Loading...
HomeMy WebLinkAboutC-832 - Street realignment, Carnation Avenue & Bayside DriveTO- CITY COUNCIL FROM: CITY MANAGER AND PUBLitWORKS DIRECTOR SUBJECT: ACCEPTANCE OF REALIGNMENT OF CARNATION AVENUE AND BAYSIDE DRIVE RECOMMENDATIONS: 1. ACCEPT THE WORK. 2. AUTHORIZE THE CITY CLERK TO FILE A NOTICE OF COMPLETION- 3. AUTHORIZE THE CITY CLERK TO RELEASE THE BONDS 35 DAYS AFTER NOTICE OF COMPLETION HAS BEEN FILED- THE CONTRACT FOR THE REALIGNMENT OF CARNATION AVENUE AND BAYSIDE DRIVE HAS BEEN COMPLETED TO THE SATISFACTION OF THE PUBLIC WORKS DEPARTMENT- THE BID PRICE WAS $34,753.90 THE TOTAL COST OF UNIT PRICE ITEMS WAS $36,6 2-7 EXTRA WORK AMOUNTED TO $ 1,683.9� THE TOTAL CONTRACT PRICE WAS $38,356.67 THE CONTRACTOR IS SULLY- MILLER CONTRACTING COMPANY, INC., OF ORANGE, CALIFORNIA. THE TOTAL COST OF THE UNIT PRICE ITEMS WAS MORE THAN THE ORIGINAL BID BECAUSE OF THE TWO FRONTAGE ROAD ENTRANCES ALONG BAYSIDE DRIVE WHICH WERE NOT SHOWN ON THE ORIGINAL PLANS AND THE NECESSITY FOR REPLACING ADDITIONAL SIDEWALK AT FIRST AND CARNATION AVENUES. THERE WERE TWO ITEMS OF EXTRA WORK. AT THE INTERSECTION OF FIRST AVENUE AND DAHLIA AVENUE A CROSS GUTTER WAS CONSTRUCTED, INCLUDING CURB RETURNS, PAVEMENT AND SIDEWALK PATCHING. THE REMAINDER OF THE EXTRA WORK WAS CAUSED BY CONFLICTS WITH THE EXISTING WATER AND SEWER MAINS RESULTING IN ADJUSTING THE STREET GRADES TO CLEAR THESE OBSTRUCTIONS. THE CONTRACT CALLED FOR COMPLETION BY MAY 26, 1963. THE WORK WAS COMPLETED BY MAY 23, 1963- PREPARED BY. DONALD C. SIMPSON PUBLIC WORKS DIRECTOR RC :DCS :GPD :VR 7 -2 -63 ROBERT COOP CITY MANAGER C. attached toil -'.n* if adopted by -Ic ivixi U =rd the cot for f or the realignment iocca =G:I AV PRe ft- Baygide Drj�M"o 5-uIIy-*il1er Contraetift for -um of $340751AS. Walter W. chom" v*,c - City Attoxvmy - 0 SUBJECT: THE REALIGNMENT OF CARNATION AVENUE ae.SAISIDE DRIVE RECOMMENDAT IONS. AwAft THE CONTRACT To SULLY•MILLEn C4WiiACTtoQ COMPANY roR $34,3.90, Ac-OPT A fL-r :LUTION AUTHORIZING THE KjV.ft AM CITY CLERK TO EXEC',I( THE CONTRACT. FOUR BIDS WERE RECEIVED AND OPENED IN THE 4M CE OP THE CITY AT 10,30 A.K. ON FfRR:'"- ti, 1963- Bii)vcR LqTAL SULLY-M'',-LER CONTRACTING CO. $34,753-90 ORANGE R. P. DUFF CONSTRUCTION CO. $35,005-94 ORANGE AGGREGATE COICTkUCTION, INC. 435A93•76 ARCADIA WARREN-SOUTH ST, INC. $38,879•10 THE LOW 610 IS Z% MORE THAW THE EotallftER'3 ESTIMATE Or 1134,ow.w $36,600-00 HAS S9'9k SUDS9TtV FOR THIS PROJECT UMBER AsoolmT No. 02-3397-o66• COUNCIL THE ESTIMATED COMPLETION DATE 15 MAY Ikv 1963- 1 -._I/- PREPARED BY: DONALD C. SIMPSON i'USLIC WORKS DIRECTOR A"EST TO OPENING 6103: CITY ItursIx Rc:cics.vjs:VR ROBERT Coo CITY MANAGER 1 F.ESOL Si. 5..7.E , 2 A ilCOOLU7,`M O 4= UMCIL os M mw I 3 Or CATIATM AVMX AM RAYS= 4 5 s ** the Patin in""" for >oark 6 a3ooaisti" of the %*aUgnmmt of Cat-nation AVeaaea and iay"46 Drive 7 in the City of Newpon Death, in acaogrduse with the #UM and 8 spiseli°f"timaas beratofoss ad"t"t bida weaas raessivot eee the 6th 9 day of lebsaeaolr. 13630, aaw pet my qpeadd ad dee sarad; awl to WMISAS. it aura that the l w*a arspanaLble M3 &W 11 t be rsfor is $OUT-kr= GMTR&CrM CtIE[!'AVYJ 12 tad, rmww, u IT RUMV0 dot the b" of Saur 13 pillow a outt'ita<sting y in $* a amount of $34033 " be mace ed 14 4nd that tha ttaet fay' tho oftsssaatima vwk be awarded to said 15 bidder, 16 is IT YVRTM RXWVO that the and city Cask am 17 web' #u%bWlSed Sod di2wte4 to exaciate a► dantmt in accoardaaaae 18 vitb the spec Haattema, bid Md this I agat DwMU of the City, 19 of NoWart Beft&, aaad that 00 City Clark be directed to 20 an emaciated Ompy to the successftl Udder. 21 A8OFM this 11th day of Feb raaaey, 1#63. 22 23 24 A7,: 25 26 27 28 29 30 31 32 CHARLES E. HART i 0 TO: CITY COUNCIL FROM: CITY MANAGER AND PUBLIC WORKS DIRECTOR SUBJECT: THE REALIGNMENT OF CARNATION AVENUE AND BAYSIDE DRIVE RECOMMENDATIONS: 1. AWARD THE CONTRACT TO SULLY - MILLER CONTRACTING COMPANY FOR $34,753.90• 2. ADOPT A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE CONTRACT. FOUR BIDS WERE RECEIVED AND OPENED IN THE OFFICE OF THE CITY CLERK AT I0:3D A.M. ON FEBRUARY 62 1963- BIDDER TOTAL SULLY - MILLER CONTRACTING CO. ;34,753.90 ORANGE R. P. DUFF CONSTRUCTION CO. $35,005.94 ORANGE AGGREGATE CONSTRUCTIONS INC. $351093.76 ARCADIA WARREN - SOUTHWEST, INC. $38,879.10 TORRANCE THE LOW BID 13 2% MORE THAN THE ENGINEER'3.E3TIMATE OF #34..000.00 $36,600.00 HAS BEEN BUDGETED FOR THIS PROJECT UNDER ACCOUNT No. 02- 3397-066. THE ESTIMATED COMPLETION DATE IS MAY 14, 1963- PREPARED BY: DONALD C. SIMPSON ROBERT COO /J PUBLIC WORKS DIRECTOR CITY MANAGER ATTEST TO OPENING BIDS: k . 5C'L ( ITT ICLERK RC.DCS ;VJSiVR 2 -.7_63