity and Deposit Company of Maryland. ja City of Newport Beach VERIFICATION I certify, under penalty of perjury, that the foregoing is true and correct to the best of my knowledge. Amp, Executed on /� mp, r t 109,1 at Newport Beach, California. M https://gs.Secure-recording.com/Batch/Confirmation/12450970 11/17/1-021 RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: City Clerk City of Newport Beach 100 Civic Center Drive Newport Beach, CA 92660 "Exempt from recording fees pursuant to Government Code Section 27383" NCTICE OF COMPLETION NOTICE IS HEREBY GIVEN that the City of Newport Beach, 100 Civic Center Drive, Newport Beach, California, 92660, as Owner, and Crosstown Electrical & Data Inc., Irwindale, California, as Contractor, entered into a Contract on March 24, 2020. Said Contract set forth certain improvements, as follows: Traffic Signal Rehabilitation Program FY 2019-2020 - C-7818-1 Work on said Contract was completed, and was found to be acceptable on November 16, 2021, by the City Council. Title to said property is vested in thq'� vner and the Surety for said Contract is Fidelity and Deposit Company of Maryland. // I I0-YA City of Newport Beach VERIFICATION I certify, under penalty of perjury, that the foregoing is true and correct to the best of my knowledge. tt `'fu�ne �rnrn Executed on , at Newport Beach, California. Fin CITY C, EnK CITY OF NEWPORT BEACH NOTICE INVITING BIDS Sealed bids shall be submitted electronically via PlanetBids to office of the City Clerk, 100 Civic Center Drive, Newport Beach, CA 92660 By 10:00 AM on the 5t—h day of March, 2020, at which time such bids shall be opened and read for TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 $790,000.00 Engineer's Estimate Approved by j James M. Houlihan eputy PWD/City Engineer Prospective bidders may obtain Bid Documents, Project Specifications and Plans via PlanetBids: http://www.planetbids.com/portal/portal.cfm?CompanylD=22078 Hard copy plans are available via Mouse Graphics at (949) 548-5571 659 W. 19th Street, Costa Mesa, CA 92627 Contractor License Classification(s) required for this project. "C-10" For further information, call Eric Loke, Project Manager at (949) 644-3336 BID INFORMATION IS AVAILABLE ON THE CITY WEBSITE: http://newportbeachca.gov/qovernment/open-transparent/online-services/bids-rFps- vendor-registration City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 TABLE OF CONTENTS NOTICE INVITING BIDS..........................................................................................Cover INSTRUCTIONS TO BIDDERS...................................................................................... 3 BIDDER'S BOND............................................................................................................ 6 DESIGNATION OF SUBCONTRACTOR(S)................................................................... 9 TECHNICAL ABILITY AND EXPERIENCE REFERENCES ............................................ 9 NON -COLLUSION AFFIDAVIT..................................................................... 13 DESIGNATION OF SURETIES...................................................................... 14 CONTRACTOR'S INDUSTRIAL SAFETY RECORD....................................................15 ACKNOWLEDGEMENT OF ADDENDA....................................................................... 18 INFORMATION REQUIRED OF BIDDER..................................................................... 19 NOTICE TO SUCCESSFUL BIDDER........................................................................... 21 CONTRACT.................................................................................................................. 22 LABOR AND MATERIALS PAYMENT BOND ............................................. Exhibit A FAITHFUL PERFORMANCE BOND........................................................... Exhibit B INSURANCE REQUIREMENTS.................................................................Exhibit C PROPOSAL.............................................................................................................. PR -1 SPECIALPROVISIONS............................................................................................ SP -1 2 City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROJECT FY 2019-2020 Contract No. 7818-1 INSTRUCTIONS TO BIDDERS 1. The following documents shall be completed, executed, uploaded and received by the City Clerk via PlanetBids in accordance with NOTICE INVITING BIDS: INSTRUCTIONS TO BIDDERS BIDDER'S BOND (Original copies must be submitted to the City Clerk's Office) DESIGNATION OF SUBCONTRACTORS ACKNOWLEDGEMENT (Subcontractor information to be submitted via PlanetBids) CONTRACTOR'S INDUSTRIAL SAFETY RECORD INFORMATION REQUIRED OF BIDDER ALL ADDENDA TO PLANS AND SPECIFICATIONS AS ISSUED BY AGENCY PRIOR TO BID OPENING DATE (if any; Contractor shall confirm via PlanetBids) TECHNICAL ABILITY AND EXPERIENCE REFERENCES NON -COLLUSION AFFIDAVIT DESIGNATION OF SURETIES PROPOSAL ACKNOWLEDGEMENT (Line Items to be completed via PlanetBids) The City Clerk's Office will open and read the bid results from PlanetBids immediately following the Bid Opening Date (Bid Due Date.) The Bid Results are immediately available to the public via PlanetBids following the Bid Opening Date (Bid Due Date). Members of the public who would like to attend this reading may go to Bay E, 2nd Floor of the Civic Center (Located at 100 Civic Center Dr.) 2. Cash, certified check or cashier's check (sum not less than 10 percent of the total bid price) may be received in lieu of the BIDDER'S BOND. The title of the project and the words "Sealed Bid" shall be clearly marked on the outside of the envelope containing the documents. Original copies must be submitted to the City Clerk's Office. 3. The City of Newport Beach will not permit a substitute format for the Contract Documents listed above. Bidders are advised to review their content with bonding and legal agents prior to submission of bid. 4. BIDDER'S BOND shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, and (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570. The successful bidder's security shall be held until the Contract is executed. Original copies must be submitted to the City Clerk's Office by the Bid Opening Date. 5. The estimated quantities indicated in the PROPOSAL are approximate, and are given solely to allow the comparison of total bid prices. 6. Bids are to be computed upon the estimated quantities indicated in the PROPOSAL multiplied by unit price submitted by the bidder. In the event of discrepancy between wording and figures, bid wording shall prevail over bid figures. In the event of error in the multiplication of estimated 3 quantity by unit price, the correct multiplication will be computed and the bids will be compared with correctly multiplied totals, The City shall not be held responsible for bidder errors and omissions in the PROPOSAL. 7. The City of Newport Beach reserves the right to reject any or all bids and to waive any minor irregularity or informality in such bids. Pursuant to Public Contract Code Section 22300, at the request and expense of the Contractor, securities shall be permitted in substitution of money withheld by the City to ensure performance under the contract. The securities shall be deposited in a state or federal chartered bank in California, as the escrow agent. 8. In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the contract. A copy of said determination is available by calling the prevailing wage hotline number (415) 703-4774, and requesting one from the Department of Industrial Relations. All parties to the contract shall be governed by all provisions of the California Labor Code — including, but not limited to, the requirement to pay prevailing wage rates (Sections 1770-7981 inclusive). A copy of the prevailing wage rates shall be posted by the Contractor at the job site. 9. The Contractor shall be responsible for insuring compliance with provisions of Section 1777.5 of the Labor Code Apprenticeship requirements and Section 4100 et seq. of the Public Contracts Code, "Subletting and Subcontracting Fair Practices Act". 10. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. 11. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. 12. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. 13. All documents shall bear signatures and titles of persons authorized to sign on behalf of the bidder. For corporations, the signatures shall be of a corporate officer or an individual authorized by the corporation. For partnerships, the signatures shall be of a general partner. For sole ownership, the signature shall be of the owner. 14. Pursuant to Public Contract Code section 9204, for any demand by contractor, whether on behalf of itself or a subcontractor that lacks privity of contract with the City but has requested that contractor proceed on its behalf, sent by registered mail or certified mail return receipt requested for a time extension, payment by the City for money or damages arising from work done by, or on behalf of, the contractor and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled, or for payment of an amount that is disputed by the City, the following is a summary of the claims resolution process to be applied: A. The City shall review the claim and, within 45 days, shall provide a written statement identifying the portions of the claim that are disputed and undisputed. This time period may be extended by mutual agreement. The claimant shall furnish all reasonable documentation to support the claim. If the City needs approval from its City Council to provide the written statement and the City Council does not meet within the prescribed time 4 period, the City shall have up to 3 days following the next regular meeting of the City Council to provide the written statement. Payment of the undisputed portion of the claim shall be made within 60 days after the City issues its written statement. B. If the claimant disputes the City's written statement or if the City does not issue a written statement in the prescribed time period, the claimant may demand in writing an informal meet and confer conference, which shall be scheduled within 30 days of receipt of claimant's demand. C. Within 10 business days of the meet and confer conference, if a dispute remains, the City shall provide a written statement identifying the portion of the claim that remains in dispute and the undisputed portion. The City shall pay any remaining amount of the undisputed portion within 60 days. Any disputed portion of the claim shall be submitted to nonbinding mediation or similar nonbinding process, with the City and claimant sharing the costs equally and agreeing to a mediator within 10 business days. If the parties cannot timely agree on a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate the remaining disputed portion. If mediation is unsuccessful, any remaining disputed portion shall be addressed using procedures outside of Public Contract Code section 9204. D. Failure by the City to meet the time requirements herein shall result in the claim being rejected in its entirety and shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. The signature below represents that the above has been rev' ed. 756309, A, C-10 Contractor's License No. & ClassificationAu-thnzed/&-gnatu-r6ftiKe president 1000000155; 06/30/2022 3/5/2020 DIR Registration Number & Expiration Date Date Crosstown Electrical & Data, Inc. Bidder 5 Bond No. CSBA-12986 City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 BIDDER'S BOND We, the undersigned Principal and Surety, our successors and assigns, executors, heirs and administrators, agree to be jointly and severally held and firmly bound to the City of Newport Beach, a charter city, in the principal sum of Ten Percent of Amount Bid Dollars ($10$ ), to be paid and forfeited to the City of Newport Beach if the bid proposal of the undersigned Principal for the construction of TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020, Contract No. 7818-1 in the City of Newport Beach, is accepted by the City Council of the City of Newport Beach and the proposed contract is awarded to the Principal, and the Principal fails to execute the Contract Documents in the form(s) prescribed, including the required bonds, and original insurance certificates and endorsements for the construction of the project within thirty (30) calendar days after the date of the mailing of "Notification of Award", otherwise this obligation shall become null and void. If the undersigned Principal executing this Bond is executing this Bond as an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under this Bond. Witness our hands this 2nd Crosstown Electrical & Data, Inc. Name of Contractor (Principal) Fidelity and Deposit Company of Maryland Name of Surety 777 South Figueroa Street, Suite 3900, Los Angeles, CA 90017 Address of Surety (213) 270-0600 Telephone day ofch 20. Authorized SA nature/Title l Authorized Agent Signature Dwight Reilly, Attorney -in -Fact Print Name and Title (Notary acknowledgment of Principal & Surety must be attached) no ACKNOWLEDGMENT State of California County of }ss. On before me, Notary Public, personally appeared ,who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature OPTIONAL INFORMATION Date of Document Type or Title of Document Number of Pages in Document Document in a Foreign Language Type of Satisfactory Evidence: Personally Known with Paper Identification Paper Identification Credible Witness(es) Capacity of Signer: Trustee Power of Attorney CEO/CFO/COO President / Vice -President / Secretary / Treasurer Other: Other Information: 7 Thumbprint of Signer ❑ Check here if no thumbprint or fingerprint is available. ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange ) On 3/2/2020 before me, _ Adrian Benkert-Langrell, Notary Public (insert name and title of the officer) personally appeared Dwight Reilly , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. ADRIAN BENKERT-LANGRELL WITNESS my hand and official seal.COMM. #2214263 N Notary Public-California 4 ORANGE COUNTY r My Comm, Expires Sep 15,2021 Signature -1ail (Seal) /j r' n Benk rt-Langrell ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. Staunt te of of California Los Angeles Y On March 3, 2020 before me, Shalea Berry, Notary Public (insert name and title of the officer) personally appeared David Heermance who proved to me on the basis of satisfactory evidence to be the person(SO whose name(%) is/am subscribed to the within instrument and acknowledged to me that he/§y executed the same in his/hW#*W authorized capacity(i)w), and that by his/MK it signature( on the instrument the person(g), or the entity upon behalf of which the person(g) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature ft SHALEA BERRY Notary Public • California =t� My Los Angeles County Commission 4 2281272 Comm.Expires Mar 16, 2023 (Seal) Bond No. CSBA-12986 ZURICH AMERICAN INSURAtNCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Daniel HUCKABAY, Dwight REILLY, Arturo AYALA, Shaunna ROZELLE OSTROM, Frank MORONES, Ben STONG, Michael D. STONG and R. NAPPI, all of Orange, California, EACH its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., iri`their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 15th day of January, A.D. 2020. wQ? �f°N4;i p+0 9Etpj` C19111(�y $SAL. t ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Robert Robert D. Murray Vice President By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this 15th day of January, A.D. 2020, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. lt�itittrrlrfr Y• j/y- � �-}� C Q ar` S%.tl Constance A. Dunn, Notary Public My Commission Expires: July 9,2023 �31in3#tiE�� City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 DESIGNATION OF SUBCONTRACTOR(S) - AFFADAVIT State law requires the listing of all subcontractors who will perform work in an amount in excess of one- half of one percent of the Contractor's total bid. If a subcontractor is not listed, the Contractor represents that he/she is fully qualified to and will be responsible for performing that portion of the work. Substitution of subcontractors shall be made only in accordance with State law and/or the Standard Specifications for Public Works Construction, as applicable. Pursuant to Public Contract Code Section 22300 appropriate securities may be substituted for any monies to be withheld to ensure performance under the Contract. The Bidder, by signing this designation, certifies that bids from the subcontractors as listed in the Bidder's electronic bid have been used in formulating the bid for the project and that these subcontractors will be used subject to the approval of the Engineer and in accordance with State law. No changes may be made in these subcontractors except with prior approval of the City of Newport Beach, Crosstown Electrical & Data, Inc. Bidder 96th ized S' natureRitl president City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 TECHNICAL ABILITY AND EXPERIENCE REFERENCES Contractor must use this formlll Please print or type. Bidder's Name Crosstown Electrical & Data, Inc. FAILURE OF THE BIDDER TO PROVIDE ALL REQUIRED INFORMATION IN A COMPLETE AND ACCURATE MANNER MAY BE CONSIDERED NON-RESPONSIVE. For all public agency projects you have worked on (or are currently working on) in the past 2 years in excess of $120,000, provide the following information: No. 1 Project Name/Number Traffic Signal Network Redesign Implementation Furnish and install (70) Edge switches, (8) Hub Switches, Project Description and (2) Core switches to redesign the traffic signal network and update fiber optic connections Approximate Construction Dates: From Sept. '17 To: Aug. '18 Agency Name City of Pasadena Contact Person David Phan Telephone (626) 744-4194 $741,235.00 Original Contract Amount $ Final Contract Amount $ $ 7 41, 2 3 5 . 0 0 If final amount is different from original, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. NO 10 No. 2 Project Name/Number North County ITS Expansion and Traffic Signal System Modernization Furnish and install 203,500 LF of 72 SM fiber cable, Project Description 11,200 LF of 12 SM fiber cable. Furnish/install Ethernet switches, video surveillance, CCTV and wireless communication Approximate Construction Dates: From Jan ' 18 To: Sept '18 Agency Name City of Lancaster Contact Person Jonathan Robnett Telephone (661) 945-6899 $2,241,410.00 2,478,401.00 Original Contract Amount $ Final Contract Amount $ If final amount is different from original, please explain (change orders, extra work, etc.) Change Orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. NO No. 3 Project Name/Number Adaptive Traffic Control System - Phase 2 Furnish and install a new CCTV cameras at 106 locations. Furnish and install new video transmitters, receivers video mux/demux units, and matrix switches. Project Description Provide fixed point cellular wireless modems at 19 intersections Approximate Construction Dates: From Nov 117 Agency Name City of Los Angeles To: May '18 Contact Person Manoocher Adhami Telephone (626) 255-4592 $2,030,750.00 Original Contract Amount $ Final Contract Amount $ $ 2, 0 3 0, 7 5 0. 0 0 If final amount is different from original, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. NO 11 No. 4 Project Name/Number Traffic Signal Interconnect (Part 14) Furnish, install, splice, terminate and test fiber optic cable, Project Description furnish and install (4) CCTV cameras, and (10) Hardened Gigabit Ethernet Switc) Approximate Construction Dates: From Nov ' 17 To: April '18 Agency Name City of Bakersfield Contact Person Mike De La Cruz Telephone (661) 326-3175 $165,802.50 $165,802.50 Original Contract Amount $ Final Contract Amount $ If final amount is different from original, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. NO No. 5 Project Name/Number Chapman Avenue Traffic Signal Synchronization Project Furnish, install, splice, terminate and test fiber optic cable, Project Description furnish and install CCTV camera systems, video detection systems, Ethernet switches, controllers, EVP systems, and Ped Signals Approximate Construction Dates: From Sept '17 To: May '18 Agency NameOrange County Transportation Authority (OCTA) Contact Person Amy Tran Telephone (714) 560-5379 $1,586,844.47 Original Contract Amount $ Final Contract Amount $ $1, 5 8 6, 8 4 4 . 4 7 If final amount is different from original, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. NO 12 No. G Project Name/Number Citywide Traffic Signal Project Description Communication, Video Detection Approximate Construction Dates: From Feb ' 2 0 To: May '20 Agency Name City of Beverly Hills Contact Person Manu Dhaliwal Telephone (310) 285-2513 Original Contract Amount $1, 312, 797Final Contract Amount $ ongoing project If final amount is different from original, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. NO Attach additional sheets if necessary. Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on-site Construction Manager for the Contractor. Upon request, the Contractor shall attach a financial statement and other information sufficiently comprehensive to permit an appraisal of th ntractor's curren financial conditions. Crosstown Electrical & Data, In c Bidder Z'z ez,Authonzed gnature/Title resident 13 Ct�S."OW12 Electrical a Data, Inc. EDUCATION RICAMO AVILA GENERAL FOREMAN 5454 Diaz St., Irwindale, CA 91706 626-813-6693 • 626-869-0192 Fax • Rica rdo.Avila@crosstowndata.com Electrical Training Institute, State Certified Electrician, 2013 Los Angeles Trade Technical College, Electrical Construction and Maintenance Certificate. CERTIFICATIONS • OSHA 10/30 Certified • Lead and Asbestos Certified • Trench Excavation Safety Trained WORK HISTORY Crosstown Electrical & Data, Inc. — General Foreman 2009 — Current • Supervise multiple crews for construction and electrical installations from start to finish. • Procure material for projects as required. • Communicate with Owners and General Contractors to meet project goals and deadlines. • Manage project budgets and perform tracking of all Time & Material work. • Utilize an in-depth knowledge of various construction plans, products and supplies to maximize project effectiveness and profitability. • Strive for all projects to come in on time and within budget at completion. • Coordinate construction schedules with general contractors. • Utilize expertise in the installation of conduit, pull boxes, fiber optic cable, copper cable, wire, traffic signals, cabinets and various other skills to perform field work and to train others. RECENT REFERENCE PROJECTS: • OCTA Adams Ave RTSSP Project (Huntington Beach) • OCTA Newport Ave/Blvd Corridor TSSP (City of Tustin & County of Orange) • OCTA Bristol Street RTSSP (Newport, Costa Mesa & Santa Ana) • OCTA Chapman Corridor TSSP (Garden Grove, City of Orange, & County of Orange) • Caltrans Contract 07A3661 -C — Electrical System Restoration to As -Build Condition in Ventura County. • Caltrans Contract 07A3662 -B — Electrical System Restoration to As -Build Condition in Los Angeles County. • Caltrans 07-293804 — Modify Communication System at Route 110/405 separation to Imperial • Caltrans 07-308604 — Upgrade ramp metering systems City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 NON -COLLUSION AFFIDAVIT State of California ) ss. County of Los Angeles ) David P. Heermance being first duly sworn, deposes and says that he or she is President of crosstown Electrical & Data, Inc. -'the party making the foregoing bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that party making the foregoing bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. I declare under penalty of perjury of the laws of the State of alifo a that true and correct. Crosstown Electrical & Data, Inc. Bidder Authori-zedS4n-­atu(e/titl6r p4resident Subscribed and sworn to (or affirmed) before me on this day of , 2020 by , proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. [SEAL] 14 Notary Public My Commission Expires: (Se -e- aV6Ched A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Los Angeles Subscribed and sworn to (or affirmed) before me on this 5th day of March , 20 20, by David Heermance proved to me on the basis of satisfactory evidence to be the personX who appeared before me. lSHALEA BERRY OMy Notary Public • California Los Angeles County Commission # 2281272 Comm, Expires Mar 16, 2023 (Seal) Signature City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 DESIGNATION OF SURETIES Bidder's name Crosstown Electrical & Data, Inc. Provide the names, addresses, and phone numbers for all brokers and sureties from whom Bidder intends to procure insurance and bonds (list by insurance/bond type): Surety Company: Fidelity and Deposit Company of Maryland 777 South Figueroa Street, Suite 3900 T,os Angeles CA 90017; 213-270-06 0 Bonding Company: CSBA - Commercial Surety Bond Agency 1411 N Batavia St Suite 201, Orange, CA 92867 ; 714-516-1232 Insurance Company: McRae Associates Insurance Services 1265 N Manassero Suite 303 Anaheim, CA 92807 ; 714-779-6999 15 City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 CONTRACTOR'S INDUSTRIAL SAFETY RECORD TO ACCOMPANY PROPOSAL Bidder's Name Crosstown Electrical & Data, Inc. Record Last Five (5) Full Years Current Year of Record The information required for these items is the same as required for columns 3 to 6, Code 10, Occupational Injuries, Summary --Occupational Injuries and Illnesses, OSHA No. 102. 16 Current Record Record Record Record Record Year of for for for for for Record 2019 2018 2017 2016 2015 Total 2020 No. of contracts 30 220 240 225 285 310 1,310 Total dollar Amount of 2mil 20mi1 25mil 25mil 28 mil 20 mil 120mi1 Contracts (in Thousands of $ No. of fatalities 0 0 0 0 0 0 0 No. of lost 0 3 2 0 2 1 8 Workday Cases No. of lost workday cases 0 0 0 0 0 0 0 involving permanent transfer to another job or termination of employment The information required for these items is the same as required for columns 3 to 6, Code 10, Occupational Injuries, Summary --Occupational Injuries and Illnesses, OSHA No. 102. 16 Legal Business Name of Bidder Crosstown Electrical & Data, Inc. Business Address: 5454 Diaz St Irwindale, CA 91706 Business Tel. No.: 626-813-6693 State Contractor's License No. and Classification: 756309; A, C-10 Title President The above information was compiled from the records that are available to me at this time and I declare under penalty of perjury that the information is true and accurate within the limitations of those records. Signature of bidder Date Title Signature of bidder Date Title Signature of bidder Date Title Signature of bidder Date Title Secretary Signature Requirements: If bidder is an individual, name and signature of individual must be provided, if doing business under a fictitious name, the fictitious name must be set fort along with the County. If bidder is a partnership or joint venture, legal name of partnership/joint venture must be provided, followed by signatures of all of the partners/joint ventures or if fewer than all of the partners/joint ventures submit with evidence of authority to act on behalf of the partnership/joint venture. If bidder is a corporation, legal name of corporation must be provided, followed by signatures of the corporation President or Vice President or President and Secretary or Assistant Secretary, and the corporate seal, or submit with evidence of authority to act on behalf of the corporation. All must be acknowledged before a Notary Public, who must certify that such individuals, partners/joint ventures, or officers were proven on the basis of satisfactory evidence to be the persons whose name are subscribed to and acknowledged that they executed the same in their authorized capacities. MOTARY ACKNOWLEDGMENT and CORPORATE SEAL MUST BE ATTACHEDI 17 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of of California Los Angeles County On March 5, 2020 before me, Shalea Berry, Notary Public (insert name and title of the officer) personally appeared David Heermance who proved to me on the basis of satisfactory evidence to be the person(SO whose name(%) is/0,4W subscribed to the within instrument and acknowledged to me that he/~WR executed the same in his1h%W.MW authorized capacity(Wx), and that by his/PWRMr signature(X) on the instrument the person(, or the entity upon behalf of which the person(g) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) SHALEA BERRY Notary Public • California ' Los Angeles County My Commission # 2281272 Comm. Expires Mar 16, 2023 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. Stateof California Los Angeles County On March 5, 2020 before me, Shalea Berry, Notary Public (insert name and title of the officer) personally appeared Andrea L. Heermance who proved to me on the basis of satisfactory evidence to be the person(si) whose name(a) is/am subscribed to the within instrument and acknowledged to me that Mshe/XW executed the same in Wher/MX authorized capacity(Da), and that by Wher/KM signature( on the instrument the person(N), or the entity upon behalf of which the person(g) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) EE SHALEA BERRY Notary Public - California Los Angeles County Commission R 2281272 My Comm. Expires Mar 16, 2023 .; City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 ACKNOWLEDGEMENT OF ADDENDA Bidder's name crosstown Electrical & Data, Inc. The bidder shall signify receipt of all Addenda here, if any, and attach executed copy of addenda to bid documents: Addendum No. Date Received Si ature 1 3/5/2020 I 18 City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROJECT FY 2019-2020 Contract No. 7818-1 INFORMATION REQUIRED OF BIDDER Bidder certifies under penalty of perjury under the laws of the State of California that the following information is true and correct: Name of individual Contractor, Company or Corporation: Crosstown Electrical & Data, Inc. Business Address: 5454 Diaz St Irwindale, CA 91706 Telephone and Fax Number: 626-813-6693 1 626-869-0192 California State Contractor's License No. and Class: 756309; A, C-10 (REQUIRED AT TIME OF AWARD) Original Date Issued:11/18/1998 Expiration Date: 11/30/2020 List the name and title/position of the person(s) who inspected for your firm the site of the work proposed in these contract documents: Mike Cuellar, Sr. Estimator The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and company or corporate officers having a principal interest in this proposal: Name Title Address Telephone David Heermance, President 1 5454 Diaz St Irwindale, CA 91706 1 626-813-6693 Wendy Parker, Vice President 1 5454 Diaz St Irwindale, CA 91706 1 626-813-6693 Andrea Heermance, Secretary 1 5454 Diaz St Irwindale, CA 91706 1 626-813-6693 Ben Heermance, CFO 1 5454 Diaz St Irwindale, CA 91706 1 626-813-6693 Corporation organized under the laws of the State of California 19 The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal are as follows: N/A All company, corporate, or fictitious business names used by any principal having interest in this proposal are as follows: N/A For all arbitrations, lawsuits, settlements or the like (in or out of court) you have been involved in with public agencies in the past five years (Attach additional Sheets if necessary) provide: Provide the names, addresses and telephone numbers of the parties; Lawsuit with the City of Fountain Valley: 10200 Slater Ave., Fountain Valley, CA 92708 714-593-4400 Briefly summarize the parties' claims and defenses; Crosstown had a subcontractor that had a dispute with the city of Fountain Valley and decided to file suit. Crosstown was the Prime contractor and was therefore listed in the lawsuit. Lawsuit has been settled in arbitration between our subcontractor and the city. Have you ever had a contract terminated by the owner/agency? If so, explain. no Have you ever failed to complete a project? If so, explain. No For any projects you have been involved with in the last 5 years, did you have any claims or actions by any outside agency or individual for labor co fiance (i.e. failure to pay prevailing wage, falsifying certified payrolls, etc.)? Yes UO 20 Are any claims or actions unresolved or outstanding? Yes 6 If yes to any of the above, explain. (Attach additional sheets, if necessary) Failure of the bidder to provide ALL requested information in a complete and accurate manner may be considered non-responsive. Crosstown Electrical & Data, In David P. Heermance c Bidder (Print name of Owner or Presid t of Corpo n/Com n ) . Z. Authorized Si ature itle president President Title 3/5/2020 Date On before me, , Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Notary Public in and for said State My Commission Expires: _ (S2, o P4-etched) 21 (SEAL) ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of of California Los Angeles ry On March 5, 2020 before me, Shalea Berry, Notary Public (insert name and title of the officer) personalty appeared David Heermance who proved to me on the basis of satisfactory evidence to be the person(* whose name(&) is/am subscribed to the within instrument and acknowledged to me that he/PQWWy executed the same in his/hOMOW authorized capacity(i w), and that by his/fir signature(�j on the instrument the person(g), or the entity upon behalf of which the person(g) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) SHALEA BERRY Notary Public - California x'�.•+ My Los Angeles County Commission ; 2281272 Comm. Expires Mar 16, 2023 City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 NOTICE TO SUCCESSFUL BIDDER The following Contract Documents shall be executed and delivered to the Engineer within ten (10) days (not including Saturday, Sunday and Federal holidays) after the date shown on the "Notification of Award" to the successful bidder: • CONTRACT WITH REQUIRED INSURANCE CERTIFICATES AND ENDORSEMENTS • LABOR AND MATERIALS PAYMENT BOND • FAITHFUL PERFORMANCE BOND The City of Newport Beach will not permit a substitute format for these Contract Documents. Bidders are advised to review their content with bonding, insuring and legal agents prior to submission of bid. Original Certificate(s) of Insurance, General Liability Insurance Endorsement, and Automobile Liability Insurance Endorsement shall be provided as required by the Contract documents and delivered to the Public Works Department within ten (10) working days after the date shown on the Notification of Award to the successful bidder. The Labor and Materials Payment Bond and Faithful Performance Bond shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, and (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570. Pursuant to Public Contract Code Section 22300, appropriate securities may be substituted for any monies to be withheld to ensure performance under the Contract. Insurance companies affording coverage shall be (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, and (2) assigned Policyholders' Rating A (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property -Casualty. Coverages shall be provided as specified in the Standard Specifications for Public Works Construction, except as modified by the Special Provisions. Certificates of Insurance and additional insured endorsements shall be on the insurance company's forms, fully executed and delivered with the Contract. The Notice to Proceed will not be issued until all contract documents have been received and approved by the City. 22 TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 CONTRACT NO. 7818-1 THIS CONTRACT FOR PUBLIC WORKS ("Contract") is entered into this 24th day of March, 2020 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and CROSSTOWN ELECTRICAL & DATA, INC., a California corporation ("Contractor"), whose address is 5454 Diaz Street, Irwindale, CA 91706, and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City has advertised for bids for the following described public work: The work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at three intersections, installation of CCN equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, installation/modification of concrete curb access ramps and sidewalk panels, installation/modification of signage, striping, and curb markings, and other items shown on, but not limited to plan T -6050-S (the "Project" or "Work"). C. Contractor has been determined by City to be the lowest responsible bidder and Contractor's bid, and the compensation set forth in this Contract, is based upon Contractor's careful examination of all Contract documents, plans and specifications. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. CONTRACT DOCUMENTS The complete Contract for the Project includes all of the following documents: Notice Inviting Bids, Instructions to Bidders, Proposal, Bidder's Bond, Non -Collusion Affidavit, Notice to Successful Bidder, Labor and Materials Payment Bond (Exhibit A), Faithful Performance Bond (Exhibit B), Permits, Standard Special Provisions and Standard Drawings, Plans and Special Provisions for Contract No. 7818-1, Standard Specifications for Public Works Construction (current adopted edition and all supplements), and this Contract, and all modifications and amendments thereto (collectively the "Contract Documents"), all of which are incorporated herein by reference. The Contract Documents comprise the sole agreement between the parties as to the subject matter therein. Any representations or agreements not specifically contained in the Contract Documents are null and void. Any amendments must be made in writing, and signed by both parties in the manner specified in the Contract Documents. 2. SCOPE OF WORK Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services required for the Project. All of the Work to be performed and materials to be furnished shall be in strict accordance with the provisions of the Contract Documents. Contractor is required to perform all activities, at no extra cost to City, which are reasonably inferable from the Contract Documents as being necessary to produce the intended results. 3. COMPENSATION 3.1 As full compensation for the performance and completion of the Project as required by the Contract Documents, City shall pay to Contractor and Contractor accepts as full payment the sum of Eight Hundred Ninety Three Thousand Two Hundred Forty Four Dollars ($893,244.00). 3.2 This compensation includes: 3.2.1 Any loss or damage arising from the nature of the Work; 3.2.2 Any loss or damage arising from any unforeseen difficulties or obstructions in the performance of the Work; and 3.2.3 Any expense incurred as a result of any suspension or discontinuance of the Work, but excludes any loss resulting from earthquakes of a magnitude in excess of 3.5 on the Richter Scale and tidal waves, including tsunamis, and which loss or expense occurs prior to acceptance of the Work by City. 4. PROJECT MANAGER Contractor shall designate a Project Manager, who shall coordinate all phases of the Project. This Project Manager shall be available to City at all reasonable times during the term of the Contract. Contractor has designated David P. Heermance to be its Project Manager. Contractor shall not remove or reassign the Project Manager without the prior written consent of City. City's approval shall not be unreasonably withheld. 5. ADMINISTRATION This Contract shall be administered by the Public Works Department. City's Public Works Director, or designee, shall be the Project Administrator and shall have the authority to act for City under this Contract. The Project Administrator or designee shall represent City in all matters pertaining to the Work to be rendered pursuant to this Contract. 6. NOTICE OF CLAIMS 6.1 Unless a shorter time is specified elsewhere in this Contract, before making its final request for payment under the Contract Documents, Contractor shall submit to Crosstown Electrical & Data, Inc. Page 2 City, in writing, all claims for compensation under or arising out of this Contract. Contractor's acceptance of the final payment shall constitute a waiver of all claims for compensation under or arising out of this Contract except those previously made in writing and identified by Contractor in writing as unsettled at the time of its final request for payment. The Contractor and City expressly agree that in addition to all claims filing requirements set forth in the Contract and Contract Documents, Contractor shall be required to file any claim Contractor may have against City in strict conformance with the Government Claims Act (Government Code 900 et seq.). 6.2 To the extent that Contractor's claim is a "Claim" as defined in Public Contract Code section 9204 or any successor statute thereto, the Parties agree to follow the dispute resolution process set forth therein. Any part of such "Claim" remaining in dispute after completion of the dispute resolution process provided for in Public Contract Code section 9204 or any successor statute thereto shall be subject to the Government Claims Act requirements requiring Contractor to file a claim in strict conformance with the Government Claims Act. To the extent that Contractor's claim is not a "Claim" as defined in Public Contract Code section 9204 or any successor statute thereto, Contractor shall be required to file such claim with the City in strict conformance with the Government Claims Act (Government Code sections 900 et seq.). 7. WRITTEN NOTICE 7.1 All notices, demands, requests or approvals, including any change in mailing address, to be given under the terms of this Contract shall be given in writing, and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first-class mail, addressed as hereinafter provided. 7.2 All notices, demands, requests or approvals from Contractor to City shall be addressed to City at: Attention: Public Works Director City of Newport Beach Public Works Department 100 Civic Center Drive P.O. Box 1768 Newport Beach, CA 92658 7.3 All notices, demands, requests or approvals from City to Contractor shall be addressed to Contractor at: Attention: David P. Heermance Crosstown Electrical & Data, Inc. 5454 Diaz Street Irwindale, CA 91706 Crosstown Electrical & Data, Inc. Page 3 8. INDEPENDENT CONTRACTOR City has retained Contractor as an independent contractor and neither Contractor nor its employees are to be considered employees of City. The manner and means of conducting the Work are under the control of Contractor, except to the extent they are limited by statute, rule or regulation and the express terms of this Contract. No civil service status or other right of employment shall accrue to Contractor or its employees. Contractor shall have the responsibility for and control over the means of performing the Work, provided that Contractor is in compliance with the terms of this Contract. Anything in this Contract that may appear to give City the right to direct Contractor as to the details of the performance or to exercise a measure of control over Contractor shall mean only that Contractor shall follow the desires of City with respect to the results of the Work. 9. BONDING 9.1 Contractor shall obtain, provide and maintain at its own expense during the term of this Contract both of the following: (1) a Faithful Performance Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in this Contract in the form attached as Exhibit B and incorporated herein by reference; and (2) a Labor and Materials Payment Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in this Contract and in the form attached as Exhibit A and incorporated herein by reference. 9.2 The Faithful Performance Bond and Labor and Materials Payment Bond shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570, and (3) assigned a Policyholders' Rating A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property - Casualty. 9.3 Contractor shall deliver, concurrently with execution of this Contract, the Faithful Performance Bond and Labor and Materials Payment Bond, and a certified copy of the "Certificate of Authority" of the Insurer or Surety issued by the Insurance Commissioner, which authorizes the Insurer or Surety to transact surety insurance in the State of California. 10. COOPERATION Contractor agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or interest in the Work to be performed. City agrees to cooperate with the Contractor on the Project. 11. PROGRESS Contractor is responsible for keeping the Project Administrator informed on a regular basis regarding the status and progress of the Project, activities performed and planned, and any meetings that have been scheduled or are desired. Crosstown Electrical & Data, Inc. Page 4 12. INSURANCE Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract or for other periods as specified in the Contract Documents, policies of insurance of the type, amounts, terms and conditions described in the Insurance Requirements attached hereto as Exhibit C, and incorporated herein by reference. 13. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS Except as specifically authorized under this Contract, the services to be provided under this Contract shall not be assigned, transferred contracted or subcontracted out without the prior written approval of City. Any of the following shall be construed as an assignment: The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor, or of the interest of any general partner or joint venturer or syndicate member or cotenant if Contractor is a partnership or joint -venture or syndicate or co -tenancy, which shall result in changing the control of Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five percent (25%) or more of the assets of the corporation, partnership or joint -venture. 14. PREVAILING WAGES In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the contract. A copy of said determination is available by calling the prevailing wage hotline number (415) 703-4774, and requesting one from the Department of Industrial Relations. All parties to the contract shall be governed by all provisions of the California Labor Code — including, but not limited to, the requirement to pay prevailing wage rates (Sections 1770-7981 inclusive). A copy of the prevailing wage rates shall be posted by the Contractor at the job site. 15. SUBCONTRACTING The subcontractors authorized by City, if any, to perform the Work on this Project are identified in the Contractor's Proposal and are attached as part of the Contract Documents. Contractor shall be fully responsible to City for all acts and omissions of any subcontractors. Nothing in this Contract shall create any contractual relationship between City and subcontractor, nor shall it create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. City is an intended beneficiary of any Work performed by the subcontractor for purposes of establishing a duty of care between the subcontractor and City. Except as specifically authorized herein, the Work to be performed under this Contract shall not be otherwise assigned, transferred, contracted or subcontracted out without the prior written approval of City. Crosstown Electrical & Data, Inc. Page 5 16. RESPONSIBILITY FOR DAMAGES OR INJURY 16.1 City and its elected or appointed officers, agents, officials, employees and volunteers and all persons and entities owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services shall not be responsible in any manner for any loss or damage to any of the materials or other things used or employed in performing the Project or for injury to or death of any person as a result of Contractor's performance of the Work required hereunder, or for damage to property from any cause arising from the performance of the Project and/or Services by Contractor, or its subcontractors, or its workers, or anyone employed by either of them. 16.2 Contractor shall be responsible for any liability imposed by law and for injuries to or death of any person or damage to property resulting from defects, obstructions or from any cause arising from Contractor's Work on the Project and/or Services, or the Work of any subcontractor or supplier selected by Contractor. 16.3 To the fullest extent permitted by law, Contractor shall indemnify, defend and hold harmless City, its elected or appointed officers, agents, officials, employees, volunteers and any person or entity owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services contemplated by this Contract (collectively, the "Indemnified Parties") from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorneys' fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim, collectively, "Claims"), which may arise from or in any manner relate (directly or indirectly) to any breach of the terms and conditions of this Contract, any Work performed or Services provided under this Contract including, without limitation, defects in workmanship or materials or Contractor's presence or activities conducted on the Project (including the negligent, reckless, and/or willful acts, errors and/or omissions of Contractor, its principals, officers, agents, employees, vendors, suppliers, subconsultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable for any or all of them). 16.4 Notwithstanding the foregoing, nothing herein shall be construed to require Contractor to indemnify the Indemnified Parties from any Claim arising from the sole negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of attorneys' fees in any action on or to enforce the terms of this Contract. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. 16.5 Contractor shall perform all Work in a manner to minimize public inconvenience and possible hazard, to restore other work areas to their original condition and former usefulness as soon as possible, and to protect public and private property. Contractor shall be liable for any private or public property damaged during the performance of the Project Work. Crosstown Electrical & Data, Inc. Page 6 16.6 To the extent authorized by law, as much of the money due Contractor under and by virtue of the Contract as shall be considered necessary by City may be retained by it until disposition has been made of such suits or claims for damages as aforesaid. 16.7 Nothing in this Section or any other portion of the Contract Documents shall be construed as authorizing any award of attorneys' fees in any action to enforce the terms of this Contract, except to the extent provided for above. 16.8 The rights and obligations set forth in this Section shall survive the termination of this Contract. 17. CHANGE ORDERS 17.1 This Contract may be amended or modified only by mutual written agreement of the parties. 17.2 The Contractor shall only commence work covered by a change order after the change order is executed and notification to proceed has been provided by the City. 17.3 There shall be no change in the Contractor's members of the project team, as listed in the approved proposal, which is a part of this contract without prior written approval by the City. 18. CONFLICTS OF INTEREST 18.1 Contractor or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act") and/or Government Code §§ 1090 et seq., which (1) require such persons to disclose any financial interest that may foreseeably be materially affected by the Work performed under this Contract, and (2) prohibit such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. 18.2 If subject to the Act and/or Government Code §§ 1090 et seq., Contractor shall conform to all requirements therein. Failure to do so constitutes a material breach and is grounds for immediate termination of this Contract by City. Contractor shall indemnify and hold harmless City for any and all claims for damages resulting from Contractor's violation of this Section. 19. TERMINATION 19.1 In the event that either party fails or refuses to perform any of the provisions of this Contract at the time and in the manner required, that party shall be deemed in default in the performance of this Contract. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, the Crosstown Electrical & Data, Inc. Page 7 non -defaulting party may terminate the Contract forthwith by giving to the defaulting party written notice thereof. 19.2 Notwithstanding the above provisions, City shall have the right, at its sole discretion and without cause, of terminating this Contract at any time by giving seven (7) calendar days' prior written notice to Contractor. In the event of termination under this Section, City shall pay Contractor for Services satisfactorily performed and costs incurred up to the effective date of termination for which Contractor has not been previously paid. On the effective date of termination, Contractor shall deliver to City all materials purchased in performance of this Contract. 20. STANDARD PROVISIONS 20.1 Recitals. City and Contractor acknowledge that the above Recitals are true and correct and are hereby incorporated by reference into this Contract. 20.2 Compliance with all Laws. Contractor shall at its own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. In addition, all Work prepared by Contractor shall conform to applicable City, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator. 20.3 Integrated Contract. This Contract represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. 20.4 Conflicts or Inconsistencies. In the event there are any conflicts or inconsistencies between this Contract and any other attachments attached hereto, the terms of this Contract shall govern. 20.5 Interpretation. The terms of this Contract shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Contract or any other rule of construction which might otherwise apply. 20.6 Amendments. This Contract may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 20.7 Severability. If any term or portion of this Contract is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Contract shall continue in full force and effect. 20.8 Controlling Law and Venue. The laws of the State of California shall govern this Contract and all matters relating to it and any action brought relating to this Contract Crosstown Electrical & Data, Inc. Page 8 shall be adjudicated in a court of competent jurisdiction in the County of Orange, State of California. 20.9 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, sexual orientation, age or any other impermissible basis under law. 20.10 No Attorney's Fees. In the event of any dispute or legal action arising under this contract, the prevailing party shall not be entitled to attorneys' fees. 20.11 Counterparts. This Contract may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which together shall constitute one (1) and the same instrument. 21. EFFECT OF CONTRACTOR'S EXECUTION Execution of this Contract and all other Contract Documents by Contractor is a representation that Contractor has visited the Project site, has become familiar with the local conditions under which the Work is to be performed, and has correlated all relevant observations with the requirements of the Contract Documents. 22. WAIVER A waiver by City or any term, covenant, or condition in the Contract Documents shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition. 23. RECITALS City and Contractor acknowledge that the above Recitals are true and correct and are hereby incorporated by reference into this Contract. [SIGNATURES ON NEXT PAGE] Crosstown Electrical & Data, Inc. Page 9 IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed on the day and year first written above. APPROVED AS TO FORM: CITY OF NEWPORT BEACH, CITY ATTORNEY'S OFFICE a California municipal corporation Date: �� / d, /Z6 2 o Date: w�28/io2o By: o_,� Aaron d. Harp City Attorney ATTEST: Date: �, OU, awo By: - Leilani I. Brown City Clerk FewJ -OFO® By: Will O'Neill Mayor CONTRACTOR: CROSSTOWN ELECTRICAL & DATA, INC., a California corporation Date.- Signed ate: Signed in Counterpart By: David P. Heermance Chief Executive Officer Date: Signed in Counterpart Andrea Heermance Secretary [END OF SIGNATURES] Attachments: Exhibit A -- Labor and Materials Payment Bond Exhibit B -- Faithful Performance Bond Exhibit C — Insurance Requirements �.v,eaa+e----•,,�—.-zmre+ f±�.ramaa��:aen.�s¢vav+smu�,r.-,-�w.es®� yz,�.�,�. an:vtwc-;�.n ,.r s est -r_:. ..e, a: �tw,ri�r€x�sgsax•, . kiss_xra ,��;sn::+�.•rw•c .�zsj Crosstown Electrical & Data, Inc. Page 10 IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed on the day and year first written above. APPROVED AS TO FORM: CITY ATTOR 'S OFFICE Date.- Aaron C. Harp City Attorney ATTEST: Date: in Leilani I. Brown City Clerk CITY OF NEWPORT BEACH, a California municipal corporation Date: By: Will O'Neill Mayor CONTRACTOR: CROSSTOWN ELECTRICAL & DATA, INC., a California corporation r Date: Zo1,r, By: David P. H rmanc Chief Executive Officer Date: y Zoe By: Andrea Heermance Secretary [END OF SIGNATURES] Attachments: Exhibit A -- Labor and Materials Payment Bond Exhibit B -- Faithful Performance Bond Exhibit C — Insurance Requirements Crosstown Electrical & Data, Inc. Page 10 THE FINAL PREMIUM IS This bond was issued in two (2) PREDICATED ON THE original counterparts FINAL CONTRACT AMOUNT EXHIBIT A CITY OF NEWPORT BEACH BOND NO. 7663358 LABOR AND MATERIALS PAYMENT BOND WHEREAS, the City of Newport Beach, State of California, has awarded to CROSSTOWN ELECTRICAL & DATA, INC. hereinafter designated as the "Principal," a contract for: the work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at three intersections, installation of CCN equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, installation/modification of concrete curb access ramps and sidewalk panels, installation/modification of signage, striping, and curb markings, and other items shown on, but not limited to plan T -6050-S, in the City of Newport Beach, in strict conformity with the Contract on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Contract and the terms thereof require the furnishing of a bond, providing that if Principal or any of Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the Work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth. NOW, THEREFORE, We the undersigned Principal, and, Fidelity and Deposit Company of Maryland duly authorized to transact business under the laws of the State of California, as Surety, (referred to herein as "Surety") are held and firmly bound unto the City of Newport Beach, in the sum of Eight Hundred Ninety Three Thousand Two Hundred Forty Four Dollars ($893,244.00) lawful money of the United States of America, said sum being equal to 100% of the estimated amount payable by the City of Newport Beach under the terms of the Contract; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the Principal's subcontractors, fail to pay for any materials, provisions, or other supplies, implements or machinery used in, upon, for, or about the performance of the Work contracted to be done, or for any other work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, or for any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, then the Surety will pay for the same, in an amount not exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as required by the provisions of Section 9554 of the Civil Code of the State of California. Crosstown Electrical & Data, Inc. Page A-1 The Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9100 of the California Civil Code so as to give a right of action to them or their assigns in any suit brought upon this Bond, as required by and in accordance with the provisions of Sections 9500 et seq. of the Civil Code of the State of California. And Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Contract or to the Work to be performed thereunder shall in any wise affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions to the terms of the Contract or to the Work or to the specifications. In the event that any principal above named executed this Bond as an individual, it is agreed that the death of any such principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the above named Principal and Surety, on the 27th day of April _'2020 . Crosstown Electrical & Data, Inc. Name of Contractor (Principal) Fidelity and Deposit Company of Maryland Name of Surety 777 South Figueroa Street, Suite 3900, Los Angeles, CA 90017 Address of Surety (213) 270-0600 Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: Ell S-/2_0 By: on C. H p City Attorney °y Z � e)"lz � Au oriz d Signature/Title Authorized Agent Signature Dwight Reilly, Attorney -in -Fact Print Name and Title NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED Crosstown Electrical & Data, Inc. Page A-2 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of "� q rxg ,,,J e S )SS. On Mcu 4—� , 20 20 before me, Shglc'.ca airf-41 , Notary Public, personally appeared 6-Ty7i who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange }ss. On April 27th , 2020 before me, Melissa Ann Vaccaro Notary Public, personally appeared Dwight Reilly proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my ha and official seal. MELISSA ANN VACCARO COMM. #2241394 �.. Notary Public -California cc Signature Melissa Ann Vaccaro ORANGE COUNTY u. (seal) My Comm. Expires May 12, 2022 Crosstown Electrical & Data, Inc. Page A-3 01 SHALEA BERRY Notary Public - California 'Commission Los Angeles County # 228! My Comm. Expires Ma' .s�wv (seal) ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange }ss. On April 27th , 2020 before me, Melissa Ann Vaccaro Notary Public, personally appeared Dwight Reilly proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my ha and official seal. MELISSA ANN VACCARO COMM. #2241394 �.. Notary Public -California cc Signature Melissa Ann Vaccaro ORANGE COUNTY u. (seal) My Comm. Expires May 12, 2022 Crosstown Electrical & Data, Inc. Page A-3 Bond No. 7663358 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Daniel HUCKABAY, Dwight REILLY, Arturo AYALA, Shaunna ROZELLE OSTROM, Frank MORONES, Ben STONG, Michael D. STONG and R. NAPPI, all of Orange, California, EACH its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents; shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 15th day of January, A.D. 2020. tna SEAL ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Robert D. Murray Vice President By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this 15th day of January, A.D. 2020, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. it nnir��r . f F \};S Constance A. Dunn, Notary Public My Commission Expires: July 9,2023 �rttnStYh' j1i THE FINAL PREMIUM IS PREDICATED ON THE FINAL CONTRACT AMOUNT This bond was issued in two (2) original counterparts EXHIBIT B CITY OF NEWPORT BEACH BOND NO. 7663358 FAITHFUL PERFORMANCE BOND The premium charges on this Bond is $ 7,648.00 , being at the rate of $11.00 $8.81 $7.69 thousand of the Contract price. WHEREAS, the City of Newport Beach, State of California, has awarded to CROSSTOWN ELECTRICAL & DATA, INC. hereinafter designated as the "Principal," a contract for: the work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at three intersections, installation of CCN equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, installation/modification of concrete curb access ramps and sidewalk panels, installation/modification of signage, striping, and curb markings, and other items shown on, but not limited to plan T -6050-S, in the City of Newport Beach, in strict conformity with the Contract on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Contract and the terms thereof require the furnishing of a Bond for the faithful performance of the Contract. NOW, THEREFORE, we, the Principal, and Fidelity and Deposit Company of Maryland , duly authorized to transact business under the laws of the State of California as Surety (hereinafter "Surety"), are held and firmly bound unto the City of Newport Beach, in the sum of Eight Hundred Ninety Three Thousand Two Hundred Forty Four Dollars ($893,244.00) lawful money of the United States of America, said sum being equal to 100% of the estimated amount of the Contract, to be paid to the City of Newport Beach, its successors, and assigns; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the Principal's heirs, executors, administrators, successors, or assigns, fail to abide by, and well and truly keep and perform any or all the Work, covenants, conditions, and agreements in the Contract Documents and any alteration thereof made as therein provided on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to its true intent and meaning, or fails to indemnify, defend, and save harmless the City of Newport Beach, its officers, employees and agents, as therein stipulated, then, Surety will faithfully perform the same, in an amount not exceeding the sum specified in this Bond; otherwise this obligation shall become null and void. As a part of the obligation secured hereby, and in addition to the face amount specified in this Performance Bond, there shall be included costs and reasonable Crosstown. Electrical & Data, Inc. Page B-1 expenses and fees, including reasonable attorneys' fees, incurred by City, only in the event City is required to bring an action in law or equity against Surety to enforce the obligations of this Bond. Surety, for value received, stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Contract or to the Work to be performed thereunder shall in any way affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions of the Contract or to the Work or to the specifications. This Faithful Performance Bond shall be extended and maintained by the Principal in full force and effect for one (1) year following the date of formal acceptance of the Project by City. In the event that the Principal executed this bond as an individual, it is agrbed that the death of any such Principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named, on the 27th day of A r' ,2020 Crosstown Electrical & Data, Inc. Name of Contractor (Principal)uth izeq ignature itl Fidelity and Deposit Company of Maryland Name of Surety 777 South Figueroa Street, Suite 3900, Los Angeles, CA 90017 Address of Surety (213) 270-0600 Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: T It Sy 2p By: ,2l Karon C. Hafp pyo City Attorney Authorized Agent Signature Dwight Reilly, Attorney -in -Fact Print Name and Title NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED Crosstown Electrical & Data, Inc. Page B-2 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Lu,) Pr -)r-12 l eS } ss. On "I 20 20 before me, �ticv lei;, �2rrc� Notary Pu lic, personally appeared 1Y, ✓/r/ who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument - I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. S./'1z" Signature ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California SHALEA BERRRY 0`7--My Notary Public - CaliforniaLos Angeles County Commission p 2281272 Comm. Expires Mar 16. 2C2? •+acs+. (seal) County of Orange }ss. On April 27th 2020 before me, Melissa Ann Vaccaro Notary Public, personally appeared Dwight Reilly proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNES my han and officiI seal. MELISSA ANN VACCARO COMM.#2241394 M �7"VIC"=" v. Notary Public -California u) ORANGE COUNTY n. Signature Melissa Ann Vaccaro (seal) My Comm. Expires May 12, 2022 Crosstown Electrical & Data, Inc. Page B-3 Bond No. 7663358 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Daniel HUCKABAV, Dwight REILLY, Arturo AYALA, Shaunna ROZELLE OSTROM, Frank MORONES, Ben STONG, Michael D. STONG and R. NAPPI, all of Orange, California, EACH its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the "ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy ol'Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 15th day of January, A.D. 2020. .G s• a9 4 ,� x. - BSAL ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Roberl D. Adurray Vice President By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this 15th day of January, A.D. 2020, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Constance A. Dunn, Notary Public My Commission Expires: July 9,2023 EXHIBIT C INSURANCE REQUIREMENTS — PUBLIC WORKS AND CONSTRUCTION 1. Provision of Insurance. Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract, policies of insurance of the type and amounts described below and in a form satisfactory to City. Contractor agrees to provide insurance in accordance with requirements set forth here. If Contractor uses existing coverage to comply and that coverage does not meet these requirements, Contractor agrees to amend, supplement or endorse the existing coverage. 2. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 3. Coverage Requirements. A. Workers' Compensation Insurance. Contractor shall maintain Workers' Compensation Insurance providing statutory benefits and Employer's Liability Insurance with limits of at least one million dollars ($1,000,000) each employee for bodily injury by accident and each employee for bodily injury by disease in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with California law for all of the subcontractor's employees. The insurer issuing the Workers' Compensation insurance shall amend its policy by endorsement to waive all rights of subrogation against City, its elected or appointed officers, agents, officials, employees, volunteers, and any person or entity owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services contemplated by this Contract. Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its elected or appointed officers, agents, officials, employees, volunteers, and any person or entity owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services contemplated by this Contract. B. General Liability Insurance. Contractor shall maintain commercial general liability insurance, and if necessary umbrella liability insurance, with coverage at least as broad as provided by Insurance Services Office form CG 00 01, in an amount not less than one million dollars ($1,000,000) per occurrence, two million dollars ($2,000,000) general aggregate and two Crosstown Electrical & Data, Inc. Page C-1 million dollars ($2,000,000) completed operations aggregate. The policy shall cover liability arising from premises, operations, products -completed operations, personal and advertising injury, and liability assumed under an insured contract (including the tort liability of another assumed in a business contract). C. Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of Contractor arising out of or in connection with Work to be performed under this Contract, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit for each accident. 4. Other Insurance Requirements. The policies are to contain, or be endorsed to contain, the following provisions: A. Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this Contract shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees, volunteers, and any person or entity owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services contemplated by this Contract or shall specifically allow Contractor or others providing insurance evidence in compliance with these requirements to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors. B. Additional Insured Status. All liability policies including general liability, products and completed operations, excess liability, pollution liability, and automobile liability, if required, shall provide or be endorsed to provide that City, its elected or appointed officers, agents, officials, employees, volunteers, and any person or entity owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services contemplated by this Contract shall be included as additional insureds under such policies. C. Primary and Non Contributory. Contractor's insurance coverage shall be primary insurance and/or the primary source of recovery with respect to City, its elected or appointed officers, agents, officials, employees, volunteers, and any person or entity owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services contemplated by this Contract. Any insurance or self-insurance maintained by City shall be excess of Contractor's insurance and shall not contribute with it. Crosstown Electrical & Data, Inc. Page C-2 D. Notice of Cancellation. All policies shall provide City with thirty (30) calendar days' notice of cancellation or nonrenewal of coverage (except for nonpayment for which ten (10) calendar days' notice is required) for each required coverage except Builders Risk Insurance, which shall contain an endorsement with said required notices. 5. Additional Agreements Between the Parties. The parties hereby agree to the following.- A. ollowing: A. Evidence of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation and other endorsements as specified herein for each coverage. All of the executed documents referenced in this Contract must be returned to City within ten (10) regular City business days after the date on the "Notification of Award". Insurance certificates and endorsements must be approved by City's Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Contract. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15) days prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies. City reserves the right to require complete, certified copies of all required insurance policies, at any time. B. City's Right to Revise Requirements. The City reserves the right at any time during the term of the Contract to change the amounts and types of insurance required by giving Contractor ninety (90) calendar days' advance written notice of such change. If such change results in substantial additional cost to Contractor, City and Contractor may renegotiate Contractor's compensation. C. Right to Review Subcontracts. Contractor agrees that upon request, all agreements with subcontractors or others with whom Contractor enters into contracts with on behalf of City will be submitted to City for review. Failure of City to request copies of such agreements will not impose any liability on City, or its employees. Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format at least as broad as CG 20380413. Crosstown Electrical & Data, Inc. Page C-3 D. Enforcement of Contract Provisions. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of non-compliance with any requirement imposes no additional obligations on City nor does it waive any rights hereunder. E. Requirements not Limiting. Requirements of specific coverage features or limits contained in this Exhibit A are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for higher limits maintained by the Contractor. Any available proceeds in excess of specified minimum limits of insurance and coverage shall be available to the City. F. Self -Insured Retentions. Contractor agrees not to self -insure or to use any self-insured retentions on any portion of the insurance required herein and further agrees that it will not allow any indemnifying party to self -insure its obligations to City. If Contractor's existing coverage includes a self-insured retention, the self-insured retention must be declared to City. City may review options with Contractor, which may include reduction or elimination of the self-insured retention, substitution of other coverage, or other solutions. Contractor agrees to be responsible for payment of any deductibles on their policies. G. City Remedies for Non Compliance. If Contractor or any subcontractor fails to provide and maintain insurance as required herein, then City shall have the right but not the obligation, to purchase such insurance, to terminate this Contract, or to suspend Contractor's right to proceed until proper evidence of insurance is provided. Any amounts paid by City shall, at City's sole option, be deducted from amounts payable to Contractor or reimbursed by Contractor upon demand. H. Timely Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor's performance under this Contract, and that involve or may involve coverage under any of the required liability policies. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. Coverage not Limited. All insurance coverage and limits provided by Contractor and available or applicable to this Contract are intended to apply to the full extent of the policies. Nothing contained in this Contract or any other agreement relating to City or its operations limits the application of such insurance coverage. Crosstown Electrical & Data, Inc. Page C-4 J. Coverage Renewal. Contractor will renew the coverage required here annually as long as Contractor continues to provide any Work under this or any other Contract or agreement with City. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Contract have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contractor's insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specifications applicable to the renewing or new coverage must be provided to City with five (5) calendar days of the expiration of the coverages. K. Maintenance of General Liability Coverage. Contractor agrees to maintain commercial general liability coverage for a period of ten (10) years after completion of the Project or to obtain coverage for completed operations liability for an equivalent period. Crosstown Electrical & Data, Inc. Page C-5 Reyes, Raymund From: Customer Service <customerservice@ebix.com> Sent: Thursday, May 14, 2020 4:53 PM To: Reyes, Raymund; Insurance Cc: sagar@ebix.com Subject: Compliance Alert -Vendor Number FV00000050 [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. This Account has moved from non-compliant to COMPLIANT status and is currently in compliance for certificate of insurance requirements. FV00000050 Crosstown Electrical & Data, Inc. Sent by Ebix, designated insurance certificate reviewer for the City of Newport Beach. City of Newport Beach TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 Contract No. 7818-1 PROPOSAL (Contractor shall submit proposals via the PROPOSAL (Bid Line Items) contained in PlanetBids. Contractor shall sign the below acknowledgement) To the Honorable City Council City of Newport Beach 100 Civic Center Drive Newport Beach, California 92660 Gentlemen: The undersigned declares that he has carefully examined the location of the work, has read the Instructions to the Bidders, has examined the Plans and Special Provisions, and hereby proposes to furnish all materials except that material supplied by the City and shall perform all work required to complete Contract No. 7818-1 in accordance with the Plans and Special Provisions, and will take in full payment therefore the following unit prices for the work, complete in place, to wit: 3/5/2020 Date 626-813-6693 1 626-869-0192 Bidder's Telephone and Fax Numbers 756309 ; A, C-10 Bidder's License No(s). and Classification(s) 1000000155 DIR Registration No. Crosstown Electrical & Data, Inc. Bidde resident Bidder',KAuthorizard Signature and Title 5454 Diaz St Irwindale, CA 91706 Bidder's Address Bidder's email address: DAVE@CROSSTOWNDATA. COM PR -1 City of Newport Beach Paye 1 TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 (C-7818-1), bidding on March 9. 2020 10:00 AM (Pacific) Panted 03 09/2020 Bid Results Bidder Details Vendor Name Crosstown Electrical & Data, Inc. Address 5454 Diaz St. Irwindale. CA 91706 United States Respondee David P. Heermance Respondee Title President Phone 626-813-6693 Ext. Email dave �_d)cross towndata.corn Vendor Type DGS;CADIR License # 756309 CADIR 1000000155 Bid Detail Bid Format Electronic Submitted March 9, 2020 9:30:42 AM (Pacific) Delivery Method Bid Responsive Bid Status Submitted Confirmation # 204300 Ranking 0 Respondee Comment Buyer Comment Attachments File Title File Name File Type BID SUBMITTAL C -7818 -1 -CROSSTOWN BID SUBMITTAL 11-7818-1 CROSSTOWN pdf General Attachment BID BOND C-7818-1 Crosstown Electrical & Data, Inc. Newport Beach Bid Bond.pdf Bid Bond Line Items Type Item Code UOM Qty Unit Price Line Total Comment Section 1 1 Mobilization LS 1 S8000000 S80 000 OG 2 Traffic, Control LS 1 S20,000 00 S201000 06 3 Provide As -Built Plans LS 1 $500 00 $500 OG 4 Remove and Reconstruct P.0 C Access Ramp EA 8 $8,825 00 5701600 06 5 Remove and Reconstruct P C.0 Sidewalk SF 3654 51100 S401194 GC, City of Newport Beach Description Page 2 TRAFFIC SIGNAL REHABILITATION PROGRAM FY 2019-2020 (C -7818-1j; bidding on March 9, 2020 10:00 AM (Pacific) Prntei 0109/2020 Bid Results Loops 614518 Type Item Code UOM Qty Unit Price Line Total Comment 6 Remove and Reconstruct P.C.C. Commercial Drivevvav Type I EA 1 $6,70000 $6:700.00 7 Irvine Avenue at University Drive Traffic Signal Modification LS 1 $267,500.00 $267 500 00 8 Irvine Avenue at University Drive Temporary Traffic Signal Operation All American Asphalt LS 1 $8,250.00 $8,25QOG 9 Superior Avenue at Hospital Road Traffic Signal Modification 400 E. Sixth Street LS 1 $205;000.00 $205;000.06 10 Superior Avenue at Hospital Road Temporary Traffic Signal Operation LS 1 $7,250.00 $7,25000 11 San Miguel Drive at Port Ramsey Place Traffic Signal Modification LS 1 $180,0OO.OG $180;000.00 12 San Miguel Drive at Port Ramsey Place Temporary Traffic Signal Operation 1000407561 $8.773.00 LS 1 $7250,00 $7250,00 Subtotal $893,244.00 Total $893,244.00 Subcontractors Name & Address Description License Num CADIR Amount Type SMITHSON ELECTRIC INC Loops 614518 1000001610 $14,660.00 1938 E KATELLA AVE ORANGE, CA 92667 United States All American Asphalt CivilCurb Ramps 267073 1000001051 $112.540.00 400 E. Sixth Street Corona, CA 92878 United States BC Traffic Specialist Striping 877686 1000407561 $8.773.00 638 W Southern Ave Orange; CA 9286.5 United States CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT PO T -4t U ADDENDUM NO. 1 Traffic Signal Rehabilitation FY 2019-2020 CONTRACT NO. 7818-1 DATE: BY: City Engineer TO: ALL PLANHOLDERS The following changes, additions. deletions, or clarifications shall be made to the Contract Documents - all other conditions shall remain the same BID OPENING DATE THE BID OPENING DATE HAS BEEN CHANGED TO: MARCH 9, 2020 at 10:00 a.m. SPECIAL PROVISIONS CLARIFICATION - SECTION 310-1 GENERAL All new traffic signal standards, poles, mast arms and luminaire arms shall be galvanized, not painted. Bidders must sign this Addendum No. 1 and attach it to the bid proposal. No bid will be considered unless this signed Addendum is attached. I have carefully examined this Addendum and have included full payment in my Proposal. CROSSTOWN ELECTRICAL & DATA, INC. Bidder's Name (Please Print) DAVID P. HEERMANCE, PRESIDENT Dain 912020 PRESIDENT Au ori* tigr;aitdre & Title CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT INDEX FOR SPECIAL PROVISIONS TRAFFIC SIGNAL REHABILITATION PROGRAM 20T01 FY 2019-2020 CONTRACT NO. 7818-1 PART 1 - GENERAL PROVISIONS 1 SECTION 1— TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1 1-2 TERMS AND DEFINITIONS 1 SECTION 2 - SCOPE AND CONTROL OF THE WORK 2-1 AWARD AND EXECUTION OF THE CONTRACT 2-1.1 Contractor's Qualifications 2-5 PLANS AND SPECIFICATIONS 2-5.2 Precedence of Contract Documents 2-6 WORK TO BE DONE 2-9 SURVEYING 2-9.1 Permanent Survey Markers 2-9.2 Survey Service SECTION 3 — CHANGES IN WORK 3-3 EXTRA WORK 3-3.2 Payment 3-3.2.2 Basis for Establishing Cost 3-3.2.3 Markup SECTION 4 - CONTROL OF MATERIALS 4-1 MATERIALS AND WORKMANSHIP 4-1.3 Inspection Requirements 4-1.3.1 General SECTION 5 - UTILITIES 5-1 LOCATION 5-1.1 General 5-2 PROTECTION 5-4 RELOCATION 2 2 2 2 2 3 3 3 3 4 4 4 4 4 4 4 4 4 5 5 5 5 5 SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK 6 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 6 6-1.1 Construction Schedule 6 6-7 TIME OF COMPLETION 7 6-7.1 General 7 6-7.2 Scheduling of Traffic Signal Work 8 6-8 COMPLETION, ACCEPTANCE, AND WARRANTY 9 6-9 LIQUIDATED DAMAGES 9 SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 10 7-1 THE CONTRACTOR'S EQUIPMENT AND FACILITIES 10 7-1.2 Temporary Utility Services 10 7-2 LABOR 10 7-2.2 Prevailing Wages 10 7-7 COOPERATION AND COLLATERAL WORK 10 7-8 WORK SITE MAINTENANCE 11 7-8.4 Storage of Equipment and Materials 11 7-8.4.2 Storage in Public Streets 11 7-8.6 Water Pollution Control 11 7-8.6.2 Best Management Practices (BMPs) 11 7-10 SAFETY 11 7-10.3 Haul Routes 11 7-10.4 Safety 12 7-10.4.1 Work Site Safety 12 7-10.5 Security and Protective Devices 12 7-10.5.3 Steel Plate Covers 12 SECTION 9 - MEASUREMENT AND PAYMENT 12 9-2 LUMP SUM WORK 12 9-3 PAYMENT 12 9-3.1 General 12 9-3.2 Partial and Final Payment. 15 PART 2 - CONSTRUCTION MATERIALS 15 SECTION 200 — ROCK MATERIALS 15 200-2 UNTREATED BASE MATERIALS 15 200-2.1 General 15 SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS 15 201-1 PORTLAND CEMENT CONCRETE 15 201-1.1 Requirements 15 201-1.1.2 Concrete Specified by Class and Alternate Class 15 201-2 REINFORCEMENT FOR CONCRETE 15 201-2.2 Steel Reinforcement 15 201-2.2.1 Reinforcing Steel 15 SECTION 214 —TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS AND PAVEMENT MARKERS 16 214-4 PAINT FOR STRIPING AND MARKINGS 16 214-4.1 General 16 214-6 PAVEMENT MARKERS 16 214-6.3 Non -Reflective Pavement Markers 16 214-6.3.1 General 16 214-6.4 Retroreflective Pavement Markers 16 214-6.4.1 General 16 PART 3 - CONSTRUCTION METHODS 16 SECTION 300 - EARTHWORK 16 300-1 CLEARING AND GRUBBING 16 300-1.3 Removal and Disposal of Materials 16 300-1.3.1 General 16 300-1.3.2 Requirements 17 SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION 17 303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS AND DRIVEWAYS 17 303-5.1 Requirements 17 303-5.1.1 General 17 303-5.5 Finishing 17 303-5.5.2 Curb 17 303-5.5.4 Gutter 18 SECTION 310 — PAINTING 310-1 GENERAL. 18 18 SECTION 314—TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS 18 314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS 18 314-4.1 General 18 314-4.2 Control of Alignment and Layout 19 314-4.2.1 General 19 314-4.4 Thermoplastic Traffic Striping and Pavement Markings 19 314-4.4.1 General 19 314-4.4.2 Surface Preparation 19 314-5 PAVEMENT MARKERS 19 314-5.1 General 19 SECTION 315 - TRAFFIC SIGN INSTALLATION 19 PART 6 - TEMPORARY TRAFFIC CONTROL 20 SECTION 600 - ACCESS 20 600-1 GENERAL 20 600-2 VEHICULAR ACCESS 20 600-3 PEDESTRIAN ACCESS 20 SECTION 601— WORK AREA TRAFFIC CONTROL 21 601-1 GENERAL 21 601-2 TRAFFIC CONTROL PLAN (TCP) 21 PART 7 - STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS 22 SECTION 700 - MATERIALS 22 700-3 COMMON COMPONENTS 22 700-3.1 General. 22 700-3.3 Standards. 22 700-3.5 Conduit 23 700-3.7 Pull Boxes 24 700-4 STREET LIGHTING SYSTEM MATERIALS. 25 700-4.9 LED Luminaires 25 700-5 TRAFFIC SIGNAL MATERIALS 26 700-5.3 Conductors and Cable. 26 700-5.3.3 Interconnect Cable. 26 700-5.3.4 Fiber Optic Cable. 28 700-5.4 Controllers. 35 700-5.4.3 Cabinets. 35 700-5.5 Traffic Signal Faces and Fittings. 41 700-5.6 Pedestrian Signal Sections. 41 700-5.9 Pedestrian Push Button Assemblies. 42 700-5.8 Detectors. 42 700-6 FIBER OPTIC EQUIPMENT 42 700-6.1 Fiber Patch Panel/Wall Interconnect Unit. 700-6.2 Fiber Distribution Unit (FDU). 700-6.3 Splice Closure. 700-6.4 Ethernet System. 700-7 CCTV SYSTEM 700-8 OPTICOM PRIORITY CONTROL SYSTEM 700-9 BATTERY BACKUP SYSTEM 700-10 LED INTERNALLY ILLUMINATED STREET NAME SIGNS. SECTION 701— CONSTRUCTION 701-1 GENERAL 701-8 FOUNDATIONS, FOUNDATION CAPS AND SLABS 701-8.2 Foundations. 701-11 PULL BOXES 701-12 CONDUIT 701-14 SERVICES 701-17 TRAFFIC SIGNAL CONSTRUCTION 701-17.4 Wiring, Conductors and Cable. 701-17.4.4 Interconnect. 701-17.4.5 Fiber Optic Cable. 701-17.6 Detectors. 701-17.6.3 Inductive Loop Detectors 42 43 44 46 47 48 48 49 50 50 53 53 53 54 56 57 57 57 57 67 67 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT SPECIAL PROVISIONS TRAFFIC SIGNAL REHABILITATION PROGRAM 20T01 FY 2019-2020 CONTRACT NO. 7818-1 INTRODUCTION All work necessary for the completion of this contract shall be done in accordance with (1) these Special Provisions; (2) the Plans (Drawing No. T -6050-S); (3) the City's Design Criteria, Standard Special Provisions and Standard Drawings for Public Works Construction, (2004 Edition), including Supplements; (4) Standard Specifications for Public Works Construction (2018 Edition) including supplements; (5) Standard Specifications and the Standard Plans of the State of California Department of Transportation (2015 Edition); and (6) Standard Specifications and the Standard Plans of the State of California Department of Transportation (2010 Edition — For traffic signal standards/poles, foundations, anchor bolts and ancillary items only). The City's Desiqn Criteria, Standard Special Provisions and Standard Drawings for Public Works Construction are available at the following website: hftp://www.newportbeachca.gov/government/departments/public-works/resources Copies of the Standard Specifications for Public Works Construction may be purchased from Building News, Inc., 1612 South Clementine Street, Anaheim, CA 92802, 714-517- 0970. The following Special Provisions supplement or modify the Standard Specifications for Public Works Construction as referenced and stated hereinafter: PART 1 - GENERAL PROVISIONS SECTION 1 — TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-2 TERMS AND DEFINITIONS Add the following definition.- City efinition: City — City of Newport Beach Page 1 of 68 SECTION 2 - SCOPE AND CONTROL OF THE WORK 2-1 AWARD AND EXECUTION OF THE CONTRACT At the time of the award and until completion of work, the Contractor shall possess a "C- 10" license. At the start of work and until completion of work, the Contractor and all Subcontractors shall possess a valid Business License issued by the City. 2-1.1 Contractor's Qualifications General This section describes mandatory experience requirements for Contractors and/or Subcontractor(s) bidding on this project. Contractors and/or Subcontractor(s) not meeting the requirements of this section will have their bid deemed non-responsive. Requirements In addition to having sufficient experience in the electrical work regarding traffic signal modifications, the Contractors and/or Subcontractor(s) shall have sufficient experience in the installation and integration of fiber optic cable, closed circuit television (CCTV) cameras, and electronic communication equipment. The minimum requirements for sufficient experience are as follows: 1. The Contractor (or its Subcontractor(s)) shall have three (3) years' experience in the installation of fiber optic cables, including fusion splicing, terminating and testing of single -mode fiber optic cable. 2. The Contractor (or its Subcontractor(s)) shall have completed at least two (2) systems where fiber optic cables were installed in outdoor conduits and the systems have been in continuous satisfactory operation for at least one year. 3. The Contractor (or its Subcontractor(s)) shall have completed at least two (2) systems where communications equipment was installed in and the systems have been in continuous satisfactory operation for at least one year. 4. The Contractor (or its Subcontractor(s)) shall have completed at least two (2) systems where CCTV cameras and associated equipment were installed in and the systems have been in continuous satisfactory operation for at least one year. Each qualifying project must have included at least two (2) miles of underground conduit with fiber optic cabling. In addition, each qualifying project must have been constructed within a public street or within a public easement. 2-5 PLANS AND SPECIFICATIONS 2-5.2 Precedence of Contract Documents If there is a conflict or discrepancy between different Contract Documents, the more stringent requirement as determined by the Engineer shall control. Page 2 of 67 2-6 WORK TO BE DONE The work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at three intersections, installation of CCTV equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, installation/modification of concrete curb access ramps and sidewalk panels, installation/modification of signage, striping, and curb markings, and other items shown on, but not limited to plan T -6050-S. 2-9 SURVEYING 2-9.1 Permanent Survey Markers Delete the second paragraph and replace with the following: The Contractor shall submit to the Engineer, a minimum of 7 days prior to the start of work, a list of controlling survey monuments, which may be disturbed. The Contractor will: a) set survey points outside the affected work area that reference and locate each controlling survey monument that may be disturbed, b) file a Corner Record or Record of Survey with the County Surveyor after setting the survey points to be used for re-establishment of the disturbed controlling survey monuments, and c) file a Corner Record or Record of Survey with the County Surveyor after reestablishment of the disturbed (permanent) controlling survey monuments. The Contractor shall protect all survey monuments during construction operations. In the event that existing survey monuments are removed or otherwise disturbed during the course of work, the Contractor shall restore the affected survey monuments at his sole expense. The Contractor's Licensed Surveyor shall file the required Corner Record or Record of Survey with the County Surveyor upon monument restoration. Existing street centerline ties and property corner monuments are to be preserved. The Contractor shall be responsible for the cost of restoring all survey ties and/or monuments damaged by the Work. 2-9.2 Survey Service Delete this section and replace with the following: The Contractor's California Licensed Land Surveyor shall utilize/follow the existing City survey records used for the project design to provide all construction survey services that are required to construct the improvements. Page 3 of 67 SECTION 3 — CHANGES IN WORK 3-3 EXTRA WORK 3-3.2 Payment 3-3.2.2 Basis for Establishing Cost 3-3.2.2.3 Tool and Equipment Rental Tool and equipment rental rates shall be based on the current Caltrans rental rates. 3-3.2.3 Markup 3-3.2.3.1 Work by the Contractor Delete this section and replace with the following: The following percentages shall be added to the Contractor's costs (prior to any markups) and shall constitute the markup for all overhead and profit: 1) Labor ............................................ 15 2) Materials ....................................... 15 3) Equipment Rental ........................... 15 4) Other Items and Expenditures ........... 15 3-3.2.3.2 Work by a Subcontractor Delete this section and replace with the following: When all or any part of the extra work is performed by a Subcontractor, the markup established in Section 3-3.2.3.1 shall be applied by the Subcontractor to the actual costs (prior to any markups) and shall constitute the markup for all overhead and profit. An additional markup of five (5) percent of the subcontracted actual cost (prior to any markups) may be added by the Contractor. To the sum of the costs and markups provided for in this subsection, one (1) percent may be added for compensation for bonding. SECTION 4 - CONTROL OF MATERIALS 4-1 MATERIALS AND WORKMANSHIP 4-1.3 Inspection Requirements 4-1.3.1 General All material and articles furnished by the Contractor shall be subject to rigid inspection, and no material or article shall be used until it has been inspected and accepted by the Engineer. The Contractor shall furnish the Engineer with full information as to the progress of the work in its various parts and shall give the Engineer timely (48 -hours Page 4 of 67 minimum) notice of the Contractor's readiness for inspection. Submittals are required for all construction material. The Engineer shall select an independent testing laboratory and pay for all testing as specified in the various sections of the Standard Special Provisions and these Special Provisions. When, in the opinion of the Engineer, additional tests and retesting due to failed tests or inspections are required because of unsatisfactory results in the manner in which the Contractor executed the work, such tests and inspections shall be paid for by the Contractor. SECTION 5 - UTILITIES 5-1 LOCATION 5-1.1 General The Contractor is responsible for, and shall at his or her expense, pothole all existing utilities which may be affected by the work to verify points of connection and potential conflicts. No segment of work shall begin until the contractor has potholed and verified points of connection and related connection material requirements, and coordinated the final/existing layout of the laterals/pipeline with the Engineer, including adjustments due to field conflicts with other utilities or structures above or below ground. In addition, the Contractor shall pothole all signal mast arm pole foundation locations as the first order of work prior to placing the traffic signal poles order, with a pothole size equal to the corresponding foundation diameter and eight (8) foot depth for each signal location. After potholing, the Contractor shall restore the sidewalk pedestrian areas with concrete and maintain these areas for the duration of the project until final reconstruction is complete. Within seven (7) calendar days after completion of the work or phase of work, the Contractor shall remove all USA utility markings. Removal by sand blasting is not allowed. Any surface damaged by the removal effort shall be repaired to its pre - construction condition or better at the contractor's expense. 5-2 PROTECTION In the event that an existing pull box, meter box or any other utility box is damaged by the Work and is not re -useable, the Contractor shall provide and install a new replacement pull box, meter box or any other utility box of identical type and size at no additional cost to the City. 5-4 RELOCATION All City owned pull boxes, water meter boxes, water valve boxes, sewer cleanout boxes and survey monument boxes (collectively known as "utility boxes") which are affected by the Work shall be replaced to finish grade with new utility boxes. During asphalt paving Page 5 of 67 operation, manholes within paving area shall be temporarily lowered and covered. Upon completion of paving operation, manholes shall be permanently adjusted to finish grade. The Contractor will be required to contact Southern California Edison, The Gas Company, cable television companies, telecommunication companies and any other utility companies to have their existing utilities adjusted to finish grade. The Contractor shall coordinate with each utility company for the adjustment of their facilities in advance of work to avoid potential delays to the project schedule. The Contractor shall provide the necessary survey control for all utility companies to adjust boxes and vaults to the final grade. The Contractor will be required to coordinate with these companies for inspection of the work. SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 6-1.1 Construction Schedule No work shall begin until a Notice to Proceed has been issued, a pre -construction meeting has been conducted, and a schedule of work has been approved by the Engineer. The Contractor shall submit a baseline schedule to the Engineer for approval a minimum of five working days prior to the pre -construction meeting. The Engineer will review the baseline schedule and may require the Contractor to modify the schedule to conform to the requirements of the Contract Documents. If work falls behind the approved baseline schedule, the Contractor shall be prohibited from starting additional work until Contractor has exerted extra effort to meet the baseline schedule and has demonstrated the ability to maintain the schedule in the future. Such stoppages of work shall in no way relieve the Contractor from the overall time of completion requirement, nor shall it be construed as the basis for payment of extra work because additional personnel and equipment were required on the job. Contractor shall update the schedule periodically or as directed by the Engineer to reflect any delay or extension of time. In additional, Contractor shall prepare 2 -week look -ahead schedules on a bi-weekly basis with detailed daily activities. The schedule shall detail all planned traffic signal outages ("dark" or "red -flash") taking place at night (Night Work). The scheduling of these items shall be maintained and updated as necessary. The Engineer shall be notified immediately when these items are rescheduled. NOTE: In an effort to expedite the necessary potholing of signal mast arm pole foundation locations prior to placing the traffic signal poles order, the City desires to issue Notice to Proceed to Contractor immediately after contract award. City and Contractor shall coordinate to expedite required paperwork and submittal approval. Page 6 of 67 6-7 TIME OF COMPLETION 6-7.1 General The Contractor shall complete all work under the Contract within 100 consecutive working days after the date on the Notice to Proceed. The Contractor shall ensure the availability and delivery of all material prior to the start of work. Unavailability of material will not be sufficient reason to grant the Contractor an extension of time. Due to the long lead times required for necessary traffic signal equipment, including, but not limited to traffic standards/poles, the Contractor shall submit justification for approval by the Engineer in order to suspend the progression of contract working days. At the end of the suspension period, the Contractor shall diligently prosecute the Work to completion. The following days are designated City holidays and are non -working days: 1. January 1 st (New Year's Day) 2. Third Monday in January (Martin Luther King Day) 3. Third Monday in February (President's Day) 4. Last Monday in May (Memorial Day) 5. July 4th (Independence Day) 6. First Monday in September (Labor Day) 7. November 11 th (Veterans Day) 8. Fourth Thursday and Friday in November (Thanksgiving and Friday after) 9. December 24th, (Christmas Eve) 10. December 25th (Christmas) 11. December 26th thru 30th (City Office Closure) 12. December 31 st (New Year's Eve) If the holiday falls on a Sunday, the following Monday will be considered the holiday. If the holiday falls on a Saturday, the Friday before will be considered the holiday. Normal working hours are limited to 7:30 a.m. to 4:30 p.m., Monday through Friday. The Contractor, subcontractors, suppliers, etc., shall not generate any noise at the work site, storage sites, staging areas, etc., before or after the normal working hours prescribed above. Should the Contractor elect to work on a Saturday, which is outside normal working hours, Contractor must first obtain special permission from the Engineer. The request may be for 8:00 a.m. to 6:00 p.m. on Saturdays only. A request for working outside the normal working hours must be made at least 72 hours in advance of the desired time period. A separate request must be made for each work shift. The Engineer reserves the right to deny any or all such requests. Additionally, the Contractor shall pay for supplemental inspection costs of $146 per hour when such time periods are approved. Page 7 of 67 6-7.2 Scheduling of Traffic Signal Work For all three traffic signal intersection locations, night work shall be included in the bid as part of the Work in order to minimize disruption to the community and shall adhere to the following requirements: A. For each intersection, the Contractor shall plan for four (4) nights of work including, but not limited to, temporary relocation and subsequent replacement of signal cabinet and related electrical conductor work, and signal standard/pole installations. B. Night work hours shall be considered to be from 9:00 p.m. to 6:00 a.m., Sunday night through Friday morning. No work is allowed Friday or Saturday nights. C. The Contractor may request additional nights. All requests must be approved by the Engineer prior to work. D. The Contractor shall notify the Engineer two weeks prior to the start of any requested night work. For further clarification, the Contractor shall use the following parameters to schedule traffic signal work: Daytime Work Normal Working Hours 7:30 am to 4:30 pm Monday thru Friday Lane Closures 9:00 am to 3:00 pm Monday thru Friday Traffic Signal Outages* 9:00 am to 3:00 pm Monday thru Thursday * Planned daytime outages (dark or red -flash) shall be approved by the Engineer prior to work. Night Time Work Working Hours 9:00 pm to 6:00 am I Monday thru Thursday Please note that turn -on of traffic signals shall not begin the functional test on a Friday, weekend, or any day preceding a holiday as outlined above. All turn -ons shall have prior authorization by the Engineer. The Contractor may perform sub -surface work consisting of the installation of conduit, foundations, and detectors, prior to receipt of all electrical materials and equipment. Above -ground signal work shall not commence until such time that the Contractor notifies the Engineer, in writing, of the date that all electrical materials and equipment are received, and said work shall start within 15 days after said date. Above -ground signal work shall be scheduled such that the signal turn -on shall occur within 10 days of the pole installation. All vehicle and pedestrian indications that are to be installed prior to signal turn -on shall be covered until the signal is turned on. Page 8 of 67 Traffic signal modification work shall be phased so that no more than one traffic signal shall be shut -down ("dark" or "red -flash") at the same time. Existing street lighting shall remain in operation until new lighting is operational. All striping, pavement markings, and signing shall be in place prior to signal turn -on and/or opening of street to public travel. Prior to installation of signal detector loops, the location of proposed striping and crosswalks shall be marked in the field and approved by the Engineer. Work sequencing shall prioritize the installation of City -furnished Pole No. 1 (Type 26-4-100) at the San Miguel Drive at Port Ramsey Place intersection. City to furnish pole shaft, mast arm, and luminaire arm. Contractor shall furnish all necessary traffic signal equipment, hardware and appurtenances per Sheet 4 of 5 of the Plans (Drawing No. T -6050-S) and these Special Provisions for all signal operations/indications provided by Pole No. 1. This is a part of the work contained in Bid Items 11 & 12 specified in Section 9-3.1 of these Special Provisions and shall be completed prior to suspending the progression of contract working days. The remainder of the work in Bid Items 11 & 12 may progress after the end of the suspension. 6-8 COMPLETION, ACCEPTANCE, AND WARRANTY Prior to acceptance of work, the Contractor shall submit a full size set of as -built plans to the Engineer. Retention payment and bonds will not be released until the as -built plans are reviewed and approved by the Engineer. A set of approved plans and specifications shall be on the job site at all times. The Contractor shall maintain as -built drawings of all work as the job progresses. A separate set of drawings shall be maintained for this purpose. These drawings shall be up-to-date and reviewed by the Engineer at the time each progress payment is submitted. Any changes to the approved plans that have been made with approval from the Engineer shall be documented on the as -built plans. The Contractor shall maintain books, records, and documents in accord with generally accepted accounting principles and practices. These books, records, and documents shall be retained for at least three years after the date of completion of the project. During this time, the material shall be made available to the Engineer. Suitable facilities are to be provided for access, inspection, and copying of this material. 6-9 LIQUIDATED DAMAGES For each consecutive calendar day after the time specified in Section 6-7.1 for completion of the work, the Contractor shall pay to the City or have withheld from moneys due it, the daily sum of $500.00. Execution of the Contract shall constitute agreement by the City and Contractor that the above liquidated damages per calendar day is the minimum value of the costs and actual damage caused by the failure of the Contractor to complete the Work within the allotted time. Page 9 of 67 The intent of this section is to emphasize to the Contractor the importance of prosecuting the work in an orderly preplanned continuous sequence so as to minimize inconvenience to residences, businesses, vehicular and pedestrian traffic, and the public as a result of construction operations. SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 7-1 THE CONTRACTOR'S EQUIPMENT AND FACILITIES 7-1.2 Temporary Utility Services If the Contractor elects to use City water, Contractor shall arrange for a meter and tender a $973.00 meter deposit with the City. Upon return of the meter to the City, the deposit will be returned to the Contractor, less a $90 monthly charge for meter use, a charge for water usage and any repair charges for damage to the meter. Water used during construction shall be paid for by the Contractor. This includes water for flushing and pressure testing water lines, compaction, dust control, irrigation during maintenance period for landscaping, etc. City shall designate to the Contractor the location of the fire hydrant or other connection acceptable for drawing of construction and temporary water. City reserves the right to limit the location, times and rates of drawing such water. 7-2 LABOR 7-2.2 Prevailing Wages In accordance with California Labor Code Section 1720.9, hauling and delivery of ready - mixed concrete for public works contracts are subject to prevailing wages. 7-7 COOPERATION AND COLLATERAL WORK City forces will perform all shut downs of water, sewer and storm drain facilities as required. The Contractor shall provide the City advanced notice a minimum of seven calendar days prior to the time contractor desires the shutdown these City facilities. A four-hour shut down of water facilities during the daytime hours of 10:00 a.m. to 2:00 p.m. or a six -hour shut down between the nighttime hours of 11:00 p.m. to 5:00 a.m. will be allowed. The Contractor will be responsible for completing all water connections within the time period allowed. The times and dates of any utility to be shut down must be coordinated with the Engineer. It is the Contractor's responsibility to notify the affected businesses and residents of the upcoming water shutdown with a form provided by the Engineer at least 48 hours in advance of the water shut down. Page 10 of 67 7-8 WORK SITE MAINTENANCE 7-8.4 Storage of Equipment and Materials 7-8.4.2 Storage in Public Streets Construction materials and equipment may only be stored in streets, roads, or sidewalk areas if approved by the Engineer in advance. It is the Contractor's responsibility to obtain an area for the storage of equipment and materials. The Contractor shall obtain the Engineer's approval of a site for storage of equipment and materials prior to arranging for or delivering equipment and materials to the site. Prior to move -in, the Contractor shall take photos of the laydown area. The Contractor shall restore the laydown area to its pre -construction condition. The Engineer may require new base and pavement if the pavement condition has been compromised during construction. 7-8.6 Water Pollution Control 7-8.6.2 Best Management Practices (BMPs) The Contractor shall submit a Best Management Practice (BMP) plan for containing any wastewater or storm water runoff from the project site including, but not limited to the following: a. No placement of construction materials where they could enter storm drain system, which includes gutters that lead to catch basins. b. Checking construction vehicles for leaking fluids. c. Providing a controlled area for cleaning or rinse -down activities. d. Monitoring construction activities. e. Minimizing usage of water when saw -cutting and vacuum the residue. f. Providing measures to capture or vacuum -up water contaminated with construction debris. g. Removing any construction related debris on a daily basis. h. Protecting work areas from erosion. The BMP will be approved by the Engineer prior to any work. The City will monitor the adjacent storm drains and streets for compliance. Failure of the Contractor to follow BMP will result in immediate cleanup by City and back -charging the Contractor for all costs plus 15 percent. The Contractor may also receive a separate administrative citation per Section 14.36.030 of the City's Municipal Code. 7-10 SAFETY 7-10.3 Haul Routes Haul routes shall be submitted to the Engineer for review and approval. Page 11 of 67 7-10.4 Safety 7-10.4.1 Work Site Safety The Contractor shall be solely and completely responsible for conditions of the job site, including safety of all persons and property during performance of the work. The Contractor shall fully comply with all state, federal and other laws, rules, regulations, and orders relating to the safety of the public and workers. The right of the Engineer or the City's representative to conduct construction review or observation of the Contractor's performance shall not include review or observation of the adequacy of the Contractor's safety measures in, on, or near the construction site. 7-10.5 Security and Protective Devices 7-10.5.3 Steel Plate Covers Steel plates utilized for trenching shall be the slip resistant type per Caltrans standards. In addition, steel plates on asphalt pavement shall be pinned and recessed flush with existing pavement surface. SECTION 9 - MEASUREMENT AND PAYMENT 9-2 LUMP SUM WORK Contractor shall submit a detailed schedule of value for all lump sum bid items to the Engineer within 15 days after award of contract. 9-3 PAYMENT 9-3.1 General Revise paragraph two to read: The unit and lump sum bid prices for each item of work shown on the proposal shall include full compensation for furnishing the labor, materials, tools, and equipment and doing all the work, including restoring all existing improvements, to complete the item of work in place and no other compensation will be allowed thereafter. Payment for incidental items of work not separately listed shall be included in the prices shown for the other related items of work. The following items of work pertain to the bid items included within the Proposal: Item No. 1 Mobilization: Work under this item shall include, but not be limited to, the cost of all labor, tools, equipment and material costs for providing bonds, insurance and financing, obtaining an equipment and material storage site, construction surveying, preparing and implementing the BMP Plan, preparing and updating construction schedules, providing submittals, attending construction meetings, and all other related work as required by the Contract Documents. This bid item shall also include work to demobilize from the project site including but not limited to site cleanup, removal of USA markings and providing any required documentation as noted in these Special Provisions. Page 12 of 67 Item No. 2 Traffic Control: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for delivering all required notifications and temporary parking permits, posting signs, covering conflicting existing signs, and all costs incurred notifying businesses and residents, preparing traffic control plans, providing the traffic control required by the project including, but not limited to, signs, cones, barricades, flashing arrow boards, K -rails, temporary striping, and flag persons. This item includes providing four (4) Changeable Message Boards (CMBs) and updating messages on the CMBs as requested by the Engineer for the duration of the project. This item also includes furnishing all labor, tools, equipment and materials necessary to comply with the W.A.T.C.H. Manual, latest edition, and City requirements. Item No. 3 Provide As -Built Plans: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for all actions necessary to provide as -built drawings. These drawings must be kept up to date and submitted to the Engineer for review prior to request for payment. An amount of $500.00 is determined for this bid item. The intent of this pre-set amount is to emphasize to the Contractor the importance of as -build drawings. Item No. 4 Remove and Construct P.C.C. Access Ramp: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for removing and disposing the existing access ramp, grading and compacting subgrade, constructing concrete access ramps from BCR to ECR, including raised truncated domes per City of Newport Beach Standard Drawing (CNB STD) No. 181, restoring all existing improvements damaged by the work, and all other work items as required to complete the work in place. Item No. 5 Remove and Construct P.C.C. Sidewalk: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for removing and disposing the existing sidewalk, grading and compacting subgrade, constructing concrete sidewalk per CNB STD No. 180-L, installing expansion joint material, constructing weakened plane joints, restoring all existing improvements damaged by the work, and all other work items as required to complete the work in place. Item No. 6 Remove and Construct P.C.C. Commercial Driveway, Type I: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for removing and disposing the existing commercial driveway, grading and compacting subgrade, constructing commercial driveway per CNB STD No. 160 -L-A at Superior Avenue at Hospital Road intersection, restoring all existing improvements damaged by the work, and all other work items as required to complete the work in place. Item No. 7 Irvine Avenue at University Drive Traffic Signal Modification: Work under this item shall include the cost of all labor, equipment and materials, including potholing and exploratory work, required to modify the traffic signal at the Irvine Avenue at University Drive intersection per the Plans and the Special Provisions. This item excludes work related to Bid Items 4 and 5 above. Page 13 of 67 Item No. 8 Irvine Avenue at University Drive Temporary Traffic Signal Operation: Work under this item may include, but not be limited to, temporary relocation of the traffic signal cabinet, temporary traffic signal poles, and temporary traffic signal wiring to maintain traffic signal operation at the Irvine Avenue at University Drive intersection, including pedestrian and bike push buttons per the Plans and the Special Provisions. Vehicle detection may be excluded from the temporary operation of the traffic signal. NOTE: The contractor shall review the location. Temporary overhead wiring is intended to limit required signal outages. The bid shall include items needed to complete the overhead wiring. Other methods may be considered during construction and must be approved by the City. Should other methods be approved that convenience the contractor, payment for some, or all, of this bid item may be reduced by the City dependent on work performed. Item No. 9 Superior Avenue at Hospital Road Traffic Signal Modification: Work under this item shall include the cost of all labor, equipment and materials, including potholing and exploratory work, required to modify the traffic signal, including striping, at the Superior Avenue at Hospital Road intersection per the Plans and the Special Provisions. This item excludes work related to Bid Items 4, 5, and 6 above. Item No. 10 Superior Avenue at Hospital Road Temporary Traffic Signal Operation: Work under this item may include, but not be limited to, temporary relocation of the traffic signal cabinet, temporary traffic signal poles, and temporary traffic signal wiring to maintain traffic signal operation at the Superior Avenue at Hospital Road intersection, including pedestrian and bike push buttons per the Plans and the Special Provisions. Vehicle detection may be excluded from the temporary operation of the traffic signal. NOTE: The contractor shall review the location. Temporary overhead wiring is intended to limit required signal outages. The bid shall include items needed to complete the overhead wiring. Other methods may be considered during construction and must be approved by the City. Should other methods be approved that convenience the contractor, payment for some, or all, of this bid item may be reduced by the City dependent on work performed. Item No. 11 San Miguel Drive at Port Ramsey Place Traffic Signal Modification: Work under this item shall include the cost of all labor, equipment and materials, including potholing and exploratory work, required to modify the traffic signal at the San Miguel Drive at Port Ramsey Place intersection per the Plans and the Special Provisions. This item excludes work related to Bid Items 4 and 5 above. Item No. 12 San Miguel Drive at Port Ramsey Place Temporary Traffic Signal Operation: Work under this item may include, but not be limited to, temporary relocation of the traffic signal cabinet, temporary traffic signal poles, and temporary traffic signal wiring to maintain traffic signal operation at the San Miguel Drive at Port Ramsey Place intersection, including pedestrian and bike push buttons per the Plans and the Special Page 14 of 67 Provisions. Vehicle detection may be excluded from the temporary operation of the traffic signal. NOTE: The contractor shall review the location. Temporary overhead wiring is intended to limit required signal outages. The bid shall include items needed to complete the overhead wiring. Other methods may be considered during construction and must be approved by the City. Should other methods be approved that convenience the contractor, payment for some, or all, of this bid item may be reduced by the City dependent on work performed. 9-3.2 Partial and Final Payment. From each progress payment, five (5) percent will be retained by the City, and the remainder less the amount of all previous payments will be paid. Partial payments for mobilization and traffic control shall be made in accordance with Section 10264 of the California Public Contract Code. PART 2 - CONSTRUCTION MATERIALS SECTION 200 — ROCK MATERIALS 200-2 UNTREATED BASE MATERIALS 200-2.1 General Crushed Miscellaneous Base (CMB) shall be used as the untreated base material. SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS 201-1 PORTLAND CEMENT CONCRETE 201-1.1 Requirements 201-1.1.2 Concrete Specified by Class and Alternate Class Portland cement concrete shall be Class 560-C-3250 unless shown otherwise on the plans. 201-2 REINFORCEMENT FOR CONCRETE 201-2.2 Steel Reinforcement 201-2.2.1 Reinforcing Steel Reinforcing steel shall be Grade 60 steel conforming to ASTM A 615 with 2 -inch minimum cover unless shown otherwise on the plans. Page 15 of 67 SECTION 214 — TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS AND PAVEMENT MARKERS 214-4 PAINT FOR STRIPING AND MARKINGS 214-4.1 General Temporary striping shall be Rapid Dry paint. Final striping shall be reflectorized thermoplastic. 214-6 PAVEMENT MARKERS All pavement markers shall comply with Section 81-3 Pavement Markers of the Caltrans Standard Specifications. 214-6.3 Non -Reflective Pavement Markers 214-6.3.1 General All new non -reflective pavement markers Types A and AY shall be ceramic. 214-6.4 Retroreflective Pavement Markers 214-6.4.1 General All retroreflective pavement markers shall be 3M Series 290 with glass -covered faces, or approved equal. PART 3 - CONSTRUCTION METHODS SECTION 300 - EARTHWORK 300-1 CLEARING AND GRUBBING 300-1.3 Removal and Disposal of Materials Removal and disposal of material shall be done by City approved licensed and Franchised Commercial Solid Waste Haulers. A current list of approved haulers can be found on the City's website at: http://newportbeachca.gov/index.aspx?page=157 and then selecting the link for Franchised Haulers List. 300-1.3.1 General The Contractor shall maintain the job site in a clean and safe condition. The Contractor shall remove any broken concrete, debris or other deleterious material from the job site at the end of each workday or as directed by the Engineer. All areas of roadway removal and replacement shall have a minimum trench width of 3 -feet to facilitate maximum Page 16 of 67 compaction. Contractor shall meet with the Engineer to mark out the areas of roadway removal and replacement. Non -reinforced concrete and asphalt wastes generated from the job site shall be disposed of at a facility that crushes such materials for reuse. Excess soil and other recyclable solid wastes shall not be disposed of at a sanitary landfill. The Contractor shall maintain monthly tonnage records of total solid wastes generated and solid wastes disposed of at a sanitary landfill. The Contractor shall report said tonnage monthly to the Engineer and provide appropriate confirmation documentation from the recycling facility. All material disposal manifests shall be provided to the Engineer prior to release of final retention. The Contractor shall dispose of all excess or waste material and shall include all fees for such disposal in the appropriate bid items. 300-1.3.2 Requirements (c) Concrete Curb, Walk, Gutters, Cross Gutters, Driveway, and Alley Intersections. Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of two (2) inches. Joins to existing pavement lines shall be full depth sawcuts. Final removal between the sawcut lines may be accomplished by the use of jackhammers or sledgehammers. Pavement breakers or stompers will not be permitted on the job. The Engineer must approve final removal accomplished by other means. SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION 303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS AND DRIVEWAYS 303-5.1 Requirements 303-5.1.1 General Sidewalks and curb access ramps shall be opened to pedestrian access on the day following concrete placement. In addition, all forms shall be removed, irrigation systems shall be repaired, and backfill or asphalt concrete patchback shall be placed within 72 hours following concrete placement. 303-5.5 Finishing 303-5.5.2 Curb The Contractor shall install or replace curb markings that indicate sewer laterals on the face of the curb. The Contractor shall mark the curb with a chiseled "S" for sewer. A two (2) day notice to the Engineer is required for requests to the City to determine the location of sewer laterals. Page 17 of 67 303-5.5.4 Gutter The Contractor shall hold the flow line tolerances to within 0.01 feet of those elevations shown on the plan. SECTION 310 — PAINTING 310-1 GENERAL. All new traffic signal standards, poles and mast arms shall be coated as detailed below: • Galvanize: The product shall be galvanized in accordance with ASTM 123; • Surface Preparation: Brush blast exterior surface to SSP7 specifications; • Application Instructions: The product shall be painted prior to delivery to the job site. Apply in conformance to the manufacturer's instructions. The total application shall be 10 to 16 mils D.F.T. consisting of 5-8 mils of epoxy primer and 5-8 mils of gloss urethane color top coat. • Touch Up: The manufacturer shall provide extra coating for field touch up due to transportation and handling. Other items to be coated shall be properly pretreated with environmentally safe, ultraviolet resistant, polyester powder coating, which shall be applied electro statically at 90 kV. and baked for 20 minutes at 375 degrees F, per ASTM D-3359, ASTM D-3363 and ASTM D-522. SECTION 314 — TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS 314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS 314-4.1 General The layout for all proposed traffic striping and pavement markings shall be pre -marked and/or cat -tracked and approved by the engineer or his representative prior to application. Temporary painted traffic striping and markings shall be applied in one coat, as soon as possible and within 24 hours after the finish course has been placed. Reflectorized glass beads or other retroreflective material shall be added to the installation of temporary paint striping. In addition to temporary pavement tabs, crosswalks shall be restriped as soon as possible, within 24 hours. Crosswalks shall not be left unpainted overnight. Page 18 of 67 314-4.2 Control of Alignment and Layout 314-4.2.1 General The Contractor shall perform all layout, alignment, and spotting. The Contractor shall be responsible for the completeness and accuracy of all layout alignment and spotting. Traffic striping shall not vary more than 1/2 inch in 40 feet from the alignment shown on the plans. The Contractor shall mark or otherwise delineate the new traffic lanes and pavement markings within 24 hours after the removal or covering of existing striping or markings. No street shall be without proper striping over a weekend or holiday. Stop bars shall not remain unpainted overnight. 314-4.4 Thermoplastic Traffic Striping and Pavement Markings 314-4.4.1 General The final reflectorized thermoplastic striping shall not be applied until the finish course pavement or slurry seal has been in place for at least 15 days. The thermoplastic shall be applied at 0.45 mm minimum thickness for all striping except crosswalks and limit lines which shall be 0.90 mm minimum thickness. If the Contractor fails to perform striping as specified herein, the Contractor shall cease all contract work until the striping has been properly performed. Such termination of work shall require the Contractor to re -install "NO PARKING, TOW -AWAY" signs and re -notify the affected residents, at the Contractor's sole expense. In addition, if the Contractor removes/covers/damages existing striping and/or raised pavement markers outside of the work area, he shall re-stripe/replace such work items at no cost to the City. 314-4.4.2 Surface Preparation Primer shall be applied to concrete surfaces prior in application of thermoplastic striping. The primer shall be formulated for the intended application. 314-5 PAVEMENT MARKERS 314-5.1 General Raised pavement markers shall not be placed until the finish course pavement or slurry seal has been in place for at least 15 days. SECTION 315 - TRAFFIC SIGN INSTALLATION Location of traffic signs shown on plans is approximate and shall be approved by the City prior to installation. Regulatory signs on signal standards, poles and mast arms shall be the sized to ensure visibility, e.g. a R3-1 sign shall be 36 -inch by 36 -inch. Signs shall be furnished and installed per CNB STD No. 924-L. Page 19 of 67 PART 6 - TEMPORARY TRAFFIC CONTROL SECTION 600 - ACCESS 600-1 GENERAL Ten (10) working days prior to starting work, the Contractor shall distribute construction notices to residents and businesses immediately adjacent to the project work, describing the project and indicating the limits of construction. The City will provide the notices. Forty-eight (48) hours prior to the start of construction, the Contractor shall distribute to the residents and businesses a second written notice prepared by the City clearly indicating specific dates in the space provided on the notices when construction operations will start for each block or street. An interruption of work at any location in excess of 14 calendar days shall require re -notification. The Contractor shall insert the applicable dates and times at the time the notices are distributed. The written notices will be prepared by the City, but shall be completed and distributed by the Contractor. Errors in distribution, false starts, acts of God, strikes or other alterations of the schedule will require Contractor re -notification using an explanatory letter furnished by the City. 600-2 VEHICULAR ACCESS The Contractor shall install and maintain in place "NO PARKING -TOW AWAY" signs (even if streets have posted "NO PARKING" signs) which shall be posted at least forty- eight hours in advance of the need for enforcement. The signs will be provided by the City at no cost to the Contractor. However, the City reserves the right to charge $2.00 per sign following any excessive abuse or wastage of the signs by the Contractor. In addition, it shall be the Contractor's responsibility to notify the City's Police Department at (949) 644-3717 for verification of posting at least forty-eight hours in advance of the need for enforcement. City "Temporary Tow -Away, No Parking" signs are available at the Public Works Department public counter. The Contractor shall print the hours and dates of parking restriction on the "NO PARKING -TOW AWAY" sign in 2 -inch high non -erase letters and numbers. A sample of the completed sign shall be reviewed and approved by the Engineer prior to posting. 600-3 PEDESTRIAN ACCESS Pedestrian access to all storefronts, offices, residences, etc., within the limits of work must be maintained at all times. The Contractor shall cooperate with the Engineer to provide advance notice to any and all establishments whose access will be impacted by construction operations, particularly sidewalk construction. Page 20 of 67 SECTION 601 — WORK AREA TRAFFIC CONTROL 601-1 GENERAL The Contractor shall furnish and install signage, barricades, delineators, yellow safety ribbons, four (4) changeable message boards (CMBs), and any other measures deemed necessary by the Engineer to safely direct the public around areas of construction, and into and out of the affected establishments. Messages for the CMBs shall be updated by the Contractor as directed by the Engineer. 601-2 TRAFFIC CONTROL PLAN (TCP) The Contractor shall provide traffic control and access in accordance with Section 7-10 of the Standard Specifications and the WORK AREA TRAFFIC CONTROL HANDBOOK (W.A.T.C.H), Latest Edition. Traffic control and detours shall incorporate the following items: 1. Emergency vehicle access shall be maintained at all times. 2. The locations and wordings of all barricades, signs, delineators, lights, warning devices, parking restrictions, and any other required details shall ensure that all pedestrian and vehicular traffic will be handled in a safe manner with a minimum of inconvenience to the public. 3. All advanced warning sign installations shall be reflectorized and/or lighted. 4. The Contractor shall accommodate the City's trash collection. If the Contractor elects to work on a street or alley during its trash collection day, it shall be the Contractor's responsibility to make alternative trash collection arrangements by contacting the City's Refuse Superintendent, at (949) 718-3466 and all affected property owners. 5. At a minimum, the Contractor shall maintain one lane of traffic in each direction at all times when completing the work. For Jamboree Road, the Contractor shall maintain two lanes of traffic in each direction at all times when completing the work. Lane closures shall be approved by the City prior to work. 6. Sidewalk closures in non-residential areas, or as determined by the City, shall be set with barricades and SIDEWALK CLOSED signs on barricades at the closure and SIDEWALK CLOSED USE OTHER SIDE signs on barricades at the closest crosswalk or controlled intersection. 7. Sidewalk closures in residential areas, or as determined by the City, shall be set with barricades and SIDEWALK CLOSED signs on barricades at the closure. Page 21 of 67 8. Bike lane closures shall have BIKE LANE CLOSED AHEAD, BIKE LANE CLOSED, and SHARE THE ROAD/BICYCLE WARNING (combination) signs mounted on barricades in order on the approach and at the closure. 9. Lane closures on Arterial Highways are limited to the hours of 9:00 am to 3:00 pm. Hours may be extended at the request of the Contractor and if approved by the City. 10.Traffic signal outages shall adhere to the parameters in Section 6-7.2 Scheduling of Traffic Signal Work. 11. During a traffic signal outage ("dark" or prolonged "red -flash"), "STOP" signs shall be furnished by the contractor. A minimum of two "STOP" signs shall be placed per approach. Barricades shall be furnished with flashing red lights when deployed at night. Signs shall be retro -reflective and in good condition. Signs will not be necessary during momentary "red -flash" while turning the traffic signal on. 12. Four (4) Changeable Message Boards (CMBs) shall be placed two weeks prior to first planned traffic signal shut -down ("red -flash" or "dark") for each of the traffic signal modification locations. Final locations and messages to be approved by the Engineer. CMBs can be removed after turn -on. 13.The Contractor shall take special care to place construction signs and CMBs to reduce the impact to pedestrians, cyclists and motorists. Where able, shoulder signs may be placed on wide sidewalks where 48 inches of clear pathway may be maintained. PART 7 - STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS SECTION 700 — MATERIALS 700-3 COMMON COMPONENTS 700-3.1 General. Contractor shall furnish all hardware to meet the Caltrans specifications for all new and relocated traffic signal equipment as shown on the plans and detailed within these special provisions. The hardware shall be hot -dip galvanized or stainless steel as detailed. 700-3.3 Standards. Traffic signal standards and poles shall be steel and conform to the 2010 Caltrans Standard Plans and Standard Specifications, including foundations, anchor bolts, and ancillary items. Page 22 of 67 Standards, Poles, Steel Pedestals, and Posts shall be finished per Section 310 - PAINTING of these Special Provisions. 700-3.5 Conduit Traffic Signal and Interconnect It is envisioned that all conduit will be installed by directional drill method and be high density polyethylene (HDPE) Schedule 80 UL continuous conduit. HDPE conduit shall be designed and engineered for direct burial, directionally drilled installation, or encased underground applications, and shall be installed at locations as shown on the plans. The PVC Schedule 80 UL conduit shall be designed and engineered for direct burial or encased underground applications, and shall be installed at the pull box modification locations where conduit elbows are upgraded to sweeps, or as shown on the plans. The PVC conduit shall be straight and the ends shall be cut square to the inside diameter. The PVC conduit system shall be designed so that straight sections and fittings will assemble without the need for lubricants or cement. All conduits shall be free from defects including non -circularity, foreign inclusions, etc. It shall be nominally uniform (as commercially practical) in color, density, and physical properties. If new conduit is being installed into an existing pull box location, the Contractor shall protect existing pull box and conduit from damage. Should the existing pull box and/or conduit become damaged, the Contractor shall repair and/or replace damaged pull box and conduit at the cost of the Contractor and not the City. Prior to repair/replacement, the Contractor shall notify the City of exact location and contents of damaged pull box and conduit. All pavement markings shall be returned to existing conditions. If disturbed, the Contractor shall replace or repair any and all pavement markings. All work shall be approved by the Engineer. The Contractor shall obtain written approval from the Engineer before installing any conduit. Quality Control All conduits furnished, as part of the Contract shall be new, UL -listed, and meet NEMA and NEC requirements pertaining to electrical conduits and components. HDPE Schedule 80 Continuous Conduit The size of the HDPE conduit shall be as shown on the plans and shall meet the following requirements: The HDPE Schedule 80 continuous conduit shall conform to NEMA TC -2 and UL651 B. Page 23 of 67 The conduit leading to splice vaults or pull boxes shall be terminated with a manufacture - produced terminator connector to seal the wall of the spice vault/pull box. The conduit shall be color coded black. The conduit shall also be marked with data traceable to plant location, date, shift, and machine of manufacture. Conduit shall be Carlon or Endot made or approved equal. PVC Schedule 80 Conduit The size of the PVC Schedule 80 conduit shall be as shown on the plans and shall meet the following requirements: The PVC Schedule 80 conduit shall conform to NEMA TC -2 and UL 651 specifications. The conduit shall have an extended 6" integral "bell' end. The conduit shall have a circumferential ring on the spigot end, which shall be used to insure proper insertion depth when connecting conduit ends. The conduit shall also be marked with data traceable to plant location, date, shift, and machine of manufacture. A complete line of fittings, adapters, and bends (sweeps) shall be provided by the conduit manufacturer and shall be manufactured from the same materials and manufacturing process as the conduit. The complete system will allow for all these fittings: Coupling Kits, Manhole Terminator Kits, Lubrication Fittings, and Repair Kits. Conduit shall be Carlon or Endot made or approved equal. Street Lighting Conduit Unless otherwise noted on the plans, street lighting conduit shall be 1-1/4" Schedule 40 PVC. 700-3.7 Pull Boxes Traffic Signal and Interconnect Pull Boxes Pull boxes shall conform to the provisions in the Caltrans Standard Specifications and Standard Plan ES -8 and these Special Provisions. All new pull boxes, each complete with cover, shall be pull box number 6 (PB#6), or pull box B40, as noted on the Plans. P13#6 shall have nominal dimensions of 30.5 inch L x 17.5 inch W x 12 inch D, as stated in these Special Provisions and per the Plans. B40 shall have Page 24 of 67 nominal dimensions of 40.5 inch L x 28.25 inch W x 14 inch D, as stated in these Special Provisions and per the Plans. The cover marking for each pull box containing fiber optic cable shall read "TRAFFIC SIGNAL" on one line and "FIBER OPTIC" on second line. The cover marking for each pull box not containing fiber optic cable shall only read "TRAFFIC SIGNAL" on one line. Pull boxes shall be provided with locking mechanisms as specified in the Caltrans Standard Plans. All splice boxes shall have vertical proof -load strength of 25,000 lbs. This load shall be placed anywhere on the box and cover for a period of one minute without causing any cracks or permanent deformations. Splice boxes shall have nominal dimensions of 36 inch L x 24 inch W x 12 inch D, as stated in these Special Provisions and per the Plans. Where pull boxes are installed in sidewalk, sidewalk shall be removed and replaced from score line to score line as directed by Engineer. Pull boxes and covers in the sidewalk or behind the curb shall be per below, Christy "Fiberlite" models, or Engineer approved equal, unless otherwise noted on the Plans. Size #5 Box #5 Lid #6 Box #6 Lid Splice Box & Lid B40 Box B40 Lid Street Lighting Pull Boxes Approved Models Christy N30 Electrical Box Christy FL30T Christy N36 Electrical Box Christy FL36T Armorcast A600197APCX12 Christy N40 Box Christy B40M All new pull boxes shall be per CNB STD No. 204-L and per the Plans. 700-4 STREET LIGHTING SYSTEM MATERIALS. 700-4.9 LED Luminaires Traffic signal luminaires shall conform to the provision in Section 86-1.02K LED Luminaires of the Caltrans Standard Specifications, the approved Caltrans LED Lighting Purchase Specification, and these Special Provisions. Each luminaire shall consist of an assembly that utilizes LEDs as the light source. In addition, a complete luminaire shall consist of a housing, LED array, and electronic driver (power supply). Page 25 of 67 Each luminaire shall be rated for a minimum operational life of 63,000 hours. Each luminaire will operate at an average operating time of 11.5 hours per night. Each luminaire is expected to have a minimum operational life of 180 months (15 years). The luminaires to be installed shall be 120 volt with integral constant wattage ballast and detachable power unit assemblies. The power unit assemblies shall contain the ballast, starter board, capacitors, and a heavy duty terminal block. The luminaire on -board circuitry shall include surge protection devices (SPD) to withstand high repetition noise transients as a result of utility line switching, nearby lightning strikes, and other interference. Each luminaire shall be installed with photoelectric controls that are operationally compatible with currently used lighting control systems. The luminaire shall provide true ninety -degree (90 degree) cutoff with no light emitted above the horizontal. The lower edge of the luminaire housing shall extend below the light source and all glassware. Glare shields external to the luminaire will not be accepted. The luminaire optical assembly shall be sealed, watertight, and filtered to prevent contamination from infiltration of gaseous and particulate matter. The lamp socket shall be factory preset to produce a medium cutoff IES Type III light. distribution. When the components are mounted on a down opening door, the door shall be hinged and secured to the luminaire housing separately from the refractor or lens frame. The door shall be secured to the housing in a manner to prevent its accidental opening. A safety cable shall mechanically connect the door to the housing. The manufacturer shall provide a warranty against loss of performance and defects in materials and workmanship for the luminaires for a period of 84 months after acceptance of the luminaires. Replacement luminaires shall be provided promptly after receipt of luminaires that have failed at no cost to the City. All warranty documentation shall be given to the City. LED luminaires shall be Leotek GreenCobra Series GC1-60E-MV-NW-3-WH-700 (see plans for exact wattage per location) or approved equal. For all intersections, Contractor shall have manufacturer technician on-site for final acceptance testing and approval of LED luminaires. 700-5 TRAFFIC SIGNAL MATERIALS 700-5.3 Conductors and Cable. 700-5.3.3 Interconnect Cable. All materials furnished, assembled, fabricated or installed under this item shall be new, corrosion resistant and in strict accordance with the details shown on the plans and in Page 26 of 67 these Special Provisions. All pairs in the cable shall be usable and free of defects, in order to meet or exceed all of the requirements contained in these Special Provisions. The Contractor shall furnish, install, terminate and test all the required twisted pair cable. All equipment for installation, terminating and testing shall be provided by the Contractor. The twisted pair cable shall conform to the latest reversions of the REA (Rural Electrical Administration) and the NEC (National Electrical Code) specification for Filled Telephone Cables RUS-PE-39. Cable Marking • The twisted pair cable outer jacket shall be marked with manufacturer's name, the month and year of manufacture, pair count and conductor size, and sequential feet marks. • The markings shall be repeated every two (2) feet. • The actual length of the cable shall be within ±1 % of the length marking. • The marking shall be in a contrasting color to the cable jacket. • The marking shall be approximately one-half ('/z) of the diameter of the cable and must be permanent and weatherproof. Quality Control The manufacture(s) of supplied optical cable, optical cable assemblies, and hardware shall be TL 9000 and/or ISO 9001 registered. General Considerations The twisted pair cable shall meet the following: • Conductors: Solid # 19 AWG copper conductors • Insulation: solid virgin high density polyethylene with telephone industry color - coding • Twisted Pairing: Individual conductors twisted into pairs of varying twist to minimize crosstalk with specific color combinations to provide pair identification (telephone industry color coding) • Filling Compound: the cable shall be gel -filled to prevent water intrusion • Shielding: the cable shall employ a thick (0.005") corrugated copper shield to provide a 100% electrical shielding coverage • Outer Jacket: a black, low density, high molecular weight virgin polyethylene, compounded to withstand sunlight, temperature variations, and other environmental conditions, including abuse during installation. • Footage Marking Printed sequentially every two feet along the outer jacket to provide readily accurate records of cable usage and reel contents When terminating the cable, the following shall be complied with: Page 27 of 67 • Each pair of matched wire shall have a minimum of ten twists after leaving the cable sheaf • All copper pairs are to be properly cleaned to remove residue • Cable shall be installed free of kinks, cuts or damages • All pairs shall be installed (landed) in a termination box in the cabinet • One end of the copper shielding cable shall be grounded 700-5.3.4 Fiber Optic Cable. Fiber optic cables shall be supplied in the configurations shown on the plans and specified in these Special Provisions. There shall be three (3) principal cable types as well as incidental cabling procured under this specification. They are identified using a naming convention as follows: 1. Mainline cable which shall contain forty-eight (48), strand single -mode optical fibers for City of Newport Beach. 2. Mainline cable which shall contain forty-eight (48), strand single -mode optical fibers for Caltrans 3. Drop cable which shall contain six (6) single -mode optical fibers. Each fiber optic cable shall be suitable for underground duct placement. The length of fiber optic cable to be installed within City Buildings does not require the fiber optic cable to be plenum and fire rated. Additionally, there will be ancillary connecting (patching) optical fiber cables furnished and installed by Contractor under this Contract and this Supplemental, which are more precisely described elsewhere in this document. All materials furnished, assembled, fabricated or installed under this item shall be new, corrosion resistant and in strict accordance with the details shown on the plans and in these Special Provisions. All fibers in the cables shall be usable fibers and free of surface imperfections and occlusions, in order to meet or exceed all of the optical, mechanical, and environmental requirements contained in this Supplemental. All cables shall be free of material or manufacturing defects and dimensional non- uniformity that would: • Interfere with the cable installation employing accepted cable installation practices. • Degrade the transmission performance and environmental resistance after installation. • Inhibit proper connection to interfacing elements. • Otherwise yield an inferior product. • Each fiber optic outside plant cable for this project shall be all -dielectric, dry water - blocking material, duct type, with loose buffer tubes, and shall conform to these Special Provisions. Page 28 of 67 The Contractor shall furnish, install, splice and test all the required fiber optic cable. All splicing kits, fiber optic cable caps, moisture/water sealants, terminators, splice trays, patch cords, connectors, pig tails and accessories to complete the fiber optic network shall be provided as incidentals. All equipment for installation, splicing and testing shall be provided by the Contractor per manufacturer's specifications and as detailed in these specifications. All fiber optic glass/cable on this project shall be from the same manufacturer and who is regularly engaged in the production of optical fiber material. The cable shall be qualified as compliant with Chapter XVII, of Title 7, Part 1755.900 of the Code of Federal Regulations, and "REA Specification for Filled Fiber Optic Cables." Packaging 1. The completed cable shall be packaged for shipment on non -returnable wooden reels. Required cable lengths shall be stated in the purchase order. 2. Top and bottom ends of the cable on spools shall be available for testing. 3. Both ends of the cable shall be sealed to prevent the ingress of moisture. 4. Each reel shall have a weather resistant reel tag attached identifying the reel and cable. Cable Marking 1. The optical fiber cable outer jacket shall be marked with manufacturer's name, the month and year of manufacture, the words "Optical Cable," telecommunications handset symbol as required by Section 350G of the National Electrical Safety CodeEI(NESC°), fiber count, fiber type, and sequential feet marks. 2. The markings shall be repeated every two (2) feet. 3. The actual length of the cable shall be within ±1% of the length marking. 4. The marking shall be in a contrasting color to the cable jacket. 5. The marking shall be approximately 2mm in height regardless of the cable diameter. 6. The cable shall be tagged in each pull box with size and direction. Payment Upon acceptance and approval of the fiber optic cable, the City will pay the remaining amount as calculated by the actual measured quantity of installed fiber optic cable at the unit bid price minus the previously paid amount (80% of bid price). Refer to Section 9-3.2 for additional details. Acceptance and approval are achieved as determined by the City and includes: • Approved fiber optic test results • Completed cable/splice repairs or replacement as determined by the test results • Measured and approved quantities of installed cable Page 29 of 67 • Uninterrupted operation of fiber optic communication network, including fiber optic cable and communication devices for one week. This item may include items installed by others. Quality Control The manufacture(s) of supplied optical cable, optical cable assemblies, and hardware shall be TL 9000 and/or ISO 9001 registered. All cabled optical fibers shall be 100% attenuation tested. The attenuation of each fiber shall be provided with each cable reel. General Considerations Fiber optic cable installed shall be single mode fiber of the size as specified on the plans and shall be Corning AL TOS all -dielectric gel -free fiber optic cable, or approved equal. Fiber Characteristics One hundred percent (100%) of the optical fibers shall meet or exceed the requirements contained in this specification. The cable shall be tested in accordance with TIA/EIA-455-3A (FOTP-3), "Procedure to Measure Temperature Cycling Effects on Optical Fiber, Optical Cable, and Other Passive Fiber Optic Components." The average change in attenuation at extreme operational temperatures (40 °C to +70 °C) will not exceed 0.05 dB/km at 1550 nm. The magnitude of the maximum attenuation change of each individual fiber will not be greater than 0.15 dB/km at 1550 nm. This figure includes an allowance of up to 0.05 dB/km for measurement repeatability. The cable shall meet the requirements of ITU -T G.652.D and shall be a low water peak fiber. All fibers within the finished cable shall be composed primarily of silica and shall have a matched clad index of refraction profile as well as the physical and performance characteristics that shall meet the requirements in the following table: Parameters Value Mode Single Type Altos or approved equivalent Core diameter -Coming 8.3 pm nominal Cladding diameter 125 pm ± 1.0 pm Core to Cladding Offset <_ 0.7 pm Coating Diameter 240 pm ±0.5 pm Cladding Non -circularity defined as: [1- (min. cladding dia - max. cladding dia.)]x100 < 1.0% Proof/Tensile Test 100 k si, min. Page 30 of 67 Parameters Value Attenuation: 7. @ 1310 nm < 0.35 dB/km @ 1385 nm < 0.31 dB/km @ 1550 nm <_ 0.25 dB/km Attenuation Uniformity No point discontinuity greater than 0.1 Green dB at either 1300 nm or 1550 nm Attenuation at the Water Peak < 2.1 dB/km @ 1383 ±3nm Attenuation At Extreme < +0.05 dB @ 1310 nm or 1550 nm Operational Temperatures (BR) Chromatic Dispersion: Violet Zero Dispersion Wavelength (/\o) 1302 < Igo S 1322 nm Zero Dispersion Slope < 0.092 ps/(nm2Arn) Maximum Dispersion: < 3.5 ps/(nm.km) for 1285 - 1330 nm RS <_ 18 s/ nm.km for 1550 nm Cut -Off Wavelength <1260 nm Mode Field Diameter (Petermann 9.2 ± 0.4 pm at 1310 nm II 10.5 ± 0.5 pm at 1550 nm Cable Outer Diameter 0.30" (7.6 mm) Buffer Tube Size 0.08" (2.0 mm) Color Coding Optical fibers shall be distinguishable from others in the same buffer tube by means of color -coding according to the following: 1. Blue (BL) 7. Red (RD) 2. Orange OR 8. Black BK 3. Green (GR) 9. Yellow YL 4. Brown (BR) 10. Violet (VL) 5. Slate SL 11. Rose RS 6. White WT) 12. Aqua (AQ) The colors shall be targeted in accordance with the Munsell color shades and shall meet TIA/EIA-598B "Color Coding of Fiber Optic Cables" and RUS 7 CFR 1755.900. The color formulation shall be compatible with the fiber coating and the buffer tube filling compound, and be heat stable. It shall not fade or smear or be susceptible to migration, it shall not affect the transmission characteristics of the optical fibers and shall not cause fibers to stick together. General Cable Performance The fiber optic cable shall withstand water penetration when tested with a one meter static head or equivalent continuous pressure applied at one end of a one meter length of filled cable for one hour, no water shall leak through the open cable end. Testing shall be done Page 31 of 67 in accordance with TIA/EIA-455-82 (FOTP-82), "Fluid Penetration Test For Fluid -Blocked Fiber Optic Cable." The cable shall exhibit no flow (drip or leak) for 24 hours at 80° C. The weight of any compound that drips from the sample shall be less than 0.05 grams (0.002 ounce). A representative sample of cable shall be tested in accordance with TIA/EIA-455-81 B (FOTP-81), "Compound Flow [Drip] Test for Filled Fiber Optic Cable". The test sample shall be prepared in accordance with method A. Crush resistance of the finished fiber optic cables shall be 220 N/cm applied uniformly over the length of the cable without showing evidence of cracking or splitting when tested in accordance with TIA/EIA-455-41 (FOTP-41), "Compressive Loading Resistance of Fiber Optic Cables." The 220 N/cm (125 Ibf/in) load shall be applied at a rate of 2.5 mm (0.1 in) per minute. The load shall be maintained for a period of 1 minute. The load shall then be decreased to 110 N/cm (63 Ibf/in). Alternatively, it is acceptable to remove the 220 N/cm (125 Ibf/in) load entirely and apply the 110 N/cm (63 Ibf/in) load within five minutes at a rate of 2.5 mm (0.1 in) per minute. The 110 N/cm (63 Ibf/in) load shall be maintained for a period of 10 minutes. Attenuation measurements shall be performed before release of the 110 N/cm (63 Ibf/in) load. The change in attenuation shall not exceed 0.4 dB during loading at 1550 nm for single -mode fibers and 1.0 dB during loading at 1300 nm for multimode fiber. The repeatability of the measurement system is typically 0.05 dB or less. No fibers shall exhibit a measurable change in attenuation after load removal. The cable shall withstand 25 cycles of mechanical flexing at a rate of 30±1 cycles/minute with a sheave diameter not greater than 20 times the cable diameter. The cable shall be tested in accordance with Test Conditions I and III of TIA/EIA-455-104A (FOTP-104), "Fiber Optic Cable Cyclic Flexing Test." The magnitude of the attenuation change will be within the repeatability of the measurement system for 90% of the test fibers. The remaining 10% of the fibers will not experience an attenuation change greater than 0.1 dB at 1550 nm. The repeatability of the measurement system is typically ± 0.05 dB or less. The cable jacket will exhibit no cracking or splitting when observed under 5X magnification. Impact testing shall be conducted in accordance with TIA/EIA-455-25B (FOTP-25) "Repeated Impact Testing of Fiber Optic Cables and Cable Assemblies." The cable shall withstand 20 impact cycles. The magnitude of the attenuation change will be within the repeatability of the measurement system for 90% of the test fibers. The remaining 10% of the fibers will not experience an attenuation change greater than 0.1 dB at 1550 nm. The repeatability of the measurement system is typically ± 0.05 dB or less. The cable jacket will not exhibit evidence of cracking or splitting at the completion of the test. Using a maximum mandrel and sheave diameter of 560 mm, the finished cable shall withstand a longitudinal tensile load of 1330 N (300 lbs.) applied for one hour (using "Test Condition II" of the test plan). The test shall be conducted in accordance with TIA/EIA- 455-33 (FOTP-33), "Fiber Optic Cable Tensile Loading and Bending Test." The measured fiber tensile strain shall be < 60% of the fiber proof strain. The cable will not experience a measurable increase in attenuation when subjected to the rated residual Page 32 of 67 tensile load, 400 N (90 Ibf). The repeatability of the measurement system is typically ± 0.05 dB or less. The cable shall be capable of withstanding a bending radius of fifteen (15) times the cable diameter under tensile loading and ten (10) times the cable diameter under a no-load condition. Drop Cable As may be required, the Contractor shall provide a single -mode optical fiber cable between each mid -span splice location and each traffic control equipment cabinet, which shall contain six (6) optical fibers. The drop cable shall have two (2) or four (4) fiber strand(s) spliced into the appropriate fiber strand in the mainline cable as prescribed elsewhere in the Plans and/or these Special Provisions. The drop cable shall have the six optic fibers terminated at its other end with connector as described elsewhere in this specification. Optical fiber cable used for a drop cable shall comply with all other aspects of the specifications as set forth in the Special Provisions for optical fiber cable. The drop cable shall have sufficient length to extend from the fiber splice location to the optical interface of the associated communications equipment, allowing for routing and securing with nylon ties plus fifty (50) feet of slack at all splice points and fifteen (15) of slack inside the cabinet, unless otherwise specified in the Plans or these Special Provisions or directed by the Engineer. The drop cable shall be sufficiently de -sheathed within the traffic control cabinet to allow adequate slack fiber to afford ease of routing of the active fiber to the communications equipment. The Contractor shall provide a thermal shrink sleeve dam or other appropriate wrapping at the beginning of the de -sheathed cable area so as to prevent loss of any aqueous gel filling from the remainder of the service drop cable. Fiber Patch Cords The fiber optic cable patch cords, assemblies and components shall be compatible components, designed for the purpose intended, and manufactured by a company regularly engaged in the production of material for the fiber optic industry. All components or assemblies shall be best quality, non -corroding, with a design life of at least twenty (20) years. All patch cords, components or assemblies of the same type shall be from the same manufacturer. The Contractor shall furnish and install Patch cords, which are fiber optic cables with connectors on both ends. Patch cords are used to connect fiber optic transmission equipment to connector panel modules. The patch panel shall interface to patch cords with approved connectors. Patch cords shall have 900JAm single fiber single mode cable with approved connectors. The patch cords shall be at least six (6) feet in length and shall be pre -sized in the factory to the required lengths. The attenuation of the cable shall be between 1.0 and .75 dB. Page 33 of 67 All patch cords shall be installed without exceeding the manufacturer specified bending radius. Acceptable equipment shall be from Corning Cable System or approved equal. Fiber Optic Fan -Out Kits If required, fan -out kit connects the fiber optic jumper cable to the fiber optic transmission equipment located in the cabinet. The fan -out shall be equipped to terminate 250pm fiber (loose tube cable) and shall provide protection for the bare fibers. The fan -out kit shall have two (2) 6- or one (1) 12 -fiber fan -out insert and 2 -meter lengths of fan -out tubing with twelve (12) single mode fibers that are ready for field installable connectors. The fan -out cable kit shall also meet the following specifications. Housing The Connectors shall be compliant Length 132 mm (5.2 in) Diameter 31 mm 1.22 in Fan Out Tubing 0.4 dB (typical) Length 2 m 78.8 in Diameter 2.9 mm 0.11 in Environmental -40°C to 70°C The fan -out kit, when installed in the existing traffic cabinets or proposed fiber optic terminal cabinet attached to the existing traffic cabinet, shall be securely anchored to the side wall of the cabinet by suitable ties. Acceptable Fan -Out Kit shall be from Corning Cable System or approved equal. Fiber Optic Connectors The Contractor shall furnish and install fiber optic pre -manufactured connectors that are single mode LC type connectors that meet the requirements for outdoor installation with Gigabit Ethernet communications. LC type connectors will be used for all outdoor and indoor installations. The LC connectors shall meet the following specifications. Page 34 of 67 The Connectors shall be compliant Interconnection Compatibility with EIAMA and JIS specifications for LC compatible connectors. Insertion Loss 0.4 dB (typical) Reflectance , -40 dB between a temperature range of -40° C to 75° C Durability —<0.3 dB change, 200 rematings. Page 34 of 67 Tensile Strength < 0.2 dB change, 10 Ib. Temperature Cycling <0.3 dB change, -40° C to 75° C Nominal Fiber OD 125µm Materials Ferrule: Ceramic Housing: Composite Accepted equipment shall be SC and LC Compatible Single Mode, as required, from Corning Cable System or approved equal. 700-5.4 Controllers. 700-5.4.3 Cabinets. Controller Assembly Testing Solid-state traffic actuated controller units, cabinets and auxiliary equipment shall conform to the provisions in these special provisions and NEMA TS2-2 standards. Cabinet Construction The following items are included in the cabinet assembly: • For 16 position main panel • Type "O", "P", and "R" aluminum cabinet powder -coated white inside and out. • Fully wired eight phase NEMA Type 2 main panel — Horizontal hardwired swing down load bay. Type 16 Malfunction Management Units (programmed for intersection) Econolite MMU • 16 -channel detector rack w/ BIU slot (minimum) • 8- 2 -channel Detectors (minimum) or (16 channel max.) Bus Interface Units — detector rack only • 12/16- Load switches All auxiliary equipment to completely operate an eight -phase traffic intersection control cabinet. General National Electrical Manufacturers Association, Traffic Control Systems, NEMA Standards Publication: TS2-Latest release. Documentation Page 35 of 67 The City reserves the right to reject traffic signal control equipment and auxiliary equipment items in which the manufacturer of such items does not have at least nine million dollars of product liability insurance. Warranty The supplier of equipment shall warranty their product to be free from defect in design and operation and that it meets all the requirements of this specification and those incorporated in this document. The term of the warranty on a wired cabinet shall be a minimum of one (1) year from date of acceptance including the Bus Interface Units and Cabinet Power Supply. Equipment such as the Controller and Malfunction Management Unit shall have a minimum of a two- year warranty. Cabinet Standards Cabinet Construction A complete NEMA TS2 Type 2 Plug N Go in a Type "O", "P" or "R" aluminum cabinet as indicated on the plans shall be supplied. Cabinets shall meet, as a minimum, all applicable sections of the NEMA Standard Publication. Where differences occur, this specification shall govern. The cabinets shall meet the following criteria: • Material shall be 5052-1-132 0.125 -inch thick aluminum. • The cabinet shall be supplied powder coated aluminum with white powder coat inside and out Federal color #17875 to match the service enclosure and battery backup cabinet. • The door hinge shall be of the continuous type with a stainless steel hinge pin. • The door handle shall be cast aluminum. With the provisions for padlock installation. • All seams shall be sealed with RTV sealant or equivalent material on the interior of the cabinet. All outside seams shall be continuous welded. • Cabinet lock shall be of the Corbin #1548-1 (#2 Key). • A roll out computer table shall be mounted under the Controller location on the First shelf. • Each cabinet shall have 3 sets of cabinet wiring diagrams. • Each cabinet shall have 2 sets of equipment manuals (Controller, MMU, etc.). Shelves Type "P" cabinets shall have two (2) substantial metal shelves extending across the back of the cabinet the cabinet shall be provided to support the controller unit, auxiliary equipment and detector rack. The lower shelf shall be easily removable without tools. Four "C" mounting Channels shall be installed on both side walls and two rear wall allowing versatile positioning of shelves and side panels. Type "O" and "R" cabinets shall have three (3) shelves. Page 36 of 67 Cabinet Wiring Equipment Accessibility All mounted panels and equipment shall have a minimum tool access clearance of 6". Ventilating Fan The cabinet shall be provided with a thermostatically controlled adjustable between 80- 150(degrees Fahrenheit) ventilation fan and shall be installed in the top of the cabinet plenum and protected by a 0.5 -amp fuse. Air Filter Assemblv The cabinet Air Filter shall be a one-piece removable, medium efficiency, synthetic air filter and shall be firmly secured to the air entrance of the cabinet. To provide for a positive air flow through the cabinet. (12' x 16") minimum. Cabinet Light Assemblv The cabinet shall be equipped with a florescent lighting fixture that shall be mounted on the inside top of the cabinet near the front edge. The florescent light shall be activated by an on/off switch that is turned on when the cabinet door is opened and turned off when the door is closed. Lightening Suppression The cabinet shall be equipped with an EDCO model SHP-300-10 surge arrester. Power Panel The Power Panel shall house the following equipment: • A 40 -amp main breaker shall be supplied. This breaker shall supply power to the main panel, controller, MMU and cabinet power supply. • A 20 -amp auxiliary breaker shall supply power to the fan, light and GFCI outlet. • An EDCO model SHP-300-10 or equivalent surge arrester. • A 50 amp, 125 VAC radio interference line filter. • A normally -open, 60 -amp, mercury contractor • A spare 15 amp, auxiliary breaker shall be provided. Convenience Outlet Three Duplex outlets shall be supplied. 1. Is for short term equipment use and shall be a 120 volt AC, 15 -Amp NEMA 5-15 GFCI 2- gang duplex outlet shall be mounted in the lower right corner of the cabinet facing the inside of the cabinet door and within 6" of the front edge of the opening of the door. 2. Is for long term equipment use and shall be a 120 volt AC, 15 -Amp NEMA 2 - gang duplex outlet shall be mounted in the upper right corner and upper left corner of the cabinet facing the inside of the cabinet. Power shall be supplied from filtered power. Inside Aux Control Panel Switches Page 37 of 67 The inside door panel shall contain three (3) switches: AUTO/FLASH, STOP TIME and CONTROLLER POWER ON/OFF. Auxiliary door panel switches shall be hard wired only. (No printed circuit boards shall be used for the door panel switches.) Controller panel shall also contain plunger style vehicle and pedestrian test switches for all phases in use (typically phase 1 to 8 & peds). 2 -Position Auto/Flash Switch In the Auto position the intersection shall operate normally. When in the Flash position, power shall be maintained to the controller and the intersection shall be placed in flash. The controller shall not be stop timed when in flash. A guard (sk3036) shall be installed to prevent the switch from being shut off accidentally. 3 -Position Auto/OFF/ON Stop Time — Switch When in the Auto position the controller shall be stop timed when the police door AUTO/FLASH switch is in the flash position or MMU flash. If in the off position the switch will release all stop time from controller. In the On position the switch shall maintain a continuous stop time to the controller. 2 -Position Controller Power On/OFF — Switch This switch shall control the controller's AC power. A guard (sk3036) shall be installed to prevent the switch from being shut off accidentally. Police Panel Switches The Police Panel shall contain one (1) switch: The AUTO/FLASH. All police panel switches shall be hard wired. A switch guard shall be provided for each switch. 2 -Position Signals ON/OFF Switch In the On position the field displays shall show either normal operation or flash. In the Off position, power shall be removed from signal heads in the intersection. The controller shall continue to operate. In the OFF position, the MMU shall not conflict or require reset. 2 -Position Auto/Flash Switch In the Auto position the intersection shall operate normally based on all other switches. In the Flash position, power shall not be removed from the controller and stop time shall be applied based on the STOP TIME switch. Cables All Controller and MMU cables shall be of sufficient length to access any shelf position. All cables shall be encased in a protective sleeve along their entire free length. All cables shall be fixed to the bottom front of each shelf. Cables shall be neatly dressed and not hang down in front of other equipment. Color Coding All cabinet wiring shall be color coded as follows: • Purple = Flash color programming • Brown = Green Signal Wiring • Yellow = Yellow signal wiring Page 38 of 67 • Red = Red signal wiring • Blue = Controller wiring • Gray = DC ground(return),(logic ground) • Black = AC+ • White = AC- • Green = Chassis Main -Panel and Wire Terminations All wires terminated behind the main -panel and other panels shall be soldered. No pressure or solder less connectors shall be used. Printed circuit boards shall Not be used on main panels. Flashing Operation Cabinet shall be wired for NEMA flash. All cabinets shall be wired to flash red for all phases. Flashing display shall alternate between phases 1,4,5,8 and phases 2,3,6,7. Detector Rack and Interface A minimum of one vehicle loop detector rack and one detector interface panel shall be provided in each cabinet. Each rack shall support up to (16) sixteen channels of loop detection, two 2- channel of EVP devices, and one (1) BIU. Preemption Wiring The cabinet shall be completely wired for Rail Road or EVP preemption as needed if specified on the plans. Main panel Configuration The main panel shall be fully wired in the following configuration: • The Main -Panel shall be a hardwired horizontal swing down sixteen position load socket load bay or as called for on the plan sheet, for a "P" cabinet. • Four or Six flash transfer relay sockets as required. • One flasher socket. • Wiring for one Type -16 MMU. • All connector cables shall be dressed neatly along the front edge of the cabinet shelf the equipment (controller & MMU) will be installed on. NO cables shall hang freely in the cabinet. Field Terminal Locations Field terminals shall be located at the bottom of the main panel and angled forward for easy viewing and wiring. Their order shall be left to right beginning with phase one and following the order of the load switches. Field terminals shall be of the barrier type. Cabinet equipment Controller Unit Shall be a Cobalt Controller provided with NTCIP level 2 protocol, ECPIP & AB3418 basic with Ethernet communications module and data key. Page 39 of 67 Detectors Cabinets shall be equipped with eight (8) TS2 detectors in single detector rack cabinet and sixteen (16) in a two (2) detector rack configuration. Econolite G-68 and G-70 detectors shall be provided or approved equal. MMU (Malfunction Management Unit) Cabinets shall be equipped with NEMA TS2 Type 16 Malfunction Management Unit with latest current released software. MMU jumper cards shall be programmed to each intersections requirements or standard 8 phase configuration for spare units. BIU (Bus Interface Unit) BIU's shall meet all TS2-1992 section 8 requirements. In addition, all BIU's shall provide 3 separate front panel indicators. Power, Valid Data and Transmit. Cabinet Power Supply The cabinet power supply shall meet the NEMA TS2 specification. All power supplies shall also provide a separate front panel indicator LED for each of the four power outputs. Front panel banana jack test points for 24 VDC and logic ground shall also be provided. Telemetry Interface Panel All cabinets shall be wired with a telemetry interface panel and telemetry connecting cable so as to work with the CENTRACS central control system. The interface panel shall also contain wiring for door open and flash alarms. Power Bus Assembly The power bus assembly shall provide filtered power for the controller, MMU, cabinet power supply and all auxiliary equipment. It shall include the SDLC Bus connecting cables wired into a surface mounted compression terminal block. It shall also include up to 6 filtered power connectors and 2 terminal strips to hardwire the power connections. Interconnect Termination All cabinets shall be supply with interconnect termination blocks, Siemons model # S66M1-50 and sub -base. Load Switch All load switches shall meet NEMA TS -2, Section 6 requirements and shall be PDC SSS - 86 -1/0 or City Approved Equal. All load sockets shall be equipped with a load switch. Flasher Unit All flasher units shall meet NEMA TS -2, Section 6 requirements and shall be EDI model 810 or equivalent. Intersection Diagram An intersection diagram, shall be made on 8 1/2" X 11" sheet of paper enclosed in plastic cover, it shall be located on the inner side of the door above the auxiliary panel. The diagram shall depict the general intersection layout, controller location, traffic signal Page 40 of 67 conduit crossings, phases, overlaps, detector assignments, and north arrow. The top of the diagram will be North and the diagram shall be approved by the City representative. Cabinet Wiring Prints The cabinet wiring prints shall be arranged in a simplistic way in terms of reading prints on three pages. Testing Facility The testing facility shall have up to fourteen days to test the controller assembly. Cabinet loaded shall be tested under full load for 14 days straight without any problems. The testing facility shall be selected by the Engineer. Equipment Turn On Requirements An Econolite representative and a signal technician from the city shall be present at the time of the controller assembly turn on. The representative shall be fully qualified to work on the controller assembly equipment. The City shall be notified at least 7 working days prior to intersection turn -on. 700-5.5 Traffic Signal Faces and Fittings. Installed vehicle indications/heads shall be furnished new, including mounting framework and hardware. Indications/heads shall be made of structural plastic and colored black. New vehicle indications shall be nominal 12 -inch diameter (300 mm), furnished with Light Emitting Diode (LED) indications, visors, and back plates. All new TV -1-T indications shall be furnished with bronze terminal compartments. Vehicle heads shall be furnished new by the Contractor with the LED units installed. Where vehicle indications are to be powder coated, new vehicle heads, visors, and back plates shall be metal. Otherwise, new vehicle heads, visors, and back plates shall be polycarbonate. Top openings of vehicle indications shall be sealed with neoprene gaskets. If shown on the plans, the Contractor shall furnish and install Lingo Industrial Electric Model LESV1T (orAgency-approvedequal) terminal compartments. All Vehicle indications shall be 12 inch LED and shall be Gelcore or Dialight brand (or Agency approved equal). 700-5.6 Pedestrian Signal Sections. Installed pedestrian indications/assemblies shall be furnished new, including mounting framework and hardware. Indications/heads shall be made of structural plastic and colored black. Where pedestrian signal faces are to be powder coated, new pedestrian housings shall be metal. Otherwise, new pedestrian assemblies shall have structural polycarbonate. Type A indications with Stainless steel hardware and shall be furnished with bronze terminal compartments. Page 41 of 67 All Pedestrian indications shall be Countdown LED and shall be Gelcore or Dialight brand (or Agency approved equal). 700-5.9 Pedestrian Push Button Assemblies. Installed pedestrian and bicycle push buttons/assemblies shall be furnished new, including mounting hardware. Pedestrian push button signs, for push button assemblies to be installed on pedestrian push button posts shall be 5" x 7-1/2". All other pedestrian push button signs shall be 9" x 12" and shall not extend beyond the mounting framework. Bicycle Push Button Assemblies Installation of push button assemblies for bicycle use shall be in accordance with CNB STD No. 913-L. 700-5.8 Detectors. Loop wire shall be Type 2. Loop detector lead-in cable (DLC) shall be Type B. Loop sealant shall be Hot -Melt Rubberized Asphalt Sealant. 700-6 FIBER OPTIC EQUIPMENT 700-6.1 Fiber Patch Panel/Wall Interconnect Unit. General Fiber Patch Panel (also called Wall Interconnect Center (WIC)) shall be furnished and installed at the locations shown on the Plans. The section includes material and installation for fiber patch panel. Description The fiber patch panel shall act as the demarcation point between the fiber optic cable via the fiber pigtail from the splice closure and the terminal equipment via the fiber optic patch cords. The Contractor shall furnish and install matching connectors. The approved type optical connectors on the end of each pigtail shall screw into a sleeve securely mounted to a patch panel within the fiber patch panel enclosure. The maximum optical loss across the connection shall not exceed 0.4 dB. The fiber patch panel housings installed in 332 cabinets shall be rack -mounted in the outdoor traffic signal controller cabinets, as shown on the plans. Contractor to verify rack space for fiber patch panel prior to procurement. If space limitations exist, Contractor shall notify Engineer. The fiber patch panel housings installed in NEMA cabinets shall be wall or shelf mounted in the outdoor traffic signal controller cabinets, as shown on the plans. Preference is for fiber patch panel to be wall mounted on side of cabinet. Page 42 of 67 Contractor shall verify space in cabinet and provide recommendation to Engineer for mounting. The fiber patch panel shall have 48 strand capacity. The cabinet shall have fiber optic cable entrances with cable sheath strain relief, leading to the fiber patch panel. All fiber terminations on the patch panel, located in the traffic signal controller cabinet, shall be SC type connectors. The Fiber Patch Panel shall be Corning Cable System or approved equal. Rack mounted fiber patch panel shall be Corning CCS -01 U, shelf/wall mounted fiber patch panel shall be Corning SPH -01P, or approved equals. 700-6.2 Fiber Distribution Unit (FDU). General The Contractor shall furnish and install fiber distribution unit (FDU) sized to be rack - mounted in the new or existing equipment rack in the City Building equipment room as shown on the Plans. The FDU shall have the capacity to terminate and connect all fiber optic cable strands installed by Contractor as part of this Project, as shown on the Plans. Contractor shall coordinate installation of rack and FDU with Engineer. The section includes material and installation for fiber distribution unit. The FDUs at the City Buildings shown in the plans shall serve as the demarcation point for work to be completed by Contractor and work to be performed by others. The Contractor shall be fully responsible for furnishing, installing and testing of the FDU all each City Building and all Field Work elements. From, but excluding the FDU, others will be responsible for elements inside the City Buildings. Description of FDU FDU shall consist of two parts: a splice shelf and a fiber patch panel. The splice shelf shall house and protect fusion splices of fibers to optical fiber pigtails with six (6) feet of pigtail slack on each fiber. The FDU shall house and protect the required quantity of connectors and splices on each pigtail and slack for fiber optic patch cords. The fiber pigtail slack shall be neatly coiled and secured in a manner that does not allow the minimum operational bending radius of the pigtail to be exceeded. The approved type optical connectors on the end of each pigtail shall screw into a sleeve securely mounted to a patch panel within the FDU enclosure. The maximum optical loss across the connection shall not exceed 0.4 dB. The patch panel shall be capable of single mode terminations grouped by six (6) to eight (8) connector sub -panels. The housing shall have fiber optic cable entrances with cable sheath strain relief. All fiber terminations on the FDU, located at communication hubs, shall be LC type connectors. Page 43 of 67 The Contractor shall provide pre -wired connectors panels, fiber pigtails, interconnection sleeves, and connector panels as required to make the indicated connections. The FDU shall have the spare capacity to hold the required number of connector panel modules and fiber capacity splice trays. The Contractor shall provide trays to house the entire number of fibers within the cable for future use. Prior to ordering the FDU and associated equipment, the Contractor shall provide submittals of the exact equipment proposed to the Engineer. The Engineer must approve the equipment submittals prior to ordering. The FDU shall be Corning Cable System or approved equal. 700-6.3 Splice Closure. General Any below ground fiber optic splices or fiber optic splices exposed to the elements shall be contained in a waterproof, rodent proof, re -enterable fiber optic splice closure designed for use on optical fiber cables in a cable vault environment where total and continuous submersion in water may be expected. Splice closures shall be complete with outer and inner closures, splice organizer trays, brackets, plugs, clips, cable ties, seals and sealant, and a dry encapsulate and shall conform to the following Special Provisions. 1. The fiber optic splice closure shall conform to the requirements of Bellcore GR 771 and shall be designed for a temperature range of -40° C. to +70° C. 2. The splice closure shall be suitable for either a direct burial or pull box/vault application. 3. The size of the closure shall allow all the fibers of the largest fiber optic cable to be spliced to a second cable of the same size. The closure shall be not more than 18 inches in length and not more than 4 inches in diameter. The closures shall be designed for both horizontal and butt splicing. 4. All materials in the closures shall be non-reactive and shall not support galvanic cell action. The outer -closure shall be compatible with the other closure components, the inner closure, splice trays, and cables. 5. The outer -closure shall protect the splices from mechanical damage; shall provide strain relief for the cable, and shall be resistant to salt corrosion. The outer -closure shall be waterproof, and re -enterable. The outer -closure shall be flash -tested at 100 kPa. 6. The inner -closure shall be of metallic construction. The inner -closure shall be compatible with the outer closure and the splice trays and shall allow access to and removal of individual splice trays. 7. The splice trays shall be compatible with the inner -closure and shall be constructed of rigid plastic or metal. Page 44 of 67 Installation 1. Adequate splice trays shall be provided to splice all fibers of the communication cable with the greatest fiber count entering the closure. 2. Upon completion of the splices, the splice trays shall be secured to the inner closure. The Contractor shall verify the quality of each splice prior to sealing the splice closure. 3. The closure shall be sealed using a procedure recommended by the manufacturer that will provide a waterproof environment for the splices. Encapsulant shall be injected between the inner and outer closures. 4. Care shall be taken at the cable entry points to ensure a tight salt resistant and waterproof seal is made which will not leak upon aging. It is acceptable to have multiple service drop cables enter the fiber optic splice closure through one hole as long as all spaces between the cables are adequately sealed. 5. The splice closure shall be mounted horizontally in a manner that allows the cables to enter at the end of the closure without exceeding any minimum bending radius specification. 6. All fiber optic cable splicing performed on this project shall be of the fusion type. All fiber optic cable splices shall be of the fusion type and shall not exceed 0.1 dB loss per splice. 7. The field splices shall connect the fibers of the two (2) fiber optic cable lengths together. The termination splices shall connect the fiber optic cable span ends with pig tails. The field splices shall be placed in a splice tray, and then the splice tray with splice shall be placed in a splice closure. 8. The termination splices shall be placed in a splice tray and the splice tray with splice shall then be placed in a fiber distribution unit or field cabinet as required. All splices shall be protected with a thermal shrink sleeve. 9. The fiber optic field splices shall be enclosed in splice closures, which shall be waterproof, rodent proof, and re -enterable, and shall accommodate all the fibers in a single cable. 10. The microduct coupling shall house the fiber optic cable up to the cable opening in the splice closure. The Contractor shall furnish and install fiber optic splice closures capable of accommodating a minimum of six (6) splice trays and a maximum of 72 splices. The splice closure shall also include the required encapsulant. The splice closure shall be able to accommodate up to four (4) cable entries. If all four cable entry holes are not required, the remaining unused entry holes will be closed such that moisture does not enter the splice closure and affect the operation of the fiber optic cable. The splice closure shall have sleeves to size the cable entry to the appropriate cable diameter. Each splice closure shall come equipped with the required number of single mode splice trays. Included within the splice closure, the Contractor shall also supply and install splice trays. Each spice tray shall be appropriately sized to fit inside the splice closure. The splice trays shall be of injection molded plastic type with a clear plastic cover so allow visibility of fibers without opening the tray. Each splice tray shall handle up to twelve (12) single mode fusion splices. Page 45 of 67 A minimum of three unopened kits required for the resealing of the splice closure shall be supplied with this contract and considered as part of the necessary equipment. Splice closures, encapsulant, trays, and reseal kits shall be from Corning Cable Systems, or approved equal. 700-6.4 Ethernet System. The following items are included in the Ethernet System: 1. Ethernet System 2. Testing 3. Warranty General The locations for the installation of Ethernet switches are shown on the corresponding design plans. The Ethernet Switches with power supplies shall be furnished by Iteris and installed by the Contractor. Ethernet Switch shall be Cisco IE -3000 8TC, or approved equal. The Ethernet Switch power supply shall be Cisco PWR-IE50W-AC Contractor shall furnish and install CAT6 cable and fiber optic jumpers to complete connections to fiber patch panel and installed hardware. CAT6-A Cable Contractor shall furnish and install CAT6-A cable and complete connections from Ethernet Switch and installed equipment in controller cabinet including traffic signal controller and video encoder, at locations as shown on the plans. Contractor shall furnish and install CAT6-A cable and complete connections from Aggregation Switch and installed equipment in rack, at locations as shown on the plans. Installation Contractor shall furnish and install switches as shown on the plans and as directed by Engineer. Testing Contractor shall complete on-site acceptance testing of installed items and certify in writing to City that installed items operate within manufacturer's requirements. Page 46 of 67 Warranty The supplier of equipment shall warranty on work performed to be free from defect in design and operation and that it meets all the requirements of this specification and those incorporated in this document. The term of the warranty on work performed shall be a minimum of one (1) year from date of acceptance. 700-7 CCTV SYSTEM General The Closed Circuit Television (CCTV) Camera System shall comply with all rules and regulations of the Federal Communications Commission (FCC) and these Special Provisions. The CCTV camera system including the dome camera, CCTV cable (video/data/power), and CCTV camera mounting hardware and shall be Contractor - furnished. The Contractor shall install the CCTV camera system at locations as shown on the Plans. CCTV IP Dome Camera The Camera shall be IP, Color CCD and capable of producing no less than 720P resolution and communicate using non-proprietary control protocol. It shall have Pan, Tilt, Zoom (PTZ) capabilities, NTCIP control language, and a minimum optical zoom of 30 X and be manual/auto focus capable. The camera shall be able to operate with a continuous 3600 rotation (no stops). The camera shall be able to operate a light rating of 3.0 lux at 60 frames per second color and at 0.3 lux at 60 frames per second black and white. The camera shall operate at NEMA TS2 voltage levels of 89 VAC to 135 VAC and environmental temperatures of -340 to 74°C. The camera shall have a minimum of 6 programmable privacy zones, zones at which the video is blanked, and 32 presets. The camera shall be in a pressurized sealed enclosure and have a built in character generator for site ID name and/or number, and alarm codes. The camera shall weigh no more than 20 lbs. and shall have dimensions no greater than 18 inches tall and 15 inches long. All equivalencies must be approved by the Engineer prior to procurement. The camera shall have the following features: • Network Interface — Ethernet (100BaseT-Tx) • Protocol — TCP, IGMP, RTSP, NTP, HTTP, ONVIF Profile S, NTCIP • CODECs — H.264 and MPEG (720p) • Pan Range - 3600 • Tilt Range - 50 to -900 • Power — POE++ Page 47 of 67 Camera shall use pole -mounting hardware provided by the dome CCTV camera vendor, capable of mounting to a vertical traffic signal pole. The pole mount shall be affixed to the pole to extend the camera towards the center of the signalized intersection. The dome CCTV camera and mounting hardware shall withstand a wind load of 80 mph when affixed to traffic signal pole without permanent damage to mechanical and electrical equipment. The CCTV Dome Camera shall be COHU Model Rise 4220HD 4221-1000 Dome or approved equal. The POE++ Injector shall be COHU Model Enable -IT 7412007-003 or approved equal. CCTV Integrated Camera Cable The integrated CCTV camera cable shall be procured from the CCTV camera vendor. No exceptions shall be allowed. The CCTV cable shall be COHU Model CA276A series or approved equal. 700-8 OPTICOM PRIORITY CONTROL SYSTEM Emergency Vehicle Pre-empt (EVP) systems are to be furnished new and installed by the Contractor per the plans. The Contractor shall arrange for a representative of the manufacturer to test the operation of the systems after installation. On new cabinet installations, the Model 764 phase selector units shall be installed in the vehicle detection rack by the cabinet manufacturer. For modifications of existing cabinets, the phase selector units shall be installed in a new Model 760 rack or if vehicle detector rack is not available/full. The EVP system shall consist of the following components: • Model 764 phase selector units, • Model 760 rack (if required), • Model 722 Optical Detector Units • Model 138 Optical Detector Cable The Contractor shall coordinate with the Manufacturer to have a technician onsite the date of the signal turn -on. 700-9 BATTERY BACKUP SYSTEM The Contractor shall furnish and install a Battery Backup System (BBS) for use with a NEMA system (shelf -mount) as detailed on plans. The Contractor shall furnish new and install all necessary cables, wiring harness, and all other equipment and incidentals, including batteries, to connect the UPS to the traffic signal controller cabinet wiring harness to provide the intended operation. The BBS shall be installed per the manufacturer's guidelines. Page 48 of 67 The Contractor shall at his own expense, arrange to have a technician, qualified to work on the BBS assembly and employed by the BBS assembly manufacturer, or his representative, present at the time the equipment is turned on. The Engineer shall be notified at least two working days prior to the beginning of the functional test period. The BBS shall be Alpha Technologies Model FXM 1100 Rugged UPS Module, Rack mount kit 2RU — 19", and MK Battery Model 8A24 HEU, or approved equal. Battery Backup Cabinet Where BBS system is to be installed on a Type "O" or "P", a separate battery cabinet for NEMA controller cabinets shall be furnished and installed to house the batteries and inverter. The battery cabinet shall be supplied powder coated aluminum with white powder coat inside and out Federal color #17875 to match traffic signal cabinet and service enclosure. The battery cabinet shall be mounted to the side of the signal cabinet at a minimum height of 30" above the foundation. The BBS Cabinet shall be McCain Model 36x20x16 BBS Cabinet, Side Mount M42513 - SC Power Coated, or approved equal. 700-10 LED INTERNALLY ILLUMINATED STREET NAME SIGNS. All street name signs shall be furnished and replaced new, including mounting brackets and hardware. Internally illuminated street name signs shall conform to Section 87-4.02C Internally Illuminated Street Name Signs of the Caltrans Standard Specifications. Type A signs with Type IV photoelectric controls shall be installed where shown on the plans. The contractor shall provide shop drawings of all of the required sign legends for review by the Engineer. IISNS shall be NuArt EdgeLit (NAIM-72-LED-D or NAIM-96-LED-D) with mounting brackets or approved equal. Each EdgeLit LED IISNS shall be equipped with factory installed photoelectric controls. Custom Sign Panels shall be white on blue background with Newport Beach logo per CNB STD No. 916-A. Page 49 of 67 SECTION 701 — CONSTRUCTION 701-1 GENERAL All materials, equipment and components furnished shall be new, be of the latest design and manufacture, and be in an operable condition. All parts shall be of high quality workmanship, and no part or attachment shall be substituted or applied contrary to the manufacturer's recommendations and standard practices. Like components shall be of the same manufacturer. Equipment shall be furnished in matching, or closely coordinating, colors and materials The equipment shall be readily accessible for service or replacement. Equipment shall be neatly located within cabinets such that there are no obstructions to air flow. There shall be proper cooling of all equipment. No equipment shall be considered which requires direct/dedicated ventilation systems. All equipment shall have conveniently located, protected on-off switches. It shall be the responsibility of the Contractor to supply and install all necessary power distribution devices including power switches, circuit breakers, grounding straps, etc., for equipment within each cabinet. All equipment shall be tagged clearly indicating the type of equipment. Where specified in the plans or these specifications, the Contractor shall provide all material and equipment per the manufacturer's name and model or catalog number. Products of other manufacturers will not be considered. Electrical and Environmental Reauirements The equipment shall meet all the specified performance requirements under the following ranges of electrical and environmental conditions (unless otherwise noted). • Primary Power - 120 volts single phase, voltage variation ± 10%; frequency range, 60 Hz ± 1. • High Frequency Interference - Spikes of 50 volts. • Low Voltage Transients - +20% of the nominal line voltage for maximum duration of one power cycle. • Temperature Range - +50 to +85 degrees F. • Temperature Gradient - 10 degrees F per hour. • Humidity - 50 to 60 percent, non -condensing. All electronic equipment shall be of solid-state design (unless otherwise noted) and modular construction. Individual electrical components in any module shall be removable and replaceable without resulting damages to the module or equipment. The design shall be such as to prevent reversed assembly or installation of connectors, fasteners, etc., Page 50 of 67 where possible malfunction or personnel hazards might occur. Each item of equipment shall be designed to protect personnel from exposure to high voltage and temperature during equipment operation, adjustments, and maintenance. All video display system and computer equipment shall be suitably protected against Electro -Magnetic Interference (EMI) and shall be sufficiently shielded so as not to produce any EMI, which would interfere with any other equipment in the City TMC. Any equipment failing to meet this requirement shall not be used. All video power circuits shall be on the same phase and dedicated for video use only. The equipment shall be protected from surges and transients in the electrical service and dedicated interconnect cable system. The equipment shall be provided with manually re-settable or replaceable circuit protection devices to protect the equipment and power sources. All such devices shall be readily accessible. Cabling Requirements All cable plugs and connectors shall be labeled and keyed to preclude improper connection. The use of ribbon type cables to connect between equipment is not acceptable unless the cables are shielded and have an extra layer of heavy-duty protection from the environment, as well as connectors on each end with some form of locking mechanism. Responsibilities of the Contractor It shall be the Contractor's responsibility to perform site inspection of the work area prior to beginning Field Work and to identify any factors that will affect the unit cost and the total cost to implement the System per the Plans and these Special Provisions. The Contractor shall be responsible for all work necessary for delivery, installation, testing, configuration, calibration and maintenance of all Field Work equipment installed as part of this contract, such that they operate as an integrated functional system until final acceptance. The Contractor shall also be responsible for all incidental accessories necessary to make the installed system, including the fiber optic communication system and CCTV system, complete and ready for operation, even if not particularly specified. Such incidentals shall be furnished, delivered and installed by the Contractor without additional expense to the Engineer or the City. Minor details not usually shown or specified but necessary for the proper installation and operation, shall be included in the work and in the Contractor's cost proposal, the same as if herein specified. The Contractor shall note that approval by the Engineer is required before ordering or installing any material and equipment that is to be used for the Contract. All communication equipment should be operationally tested before they are shipped to the project site. Page 51 of 67 The Contractor shall fully inform himself/herself regarding any and all peculiarities and limitations of spaces available for installation of all Field Work and materials furnished and installed under this Contract. The Contractor shall exercise due and particular caution to determine that all parts of the Field Work are made quickly and easily accessible after installation. Although the location of equipment may be shown on the Plans in certain positions, the Contractor shall be guided by details and conditions at job; the Plans are essentially diagrammatic, intended to indicate the scope of work to be done, and are not to be used for fabrication. It shall be the responsibility of the Contractor to make sure that the equipment he/she proposes to use will fit into the available space with proper clearances. The Contractor shall verify all controlling field dimensions before ordering or fabricating any material. No equipment or materials to be installed as part of this contract shall be ordered prior to receiving written approval from the Engineer. The Contractor shall maintain the project site in a neat condition. No debris shall be left under any circumstances. The Contractor shall keep material and equipment at his facility and shall deliver only material needed at a given time to the project site. The material shall be delivered in a coordinated manner, and as approved by the Engineer. When the installation of all equipment is completed, the Contractor shall dispose all unused materials. Prior to disposal, the Contractor shall identify all unused materials with the Engineer and obtain the approval from the Engineer. The Contractor is required to observe all regulations and ordinances of the City as they apply to work in City buildings, streets, and other rights-of-way or City property. The Contractor shall procure encroachment permits for all work done outside City right - or -way, including work completed on Caltrans right -or -way, at the Contractor's expense. The Contractor shall coordinate the Field Work with all required agencies and utility companies. If other equipment not mentioned in these Special Provisions is deemed necessary by the Contractor for a complete and successful installation of the Field Work described in Section 1.2, the Contractor shall do so in concert with the equipment list submittal. This section of the submittal shall be entitled "OTHER PERTINENT EQUIPMENT" and the Contractor shall include a brief justification statement relative to the inclusion of this equipment. The purchase of additional equipment is subject to approval by the Engineer. It is the Contractor's responsibility to ensure that a complete and working system installation is achieved. The Contractor shall assign project management staff to coordinate all project activities with the City, the Engineer and other vendors. Page 52 of 67 701-8 FOUNDATIONS, FOUNDATION CAPS AND SLABS 701-8.2 Foundations. Portland cement used shall be Type V. Placement of concrete shall conform to the provisions in Section 51-1.03D Placing Concrete of the Caltrans Standard Specifications. All abandoned foundations shall be removed completely. Foundation concrete shall be vibrated to eliminate air pockets. The Contractor shall define exact location of all utilities in the vicinity of the new foundations, by hand digging if necessary. After all utilities are established, the Contractor shall contact the Engineer for authorization of specific foundation location. Foundations shall be hand - dug until clear of obstructions. 701-11 PULL BOXES All pull boxes shall be located at the locations shown on the Plans, or as directed by the Engineer. However, these locations may be changed to suit field conditions as directed or approved by the Engineer. No pull box shall be located on the driveway apron, or above catch basin, or within one (1) foot of any existing, proposed or future (as shown on plans) wheelchair ramp, or within one foot from the curb in case of streets without gutter, or within thirty (30) inches from any pole foundation, or other locations which may interfere with the movement of people or vehicles, unless approved by the Engineer. Pull boxes within unimproved areas shall have a Class 1 flexible Post Delineator, per Caltrans Standard Plan A73 -C installed adjacent to the pull box. Within the pull box, the conduit shall be placed in a manner that the lowest portion of the opening shall be a minimum of two (2) inches above the bottom of the pull box. The top portion of the conduit shall be not less than eight (8) inches from the top of the pull box. The maximum thickness of the rock shall be one (1) inch. The conduit shall also be placed in a manner to allow the cable/wire to be pulled in a straight line and clear the side of the pull box by at least two (2) inches. The distance between pull boxes shall not exceed 800 feet, unless otherwise shown on the plans, unless otherwise specified in the Plans or these Special Provisions, or as directed by the Engineer. A minimum of fifteen (15) feet of slack fiber optic cable, or length as shown on plans, shall be coiled in each pull box at all locations, unless otherwise specified in the Plans or these Special Provisions, or as directed by the Engineer. Page 53 of 67 If new pull boxes are replacing existing pull boxes, the Contractor shall protect existing conduit and cable from damage. Should the existing conduit or cable become damaged, the Contractor shall repair and/or replace damaged conduit or cable. Prior to repair/replacement, the Contractor shall notify the Engineer and the City of exact location, and provide a detailed description of damage. Any existing features or improvements damaged by the Contractor shall be replaced in kind, at the cost of the Contractor and not the Engineer or the City. Pull boxes shall be installed with lid and completely secured prior to any conductor or cable installation. Where the sump of an existing pull box is damaged by the Contractor's operations, the sump shall be reconstructed and if the sump was grouted, the old grout shall be removed and new grout placed at the cost of the Contractor and not the City. Excavating and backfilling shall conform to the provision in section 87-1.03E , Excavating and Backfilling for Electrical Systems of Caltrans Standard Specifications except that the backfill material shall not contain rocks graded larger than one (1) inch. 701-12 CONDUIT All conduits shall be installed at locations as shown on the plans, or as directed by the Engineer. Locations of proposed conduit are approximate and may be changed to suit field conditions as directed or approved by the Engineer. Conduit shall be laid to a depth as shown on the plans. A minimum of thirty- (30) inches of cover to the top of the conduit is required at all locations. Conduit shall be placed in a manner to allow the cable/wire to be pulled in a straight line and clear the side of the pull box by at least two inches. Where conduits are shown on the plans to be installed parallel and adjacent to each other, they shall be installed together in a common trench or directional drill bore. Make right angle bends in conduit runs with long -radius elbows or conduits bent to radii not less than three (3) feet. All bend radii shall be three (3) feet unless otherwise set forth elsewhere in this Special Provisions or as directed by the Engineer. The sum of the angles for conduit bends between two consecutive pull boxes shall not exceed 270 degrees. All conduit bends shall be factory bends done by the manufacturer. Hot box or other field bends will not be accepted. The bell and spigot ends of each PVC conduit shall be chamfered by the manufacturer. Transition of the conduit without bends shall not exceed more than one foot for every ten feet. Page 54 of 67 Make bends and offsets so that the inside diameter of conduit is not effectively reduced. Unless otherwise indicated, keep the legs of a bend in the same plane and the straight legs of offsets parallel. Do not use diagonal runs except when specifically noted in the drawings. Provide a waterproof label on each end of the pull rope to indicate the destination of the other end. Conduits entering vaults shall terminate flush with the inside walls of each pull box Conduits entering vaults and pull boxes shall be capped or sealed to prevent ingress of water, debris, and other foreign matters into the conduit. Immediately prior to installing cables, conduits shall be blown out with compressed air until all foreign material is removed. After cables have been installed, the ends of conduits shall be sealed with a reusable mechanical plug. Conduit and fittings shall be supplied with an ultraviolet inhibitor Within pull box, conduit shall be placed to provide a minimum clearance of two (2) inches between the lowest portion of the opening and the bottom of the pull box. And there shall be a minimum clearance of eight (8) inches between the top portion of the opening and the top of the pull box. Conduit shall enter the pull box at not more than a 45 -degree angle. In addition, conduit may not be terminated less than 45 degrees to the ground level, except for pull boxes with extension. Conduit ends shall be terminated three (3) inches above the gravel surface and nine (9) inches clearance between the top of the bushing and the top of the pull box shall be provided. Within the splice vault, the conduit shall be laid no closer than two (2) inches from any wall of the splice vault. After conductors/cables have been installed, the exposed end of conduits remaining in pull boxes and controller cabinets shall be sealed with a sealing compound as approved by the Engineer. Direction Bore Conduit shall be installed by directional drilling method at the locations shown on the plans, unless specified otherwise by the Engineers. Drilling pits shall be kept at least two (2) feet clear of the edge of any type of pavement wherever possible. Conduit alignment shall be located under stamped pedestrian crosswalks to prevent check pits in special pavement. Excessive use of water, such that pavement might be undermined or subgrade softened, will not be permitted. Page 55 of 67 Trenching Trenching in Newport Beach right of way shall conform to Newport Beach Standards Installation of conduit in unpaved areas (dirt) shall conform to the following: Conduit shall be placed in a trench approximately two (2) inches wider than the outside diameter of the conduit to be installed. Trench shall not exceed eight (8) inches in width. A minimum of thirty- (30) inches of cover to the top of the conduit is required. For all pull boxes the trench may be hand dug to required depth. Where cover to top of conduit is less than thirty- (30) inches, the conduit shall be placed in the bottom of the trench and the trench shall be backfilled with sand -cement slurry backfill, containing not less than two (2) sacks (188 pounds) of cement per cubic yard of Type I or II Portland cement added per cubic yard of imported sand and sufficient water for workability. The top four (4) inches shall be backfilled and compacted with native soil. 701-14 SERVICES Electrical service shall be modified Caltrans Type II or Type III -BF, unless otherwise shown on the plans, and furnished by the Contractor. It shall be equipped with five (5) circuit breakers (100 -amp main, 15 -amp IISNS (internally illuminated street name sign), 30 -amp lighting, and 15 -amp spare, and 50 -amp signal) and test blocks inside cabinet. For Type II enclosures refer to Caltrans Standard Plan ES -213 and City Standard Drawing No. 910-L (P and R cabinets). For Type III -BF enclosures refer to Caltrans Standard Plan ES -2E for further details. Service enclosure shall be powder coated white inside and out Federal color #17875 to match the traffic signal cabinet and battery backup cabinet. If service equipment cabinet design deviates in any way from the details shown on the plans, details of such deviation shall be submitted to the Engineer for review before fabrication of the contract cabinet. If deemed necessary by the Engineer, one complete prototype cabinet shall be delivered to the Engineer for review at least 30 days before fabrication of the contract fixtures. The prototype cabinet will be returned to the Contractor and, if permitted by the Engineer, the cabinet may be installed in the work. It shall be the Contractor's responsibility to verify the location of service to make arrangements for necessary connection for the traffic signal and lighting system. If an alternate service location is necessary due to a utility conflict or Edison requirement. The alternate location shall be approved by the Engineer. The Contractor shall contact Edison within three days of receiving the Notice to Proceed. Contractor is responsible to determine and verify the exact location of electrical service. Failure to comply shall be a basis for rejecting requests for additional working days based upon utility company delays. Page 56 of 67 701-17 TRAFFIC SIGNAL CONSTRUCTION 701-17.4 Wiring, Conductors and Cable. 701-17.4.4 Interconnect. The twisted pair cable shall be installed in new and existing conduit as shown on the plans. The new cable shall be terminated on existing terminal blocks located in the traffic signal controller cabinets and at the Central Library, as shown on the Plans. The new twisted pair cable will support communications with existing twisted pair cable, as shown on the Plans. Proposed and existing twisted pair cables contain 12 pairs. The Contractor shall terminate the new twisted pair cable to match pairs of the existing twisted pair cable. Communication Link Testing The twisted pair cable will support Ethernet over copper communications along at the locations shown on the plans. This will require one pair of the twisted pair cable to create a daisy -chain communications link between the Ethernet switches at the project intersections. Upon installation of the new twisted pair cable at the locations as shown on the Plans, the Contractor shall test the signal strength of all twisted pair cables between the intersections listed above. Note that this requires the Contractor to test not only the new twisted pair cable installed as the locations as shown on the Plans, but also to test existing twisted pair cable. This information shall be provided to the Engineer to determine the optimum pair of twisted pair cables to use between each intersection listed above for Ethernet communications. The Contractor shall provide all personnel, equipment, instrumentation, and materials necessary to perform all testing herein. Results of test to be submitted to the City in a CD. Submitted to both Contractor and Engineer and shall be made part of the Operations and Maintenance Manual. 701-17.4.5 Fiber Optic Cable. Fiber optic cables shall be installed in continuous lengths without intermediate splices throughout the project, except at the location(s) specified in the Plans. When ordering fiber optic cable the Contractor shall exercise extreme caution so as to ensure that no additional splicing, beyond that indicated in the Plans, shall be required. Should the Contractor believe additional splices are required; this matter shall be immediately brought to the attention of the Engineer for resolution. The Contractor shall install the fiber optic cable in strict adherence to the manufacturer's recommended procedures. Care shall be taken to avoid cable damage during handling and placing. Fiber optic cable is sensitive to excessive pulling, bending and crush forces. Page 57 of 67 The minimum bending and maximum tension requirements for installing the fiber optic cables shall be according to the manufacturer's specifications. Cable installation personnel shall be familiar with the cable manufacturer's recommended procedures including, but not limited to the following: • Proper attachment to the cable strength elements for pulling during installation. • Cable tensile limitations and tension monitoring procedures. • Cable bending radius limitations. The installation of loose tube fiber on Caltrans right-of-way shall be installed per Caltrans standards. Contractor shall be responsible for making himself/herself fully aware of the Caltrans standards. Mechanical aids may be used to assist cable installation. The pulling eye/sheath termination or cable grip hardware on the optical fiber cables shall not be pulled over any sheave blocks. Field installed pulling grips with a rotating type swivel shall be used to pull the fiber optic cable. A Corning Cable System GRP series or equivalent woven wire type of grip is recommended. When power equipment is used to install optical fiber cabling, the pulling speed shall not exceed 30 meters per minute. The pulling tension and bending radii limitation for optical fiber cables shall not be exceeded under any circumstances. A tension measuring device or break -away swivel shall be placed between the pull line and the end of the cable to ensure that the tension does not exceed 80 percent of recommended tension or 2225 N, whichever is less. A ball bearing swivel shall be utilized between the pull line and the end of the cable to prevent the cable from twisting during installation. Large diameter wheels, pulling sheaves, and cable guides shall be used to maintain the appropriate bending radius. During cable installation, the bend radius shall be maintained at a minimum of twenty times the outside diameter of the cable. The cable shall not be stressed beyond the minimum bend radius at any time during installation. Tension monitoring shall be provided at all times during the pulling operation and shall be accomplished using commercial dynamometers or load -cell instruments. Fiber optic cable shall be installed using a cable pulling lubricant recommended by both the fiber optic cable and the conduit manufacturer, and a non-abrasive pull rope/tape conforming to the provisions described under "Conduit" elsewhere in these Special Provisions. Cable lubricant shall be compatible with the fiber optic cable outer sheath and existing cable where fiber cable is installed in a conduit with other existing cable. Lubricant shall be applied according to the manufacturer's recommendations. Contractor's personnel shall be stationed at each vault and pull box through which the cable is to be pulled to lubricate and prevent kinking or other damage to the cable. The Contractor shall submit detailed installation procedures (pull plans) for review twenty (20) working days prior to pulling in each optical fiber segment. The pull plan shall state the exact operational procedures to be utilized and identifies the physical locations for Page 58 of 67 equipment placement, proposed equipment setup at each location, location of the manpower, the pulling methodology and the estimated pulling tensions for each pull section. The Contractor shall provide the pulling tension calculations and any backup information with the pull plan. Where the fiber optic cable is installed in existing conduit or utility ducts that contain existing cables, the Contractor shall install the fiber in conduit without removal of the existing cables, unless otherwise specified on the plans. The Contractor shall be responsible for replacing any cables damaged during removal and reinstallation at the cost of the Contractor and not the Engineer or the City. Cable slack shall be provided for each cable at each fiber optic splice location, as shown on the plans and as specified in these Special Provisions. Cable slack shall be divided equally on each side of a splice closure or pull box. Sufficient slack shall also be provided at all pull boxes to facilitate placing the optical fiber cable against the side of the pull box. At all pull boxes and cable vaults, cable slack, as shown on the plans, shall be left by the Contractor for all installed fiber cable. Cable slack shall be coiled and secured to the racking hardware with tie wraps. The Contractor shall ensure that the minimum bending radius of the optical fiber cable is not compromised when preparing this stored cable slack. Following installation of the cable in duct, all duct entrances in cabinets, pull boxes and vaults shall be sealed with mechanical plugs; or at the discretion of the Engineer, duct sealing compound, to prevent the ingress of moisture, foreign materials and rodents. Splicing Fiber optic cable shall be installed without splices except where specifically allowed on the Plans or described in these Special Provisions. The single -mode fiber optic cables designated as mainline cable shall be spliced only at pull box locations as shown on the plans. When splicing into a mainline cable, only those fibers associated with a specific traffic control device shall be severed. All other fibers shall remain intact. The Engineer may allow additional splices between these specified locations. Splicing - Optical fibers shall be spliced using the fusion splice method and the insertion loss shall not exceed 0.07 dB of loss per splice. Field splicing is permitted for the following: • Connection of cable reel sections. • Connection of a mainline cable to a drop cable. • Connection of service drop cable or breakout cable to an optical fiber pigtail at traffic equipment cabinets or the patch panels in a hub equipment cabinet or at the TMC. • Connection of the mainline cable to an optical fiber pigtail at the FDU in the TMC or at the field location as shown on the plans. Page 59 of 67 • Connection of two or more mainline fiber optic cables as shown on the plans. The Contractor shall not exceed the maximum number of field splices permitted as shown on the plans. Completed splices shall be placed in a splice tray. The splice tray shall then be placed in a watertight splice enclosure. Field splices shall be conducted only at locations as shown on the plans as an approved splice location. All splicing equipment shall be in good working order, properly calibrated, and meeting all industry standards and safety regulations. Cable preparation, closure installation, and splicing shall be accomplished in accordance with accepted and approved industry standards. Using a mid -span splicing method, a drop cable shall be joined to the fibers in the fiber optic cable span. The termination splices shall be placed in a splice tray and the splice tray(s) shall then be placed in a watertight splice closure. Equipment cabinets shall be equipped with splice trays suitable for storage and protection of each single -mode optical fiber pigtail and the splice connection to cable fibers. Equipment cabinets shall be equipped with a suitable means for routing and securing of cables, fibers, and pigtails to prevent damage to fibers during all regular operation and maintenance functions All splices shall be protected with a thermal shrink sleeve. All fibers shall be labeled in the splice tray with permanent vinyl markers. Pigtail ends shall also be labeled to identify the destination of the fiber. Pigtail ends shall also be labeled to identify the destination of the fiber. Upon completion of the splicing operation, all waste material shall be deposited in suitable containers, removed from the job site, and disposed of in an environmentally acceptable manner. Fiber Optic Cable Assemblies Cable assemblies (connectors, pigtails and jumpers) shall be products of the same manufacturer. The cable used for cable assemblies shall be made of fiber meeting the performance requirements of these Special Provisions for the fiber optic cable being connected, except that the operating temperature shall be modified to -20° C. to +70° C. Manufacturer's attenuation test results shall be provided for all cable assemblies. The outer jacket of jumpers shall be yellow. Optical Fiber Connectors - All optical fiber termination components shall meet or exceed the applicable provisions of TIA/EIA-455-B, Standard Test Procedure for Fiber Optic Fibers, Cables, Transducers, Sensors, Connecting and Terminating Devices, and Other Fiber Optic Components. Page 60 of 67 All optical fiber connectors shall be of industry standard approved connector for single - mode optical fiber and shall meet or exceed the applicable provisions of TIA/EIA-455-2C (FOTP-2), Impact Test Measurements for Fiber Optic Devices, TIA/EIA-455-5B (FOTP- 5), Humidity Test Procedure for Fiber Optic Components, and TIA/EIA-455-34A (FOTP- 34), Interconnection Device Insertion Loss Test. When tested in accordance with FOTP —2, the connector assembly will be subjected to ten impact cycles by being dropped from a height of 1.5 m. The maximum insertion loss measured before and after the impacts should be < 0.50 dB. The mean insertion loss of the before and after impacts should be < 0.30 dB. The insertion loss increase measured before and after the impacts should be < 0.30 dB. The maximum reflectance measured before and after the impacts should be < 40 dB. When tested in accordance with FOTP — 5, the connector assembly will be subjected to test conditions of 75 °C and 95% relative humidity for 7 days. Measurements of loss and reflectance will be made at the beginning of the test, at a minimum of six hour intervals during the test, and at the end of the test. The maximum insertion loss measured before, during, or after the test should be < 0.50 dB. The mean insertion loss of the before, during, or after the test should be < 0.30 dB. The insertion loss increase measured before, during, or after the test should be < 0.30 dB. The maximum reflectance measured before, during, or after the test should be < 40 dB. Optical fiber connectors shall satisfy all of the interface parameters of equipment components as may be defined by the transmission equipment specifications. All optical fiber connector assemblies shall be machine polished for low back -reflection and low insertion losses at both 1310 nm and 1550 nm operating wavelengths. Single -mode pigtails shall be provided with factory pre-connectorized single -mode connectors. Connectors shall have maximum insertion loss of 0.27 dB or better. Connectors shall have a stainless-steel barrel (coupling nut) with a bayonet connection design, ceramic (zirconia) ferrule. Each connector shall be capable of 200 repeated matings with a total maximum additional increase in insertion loss after 200 matings limited to 0.30 dB. Each connector shall have a return loss (back reflection) equal to or better than 55 dB. All connectors shall be factory -assembled and tested. There shall be no fabrication of connectors in the field. All unmated connectors shall have protective caps installed. Couplers - Couplers shall be made of nickel plated zinc or a glass reinforced polymer that is consistent with the material forming the associated approved connector. The design mechanism for mounting the coupler to the connector panel may be flanged or threaded but shall coincide with the connector panel punch -outs. All coupler sleeves shall be ceramic of the split clamshell or cloverleaf design. The temperature operating range for couplers shall be the same as that specified for the connectors. Pigtails - Pigtails shall be of simplex (one fiber) construction, in 900 (Dm tight -buffer form, surrounded by aramid for strength, with a connector on one end. The outer jacket shall be yellow PVC with a nominal diameter of 3 mm, marked with the manufacturer's Page 61 of 67 identification information. All pigtails shall be of adequate length for the intended connection purpose, but not less than one meter in length. Pigtails installed in conduit shall follow the installation procedures outlined for fiber optic cables, except that the pulling tension shall not exceed 500 N (110 Ibf.). Jumpers - Jumpers shall be duplex. All jumpers shall be at least two (2) meters in length, sufficient to avoid stress, and allow orderly routing. Jumpers shall have appropriate connectors on both ends. Fiber Assignments The fiber assignments tables and schematics will be provided as part of the plans. Fiber Optic Cable Link Testing The installed optical fiber cable shall be tested for compliance with the transmission requirements of this specification, the cable and hardware manufacturer's specifications, and prescribed industry standards and practices. The Contractor shall provide all personnel, equipment, instrumentation, and materials necessary to perform all testing herein. Multiple tests shall be required prior to shipment as well as before and after installation of the cable. The results of these tests shall be logged and posted in the cabinet and in a conspicuous location for future comparisons. Documentation of all test results shall be provided to the Engineer within two working days after the field tests are performed. The documentation shall also be made part of and submitted as part of the Operations & Maintenance Manual. The types of acceptance tests required by the City of fiber optic cable system certification are: • Documentation of compliance with the fiber specifications, as specified in these Technical Provisions, shall be supplied by the fiber manufacturer. Before shipment, but while on the shipping reel, 100% of all fibers shall be tested for attenuation. Copies of the results shall be: - Maintained on file by the fiber manufacturer, with a file ID number for a period of five (5) years. - Attached to each fiber cable shipping reel in a waterproof pouch. - Results of test to be submitted to the city in a CD. - Submitted to both Contractor and Engineer and shall be made part of the Operations and Maintenance Manual. Continuity Testing (Before Installation) The fiber cable shall be physically inspected on delivery and the attenuation shall be measured for 100% of the fibers. In addition, the continuity test procedure shall be used Page 62 of 67 on short links (less than 300 feet) of the cable system during construction to validate continuity of fiber elements. Failure of any single fiber within the cable to comply with these Technical Provisions shall be cause for rejection of the entire reel. Test results shall be recorded, dated, compared and filed with the copy accompanying the shipping reel in a waterproof pouch. Attenuation deviations of greater than 5% from the shipping records shall be brought to the attention of the Engineer. The cable shall not be installed until completion of this test sequence and the Engineer provides written approval. Copies of traces and test results shall be submitted to the Engineer in a CD. If test results are unsatisfactory, the reel(s) of fiber optic cable shall be rejected. The rejected reel(s) of cable shall be replaced with new reel(s) of cable at the Contractor's expense. The new reel(s) of cable shall be tested upon delivery as described herein. Cable continuity shall be verified using a visual light source, typically a 635 -nm laser diode. For cables with insertion loss of less than 3 dB, the light source shall be the Corning Cable System OS -1 OOD test set, a RIFOCS 263A visual fault finder, or equivalent. The continuity test procedure shall also be used to verify continuity on all fibers prior to measuring pre -installation attenuation using an Optical Time Domain Reflectometer (OTDR). This insures that the fibers are completely continuous from end to end, since single -ended OTDR tests cannot reveal fiber discontinuities close to the cable endpoints. Continuity Testing (After Installation) These tests shall occur after the termination process has been completed. Each point- to-point link shall be tested for optical power loss with an OTDR in both directions. The connectors shall be identified by numbered colored tape, where each tape color shall be consistent throughout the project. The Contractor shall use OTDR testing to insure that each fiber is one continuous length (contains no splices within the cable structure) and meets the attenuation specifications of the manufacturer and cognizant industry standards. OTDR measurements made before the cable installation provide baseline data for comparison to post -installation OTDR tests. The OTDR test also provides useful measurements and documentation for the installed system. Therefore, OTDR traces shall be generated into a hard copy and software file on a CD for the purpose of developing historical as -built, documentation regarding the cable's condition before and after it was installed. The hard -copy and CD documentation shall be provided to the City. The recordings shall also be made part of and submitted as part of the Operations & Maintenance Manual. If specialized software (i.e. other than Microsoft Office Products) is needed to access and read OTDR electronic test results, the Contractor shall provide licensed software to the City at no cost. Page 63 of 67 Prior to conducting OTDR tests, the Contractor shall provide the City with information regarding the test equipment to be utilized (manufacturer and model number) plus the equipment calibration procedures that will be utilized by the Contractor. Quality tests shall consider both attenuation and localized loss discontinuities. The OTDR shall be equipped with a switchable, dual wavelength module with 1300 nm and 1550 nm light sources, and be compatible with single mode test fibers. The OTDR shall either be capable of writing to a floppy disk or configured with a plotter to provide a hard copy record of each test measurement. The OTDR shall be equipped with sufficient internal masking to allow the entire cable section to be tested. This may be achieved by using an optical fiber pigtail of sufficient length to display the required cable section, or by using an OTDR with sufficient normalization to display the required cable section. A hard copy XY plot shall be provided to the City for all fiber optic tests. All traces shall display the entire length of cable under test, highlighting any localized loss discontinuities. The trace shall display fiber length (in meter/feet), fiber loss (dB), and average fiber attenuation (in dB/mile) as measured between two markers placed as near to the opposite ends of the fiber under test as is possible while still allowing an accurate reading. Time averaging shall be used to improve the display signal-to-noise ratio. If connectors exist in the cable under test, then two traces shall be recorded. One trace shall record the fiber loss (dB) and average attenuation (dB/mile) of the entire cable link, including connectors. The second trace shall display a magnified view of the connector regions, revealing the connector losses (dB). All connector losses shall be measured using the Least Squares Approximation (LSA) or 5 -point splice loss measurement technique. The OTDR trace shall also include the following information: • The date and time of the test • The Cable ID number • The fiber color or ID number • The optical wavelength used for the test • The refractive index setting of the OTDR • The pulse width setting of the OTDR *The averaging interval of the test Each connector shall be tested for optical loss using an OTDR. Measure each connector in both directions, at 1550 nm, for single mode connectors. An XY plot, from the OTDR, shall be provided for each connector measurement. Connector loss shall meet or exceed the requirements of the connector specifications. The OTDR shall be calibrated for correct index of refraction to provide proper length measurement for the known length of reference fiber. Insertion Loss Testing (After Installation) Insertion loss testing is performed after the cable has been installed, terminated with connectors, and connected to the patch panels. It is used to closely emulate the losses Page 64 of 67 incurred in a fully assembled optical data link. It measures actual losses through connector panels and fiber cable. A light source from an insertion loss test set directly replaces the data transmitter at the output launch point and an optical power meter replaces the data receiver at the data receiver input port. The Contractor shall conduct insertion loss testing on all installed and terminated optical fiber elements. Insertion loss test measurements for each fiber on each cable shall be documented by the Contractor and the results provided to the City. Testing shall be conducted at 1550 nm for all single mode cables. Total end-to-end loss for each fiber in each cable shall be within the fiber optic modem manufacturer's allowable loss budget specifications. If it is not, the Contractor shall take corrective measures to bring the cable link's insertion loss into compliance with the manufacturer's specifications, including remating and re -termination of the connectors, and/or replacement of the cable. The Contractor shall provide the City with information regarding what type of test equipment will be utilized (manufacturer and model number) plus the equipment calibration procedures that will be utilized by the Contractor prior -to conducting this test routine. The test recordings for all fiber cables shall be provided on documentation sheets in a form to be determined by the City and submitted to the City within two (2) weeks after termination of the fiber elements. The recordings shall also be made part of and submitted as part of the Operations & Maintenance Manual, discussed elsewhere in these Special Provisions. Insertion Loss Test Equipment (Fiber Optic Cable) 1. Testing Light Source: An LED laser light source with a wavelength equal to the operational system wavelength shall be used. The LED shall be stable within 0.1 dB in output power over a time period sufficiently long to perform the measurement. 2. Launch Reference Cable: It shall provide for attachment to the light source. The launch reference cable shall be of the same fiber size and type as the fiber under test. To eliminate cladding modes, a self -mode -stripping cable or a low loss (-0.5 dB) mandrel wrap mode filter shall be used. 3. Power Meter: The detector in the power meter shall have an effective numerical aperture (NA) and active area that is larger than the fiber under test. The power meter shall have a sufficient measurement range to measure the insertion loss of the cable and connectors in the link. The power meter must be linear over the range of losses to be measured in the system and have sufficient resolution for the proposed measurements (0.05 dB). The power meter must be able to measure both absolute power in units of dBm and relative loss in units of dB. The power meter must also be able to change its calibration wavelength to match the system (1310 nm, or 1550 nm) operation wavelength. The meter shall be capable of measuring to -70 dBm. Page 65 of 67 Insertion Loss Test Procedures and Execution The Contractor shall provide all personnel, equipment, instrumentation and supplies as necessary to perform all testing. Zero Reference Cable: Connect the launch reference cable between the test light source and the power meter detector. Illuminate the reference cable and record the optical power as Ref. Power 1 in dBm. System Insertion Loss: The system to be tested shall be inserted between the launch reference cable and the power meter, completing the optical path from the LED to the power meter. Record the optical power shown on power meter as Test Power 1 in dBm. System Insertion Loss 1 is then calculated by the following equation: NOTE: Record insertion loss as a positive value. System Insertion Loss 1 (dB) = Ref. Power 1 (dBm) — Test Power 1 (dBm) The system under test shall then be tested from the other end in a similar fashion as above. Here, record the output of the launch reference cable as Ref. Power 2 and the output of the system link as Test Power 2. System Insertion Loss 2 is calculated identically: System Insertion Loss 1 (dB) = Ref. Power 1 (dBm) — Test Power 1 (dBm) The results of the insertion loss testing shall be recorded along with the test date, name of person performing the test, and the brand name, model number and serial number of the equipment used during the test. All results shall be made part of and submitted as part of the Operations & Maintenance Manual, discussed elsewhere in these Special Provisions. Fiber Optic Cable Route Records The Contractor shall provide the City with a cable route diagram indicating the actual cable route and foot marks, for all intersections, directional change points in the cable routing, and all termination points. The Contractor shall record these points during cable installation. Cable system As -Built drawings showing the exact cable route shall be provided by the Contractor to the City. Information such as the location of slack cable and its quantity shall also be recorded in the cable route diagram. This information shall be included as part of the Operations & Maintenance Manual. Each fiber connectors and patch panel connectors shall be tagged with its fiber number and associated field element location. Each tag shall be permanently attached by a nylon tie -lock to the cable or connectors. The cable shall be tagged in each pull box. #10 Green Tracer Wire The Contractor shall furnish and install #10 green wire in all conduit segments where fiber optic cable is installed, as shown in the plans, including all new and existing conduit segments where work is completed. All #10 wires entering a pull box shall be joined by a split -bolt connector. Page 66 of 67 701-17.6 Detectors. The number of sensor units and lead-in cables required to achieve the specified detection shall be installed. Lead loops shall be installed per CNB STD Nos. 923 -L-A and 923 -L -B. Lead loops shall be modified Caltrans Type E, and placed immediately behind the limit line/crosswalk. Remaining presence loops shall be Type E, spaced 10 feet apart and installed per Caltrans Standard Plans ES -5A and ES -5B. Bicycle loops shall be Caltrans 3'x 6' Type D loop detector. All installed loop detectors shall be completely functional to the satisfaction of the Engineer prior to the turn -on of the modified traffic signal. 701-17.6.3 Inductive Loop Detectors All installed loop detectors shall be completely functional to the satisfaction of the Engineer within five consecutive working days after placement of pavement finish course. Page 67 of 67 APPENDIX 1 - CITY OF NEWPORT BEACH STANDARD DETAILS CUR8 I-A(.f T- N 318" EXPANSION 101N1 MATERIAL (TYP) -- cuRr1 Access annus sHAL r. COMPLY WITH CURRENT ADA REQUIREMENTS' R=15' 1'0R LOCAL SIRESS AND 2.5'1 OR AR IrRIAL /,�; UK f!;S 0 1-1 ffl? WISESPrCIFffl) CONCRI--l-k-SHALL 131.560-C-3250 10' IYPICAL MIN. SIOPI.-2%MAX IANDS(APL A 71 PARKIAl I Y V11 STRFF T 7REFS REQUIRED WUR DISIANCE FROM CURB J PIM.P.C.C.TO PROPERTY LINE EXCEEDS 6 FFIT IN RFSIDCNTIJL 'TYPICAL. SE',CTION ARL -AS. CONCREIF SIDEWALK IN COMMERCIAL AREAS WITH STRIETTREFS, 318" EXPANSION JOINT IIIA IERMI WEAKENED PLANFJOINT S I-.114"SAWED, QUICK-10INTOREQUAL 81 8, 8, 8' 81 8' 8' 8, PUNIING OR CONCRETE WALK & I'APAINISION JOINTS I I WOR 1« "IANDARODHAILN0. SIDEWALK DETAIL 1.80-L. I Sl: \Vl I I I N-1 ANDARD SPL( '11- K iVl'[(),\Is 1;m P(1131.1(' WORKS CONSTRI;("l [ON 'A OR 13 VARIABLE 1I, MIN _ I (111 111.16111 GF 2% MAX 4' MIN i3 x IRE rAINING' GURH I . RON I EDGE to i'i OF 91OFWAW n co HONI EDGL /� n a, \ j' 01. SIDIWALK W, Iyp. / / P ULL IiL1GFl f CF Al CURET A OR 13) /1 10% MAX cl: VARIACILF (T CASE "A" 0" GI MAX 5% MIN & VAIRIAIII.1 SLOPE ` 8.3% MAX 'A ON 11) IRE, WINING CURD ] ly ]ESSAIRY A I o', cr W - , I INFC PROIDLI? I Y L.INI. X I' MIN o" cI CASE "E" FOLL 2% MAX � Il I IL IICF cli 4' MIN VARIAIJI I 57 MIN 5% MIN 0" CF 1i.3% MAX z 8.3% MAX nlw FRONT FOCI: OF 9 DEWALK RE FAINING CURD i FULL --- ------ -- < 1-11:1011 10% MAX A 1 ("Ut-W d A OR B CASE "B" 5% MIN &, I [RON F HFIAINING CLIPH 8.3Y, MAX TGI 01 '[--WAI K 0" GF 4' MIN 2% MAX 0" CIF VARIABI.1- 3% WAN & 5% MIN & FRONT EOGIE A, -i/ MAX 8.3/ MAX OF SM)VWALK o" cr FULL CASE "F" ---- - -- ----- HEIGHT CF CAS -E C LT11�'DIRT I I'd WI 11 N 1;11)1-.WAI-I< IS -11 IAN 6' WIDI I?F fAINING A) WHO \X I VARIP JOIN f: X. 0 (,l 4' MIN 41 G" Yll, MAX I' MIN VAPIA131-F GI 5% k I HLI 11FIGIlf GF K, MN MAX MIN I RON I I-oct. I o"/ i n: OF SIDEWALK v ALONG AGCESs 2% MAX ?AMP LANDING SL01117 HCR FROM EDGE FULL 10% MAX OF SIDEWALK 11FIGHT Cf - A F COP\11 A) cl CASE "D" GNSE -------------- - .. .... ----- ---- --- ...... .. -- ------- -- DRAWN: 11. KIIARA/1,11 DAll: I?/)o/.'ow CITY OF: NEWPOR'F BEACH DEPARTMENT OF PUBLIC WORKS ---------- -- ----- - ------ CURB A CESS IRAMP STANDARD DRAWING 1,10. 181 !;IIH I I OF I 1011 OF RAMP - 4' MIN 2% MAX 57 MIN V. 8.3/ MAX SECTION A -A 101' 01 RAMP RI- I AINING CIJI?IJ 11: NECESSARY SIG NOW 9 4' MIN I 2% MAX F 5% MIN N. 8.6% MAX SECTION B-13 DITRI:YS FNIIRF 9DI--WA1 K AS RFOUIPH) RAISE-I)TRUNCA"fl-D . - -- -- I - -- - ------- DOME PATTERN (IN-LINE) 101' DIAMHI H 0.45" MIN AND 0.41" MAX i o.2', DASI DIAMILP 0.9" MIN AND 0.92" MAX RAISEI)TRUNCATED-DOME IU7. MAX CF AI CUP13 CASE "o" iX MAX CURB NOTES: 1. GOI?IJ AND Gt) I IFU WILL IT POURED 1) 1 WS I AND RAMP 11 IL I 0110WING DAY TO CREATE GOLD JOIN1, 2. LOCAHONS WIIII CROSS t;IlAt-I IIAVI. SPANDREL RITI.AGED. ;5. PARKWAY I.ANI)'.)(,Al)[- AND lRffl(,A*r]ON ';IIAI.I- IK MODIFIED 114 KIND. PAY LIMII UcR/t:cR 1("/I:I- DETAIL A CURB RAIVIP PAY DPITIZIP I ION OF ki V11;I01,111, CITY OF: NEWPORT BERCI-1 DEPARTMENT' OF PUBLT.0 WORKS - --- ------- -.1 --------------- . DRAWN; . 1). KHARA/Mi "ESS RAMP - - CURB ACC. DAll : 9/ 11`/71119 ?" Gtj I IuR I CURB Is'. GOTTEN ;, PAKIII 5 1 ANDAM) DRAWN(; 1`101 ,.1.81 S1IEC 1201 RETAINING CURD SFUN011.9 2% MAX A SECTION C.7c. 2.3' MIN ANO 2.4" MAX GFNIEN TO GENIFIR SPACING, ryi,. RAISE-I)TRUNCA"fl-D . - -- -- I - -- - ------- DOME PATTERN (IN-LINE) 101' DIAMHI H 0.45" MIN AND 0.41" MAX i o.2', DASI DIAMILP 0.9" MIN AND 0.92" MAX RAISEI)TRUNCATED-DOME IU7. MAX CF AI CUP13 CASE "o" iX MAX CURB NOTES: 1. GOI?IJ AND Gt) I IFU WILL IT POURED 1) 1 WS I AND RAMP 11 IL I 0110WING DAY TO CREATE GOLD JOIN1, 2. LOCAHONS WIIII CROSS t;IlAt-I IIAVI. SPANDREL RITI.AGED. ;5. PARKWAY I.ANI)'.)(,Al)[- AND lRffl(,A*r]ON ';IIAI.I- IK MODIFIED 114 KIND. PAY LIMII UcR/t:cR 1("/I:I- DETAIL A CURB RAIVIP PAY DPITIZIP I ION OF ki V11;I01,111, CITY OF: NEWPORT BERCI-1 DEPARTMENT' OF PUBLT.0 WORKS - --- ------- -.1 --------------- . DRAWN; . 1). KHARA/Mi "ESS RAMP - - CURB ACC. DAll : 9/ 11`/71119 ?" Gtj I IuR I CURB Is'. GOTTEN ;, PAKIII 5 1 ANDAM) DRAWN(; 1`101 ,.1.81 S1IEC 1201 I. 11 DISIANCE IROM GURU TO BACK OF SIDEWALK IS 1'00 511010 TO ACCOMMODAIE RAMI' AND 4' MIN I'I_AIIORM (LANDING) AS IN CASE A, IME SIDEWAI K MAY III- IN PRESSED I ONGI IUDINA1.1 Y OR MAY UE WIDENED AS IN CASE D. 2. IF SIDEWALK IS 11',S TI IAN 6' WIDI., IIII: FI11.1- WID II I OF IIII. SIDEWALK SI TALI- Ill.: DIPRICS SI[0 AS SHOWN IN CASE C. S. (NOI USED) 4. (NOI USED) 9. TIII- PAY LIMITS FOR CURT] ACCESS RAMPS SHAH HI: AS SHOWN IN DETAIL A. G, 1RANSHIONS IROM RAMPS 10 WALKS, GUI IFKS, OR SIRI F IS SHAI.I. Bl: FLUS'll AND FRIT. OI ABRUPI CIIANGI S. /. SIDEWALK AND RAMP TFIICKNI:SS, "I' SIIALL 131: 4" MIN. K (I III -TTY PULI 13OXiS, MANIIOIFS, VAUI IS AND All OIIIFR U IIIIIY IACII IfII'S WHIN TIIE HOUNDARIES OF IIII CURN RAMP SI IAIJ BIC RICLDCAII-D OR ADJUS IED 10 GRADE. 9. COUN'IFRSLOITS' OF ADJOINING GUITERS AND ROAD SURl'AGES IMMEDIAIIIY AOJACPNT 10 AND WIEIIIN 11" 01 IIII CURB FLOWI_INE SIIALL NOT UE STEEPER IRAN IV:2011 (5,0%). 10. RAISED 1RUNCAIED DOMES SHALL DE DARK GRAY IN COLOR AND SIIALL 131- ADA PAVERS AS MANUTACRJUVO BY WAOSAU 111_L, INC OF WISCONSIN, ADA -2 COLOR A--90 OF? API'ROVED I -OVAL. 11. DICfIi:CTADLF. WARNING SIJNIACI_S SHALL_ IT A MINIMUM 01 48" WIDE: PERPENDICULAR 10 fill:: DIRLC HON OF 1RAVI1. AND I:X II ND 36" MINIMUM IN TIIE DIRECTION O1 TRAWL. _................. ._...... C:CTY OF NEWPORT* BEACH DEPARTMENT OF PUBLIC WORKS DRAWN: P. KIIARA/FII DA 11,: SIU RB A - CES...'' IMP STANDARD DRAWING F10, :x.81. SNer I.1 Of 1 TRAFFIC SIGNAL POLO: PEDESTRIAN PUSH (SUTTON _ BICYCLE PUSH BUTTON 0 NOTES: L. BICYCLE PUSH BUTTON (BPB) SIGN SHALL BE S"x7-•1/2" PER CALTRANS S I-ANDARD III. -AN ES -5C. 7. BPB HOUSING SHALL BE TYPE B. 3. BPB ASSEMBLY SHALL 13E MOUNTED SO 'THAT BUTTON IS A130VE SIGN. PEDESTRIAN AND BICYCLE PUSH BUTTON MOUNTING CONFIGURATION BICYCLE PUSH BUTTON ASSEMBLY 3'..610 Pf_.DLSTRIAN PUSH BUT -TON ASSEMBLY - --- ------ MOM - MO n D CITY 01 NL?WPORT Bl?r\C'[�f UEPAR'1'Mf?NT OF l'U13L,IC; Wt)RIC�� - - - _ - -- srnriunuu oi_ rnIt, NO. TON INSTALLAT10N DEF . IS RICYCLE PUSH 13(fl" Al. 913-11- - - --- --- - - -- -- - - --- USIS WFYI I STAN DA IM SIT'(111CA HONS FOR NJIII,W WORKS ('ONS I RUCTION SIitLI i ) ... .... . §\ \ )[ / �m 1 < U z \ O / \ \ ® \ g Q /� z 2 m 2 � / \ \ \ / \ / © E \ \ ?Lu \ E a \ c u / / I / _§ , o $ _ %[ v < u I E < \ « u ui g k / < / \ / \ \ ®> u- O m g y \ � � o \\ ro 2: E < /\ G A/ @ < /eo \<\ LLJ /\ /yu u z 3 U -)e < E z 2 j\ DO \ LLJy \ Lu 2 \ \ / \ E z m @ e 3 ® u < / \ % f 2 / / u Z k 0->&_ g CL o / LL� \ 2 \\ m 0 / \ R 3 j U < - R k / \ / / \ \ \ \ � u R / z § 2 h\\ L < j o 2@ e@\ e m _ c I u / m b\ %� u G ^ ^ \ / < E0 o < o � CO ». g ' " \/ E g R u R@ 2 @ u E u < \ o \ / / / g @ Z \ \ \ -J -j o -i ® 2 o z= W d d q d z e / / / / \ / b \ (D 3 ©® / .... / \ \ \ \ \ / - 1-1 \ z g m u z !E zo " � �z o- _'. , 9&•4a a m6 , m e mu _KS m. I ADOPTED CITY OF NEWPORT BEACH DEPARTMENT OF PUBLIC WORKS INTERNALLY ILLUMINATED STANDARD DETAIL NO. STREET NAME SIGN 916-A SHEET USE WITH STANDARD SPECIFICATIONS FRmBILCWORKS CONSTRUCTION DMlTUNEOKCROSSWALK PER PI NOTE? L UN|fSS UTU[KVVB[ END [CA [[DTYPE E LVVP6S|ALL DEG DV\MLIRANDTYT D LOOPS SHALL NE3'x6' 2 LOOPS SHALL RECEN[EREDlNTHE LANE UNLESS OTHEKVV6[5UOVVN. PiA[ELF-AD LOOPS lMMED[ATELY[NADVANCE UFLIMIT DNEOKCROSSWALK. ], AMAXIMUM OF4LOOP DETE[[ORSSI- ALL BEON 1 DF[ECTOR LEAD 4N [ABL[(DL[). T SEE C[[YSTD-9Z]i-B FOR C8|][K8NS M0DlF1ED '|YPE E |DOPWIN D[NG DEFAIL. l LOOP WERE. SHALL BE: lYPFl LOOP DETECTOR LE8D'[NCABLE (U|/C)SH8LLUE|YPr8. G, LOOPS SHALLBEINSTALLED PER C8[[KANSSlAND8KD N/lN FS -M AND EI -5B. 7 LOOP 3[ALANT3HALLDEHOT-MEL[RUBDEKIZEDAIPHAOFSEAi/\N[ � ----- ----- -- CITY0|'� N|�VV|`<)|[[|U!/\(.|| UB`N<l��[Nl�0|� P|UU](' VV(>KKH � � � �� 1-0, OP K����� �' K_«~»��U- ���_ K 'EC -11 ­0R -1:.' ���^� 92-'3,-1[_,-,A ~ ~~ � LEGEND.: � iox D[TECFOKINPUT FOR Tl1K0U6H 0 0 71'0Y PHASES DETECTOR INPUT FOR LEFTTURN ' PHASES -+ >-can (013 BICYCLE. LOOP DE[E[TOK[NPUl' CA[TRANSTYPE [ LOOP DETE[]DK I FURN-' MODIFIED [8LTk803TYPE E LOOP \!/ DETE[T0K(LEAD LOOPS) VFIROUC&I CALTRANSTYPE 0LOOP DLT[CR}R / |LANES | ^-BIKELAN[ ( ) � | | 1-4Y / | | | | | FGU[U�K CUKBF8OF� NOTE? L UN|fSS UTU[KVVB[ END [CA [[DTYPE E LVVP6S|ALL DEG DV\MLIRANDTYT D LOOPS SHALL NE3'x6' 2 LOOPS SHALL RECEN[EREDlNTHE LANE UNLESS OTHEKVV6[5UOVVN. PiA[ELF-AD LOOPS lMMED[ATELY[NADVANCE UFLIMIT DNEOKCROSSWALK. ], AMAXIMUM OF4LOOP DETE[[ORSSI- ALL BEON 1 DF[ECTOR LEAD 4N [ABL[(DL[). T SEE C[[YSTD-9Z]i-B FOR C8|][K8NS M0DlF1ED '|YPE E |DOPWIN D[NG DEFAIL. l LOOP WERE. SHALL BE: lYPFl LOOP DETECTOR LE8D'[NCABLE (U|/C)SH8LLUE|YPr8. G, LOOPS SHALLBEINSTALLED PER C8[[KANSSlAND8KD N/lN FS -M AND EI -5B. 7 LOOP 3[ALANT3HALLDEHOT-MEL[RUBDEKIZEDAIPHAOFSEAi/\N[ � ----- ----- -- CITY0|'� N|�VV|`<)|[[|U!/\(.|| UB`N<l��[Nl�0|� P|UU](' VV(>KKH � � � �� 1-0, OP K����� �' K_«~»��U- ���_ K 'EC -11 ­0R -1:.' ���^� 92-'3,-1[_,-,A ~ ~~ � TWISTFT (M I WINDING DETAIL MODIFIED TYPE E LOOP DETECTOR (NOT -1-0 SCALE) AN SAWCUT'DETAll MODIFIED TYPE E LOOP DE -l -FC -FOR (NO -1-1-0 SCALE) eta it Finish A001PILD CITY (*'Ni?MPORTIWACI I YANDAMID111,11110, LOOP DETEC"I""01IRS 923-1-13 \\TIII STA IN DA R D'SPIVIF1 UA HONS FOR N I 1I.W\VORKSCON`l 1814-1 ION --RAFFIC SIGN 7-.' MIN. __tw_- fi VARIES 2" x 2" O.D. .1.11 GA. UNISIRU-( POSI ' 8' MIN WFIEN INSTALI117 T MIN }` ON OR AWACENT TO 4".-6" ABOVE: BICYC1_L SIDI_WALI<S, FINISH SURFACE PATHS OR WALKWAYS. 2-1/11" x "2-1./4" O.D. 12 GA. UNISIRUT BASL: V- f TNISH SURFACE: 1.8" I.N CON( RE -IT 30" IN DIRT J."Y' :CCAI_. SIGN ]'Ns-r.\I._L/1.I..:I:UN NO-rFS L. SIGN SHALL BI:' STANDARD SIL(' PER I'I-IE CALIFORNIA MUTCD UNI -.[.-.SS OTHERWISE SHOWN. RE'IRORI 1-1..LC-rIVL SI-IEI-T:ING SHALL. 13E TYPE /L OR GRLA F`R. SIGN SHALL BF MADE OF ALUMINUM (0.08 INCH TI-IICI<NESS). 2. NEW SIGN POSTS SHALL_ BL 1.1 GAUGE, 2 INCH SQUARE (O.D.) UNIS RU r INSTALLED INTO A '1.2 GAUGE 2-1/4-INCI-I UNISTRUT (O.D.) BASE. UNISFRUT BASE SHALL. 13F. INSTALLED AT A DFPFEI OF 18 INC:I-IFS IN CONCREIT: AND 30 INCLIES IN DIRT. CONTRACTOR SHALL USA LOCATION PRIOR TO INSTALI-ING SIGN. 3. SIGN MOUNTING HARDWARE AND BRAC H -S ' IHAI...L 13F 5/16 INCH S-IALNI..[---.SS ST1-1---.. ANI*I-SI-ICE LUBRICANT SHALL- BF. APPLILD TO MOUNTING I-IARDWARI PRIOR 1-0 Ms-I-ALLATION. ,L. SIGNS S-IALT. BL::INSIAI_LE:D AT A CLEAR I (EIGHT OF 7 PI_I=1 UNI_F SS OTHERWISE SHOWN ON PLANS. LOCATION OF SIGNS SHOWN ON PLANS IS APPROXIMATE- AND SHALL 1:31 APPROVED BY THL CITY PRIOR 1-0 INSTAL.I_ATION. SIGNS INS MILE]) ON OR ADJACM1 .0 BICYCLE: SIDEWALKS, PATHS, OR WALKWAYS SHOULD BI=: I.NSTAI_I..LD AT A CL -EAR I -IE IGHT OF 8 FEET. wvid6 A1,0111 1 1) CITY OF RII?WI'ORT III "/\('I I DI?P\12 I MI�,i�l'I' OI-' III J131.1(_' WORKS SI "ANI WM Pi IAll NO. Util: wiTif STANDARD SI'I.0 HFICA'I IO'\IS I--()R-PHRI.IO' WORMS CONS ('RUO" HON �aurr i