Loading...
HomeMy WebLinkAboutC-831 - Engineering services agreement, realignment part of Jamboree Road<r �pUyCiL: a, TO: CITY COUNC 1 L ; _ 1 - r tIL� FROM: CITY MANAGER AND PUBLIC WORKS DIRECTOR `t 16; _n. 1�., SUBJECT: JAMBOREE ROAD REALIGNMENT - DESIGN ENGINEERING SERVICES/ ae RECOMMENDATION: AUTHORIZE THE CITY ATTORNEY TO PREPARE AN AGREEMENT WITH THE ENGINEERING FIRM OF PORTER, O'BRIEN AND ARMSTRONG TO PERFORM THE SUBJECT ENGINEERING SERVICES. IN SCHEDULING THE CAPITAL PROJECTS FOR THE 1962 -1963 FISCAL YEAR, IT WAS DETERMINED THAT THE DESIGN ENGINEERING FOR THE JAMBOREE ROAD PROJECT SHOULD BE DONE BY AN OUTSIDE CONSULTANT. PORTERA O'BRIEN AND ARMSTRONG, THE FIRM THAT DID THE SOILS ENGINEERING WORK FOR THE PROJECTS HAS SUBMITTED A FAVORABLE PROPOSAL FOR THE DESIGN ENGINEERING. THE FEE FOR DESIGN WILL BE $9,200. THE SOILS ENGINEERING FEE ALREADY PAID WAS $1,800, FOR A TOTAL OF $11,000. DUE TO THE COMPRESSIBLE NATURE OF UNDERLYING SOILS DEPOSITS IT WILL BE NECESSARY TO CONSTRUCT THE FILL IN STAGES. tT IS ANTICIPATED THE CONSTRUCTION PERIOD WILL EXTEND OVER AN 18- MONTH'PERIOD- THE ORANGE COUNTY FLOOD CONTROL DISTRICT PLANS TO CONSTRUCT A CHANNEL OF ABOUT 350 FEET IN WIDTH WHEN SAN JOAQUIN DAM IS, REMOVED. IT IS PROPOSED TO BUILD A BRIDGE AT THIS TIME WHICH WILL SPAN THE PRESENT CHANNEL WITH A LENGTH APPROXIMATELY EQUAL TO THE, EXISTING WOODEN STRUCTURE- ,THE NEW BRIDGE WILL BE DESIGNED SO THAT IT CAN BE LENGTHENED WHEN NECESSARY TO CROSS THE FUTURE FLOOD CONTROL CHANNEL. PREPARED BY: DONA�D C. SIMPSON PUBLIC WORKS DIRECTOR RC:DCS:BBN:vs 12/4/62 AOSELRT��d7 CITY MANAGER VVVV 12 `� t 1 .;fit 57 2 A 22SOL ON or WAIL W TIM . CtTi Cw sawaT � . at 4Y' 5 .3, Owe ban be" preamted to the City Coil of 6 the '1 of Noupmt . a a i& smM: -t bot*M the {:.tea of 7 t ?* ea�ii sar g C, 0,I tes & Armatreft Peet 8 canwutim w rA The reali*mmt of im"ov" Aosd 9 b-,- Zww 3"1# say b rive asap tAlj s head, emsiStift of dstiqu, 10 p3a" fi tat , and 11 r tbommy Ca"011 bas Cassidowed Zbe t*=w MA6 12 I Oemaitums *f said amt -Ta at M# tamd tbm to be rassew6le R 131 , �abg 14 *N* TMLMA P U tt REWLTO tkat PAILd tr"t isti. 15 arprav" and tbo Aegaar ltd city clerk sr: 7 WktbVri=d Qe . 16 directod to the Saw an bats ii of tke Cif of yq6V"t 171 181 t i7th dAy of , l9411 19 20 �. w ..n..�,�.. w.... 7� 21 ATM 22 r" 24 25 26 27 28 29 30 31 32 -1 tt To: Fran: t � CITY OF NUMT UACH ITY AT 90RM �Z Public Works Director City Attorney December 140 1962 Subject: Engineering contract in connection with Jamboree Road realignment Attached are the original and two copies of proposed contract with Porter, O'Brien & A.L::..tra-ag for ",6iticerin services consisting of design, plans and specifications for the Jamboree Road realignment project. Tkwae should be executed by whe engineer and returned to the City Clerk for execution by the City. A resolution approving the contract and authorizing its execu- tion by the City is being forwarded to the City Clerk for pre - sentation to the Council on December Ii, 1962. WWC:mec Encs. cc - City Manager City Clerk, Walter W. CI.=amza City Attorney t TO: CITY COUNCIL FROM: CITY MANAGER AND .PUBLIC WORKS DIRECTOR SUBJECT: SOILS ENGINEE EE ROAD REALIGNMENT POSITION:. �a e� /° " t^��i` Y ,ea( RECOMMENDATION: FILE: �°G v -- -" -'r AUTHORIZE FREF AT,ICONTRACT WITH PORTER AND O'BRIEN FOR SOILS ENGINEERING ON THE JAMBOREE ROAD REALIGNMENT. BECAUSE OF'THE FILL AND THE BRIDGE OA THE PROPOSED REALIGNMENT OF JAMBOREE ROAD CERTAIN SOILS ENGINEERING.WORK WILL BE-NECESSARY. THE FIRM OF.PORTEk AND O'BRIEN HAS PROPOSED TO DO THIS WORK FOR A FEE OF $1,800.00. THE IRVINE COMPANY HAS INDICATED THAT IT WILL SUPPLY EXCESS FILL DIRT. FROM THEIR EAST BLUFF DEVELOPMENT FOR.THIS PROJECT AT NO•COST TO THEM CITY. THEREFORE IT IS DE31RABLE THAT THE SOILS ENGINEERING BE COMPLETED AS QUICKLY AS POSSIBLE SO THAT THE CITY CAN TAKE ADVANTAGE OF THE IRVINE COMPANY OFFER'AND THE RESULTANT SAVINGS IN MONEY. PORTER AND O'BRIEN NAS.ALSO SU13MITTED A PROPOSAL FOR COMPLETE DESIGN OF THE PROJECT. ESTIMATED FUTURE WORK LOADS OF THE ENGINEERING DIVISION INDICATE THAT IT MAY BE NECESSARY THAT THE DE31GR BE DONE-BY AN.' OUTSIDE CONSULTANT- PREPARED BYl- DONALD C. StMPSOM OSEP V PUBLIC WORKS DIRECTOR CITY MANAGER RC:DCS- BBN:VR 4 -5 -62