Loading...
HomeMy WebLinkAboutC-877 - Engineering Services for Jamboree Road Realignmenti 911 /63 (6) « �~ I f 1 CONTRACT FOR ENGINEERING 2I SERVICES 3� THIS AGREEMENT is made and entered into this lo day of 4I A 1963, by and between the CITY OF NEWPORT BEACH, a 5I municipal corporation, hereinafter referred to as "City ", and 6 PORTER, O'BRIEN & ARMSTRONG, a partnership and a licensed engineer - 71 ing firm, hereinafter referred to as "Engineers "; s WHEREAS, City intends to realign Jamboree Road between 9 Back Bay Drive (formerly known as Bayside Drive) and Palisades 10 Road, and to construct a bridge over the San Diego Creek drainage 11 channel, hereinafter referred to as "Project "; and 12 WHEREAS, engineering services are necessary in connection 13 with said project consisting of plans and specifications for said 14 project; and 15 WHEREAS, Engineers have furnished City with plans and 16 specifications for the "project" pursuant to a contract between 17 said parties entered into on January 4, 1963; and 18 WHEREAS, City has decided to make substantial changes in 19 the "project" which will necessitate additional engineering serv- 20 ices, including a revision of the plans and specifications previous] 21 submitted by Engineers; and 22 WHEREAS, Engineers have submitted a proposal to perform 23 such additional engineering services and to revise said plans and 24 specifications; 25 NOW, THEREFORE, the parties agree as follows: 26 I. Scope of Work. Engineers agree to perform the fol- 27 lowing services: 28 (a) To furnish revised plans, specifications and 29 cost estimates for the project, including, but not necessarily 30 limited to, the following specific items: 31 (1) To design and to furnish plans and speci- 32 fications for a bridge across the San Diego Creek channel. i I 1� The bridge shall be designed with a length of approximatel 2 360 feet and a width of 33 feet with sidewalk and with 3f provision for future widening. 4 (2) To prepare an economic analysis of alternat 511 bridge designs in order to aid in determining the most 6lI economical structure consistent with design requirements. 7I (3) To conduct additional subsurface investiga- 8 tion needed as the result of the increased length of the 9 bridge. 10 (4) Revision of grading, drainage and other 11 details necessitated by the changes in the bridge design. 12 (b) The revised plans and specifications shall 13 include special provisions, all of which shall be suitable for 14 use by City to call for competitive bids. 15 (c) All drawings shall be prepared in ink on stand 16 Mylar sheets which will be furnished by City. 17 II. Checking of shop drawings and revision of plans and lg specifications as necessary to accommodate conditions discovered 19 during construction shall be included within the contract price 2011 hereinafter stated. 21 III. Engineersshall be available for consultations with 22 the Public Works Director and his staff regarding interpretation 23 of the plans and other problems which may from time to time arise 24 at no additional cost to City. 25 IV. Original drawings, reports, notes, maps, and other 261documents shall become the property of the City and may be repro - 27 duced as deemed necessary by the Public Works Director. 28 V. Engineering work, except bridge design, shall be per - 29 formed in the Newport Beach offices of Engineers. 30 VI. City reserves the right to terminate this contract 31 at any time by giving Engineers three (3) days' prior written notice 32 either by personal service or by placing said notice in the United 2. 11 2 3 41 62 0 7' 8 9', 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 0 0 W States mails, postage prepaid, addressed to any of Engineers' busi- ness offices. In the event that City shall terminate this contract it shall reimburse Engineers on the basis of its actual payroll costs incurred to the date of termination plus 110 %. VII. All plans, specifications, and other documents for the project shall be completed to the satisfaction of the Public Works Director of City and delivered to him within 90 calendar days following the execution of this agreement by the City. VIII. In consideration of the performance of the above- described engineering services, City agrees to pay Engineers the actual costs of said services computed on the basis of the follow- ing fee schedule, but in no event shall the City be obligated to pay more than the total sum of $14,400.00. Fee Schedule Design Engineer Structural Engineer Draftsmen Typist Drill Rig with crew Laboratory Tests $76.30 /day 52.36/day 40.00 /day 35.00 /hour Consolidation & Swell $60.00 /each Moisture Content and Unit Dry Weight 5.00 /each Mechanical Analysis with Hydro 25.00 /each Unconfined Compression Strength 7.50 /each Atterberg Limits 25.00 /each Triaxial Shear 25.00 /each Payment shall be made on the following basis after sub- mission to the Public Works Director of an itemized statement: (a) Seventy -five per cent (75 %) to be paid within 20 days after submission of the completed plans, specifications, and additional subsurface investigation to the Public Works Director. (b) Twenty per cent (20 %) to be paid within 30 days after approval of the plans and specifications by the City Council, but in any event not later than 90 days after delivery of the plans and specifications. 3. 0 V lI! (c) The final five per cent (5 %) to be paid 21 upon acceptance of the construction work by the City 31 Council, but in any event not later than 18 months after I 4i submission of the plans and specifications to the Public 51 Works Director. i 6 In addition, City shall reimburse Engineersfor the actual 7 cost of reproduction of copies of said plans, specifications and 8 related documents requested by city. 9 IN WITNESS WHEREOF, the parties have executed this con - 10 tract as of the day and year first above written. 11 CITY OF N PORT BEACH 12 � 13 By / _ /Mayor 14 Attest: ; 15 L- �, City M-Fk 16 17 CITY 18 PORTER, O'BRIEN & ARMSTRONG 19 20 By 21 ENGINEERS 22 23 24 25 26 27 28 29 30 31 32 4. WK. c 4/16 63 (12) 2 A AESOL MOV SOP TK ciTY CCuNCIL OF T ?u? CITY OF NEWPORT ' iCR AUMUZING THE F.XigCDTION OF 3 A CONTYACT WITH I'f1ATER O' BRLEN & ARNS'TRt' W FOR ENGMERIXG MVIUS 4• 51 LUMUS. there hey been pseyanted to the City COMC" of 1 611 the City of reE:+port Mach a eert'ain contract betweu the City of A 9 10 11, 121 13 14 15,I 16 17 18 1911 21 22 23 24 25 26 27 28 29 30 31 32 Ne sort Bt-ach and Pnrtex, Wlr'ien F, Areastronr for additi m,11. engineering services, including a revision of pleas and specifica- ticnes in connection with the realignment of Jarvibaree Road between Back Bay Drive and Palisades Road and the constmiction of a bridge over the San Diego Creek drainage channel; and CS'tMEA.S, the City Council bas considered the terms and conditions of said ccntroct and found thews to be reasannb'c and equitable, W(W, THEREFORE, BE IT RESOLVED that said contract be approved and the Mayor and City Clark are hereby autheri €ee and directed to execute the same on behalf of the City of ?:ewport Reach. ADOPTED this 28th fitly of October _y 1963. ATT$ST: ..... ^ ^ ty b a% TO: Finance Director FROM: City Clerk SUBJECT: Contract Contract No. 877 Date November 4. 1963 Authorized by Resolution No5881 , adopted on October 28, 19 Date Mayor and City Clerk executed Contract October 30, 1963 Effective date of Contract October 30, 1963 Contract with Porter, O'Brien & Arm Address 510 - 318t Street Newport Beach, California Brief description of Contract Engineering services in connection with Jamboree Road realignment. Amount of Contract See Contract. City Clerk • 0 November 1, 1963 Two copies of the agreement between the City and Porter, O'Brien & Armstrong were delivered to Ben Nolan of Public Works with a copy of Resolution No. 5881 on October 31. Ben will transmit a copy to Porter, O'Brien & Armstrong. � J CITY OF NEWPORT BEACH CITY ATTORNEY DEPARTMENT September 16, 1963 To: City Clerk From: City Attorney Subject: Contract for engineering services in connection with Jamboree Road realignment Transmitted is a copy of the proposed contract with Porter, O'Brien & Armstrong for engineering services in connection with the revision of the plans and specifications for the Jamboree Road realignment project, together with a resolution which, if adopted by the City Council, will approve the same and authorize its execution on behalf of the City. The contract has been forwarded to the Public Works Director to obtain its execution by the engineers, after which it should be presented to the Council for consideration along with the subject resolution. Walter W. Charamza City Attorney By T .1X/�' .eym THS :mec Assistant Cit Attorney Encs. cc - City Manager Public Works Director 1. ti V- RECE! CITY SE ; - CITY OF r Sept,-anber 13, 1963 To: Public Works Director From: City Attorney Subject: Contract for engineering services Transmitted are the original and two copies of a proposed contract. with Porter, C Brien & Armstrong `or engineering services '.r. cornecL'on with the revision of the plans and speci fications for the 3aulboree Roar' l reaignment "project. satisfec`ory, '_t i; >sc-gested tbnsc be executed b)' t'.a e_:i�ineerinfr firm and transmitted to the City Clerk for ;fres ntation to the City Council. A resolution approving the contract and authorizing its execution by the City will be forwarded to the City Clerk for consideration by the Council when the contract is returned. Walter W. Charamza City Attorney By _. fly . Seymou r THS:mec Assistant City Attorney Ence. cc - City Manager City Clerk CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT NO. TO: CITY CLERK FROM: PUBLIC WORKS DIRECTOR t Date OCTOBER 23, 1963 SUBJECT: JAMBOREE ROAD REALIGNMENT - AGREEMENT FOR REVISION OF PLANS ATTACHED ARE THE ORIGINAL AND TWO COPIES OF THE SUBJECT AGREEMENT. ALL THREE HAVE BEEN EXECUTED BY THE ENGINEER. IT IS EXPECTED THAT THE COUNCIL WILL AUTHORIZE EXECUTION AT THE MEETING OF OCTOBER 28, 1963 IN ACCORDANCE WITH A RESOLUTION TRANSMITTED TO YOU BY THE CITY ATTORNEY. PS. , D. ATTS. DCS:BBN:vs