Loading...
HomeMy WebLinkAboutC-1107 - Engineering Services for Bayside Drive improvements0 4 Date February 9, 1967 TO: Finance Director FROM: City Clerk SUBJECT: Contract Contract No. C- 1107.1E Authorized by Resolution No.6421 adopted on August 8, 1966 Date January 26, 1967 Effective date of Contract Contract with Donald C. Simpson Address Brief description of Contract Engineerinm services, ftmide Drive Improvements Amount of Contract per standard fee but not to exceed $2,000 City Clerk * 0 ! CITY OF NEWPORT BEACH CALIFORNIA FEBRUARY 20 1967 MR* DONALD C. SIMPSON CONSULTING ENGINEER 3345 WEST NEWPORT REVD. NEWPORT BEACHO CALIFORNIA SUBJECT: CONTRACT FOR ENGINEERING SERVICES - BAYSIDE DRIVE IMPROVEMENTS DEAR SIRE ATTACHED FOR YOUR FILES 15 A COPY OF THE SUBJECT AGREEMENT WHICH HAS BEEN EXECUTED BY THE CITY. VERY TRULY YOURS fl" HUNTER T. COOK PROJECT ENGINEER CC: CITY CLERK W, ORIGINAL HTC:NAJ ATT: GD$: eu� • 12/5166 (7) - I 1 I CONTRACT FOR ENGINEERING SERVICES (Bayside Drive Improvements) 2 3 THIS AGREEMENT is made and entered into this ZCo day of 4 196, by and between the CITY OF NEWPORT 5 BEACH, a municipal corporation, herein referred to as "City ", and 6 DONALD C. SIMPSON, a licensed civil engineer, herein referred to 7 as "Engineer ". 8 RECITALS: 9 City proposes to construct,certain street, drainage, 10 sewer and water system improvements as specified in "Bayside Drive 11 Study, Carnation Avenue to a point 1100 feet westerly, April, 12 1966"; and 13 Engineer has submitted a proposal to perform the neces- 14 sary engineering services in connection with said improvements. 15 AGREEMENT: 16 1. City engages Engineer to furnish the services hereinafter 17 mentioned, at and for the compensation herein stipulated, and 18 Engineer accepts said engagement upon the terms hereinafter set 19 forth. 20 2. Engineer shall: 21 (a) Undertake a preliminary investigation of the overall 22 project, including discussions and negotiations with all I 23 agencies involved in the project. 24 (b) Prepare specifications and provide general super - 25 vision and office advice concerning test boring, subsurface 26 investigations and such other design and construction tests 27 that may, from time to time, be required by City. 28 (c) Prepare construction bid proposals and detailed 29 plans and specifications for the improvements outlined above, 30 suitable for use by the City in calling for competitive bids. 31 (d) Prepare quantity estimates and related cost est- ' 32 imates for the improvements outlined above. i r J 1 i 1 (e) Provide assistance in analyzing bids. 2 (f) Be available for general supervision, field trips, 3 consultations and advice during the construction period of 4 the project. 5 (g) Check the required shop drawings and make revisions 6 of the plans and specifications as necessary in order to 7 accommodate unknown conditions discovered during construction. 8 (h) Be available for consultations with the Public 9 Works Director and his staff regarding interpretation of the 10 plans and specifications. 11 3. City shall provide all field surveys and secure recom- 12 mendations from a soils engineer and a geologist on the construe- 13 tion of the retaining wall along the northerly side of the project. 14 4. Original drawings, reports, notes, maps and other doc- 15 uments shall become the property of the City and may be reproduced 16 as deemed necessary by the Public Works Director. 17 5. City reserves the right to terminate this contract at any 18 time by giving Engineer three (3) days' prior written notice in 19 the United States mails, postage prepaid, addressed to any of 20 Engineer's business offices. In the event that City shall term - 21 inate this contract, it shall reimburse Engineer on the basis of 22 its standard fee schedule contained in its proposal dated August 23 18, 1966. 24 6. All plans, specifications and other documents for the 25 project shall be completed to the satisfaction of the Public Works 26 Director of City and delivered to him within ninety (90) calendar 27 days following receipt by Engineer of the soils report from City. • 28 7. In consideration of the performance of the above described 29 engineering services, City agrees to pay Engineer an amount based 30 upon the standard fee schedule contained in Engineer's proposal 31 dated August 18, 1966, but in no event shall said amount be greater 32 than $2000. The amount to be paid to Engineer shall be payable as i 2. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 /67 follows: (a) Monthly partial payments, each payment to be the amount earned as determined by the fee schedule. The sum of the monthly partial payments shall not exceed ninety percent (90 %) of the above maximx= fee. (b) The balance of the total amount to be paid upon acceptance of the construction work by the City Council, but in any event not later than eighteen (18) months after the signing of the plans by the Public Works Director. In addition, City shall reimburse Engineer for the actual cost of reproduction of copies of said plans, specifications and related documents, and filing fees, checking fees and other related costs authorized by the Public Works Director and advanced by Engineer. 8. Engineer shall indemnify and save harmless the City,and its officers and employees, from all damage and liability arising from any errors, omissions, or negligence in Engineers performance of this contract and of the engineering work and services herein provided. IN WITNESS WHEREOF, the parties have executed this con- tract as of the day and year first above written. CITY OF NEWPORT BEACH APPROVED AS TO ORM: By / _) Tully IV Seymo City Attorney �, CITY ENGINEER (Execution of this agreement by the City Manager authorized by Resolution No. 6421 adopted August 8, 1966.) 3.