HomeMy WebLinkAboutC-8619-1 - Grant Application for Balboa Island/Corona del Mar Microtransit Feasibility Study (Project V)CITY OF
NEWPORT BEACH
Balboa Island/Corona del Mar Microtransit
Feasibility Study
OCTA Comprehensive Transportation Funding Program (CTFP)
Community -Based Transit/Circulators (Project V)
H i r �rHWl;
AJ)T 42 OW
1 I -•W
Balboa
Island
• BALBOAFUNZONE
• BALBOA PIER
IFGEND
POINT OF INTEREST
FASH ON
ISLAND MALL
Nert
E'.
Cen er
NEWPORT
• TRANSPORTATION
CENTER
0VIC
CENT
ER
• CIVIC CENTER
ESR 14P
Irvne
i
Terrace
CORONA EL MAR PLAZA
SHO INO CTR
rA
Balboa Corol I
Peninsula
v
CORONA DEL F:: 'SIN
STATE BEACH
PREPARED FOR:
Orange County Transportation Authority
600 S. Main Street
Orange, CA 92868
December 12, 2019
OASIS SENIOR
:ITIZENS CENTER
del Mar
hk,Y
a�
,ane N
PREPARED BY:
City of Newport Beach
100 Civic Center Drive
Newport Beach, CA 92660
City of Newport Beach
OCTA Project V
1. Application..................................................................................................................... 1
2. Project Scope of Work................................................................................................... 6
• Project Description......................................................................................................... 6
• Project Location Map..................................................................................................... 7
• Project Need................................................................................................................... 9
• Goals and Objectives....................................................................................................10
• SOW Tasking................................................................................................................. 11
• Estimated Costs............................................................................................................ 15
• Schedule.......................................................................................................................16
3. Draft Resolution (to Council January 14, 2020).......................................................... 17
I
OCTA
PROJECT V
2020 Call for Projects Application & Scoring Criteria
APPLICATION CHECKLIST
Application materials should be submitted in the order they are listed below. Refer to the CTFP Guidelines for
more detailed application requirements. Points shown are the maximum points given per category.
Completed Application
✓
Board/Council Resolution (Draft Permitted Initially)
✓
Scoring Criteria— 100 Points Total (NOT APPLICABLE FOR PLANNING APPLICATION)
Financial Commitment (15 Points)
❑
Cost Effectiveness (10 Points)
❑
Estimated Operating Cost per Revenue Vehicle Hour
❑
Lease/Cost Estimates & Project Backup Documentation
❑
Project Readiness (10 Points)
❑
Project Implementation Schedule
❑
Planning and Environmental Documentation
❑
Operations Plan (15 Points)
❑
Draft Timetable & Headways
❑
Route Map w/ Existing Transit Service
❑
Stop Locations Identified
❑
Fleet Size & Summary of Vehicle Types
❑
Maintenance Facilities Identified & Service Plan Developed
❑
Average Service Speed by Time Period
❑
Paratransit Plan
❑
Ridership Projection (5 Points)
❑
Projected Average Daily Boardings (Opening Year)
❑
Funding Plan (10 Points)
❑
Partnership Arrangements
❑
Service Coordination Plan
❑
Cost of ADA Service Considered/Addressed
❑
Service Type (15 Points)
❑
Agency Experience (10 Points)
❑
Community Benefit (10 Points)
❑
Updated: 10/14/2019 Page 1 of 5
OCTA
PROJECT V
2020 Call for Projects Application & Scoring Criteria
APPLICATION INSTRUCTIONS
Local Agencies applying for Project V funds are required to complete and submit this application. Application
materials must be included in the order in which they are listed on the Application Checklist. Any projects not in
compliance with the CTFP Guidelines will not be eligible for funding.
Applicant Information
Agency:
City of Newport Beach
Project Manager:
Brad Sommers, P.E.
Title / Department:
Principal Civil Engineer, Public Works Department
Phone:
949-644-3326
Email:
bsommers@newportbeachca.gov
Project Title:
Balboa Island/Corona del Mar Microtransit Feasibility Study
Project Description
The City of Newport Beach requests $58,500 in funding for new service planning from OCTA's Project V.
The proposed project will determine the feasibility of a new microtransit service in two of the most popular
areas of the City: Balboa Island and Corona del Mar with potential connection to Newport Center and Irvine
Terrace. Growing traffic congestion, limited parking, and limited mobility are ongoing and growing concerns
for area merchants, their employees, and residents, creating a need for new solutions, such as microtransit.
These areas combine dense housing with high-value destinations for residents and visitors offering a broad
range of retail, restaurant, and entertainment activities. The target areas are also vital elements of the City's
tourist economy. The long-term success of these economic engines is closely tied to the ease of mobility
and parking of the residents, employees and visitors within the focus area.
The proposed study will identify whether a microtransit service will alleviate congestion and parking
concerns, be cost effective and beneficial to the community. The study will examine ridership and demand,
potential routes and stops, vehicle options, operational and cost details, ADA accessibility, etc. The
feasibility study will include significant community outreach to gather input and garner support. The City will
hire an expert consultant to conduct the feasibility study, and estimates that the Consultant will spend
approximately 500 hours to complete the study and produce the written feasibility study that includes
recommended alternatives that can be implemented through Project V and coordinates with existing services
such as OCTA bus service, Balboa Peninsula's trolley services, and others. The Consultant will be assisted
by staff from the City's Public Works Department along with other potential partners within the Balboa Island,
Corona del Mar and Newport Center communities. The City will provide the required 10% match for the
proposed project in addition to providing support to the Consultant in project management and reporting,
providing data and information, assisting with community outreach, and providing input and guidance on the
study's required analyses.
Additional details are provided in the attached Scope of Work, including need for the project, description of
the proposed service area, tasking, cost estimate, funding plan, and schedule.
Updated: 10/14/2019 Page 2 of 5
OCTA
PROJECT V
2020 Call for Projects Application & Scoring Criteria
Describe Source of Agency Funds:
The required 10% match ($6,500) will be sourced from the City of Newport Beach Contribution Fund.
Cost Effectiveness
Operating Cost per Boarding Opening Year:
Proposed Funding Summary
Annualized Operating & Capital Cost per
Passenger:
N/A for planning project
Total Project Cost:
$65,000
Match Rate:
N/A for planning project
10%
Capital Funding:
N/A for planning project
Level of Commitment:
Commitment Letter
Operating Reserve:
N/A for planning project
Non -Applicants:
N/A for planning project
Proposed Funding Breakdown
Include anticipated expenditures (i.e. Bus stops, staff time,
marketing, etc.)
Ca
ital
Operations & Maintenance O&M
Expenditure
Anticipated Cost
Expenditure
Anticipated Cost
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Initial
Marketing
Planning
Expenditure
Anticipated Cost
Expenditure
Anticipated Cost
Click to add
$ Click to add
Consultant to Conduct
Feasibility Stud
$ 65,000
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Click to add
$ Click to add
Describe Source of Agency Funds:
The required 10% match ($6,500) will be sourced from the City of Newport Beach Contribution Fund.
Cost Effectiveness
Operating Cost per Boarding Opening Year:
N/A for planning project
Annualized Operating & Capital Cost per
Passenger:
N/A for planning project
Project Readiness
Opening Month and Year:
N/A for planning project
Phase Ready:
N/A for planning project
Updated: 10/14/2019 Page 3 of 5
OCTA
PROJECT V
2020 Call for Projects Application & Scoring Criteria
Special Event Transit (If Applicable) (Add additional pages if needed)
Projected Average Daily Boardings 1st Year:
Total Annual Boardings
Annual Operating Days
N/A for planning project
Event Name
Date
Time
Location
Community/Activity Centers/Tourist Attractions
Served:
N/A for planning project
Select date.
Click here to
Click here to enter text.
Click here to enter text.
enter text.
Click here to enter text.
Select date.
Click here to
Click here to enter text.
enter text.
Click here to enter text.
Select date.
Click here to
Click here to enter text.
enter text.
Click here to enter text.
Select date.
Click here to
Click here to enter text.
enter text.
Minimum Eligibility
YES
NO
A
Applicant is eligible to receive M2 funding:
✓
❑
B
Supplement rather than supplant existing transit services: N/A -planning
project
❑
❑
C
Projects meet ADA requirements: N/A -planning project
❑
❑
D
Financial plan for ongoing operations & maintenance: N/A planning
project
❑
❑
E
Project approved by Board/Council and partner jurisdictions: Resolution to go
✓
❑
to City Council January 14, 2020 for approval
F
Local funding meets minimum 10% match requirement:
✓
❑
Transit Usage (Provide rationale with application materials)
Projected Average Daily Boardings 1st Year:
Total Annual Boardings
Annual Operating Days
N/A for planning project
Fixed -Route Bus/Rail Connections
Number of fixed -route connections (w/in 1/4
mile):
N/A for planning project
Community Connections (Add additional pages if needed)
Community/Activity Centers/Tourist Attractions
Served:
N/A for planning project
Click here to enter text.
N/A for planning project
Click here to enter text.
Click here to enter text.
Updated: 10/14/2019 Page 4 of 5
OCTA
PROJECT V
2020 Call for Projects Application & Scoring Criteria
Proposed Service Type
Proposed Project/Service Service N/A for planning project
Type
Agency Experience (Add additional pages if needed)
Balboa Peninsula See attached Scope of Work for description
Previously Operated Trolley
Service Oasis Senior Shuttle See attached Scope of Work for description
(List All Applicable)
Service Description (Include service length)
Has a feasibility study been completed for the proposed service? If so, please Yes ❑ No
attach the study to the application packet.
Applicant is requesting Pre -Award Authority (See page 6-3 of the Guidelines Yes ❑ No
for pre -award authority provisions):
Additional Comments
As required, attached is a detailed Scope of Work that outlines the need for the feasibility study, goals and
objectives for the proposed service, the list of tasks required to complete the feasibility study, the proposed
schedule, the City's staffing plan, and additional details about the City's experience with similar transit
services.
I hereby certify that the information provided herein this form is accurate and consistent with accompanying
documentation. / further certify that the above information has been approved by Council resolution and that
awarded funds will not be used outside of their intended purpose.
Brad Sommers, P.E.��'
Name (Print) �,ggnat,,,��
E
Updated: 10/14/2019 Page 5 of 5
Orange County Transportation Authority
Community -Based Transit/Circulators (Project V)
SCOPE OF WORK
Balboa Island/Corona del Mar Microtransit
Feasibility Study
INTRODUCTION
The City of Newport Beach (population 85,326) requests $58,500 in funding for new service
planning from OCTA's Project V. The proposed project will determine the feasibility of a new
microtransit service in two of the most popular areas of the City: Balboa Island and Corona del
Mar, with potential connection to Newport Center and Irvine Terrace. The idea was first posed by
Balboa Island and Corona del Mar business owners and residents, who approached the City
requesting assistance in addressing congestion, which they fear poses a barrier to the mobility of
the residents and long-term sustainability of the City's tourism industry. The City has enjoyed a
record high -number of visitation numbers with 7.3 million people passing through the City in 2017
generating $1.213 in spending, $43M in local taxes (the third-largest revenue source for the City),
and supporting 16,000 jobs. Two similar microtransit services, FRANC (Free Rides Around
Newport Center), and FRAN (Free Rides Around the Neighborhood) in Anaheim, as well as the
Balboa Peninsula Trolley have raised awareness among business owners and residents of the
potential of microtransit to improve mobility in small, dense and congested areas.
PROPOSED SERVICE AREA
The study's area of focus is Balboa Island and Corona del Mar with possible connection to
Newport Center and Irvine Terrace (see map next page).
Ralhna Island
This 0.2 -square mile island community is
home to more than 3,000 people and more
than 100 business. With densely placed
homes and as a key Newport Beach tourist
attraction, parking and mobility are
challenging year-round, and especially
during the peak summer season.
Contributing to the concern is the sheer
number of visitors, limited number of on -
street parking spaces, and narrow streets,
many of which are one-way. Access to the
Island is limited to a short two-lane bridge
and the Balboa Island Ferry, a privately
operated fleet of three, three -
car ferryboats.
Fig. 1: Summer holiday traffic pictured on Balboa Island (2018).
FASHION
_ \
ISLAND MALL
NIVVMrt
EN
Cen er NEWPORT
\ • TRANSPORTATION
CENTER
H IN IC'ET COASTHwy
ApT42,000 \ qyM
CENTER
C1,1� CPJTE
- I.E -:E OF O
. I .E 11 TI1ICT•z �gPs¢O
Balboa Irvine
-L = - Terrace �o
FE Island 9Q
• BALBOA FUN ZONE BS SnR d�Y CORO HOMAR
CTRSA
P
YQ
OASIS SENIOR CENTER
O, n "ITIZENS
• BALBOA PIER -O\O
O'.
Balboa CoronO del Mar
Peninsula
W
LEGE'.. ��hy
PANT rF I`:TE�E�:T co,or•IA EEL a.Ail meati
STATE REACH
aQ
40
Corona del Mar
Corona del Mar (CdM) is a residential community with a vibrant commercial area that has an
abundance of upscale stores and restaurants. CdM has bluffs offering celebrated ocean views
and popular public beaches. Limited mobility in this roughly 0.6 -square -mile area is due to
constrained capacity, substantial pedestrian and bicycle activity, and on -street parking friction.
Coast Highway, the primary route through Corona del Mar, is a regional facility (continuation of
State Route 1) carrying a large amount of through traffic during the morning and evening peak
hour periods. Due to its constrained width and capacity, Coast Highway often bottlenecks,
creating congestion within CdM.
tee, .a. ,p�%j�%;✓ G.'.. / `
ani
Fig. 2: Corona del Mar pictured. Coast Highway highlighted, showing the hundreds of restaurants, shopping,
ILand other high-value destinations for visitors, employees, and residents.
Newport Center
Newport Center is a residential, business, shopping, and
entertainment district located on a bluff overlooking
Newport Harbor and centered around the Fashion Island
regional shopping mall, which is one of the premier
shopping venues in the County. Newport Center occupies
a large city block that is approximately 0.7 -square miles.
In addition to the nearly 170 retailers and entertainment
venues at Fashion Island, there are numerous businesses,
condominiums and hotels. Circulation and parking can be
challenging and led the Center's owner to develop their
own microtransit solution (FRANC) focused on the
Center's customers, residents and employees (see more
information about the service below).
Irvine Terrace
This area is almost entirely residential bordered by Coast
Highway. Close proximity to Balboa Island, Corona del
Mar and Newport Center provide potential benefit for this
neighborhood through a transit option, allowing residents
to travel the last mile without single occupancy use of
their vehicle.
Fig. 3: Newport Center's numerous office
buildings, residential condominiums, hotels
pictured around the centrally located Fashion
Island mall.
COORDINATION WITH AND CONNECTIVITY TO EXISTING SERVICES
The proposed study would consider, coordinate, and align proposed services with existing
adjacent and overlapping transit services including:
• FRANC — Free Rides Around Newport Center is focused on moving employees,
residents, and visitors in a concentrated area around the Fashion Island mall within
Newport Center. The proposed service would provide service across a broader area of
Newport Center, and through neighboring Corona del Mar and across the harbor to
Balboa Island. FRANC is operated by Irvine Company;
• The Balboa Peninsula Trolley — the City's free, peak -season trolley debuted in 2017. The
service provides visitors and residents the ability to visit and travel the Peninsula (another
of the City's congested tourist destinations) and leave their car at a remote parking lot.
The popular service was launched and is operated with funding from OCTA's Project V;
• Oasis Senior Center Shuttle — The Oasis Shuttle provides seniors with transportation
to/from their residence in Corona del Mar and Newport Coast. The service connects
them with medical appointments, shopping, essential errands, and the Oasis Senior
Center. The program is operated by the City and users are charged a small fee from
$1.50 to $3.00 depending on the destination; and
• OCTA's local bus service (which has stops throughout the target area); Newport
Transportation Center located in Newport Center (from which riders can access
destinations throughout Orange County including John Wayne Airport, Amtrak and
Metrolink in Santa Ana and Anaheim); and paratransit service offered through Oasis
Senior Center located in Corona del Mar.
PROJECT NEED
1. Improved Mobility for Visitors, Employees, and Residents. Growing traffic congestion and
limited parking present growing concerns for area merchants, their employees, and residents.
Parking issues and congestion in the service areas are common and impacts are significantly
increased during the peak summer season. During June, July and August, traffic is substantially
higher than typical spring/fall or winter conditions. Volumes on already congested roadways
generally increase by almost 30%.
Microtransit will enhance mobility for persons who live in the area allowing them to leave their car
at home and still access major points of interest in the service area. The Federal Highway
Administration reports that more than 35% of vehicle trips are under two miles, presenting a great
opportunity for residents to take advantage of an easy-to-use service and avoid congestion and
parking woes. Significantly, microtransit also offers a first -last mile solution for tourists and others
who are driving from distant locations. Visitors could utilize under -used parking on the perimeter
of the service area and use microtransit to reach their destination. For example, a family residing
in Los Angeles County could make a day -trip to Newport Beach by driving to the City, parking at a
lot near the service area, and taking microtransit to Fashion Island to shop; they could then pick
up the service yet again to travel to the beach in Corona del Mar. At the end of their day, the
service would take them back to their car. They will have enjoyed all of the amenities of the area
without the hassle of parking and without having to navigate the traffic that is inevitable once in
these areas. Microtransit options often are quiet and emission -free, leaving a smaller "footprint."
Service will be designed to take advantage of less -used roadways, and part of the study will be to
identify perimeter parking options, route options, coordination with other transit services
(described above) to maximize mobility options, and to work with the City's Public Works
Department to ensure that the routes do not cause unanticipated circulation issues.
2. Threats to Long -Term Economic Sustainability in the Proposed Service Area. As noted above,
the tourism industry is the third largest revenue source for the City providing $43M annually in
local taxes and supporting 16,000 jobs. Concerns among area merchants are the impetus for
discussions of microtransit, and specifically concerns about the sustainability of their businesses
in the face of degraded mobility in the service area. Balboa Island merchants have noted minor
decreases in sales that have driven them to identify possible causes; they question whether the
area's congestion and limited parking is a barrier to visitors. The long-term success of the City's
economic engines is closely tied to the ability of employees and visitors to easily travel to and
from their destinations.
COMMUNITY AND STAKEHOLDER PARTICIPATION
The project will include a robust outreach effort (described in detail in the Tasking section below)
that supports the project as follows:
• Considers and incorporates:
o Outreach and feedback already received from previous traffic calming studies
conducted throughout the City;
o Existing local data that illustrate mobility, circulation, and parking conditions; and
o Information from similar microtransit projects including The Irvine Company's
FRANC microtransit service and Anaheim Resort Transportation's FRAN;
• Utilizes best practices used by the City in previous community engagement efforts such as
Town Hall and community associations meetings; and
• Solicit support from potential project partners in the community, such as businesses and
homeowner's associations, that have shown interest in the project.
RESPONSIBLE PARTIES
The City of Newport Beach (Public Works Department) will be responsible for project
implementation, administration, and performance. The City will engage an experienced
Consultant to conduct the feasibility study and all associated analyses. The Consultant will assist
with community and stakeholder outreach activities, including sharing summaries of their
analyses and preliminary vision for the proposed service. The Consultant will be responsible for
developing the draft and final Balboa Island/CdM Microtransit Feasibility Study.
GOALS AND OBJECTIVES
The goal of the feasibility study is to identify whether microtransit service in the proposed service
area is feasible, cost effective and beneficial to the community. The objectives include:
• Conduct analyses of: ridership/demand, routes and stops, different types of possible
vehicles, operation details and the roles of the City and its partners, ADA accessibility,
costs and benefits, and identify potential funding sources;
• Conduct community outreach to ensure that the voices and concerns of residents,
merchants, and other stakeholders are heard, and all planning activities accommodate
their interests to the greatest extent possible;
• Identify preferred alternatives, make recommendations, and identify next steps; and
• Develop a written feasibility study that details the above, and present to OCTA and the
City Council for approval.
The project is aligned with the City's own goals (as stated in the General Plan) to:
• Reduce summertime visitor traffic impacts including implementing services that encourage
use of remote visitor parking and expanded transit (e.g., bus or shuttle) to reduce visitor
traffic (CE 1);
• Implement a transportation system that provides mobility for residents and encourages
use of public transportation as an alternative to automobile travel, including identifying
services for Special Need Populations (e.g., elderly, disabled, and other transportation
disadvantaged persons), and focusing on seasonal services (CE 4); and
• Reduce automobile travel through the use of travel demand management strategies and
encourage the use of alternative transportation modes, such as ridesharing, carpools,
vanpools, public transit, bicycles, and walking; and provide facilities that support such
alternate modes (CE 6).
10
TASKING (Preliminary)
1. PROJECT MANAGEMENT
Task 1.1 — Consultant Procurement
The City will develop and issue a Request for Proposals (RFP) for a Consultant to conduct the
analyses, develop the written Feasibility Study, and participate in all community and stakeholder
outreach events. Procurement will follow the City's established procedures, and the City will
make their selection based on qualifications, directly -related experience, and cost-effectiveness.
Task 1.2 — Project Monitoring
During the course of the project, the City will conduct regularly -scheduled meetings with the
Consultant (in-person and via telephone) to monitor project progress, identify project
implementation barriers and identify solutions, and discuss upcoming tasks. The City will monitor
the project's budget and timeline to ensure the project stays on -track, and will be responsible for
ongoing quality control monitoring of the Consultant.
Task 1.3 — Semi -Annual and Final Performance Reporting
The City will develop and submit semi-annual reports and the final report to OCTA in a timely
manner as prescribed in the grant agreement. The reports will summarize project progress and
obstacles, and will include copies of deliverables.
Task 1.4 — Reimbursement Requests
The City will develop and submit reimbursement requests to OCTA in a timely manner as
prescribed in the grant agreement.
Deliverables:
Procurement materials (e.g., RFP, list of applicants, materials from the selected
Consultant).
Semi-annual progress reports.
Reimbursement requests.
2. CONDUCT PROJECT KICK-OFF MEETING
The City will plan and conduct a kick-off meeting with the Consultant and OCTA to review and
discuss the grant agreement, implementation expectations and timelines, reporting and invoicing,
and immediate and long-term action items.
Deliverables:
• Meeting agenda, participant list, meeting minutes, and any additional materials produced
for or after the meeting.
3. REVIEW EXISTING MATERIALS
The Consultant will review existing materials including:
• Related General Plan elements;
• Information and data from traffic calming studies completed by the City;
• Community profile and service area characteristics (including estimates of population and
tourism growth);
• Local data and information that show existing mobility, circulation, and parking conditions;
• State of the industry studies and case studies of microtransit in other jurisdictions (review
materials and interview relevant personnel); and
11
• Materials and data about existing transit options in the service area (e.g., OCTA buses,
Newport Center's FRANC, Balboa Peninsula Trolley, etc.).
Deliverables:
• List of materials reviewed.
4. ESTIMATE DEMAND AND RIDERSHIP
The City anticipates that the Consultant will conduct an analysis of demand and estimate
potential ridership that includes the following:
A. Calculate trip generation rates (predicting trips originating in the service area and trips
destined for the service area). The Consultant will develop assumptions based on development
types in the service area (i.e., hotel rooms, retail and restaurant square footage, office square
footage, residential square footage, etc.), population, presence of major employers, etc., and
make calculations based on standard trip generation models. The result will be a trip generation
rate for microtransit and total number of likely daily trips in the proposed service area.
B. Estimate parking utilization. The Consultant will inventory the parking spaces in the
service area and in perimeter areas, and analyze utilization. This information will be used to
develop service models that identify perimeter parking for visitors coming from outside the City.
C. Review empirical data from microtransit operations in the State and across the county.
Deliverables:
• Description of the trip generation model including assumptions, data sources, and tabular
data that shows rates and number of daily trips for various scenarios;
• Findings from the parking utilization analysis including numerical findings and mapped
locations of parking assets; and
• Findings from the review of case studies and empirical data.
5. CONDUCT ANALYSES
The Consultant will conduct a number of additional analyses to inform the development of the list
of recommended alternatives. These analyses will examine:
• Routes and Stops — A number of routes will be considered including on and off major
roadways and using other less -utilized surface streets. Stops will also be considered in
conjunction with major points of interest/high-value destinations, some of which are
preliminarily outlined on the map provided above.
• Vehicle types — Several types will be examined, and the Consultant will lean heavily on
case studies of existing microtransit services and their experiences with various
vehicles.
Operation Details and Responsibilities — Details to examine include: the role of the City
and its partners in operations and whether a 3rd party transit operator will be involved,
fares (and payment methods if the service is not free), hours of operations, booking
methods (i.e., ride -hailing apps, dial -a -ride, kiosks, etc.), coordination with existing
services such as Newport Center's FRANC, various delivery concepts (i.e., direct hailing
(purely demand responsive), high -frequency fixed -routes, or a hybrid), etc.
ADA Accessibility — Accessibility will be considered in all of the analyses listed above.
Potential Funding Sources — The feasibility study's recommended alternatives will
include services that can be implemented with Project V funding, but the study will also
examine the ability of partners to assist with operating costs, rider fees and other
possible grant funding sources.
12
The analyses are listed separately, but they will be conducted concurrently as they are inter-
related. For instance, possible routes are dependent on vehicle types, as certain vehicles such
as Neighborhood Electric Vehicles have speed limit barriers that limit the streets on which they
can operate; other vehicle types might be too wide to operate on narrow streets. Similarly, vehicle
selection and route stops must take ADA accessibility into account.
Deliverables:
• For each analysis, the Consultant will detail the assumptions, analytic methods, and
summary findings.
6. CONDUCT PUBLIC OUTREACH
Task 6.1 — Schedule and Host Three Public Meetings
Three public meetings will be held to describe the vision and benefits of the proposed microtransit
project; share the results of the analyses conducted to -date; share information, success stories
and challenges of other microtransit projects in the state and across the nation; and share initial
recommended alternatives. The objective is to get feedback on the entire breadth of the proposed
microtransit including delivery concepts, vehicles, routes, stops, etc. Meetings will be held in
locations that are easily accessible and at convenient times of day (nights and/or weekends), and
the City will ensure that access is ensured for all residents (i.e., access to the venues for persons
with disabilities.) Invitations will be issued from both traditional media (e.g., paper notices, social
media (including both the City's and potential partners' Facebook, Instagram, Twitter accounts
and websites), and from handouts and posters that will be placed at businesses around the
service area.
Task 6.2 — Share Preliminary Recommendations on Social Media (`Virtual' Community/
Stakeholder Engagement)
The City will share the preliminary recommendations online for review by persons who are unable
to attend the public engagement meetings, and invite feedback. The online channel may include
the City and potential partners' webpages and social media channels. The preliminary
recommendations that will be posted may include possible route maps, photos of vehicle types,
and descriptions of the proposed delivery concept.
Deliverables:
• Public meeting agendas, attendee list, meeting minutes, and photographs.
• Copies of traditional and social media postings.
• Copies of preliminary materials shared online and copies of feedback received
(i.e., e-mails and/or regular letters).
7. CONDUCT BENEFIT COST ANALYSIS OF THE TOP RECOMMENDED ALTERNATIVES
The Consultant will confer with the City and partners to identify three recommended service
options. All recommended alternatives will be for services that can be implemented within the
operating subsidy provided through Project V (as required), and all alternatives will coordinate
with existing services as described above. The Consultant will conduct a benefit cost analysis for
each of the three alternatives using a methodology to be identified by the Consultant and
approved by City.
Deliverables:
• List (and description) of the three recommended alternatives.
• Benefit cost analysis (BCA) results and description of the BCA model or software used.
13
8. DEVELOP DRAFT FEASIBILITY STUDY AND DISTRIBUTE FOR FEEDBACK
The Consultant will develop the draft Balboa Island/CdM Microtransit Feasibility Study. The City
anticipates that the following sample `Table of Contents' is representative of the final contents of the
document (exact contents will be determined by the City after conferring with the Consultant).
1. Executive Summary
2. Community and Service Area Description
3. Need for the Project
4. Analysis Results:
4.1 Ridership/Demand
4.2 Routes and Stops
4.3 Vehicles
4.4 Operation Details and Responsibilities (including coordination with existing services)
4.5 ADA Accessibility
4.6 Community Interest and Support
4.7 Potential Partners and their Roles/Responsibilities
4.8 Potential Funding Sources
5. Preferred Alternatives, Cost -Benefit Analyses, and Recommendations
6. Goals and Metrics for the Recommended Service and Next Steps
The draft Study will be provided to the following for review and feedback: City staff, City Council,
OCTA, and potential project partners.
Deliverables:
Draft Balboa Island/Corona del Mar Microtransit Feasibility Study
Summary of feedback received from reviewers.
9. DEVELOP FINAL FEASIBILITY STUDY AND SUBMIT FOR APPROVAL
The Consultant will incorporate feedback received from the reviewers and will develop the final
Feasibility Study document. The City will provide the final document to OCTA for review, and
once final, the City will present the study document to the City Council for review. OCTA will be
credited in all materials created during the course of the project.
Deliverables:
• Final Balboa Island/Corona del Mar Microtransit Feasibility Study
14
TASKS AND ESTIMATED COSTS
1 Project Management (including reporting, reimbursement requests, and City N/A N/A
procurement)
**Costs provided by the City outside of the grant**
z
Conduct Project Kick-off Meeting
City
5
$650
Consultant
OCTA
3
Review Existing Materials
Consultant
50
$6,500
Project Partners
4
Estimate Demand and Ridership
Consultant
50
$6,500
5
Analyze Possible Routes, Stops, Vehicles, Operations, ADA Accessibility, Partners and Consultant
160
$20,800
Roles, and Funding Sources.
6
Conduct Public Outreach (3 public or pop-up meetings) and social media outreach
Consultant
50
$6,500
City
Project Partners
7
Conduct Benefit Cost Analysis of the Top Recommended Alternatives
Consultant
40
$5,200
8
Develop Draft Feasibility Study and Present for Review/Feedback (from OCTA,
Consultant
120
$15,600
project partners, City Council, etc.)
City
Preliminary TOC of Feasibility Study:
Project Partners
1. Executive Summary
OCTA
2. Community and Service Area Description
3. Need for the Project
4. Analysis Results:
4.1 Ridership/Demand
4.2 Routes and Stops
4.3 Vehicles
4.4 Operation Details and Responsibilities (including coordination with existing
services)
4.5 ADA Accessibility
4.6 Community Interest and Support
4.7 Potential Partners and their Roles/Responsibilities
4.8 Potential Funding Sources
5. Preferred Alternatives, Cost -Benefit Analyses, and Recommendations
6. Goals and Metrics for the Recommended Service and Next Steps
9
Develop Final Feasibility Study and Present to Council and OCTA
Consultant
25
$3,250
City
Project Partners
OCTA
FUNDING PLAN
OCTA Project V $58,500 (90%)
Cash Match* $6,500 (10%)
TOTAL $65,000
*The required cash match will be provided by:
*City of Newport Beach ($6,500) (Contribution Fund)
15
SCHEDULE
1 Project Management (including reporting, reimbursement requests, and procurement) Months 1-12
2
Conduct Project Kick-off Meeting (after Consultant procurement)
Month 3
3
Review Existing Materials
Month 4
4
Estimate Demand and Ridership
Month 4
5
Analyze Possible Routes, Stops, Vehicles, Operations, ADA Accessibility, Partners and Roles,
and Funding Sources.
Months 5 -7
6
Conduct Public Outreach (3 public or pop-up meetings) and social media outreach
Months 6 - 7
7
Conduct Benefit Cost Analysis of the Top Recommended Alternatives
Month 8
8
Develop Draft Feasibility Study and Present for Review/Feedback (from OCTA, project
partners, City Council, etc.)
Months 9 - 10
9
Develop Final Feasibility Study and Present to Council and OCTA for Approval
Months 11- 12
STAFFING
The consultant will be assisted by staff from the City's Public Works Department and potential
project partners that represent the interests of the area's merchants and residents, and have
strong connections to the communities. The City and potential project partners will provide
support to the Consultant in project management and reporting, providing data and information,
assisting with community outreach, and providing input and guidance on the study's required
analyses.
Proposed staff will include:
Brad Sommers, Principal Civil Engineer - Project Manager
Eric Loke, Senior Civil Engineer — Grant Administrator
16
RESOLUTION NO. 2020-5
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
NEWPORT BEACH, CALIFORNIA, AUTHORIZING AND
APPROVING SUBMITTAL OF A FUNDING APPLICATION
FOR THE BALBOA ISLAND/CORONA DEL MAR
MICROTRANSIT FEASIBILITY STUDY PROJECT TO THE
ORANGE COUNTY TRANSPORTATION AUTHORITY FOR
FUNDING UNDER THE PROJECT V COMMUNITY-BASED
TRANSIT/CIRCULATORS PROGRAM
WHEREAS, the City of Newport Beach ("City") desires to implement a
Balboa/Corona del Mar Microtransit Feasibility Study Project ("Project");
WHEREAS, the Orange County Transportation Authority's ("OCTA") Community -
Based Transit/Circulators Program ("Project V Program") establishes a competitive
process to enable local jurisdictions to develop community-based local transit services
that complement regional transit services and meet needs in areas not adequately
serviced by regional transit;
WHEREAS, the OCTA intends to allocate Project V funds within the incorporated
cities and the County of Orange;
WHEREAS, the OCTA has established the procedures and criteria for reviewing
applications as identified in the Project V Guidelines;
WHEREAS, the City has been declared by OCTA to meet the eligibility
requirements to receive revenues as part of OCTA's Measure M2 ("Measure M2");
WHEREAS, the City's Circulation Element is consistent with the County of Orange
Master Plan of Arterial Highways;
WHEREAS, by this resolution, the City Council of the City of Newport Beach
authorizes the nomination of the Balboa Island/Corona del Mar Microtransit Feasibility
Study Project;
WHEREAS, the City must include all projects funded by Net Revenues in the
seven-year Capital Improvement Program as part of Measure M2 eligibility requirement;
WHEREAS, should OCTA's Board of Directors approve funding for the Project as
part of the Project V Program, OCTA shall provide ninety percent (90%) of the funding for
the Project, not to exceed Fifty Eight Thousand Five Hundred Dollars and 00/100
($58,500.00);
Resolution No. 2020-5
Page 2 of 3
WHEREAS, by this resolution, the City Council of the City of Newport Beach
intends to agree to provide ten percent (10%) in matching funds for the Project, as
required by the Project V Program's Guidelines;
WHEREAS, if the Project's total costs exceed Sixty -Five Thousand Dollars and
00/100 ($65,000.00), the City shall be responsible for any additional costs of the Project;
WHEREAS, should OCTA's Board of Directors approve the funding of the Project,
by this resolution, the City authorizes a formal amendment to the seven-year Capital
Improvement Program to add projects approved for funding upon approval from the
OCTA Board of Directors;
WHEREAS, the City will comply with any applicable provisions of the Americans
with Disabilities Act, and any other federal, state, and/or local laws, rules and/or
regulations;
WHEREAS, the City will consult with OCTA regarding the need for a paratransit
plan prior to starting any future operations;
WHEREAS, the City of Newport Beach will not use Measure M2 funds to supplant
developer fees or other commitments; and
WHEREAS, in accordance with applicable law, the City will provide OCTA's
representatives access to and the right to examine all records, books, papers or
documents related to the Project.
NOW, THEREFORE, the City Council of the City of Newport Beach resolves as
follows:
Section 1: The City Council does hereby approve submission of the funding
application for the Balboa/Corona del Mar Microtransit Feasibility Study Project.
Section 2: The City Council does hereby authorize a formal amendment to its
seven-year Capital Improvement Program to add the Balboa/Corona del Mar Microtransit
Feasibility Study Project for funding upon approval from OCTA's Board of Directors to
fund the Project.
Section 3: The City Council does hereby agree to provide matching funds for the
Project in the amount of ten percent (10%) of Sixty -Five Thousand Dollars and 00/100
($65,000.00), as required by the OCTA Community -Based Transit/Circulators Program
Guidelines, and the funds shall be used as supplemental funding to aid the City in the
administering of the Balboa/Corona del Mar Microtransit Feasibility Study Project.
Resolution No. 2020-5
Page 3 of 3
Section 4: The City Council does hereby agree that City shall be responsible for
any additional costs of the Project, if the total cost of the Project exceeds Sixty -Five
Thousand Dollars and 00/100 ($65,000.00).
Section 5: The recitals provided in this resolution are true and correct and are
incorporated into the operative part of this resolution.
Section 6: If any section, subsection, sentence, clause or phrase of this resolution
is, for any reason, held to be invalid or unconstitutional, such decision shall not affect the
validity or constitutionality of the remaining portions of this resolution. The City Council
hereby declares that it would have passed this resolution, and each section, subsection,
sentence, clause or phrase hereof, irrespective of the fact that any one or more sections,
subsections, sentences, clauses or phrases be declared invalid or unconstitutional.
Section 7: The City Council finds the adoption of this resolution exempt from the
requirements of the California Environmental Quality Act ("CEQA") pursuant to Sections
15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect
physical change in the environment) and 15060(c)(3) (the activity is not a project as
defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title
14, Division 6, Chapter 3, because it has no potential for resulting in physical change to
the environment, directly or indirectly.
Section 8: This resolution shall take effect immediately upon its adoption by the
City Council, and the City Clerk shall certify the vote adopting the resolution.
ADOPTED this 14th day of January, 2020.
ATTEST:
C
Leilani I. Brown,
City Clerk
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFI E
C. _-,
Aaron C. Harp
City Attorney
O'NeillWill
STATE OF CALIFORNIA }
COUNTY OF ORANGE } ss.
CITY OF NEWPORT BEACH }
I, Leilani I. Brown, City Clerk of the City of Newport Beach, California, do hereby certify that the
whole number of members of the City Council is seven; the foregoing resolution, being Resolution
No. 2020-5, was duly introduced before and adopted by the City Council of said City at a regular meeting
of said Council held on the 14th day of January, 2020; and the same was so passed and adopted by the
following vote, to wit:
AYES: Mayor Will O'Neill, Mayor Pro Tem Brad Avery, Council Member Joy Brenner,
Council Member Diane Dixon, Council Member Duffy Duffield, Council Member Jeff
Herdman
NAYS: None
RECUSED: Council Member Kevin Muldoon
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed the official seal of
said City this 151h day of January, 2020.
rn �
V vv ••r
Leilani I. Brown
City Clerk
Newport Beach, California