Loading...
HomeMy WebLinkAboutC-1332 - Study of Master Plan Supply Facilities for Portions of Pressure Zones III, IV, and V - Harbor View HillsMAR 22 )t)h March 22, 1971 TO: CITY COUNCIL By the CITY COUNCIL FROM: Public Works DepartmenirITY OF NKwOMRt WCH SUBJECT: STUDY OF MASTER PLAN WATER SUPPLY FACILITIES FOR PORTIONS OF PRESSURE ZONES III, IV, AND V. RECOMMENDATIONS: 1. Receive the report on "Master Plan Water Supply Facilities for Portions of Pressure Zones III, IV, and V ". 2. Refer report to the Council Water Committee for study. 3. Authorize the staff to obtain proposals for design and preparation of plans and specifications for construction of the facilities. DISCUSSION: On December 21, 1970 the Council authorized execution of an agreement with Shuirman- Simpson, Civil Engineers, for performing the subject study. Copies of the resulting report are attached for members of the Council. In connection with the development of the recently annexed area known as Upper Harbor View Hills, Sector IV, construction of the facilities studied is needed. These facilities consist of a major pumping station for Pressure Zones III and IV at Big Canyon Reservoir, a transmission main in the future easterly extension of San Joaquin Hills Road, and a Zone IV reservoir to be located northerly of San Joaquin Hills Road and easterly of future Spy Glass Hill Road. Construction of a pressure regulated inter- connection between Zones II and III at Big Canyon Reservoir will also be included in the project. A meeting of the Council Water Committee has been scheduled for March 29. Among other items on the agenda, it is anticipated that the committee will consider recommendations on the financing of the construction of the water supply facilities. In order to meet current scheduling it is also recommended that proposals be obtained from consultants for design of the facilities. It is expected that detailed information and recommendations regarding costs, financing, and design agreements will be presented for Council consideration at the meeting of April 12, 1971. r in iirector I0 MAR 2 z 1971 By the CITY COUNCIL C)TY s;W NrwpiQ%,v pWQH CITY OF NEWPORT BEACH MASTER PLAN WATER SUPPLY FACILITIES PORTIONS OF ZONES III, IV '& V L March, 1971 J March 15, 1971 CONSULTING CIVIL ENGINEERS Public Works Department City of Newport Beach Newport Beach, California Attention: Mr. Benjamin B. Nolan Gentlemen: In accordance with the Agreement dated December 23, 1970, we have completed the necessary engineering studies for Master Plan Water Supply Facilities for portions of zones III, IV, and V, and are submitting herewith our report. The ultimate estimated cost of the improvements recommended, including the two pumping stations, reservoir, transmission mains, and pressure reducing station is $435,200. The estimated cost of the first phase of the improvements required to serve Sector IV of Harbor View Hills is $369,800. The cost estimates include an allowance for a million gallon prestressed concrete reservoir buried to the top of the walls, but not covered with earth. Also, land- scaping of the site has not.been included in the estimates. If the landscaping installation is to be the responsibility of the City and the reservoir is to be completely buried, then the cost estimates will need to be increased. A substantial amount of time was spent on an economic comparison of electric motors versus natural gas engines as prime movers for the two pumping stations. The annual cost of natural gas engines appears to be slightly less than for electric motors, but because of greater reliability and simplified maintenance the electric motors have been recommended. We will be available at your convenience to discuss any aspect of the report. . Respectfully submitted, SHUIRMAN- SIMPSON Don ld C. Simpson Fritz C. `Sk�leppat • DCS:c NEWPORT CENTER BUILDING 369 San Miguel Drive Newport Beach, California 82660 0141644 -0663 • 1• s INDEX SECTION PAGE I. Purpose of Study ----------------------- -, - - -- 1 II. Criteria ------- ------ -=------- ------ -- - - -- -- 3 III. Board of Fire Underwriter Requirements - - - - -- 3 IV. Water Service Zone IV - General ------- - - - - -- 4 A. Water Requirements ------ ------- --- - - - --- 5 B. Proposed System------------------- - - - - -- 6 C. First Phase Development'----------- - - - - -- 8 D. First Phase Reservoir Capacity ---- - - - - -- 9 E. Elevation of Reservoir No. 1 ------ - - - - -- 11 F. Type of Reservoir Construction ---- - - - - -- 14 V. Pressure Reducing Station Zone III to Zone II --------- --------------- ---- - - - - -- 16. VI. Pump Station Zone III ----------------- - - - - -- 18 A. Operational Criteria -- =- .---------- - - - - -- 18 B. Electric Motor Alternate ---------- - - - - -- 19 C. Natural Gas Internal Combustion Engine Alternate --------------=--- - - - - -- 20 D. Type of Pump ------- --------------------- 21 VII. Pump Station Zone IV ------------------ - - -- -- 22 A. Operational Criteria -------------- - - - - -- 22 B. Electric Motors as Prime Movers.--- - - - - -- 23 C. Natural Gas Internal Combustion Engines as Prime Movers ----------- - - - - -- 23 VIII. Cost Comparisons of Electric Motors versus Gas Engines -------------------- - - - - -- 25 IX. Cost Estimates ------------------------ - - - - -- 29 TABLES Table No. 1 -------------- --------- ---- - - - - -- 10 Table No. 2 ----- ---------------------- - - -- -- 12 Table No. 3 ------- -------------------- -- - - -- 12 . Table No. 4 ------------------------- -- - - - - -- 22 APPENDIX PAGE Operating Cost for Electric Motors Zone III and IV - - -- 31 Operating Cost for Natural Gas Engines Zone III and IV- 34 Pump Station Zone III, Electric Motors - Cost Estimate- 36 Pump Station Zone IV, Electric Motors - Cost Estimate -- 38 Pump Station Zone III, Natural Gas Engines - Cost Estimate ----------------------------------- - - - - -- 39 Zone IV Natural Gas Engines - Cost Estimate ----- - - - - -- 42 "Phase I" Construction Estimate ----------------- - - - - -- 42 Sitework Pump Station Zone III and IV ----------- - - - - -- 45 Pressure Reducing Station Zone III to Zone II - Cost Estimate ----------------------------------- - - - - -- 46 Reservoirs - Cost Estimate ---------------------- - - - - -- 47 Transmission Mains - Cost Estimate -------------- - - - - -- . 48 • POWER SCHEDULES Southern California.Edison Company - Schedule No. PA -1 Southern California Edison Company - Schedule No. PA -2 Southern California Gas Company - - -- Schedule No. G -46 Southern California Gas Company - - -- Schedule No. G -51 PLATES Plate 1 - Water Service Zones III and IV Plate 2 - Reservoir No. 1 Plate 3 - Pump Station - Zone III & IV - Electric Motors Plate 4 - Pump Station - Zone III & IV - Natural Gas Engines Plate 5 - Water Transmission Mains • I. PURPOSE OF STUDY 40 The purpose of this study was to investigate, analyze, and submit preliminary alternative layouts and cost estimates for Master Plan Water Supply Facilities for portions of Zones III, IV, and V to be constructed by the City and a pressure reducing station that would permit water to be supplied from Zone III to Zone II. The following specific items were included in this study: 1. Review the existing schematic designs for the Zone III and the Zone IV pumping stations to be located adjacent to Big Canyon Reservoir. 2. Investigate alternative designs for the two stations, • using Big Canyon Reservoir as a suction for the Zone III station, and the Zone III pumping station and /or existing 24 -inch Zone III line as suction for the Zone IV pumping station. 3. Recommend the capacities and the number of pumps for each pumping station that would allow for stage construction to meet the required demand as the area to be served increases. 4. Prepare a preliminary layout for a pressure regulated interconnection between Pressure Zones III and II at Big Canyon Reservoir. 5. Prepare preliminary cost estimates for the pressure regulated interconnection and the Zone III and Zone . IV pumping stations. - 1 - 0 6. Prepare an economic analysis of electrical motors versus natural gas engines for the pumping station PUMPS 7. Determine the capacity and investigate alternative designs for.the Zone IV reservoir. 8. Prepare cost estimates and preliminary layouts for the 16 -inch transmission main and the Zone IV reservoir required to serve Sector IV of Harbor View Hills. 9. Prepare alternative preliminary layouts showing the relationships of the pumping stations, pressure regulator, transmission main, and reservoir which will permit a specific alternative to be chosen. - 2 - I2. CRITERIA • In general the 1965 report of James M. Montgomery, Consulting Engineers, entitled "Study of Water Pressure Zone III ", has been used in this study to determine water requirements and boundaries of the various service zones. In the Montgomery report a water duty of 2.5 acre -feet/ acre /year was recommended for use in determining the water requirements for single - family residential developments. It was further recommended in the Montgomery report that the maximum day demand for design purposes be equal to 1.8 times the average day, and that the peak hour demand be equal to 3.6 times the average day. The Montgomery report recommended that Service Zone contours. III. BOARD OF FIRE UNDERWRITER REQUIREMENTS Fire flow and storage requirements were discussed with the engineers of the Pacific Fire Rating Bureau, and the grading schedule used by the Bureau in rating a city's fire protection system was reviewed. It was concluded that the reliability of the water system is rated by the Bureau on the • -. 3 III be defined by 170 -foot and 355 -foot contours and that Service Zone IV be bounded by the 355 -foot and 540 -foot contours. III. BOARD OF FIRE UNDERWRITER REQUIREMENTS Fire flow and storage requirements were discussed with the engineers of the Pacific Fire Rating Bureau, and the grading schedule used by the Bureau in rating a city's fire protection system was reviewed. It was concluded that the reliability of the water system is rated by the Bureau on the • -. 3 system's ability to provide maximum day demand plus the • required fire flow under the following conditions: 1. Any portion of the pipe network out of service for 5 days. 2. The largest pump out of service for 5 days. 3. Power to drive pumps out for 2 days. In areas which are primarily residential in character the duration of the required fire flow may be reduced by 50 percent when applying the above criteria. In a pump -tank system, as is planned for Water Service Zone IV and the other higher zones, the pumps, pipe networks, and reservoirs are the individual elements making up the total integrated system. From the Underwriter's point of view, they are concerned with • the reliability of the total integrated system rather than any of the separate elements. Therefore in designing a pump -tank system the individual elements should be designed to develop the most economical system that will provide the required reliability. IV. WATER SERVICE ZONE IV - GENERAL In the 1965 Montgomery report, Water Service Zone IV was shown as an area comprising 750 acres of land in the coastal area of the Irvine Ranch, bounded on the west by new MacArthur Boulevard and on the east by the drainage divide easterly of Crystal Cove. In that report it was assumed that the ultimate easterly boundary of the City would be this same drainage divide. For the purposes of this Study it has been assumed that • - 4 - this is still the most probable easterly limit of the service • boundary, but at the same time it is recognized that a system should be designed,which would be flexible enough to, accommodate either an increase or a decrease in the ultimate service area. The general extent of the proposed service area is.shown on Plate I. The area outlined is approximately 850 acres. As can be seen, this service zone is a narrow strip of land lying between the 355 -foot and the 540 -foot contours. A large part of this zone represents a transition in topography between the Coastal Shelf and the ridges of the San Joaquin Hills.. The general steepness of the slopes would seem to suggest that the overall densities of land use might.be somewhat less than in either Zone III below or Zone V above. Although planned land uses in part of the service zone • are currently being studied by The Irvine Company, it appears that the Montgomery report assumption that the primary land use will be single - family detached dwellings is still valid. Therefore, in estimating water requirements it has been assumed that the ultimate land use for the service zone will be single - family detached dwellings. A. WATER REQUIREMENTS Based on a predominantly single - family residential development, an ultimate area of 850 acres and a water duty of 2.5 acre - feet /acre /year, the water requirements for the service zone are estimated as follows: • - 5 • \J L Annual demand 2120 Acre -Feet Average day --------- - - - - -- 1330 gpm Maximum day --------- - - - - -- 2400 gpm Peak hour -- - - - - -- 4800 gpm Although the Board of Fire Underwriters recommends a minimum fire flow of 750 - 1000 gpm for a four -hour duration for residential -type developments, it is recommended for planning purposes that a fire flow of 1500 gpm and a duration of six hours be used. This would provide some flexibility in the event.uses requiring larger fire flows, such as schools, apartment complexes, or neighborhood shopping centers, are constructed. $, PROPOSED SYSTEM. In the Montgomery report, the ultimate Zone IV system consisted of a pumping station located at Big Canyon Reservoir and a ground level reservoir on Pelican Hill connected by a 16-inch pipe line. It was recommended that the pumping station be sized to pump an average maximum day requirement of approxi- mately 2100 gpm. The reservoir was to be 3.0 million gallons which would provide one maximum day's water requirement. In the Montgomery report, the area of the zone was shown. as 750 acres;however the area of the zone outlined on Plate I is approximately 850 acres. This is the reason maximum day demand is shown as.2400 gpm in the paragraph above. In determining the pumping and storage requirements it is recommended that the reliability requirements of the ^ 6 - • Underwriters be applied insofar as is practical and economically feasible. If the pipe line is broken just beyond the pumping station, then the total 5 -day maximum demand plus fire flow would have to be obtained from storage. This would require a reservoir or.reservoirs with a capacity of 17.7 million gallons. Of this total only 0.24 million gallons would be the fire flow requirement. The same storage quantity would be required if there was a total pumping station failure. It does not appear to be economically feasible to provide this quantity of storage. A more balanced system could be obtained by reducing the size of the reservoir and increasing the reliability of the pumping station through the.use of standby pumps and secondary sources of power. Due to the configuration of the zone, the reliability • of the pipe line network could be increased only by the construction of a parallel main or by the development of a secondary.source of supply. A .parallel main in itself would not necessarily provide increased reliability in all cases. A wash -out of a road or an earthquake fault might damage both lines simultaneously because of their proximity. A secondary source of supply would provide much greater reliability. In the 'Montgomery report it was recommended that all of the water service zones above Zone IV obtain their primary source of supply from a pumping station to be located at San Joaquin Reservoir. If and when this pumping station, together with reservoirs in the higher zones, are constructed a secondary source of supply would then be available to Zone IV. - 7 - In the City of Los Angeles, the Department of Water and • Power operates numerous pump -tank systems throughout the Santa Monica Mountains. The Department's standard criteria for the design of these systems is that 300,000 gallons of storage be provided for every cubic foot per second of maximum day demand. The pumping stations are sized to deliver an average of one maximum.day demand with the largest pumping unit out of service. In general, the pumps are powered by electric motors. A standby gas engine driven pump, sized to deliver the fire flow requirement or a minimum of 1500 gpm, is also installed at each station. The Los Angeles City storage criteria, if applied to Zone IV, would require a reservoir capacity of 1.6 million gallons. In general, the City of Los Angeles attempts to provide at least two reservoirs • to serve each zone with each reservoir having a minimum capacity of 1 million gallons. Based on all the factors discussed above and an ultimate Zone IV development of 850 acres, it is recommended that one maximum day's storage or-3.5 million gallons be provided with a_ minimum of two reservoirs. The pumping station for this same service area should be designed to pump an average maximum day's demand or 2400 gpm. C. FIRST PHASE DEVELOPMENT The first phase development that will be served by the Zone.IV pumping station and reservoir is Sector IV of Upper Harbor View Hills. This development will have approximately 130 acres in Service Zone V, and 160 acres in Service Zone IV. 8 This initial development is shown on Plate I. The initial • 290 acres-in Zones IV and V will have a maximum day demand of approximately 800 gpm. The reservoir capacity to provide one maximum day's storage would be 1.15 million gallons. It is not feasible to construct the initial reservoir at the Pelican Hill location as shown in the Master Plan. Since The Irvine Company has not completed precise planning for development in the Pelican Hill area, it would probably be impossible to construct a reservoir that could be. integrated into a future development. In addition, the pipeline from the pumping station at Big Canyon Reservoir to Pelican Hill would need to traverse undeveloped land, and it is likely that future development would necessitate an expensive relocation. • Due to the proximity of the proposed reservoir site in Sectoriv to the pumping station, it .would be difficult to . construct a reservoir with capacity to serve the entire Zone as envisioned in.the Master Plan. Such a reservoir at this site would need to be constructed at.an excessively high elevation.in order to. provide reasonable operating pressures at the extreme easterly end of the Zone. A reservoir constructed at such an elevation would require the pumping station to operate against an excessively high head. In addition, a single reservoir would not provide operating flexibility to temporarily take the reservoir out of service. D. FIRST PHASE RESERVOIR CAPACITY In order to determine the capacity of Reservoir No. 1 • - 9 .- 1 • (Upper Harbor View Hills) a Hardy -Cross network analysis was made of the ultimate system to serve the Zone.. It was assumed for the purposes of analysis that Reservoir No. 2 would be constructed eventually in the vicinity of Pelican Hill. TABLE N0. 1 Pump Reservoir Reservoir DEMAND Station No. 1 No. 2 flow(gpm) flow(gpm) flow(gpm) Max Day + 1500 gpm Fire Flow 2400 225 in 1725 out Peak Hour Max Day, Reservoirs only 2400 420 out 1980 out 0 860 out 1540 out Filling of Reservoirs, 0 Demand 2400 1170 in 1230 in Table No. 1 shows the inflows and outflows from the two reservoirs under varying demand conditions that were obtained from the network analysis. As can be seen, the outflows from Reservoir No. 2 are greater than from No. 1 under ail operating conditions. The ratio of the outflows is approximately 1:4 under peak hour conditions and 1:2 for a maximum day without the pumping station operating. Based on this analysis it appears that the capacities of the two tanks probably should be in the ratio of approximately 1:3. It is therefore recommended that Reservoir No. 1 have a capacity of 1.0 million gallons. If. the ultimate service zone remains as shown in the Montgomery report, then Reservoir No. 2 should have a capacity i 10 - E • • of approximately 2.5 million gallons. The 1.0 million gallons in Reservoir No. 1 will provide approximately one maximum day's storage for the first phase of development. If the service zone continues to expand easterly, available storage would be reduced below one maximum day until such time as the second reservoir.is constructed. If, because of rapid expansion of the zone, the available storage were reduced below a desirable minimum the total water supply for the zone could be increased on an interim basis until the second reservoir were available by adding additional pumping capacity. E. ELEVATION OF RESERVOIR NO. 1 The problem of selecting an elevation for Reservoir No. 1 is complicated due to the ultimate service . area and location of Reservoir No. elevations that should be analysis was made for two varying operating conditi� uncertainty of the size of the not knowing for certain the future 2. In order to obtain the range of considered, a Hardy -Cross network different systems with a number of ins.. The first system to be analyzed provided for an ultimate service area as shown in the Montgomery report, and consisted of a pumping station at Big Canyon Reservoir with a capacity to supply average maximum day requirements, and two reservoirs located in Upper Harbor View Hills and on Pelican Hill, Table No. 2 shows the reservoir elevations that would be required to provide the indicated pressures in the upper- most portions of the zone in the vicinity of Reef Hill. - 11 - • Pump . Reservoir Reef Hill DEMAND Station Water Surface Elev. 540. psi Elev. I psi Max Day, Reservoirs only 160 641 40 Max Day + Fire Flow 1500 gpm 2400 gpm from Pump 181 668 20 Max Day + Fire Flow . 1500 gpm without pumps 172 671 20 Peak Hour 173 652 40 Filling of Reservoirs, no demand 171 641 44' . The second system analyzed was for a service zone extending easterly to.the vicinity of Pelican Hill with a pumping station at Big Canyon Reservoir, and a single reservoir.located in Upper • Harbor View Hills. The required reservoir water service elevations to obtain the indicated pressures are shown.in Table No. 3 TABLE NO. 3 P.S. Press. Reservoir Pelican Hill DEMAND and Water Surface Elev. 540 Output Elev. & Outflow psi Max Day, + Fire Flow 1500 gpm 150 psi 621' 20 psi 1600 gpm 1600 gpm Peak.Hour 164 psi 655' 40 psi 1600 gpm 1800 gpm - 12 - The operating pressure for maximum day or peak hour • conditions should be a minimum of 40 psi in the uppermost portion of the zone. Likewise for maximum day plus fireflow, conditions the minimum pressure anywhere in the zone should be 20 psi. This could be achieved by setting the water surface elevation of Reservoir No. 1 at approximately 671 feet. As can be seen from Plate No. 2, for a reservoir with a height of 25 feet, the top of the pad for a covered reservoir would need to be approximately 689 feet. On the other hand, if.the water surface of Reservoir No. 1 is set at.a somewhat lower elevation, the minimum operating pressures in the easterly extremities of the ultimate service zone could be increased to the recommended minimums by installing an in -line booster pump or, if and when the secondary source of. • supply is provided from San Joaquin Reservoir, the pressure could be boosted by obtaining some water from the higher service zone. In addition, Reservoir No. 2 could be. located near the easterly extremity of the zone, thus improving pressure conditions. Rather than require the pumping station at Big.Canyon Reservoir to continuously operate against a higher head, it is recommended that the water surface elevation of Reservoir No. 1 be set at an elevation of 640 feet and that, if and when needed, the pressures in the extremity of the zone be increased by one of the three suggested... alternative methods. It is further recommended that Reservoir No. 1 have an overall height of approximately 25 feet and an internal . • - 13 - diameter of approximately 85 feet. This configuration in the • tank would require the bottom of the tank to be set at elevation 630 as shown on Plate No. 2. The upper ten feet of the tank should be used for operational storage, and the lower ten feet of the tank reserved for fire storage. If the operational storage is located above elevation 640 then a minimum pressure of 40 psi would be available on a maximum day in all portions of the zone without the pumping station oper- ating. The lower ten feet of the tank would provide 0.5 million gallons storage. Approximately 0.54 million gallons is. required for a fire flow of 1,500 gpm for a six -hour duration. F. TYPE OF RESERVOIR CONSTRUCTION. The reservoir should be either a steel tank with exterior and interior protective coatings or a prestressed reinforced • concrete tank without exterior or interior protection. The cost of burying a steel tank beyond one -third of its depth increases sharply, whereas the cost of the pre- stressed concrete tank is essentially the same whether totally exposed or buried to the top of the tank. The cost of a"million gallon reservoir, using a steel tank buried not more than one -third its height, without site preparation, backfill, and inlet and outlet structures, is approximately $80,000. The cost of the same size reservoir using a pre- stressed concrete tank, either totally exposed or backfilleo to the top of the tank, exclusive of site preparation, backfill, and inlet and outlet structures is $107,000 based on an E.N.R. index of 1400. If it is desired • - 14 - to bury the pre- stressed concrete tank and landscape the top, then three feet of fill would be required. The loading from the three feet of backfill would increase the cost of the tank $2.60 per square foot, or for a tank of 85 ft. diameter the additional cost would be approximately $14,700. If the reservoir is located within the Upper Harbor View Hills development, immediately adjacent to single - family homes, it is recommended that the tank be backfilled to the top of the wall except for a wall portion that might be exposed in a cut or fill slope. The additional $14,700 expenditure to completely cover the tank must be weighed against the aesthetic value of not having the top surface exposed, and /or the value of the additional useful space. If the developer provides a • site with a pad elevation the same as the bottom of the tank and stockpiles the necessary backfill material, it is estimated that the cost of backfilling the tank will add approximately $18,000. In addition to improving the appearance, the tank manufacturers indicate that complete backfilling substantially increases the life of a concrete tank because temperature differentials between the interior and exterior surfaces of the wall are reduced, thus minimizing cracking and spalling. 40 - 15 - • V. PRESSURE REDUCING STATION ZONE III TO ZONE II The estimated ultimate average day water require- ment for Zone III will be 3,760 gpm, according to the 1965 report of James M. Montgomery. To determine the maximum. flow which the station will have to handle, the following assumptions were made: 1 Station will supply water to Zone II on an emergency basis only and, therefore, ..may be designed for intermittent flow. 2. During operation of the station, the demand in Zone III will not exceed 3,760 ..gpm (ultimate average day). 3.. The pressure in the proposed.24" pipe which will feed the station, shall not be less than + 40 psi. 4. The existing 16" pipe at the Irvine Industrial Complex will be extended to • connect to C.M. 11. Based on the above assumptions, the maximum allowable flow from Zone III to Zone II through the station is 14,000 gpm. Any greater flow would lower the pressure in portions of Zone III below 40 psi, and would also result in excessive velocities in the 24" line. A typical layout for the station is shown on Plate 3 and 4. The 12" Clayton Valve #92 shown has a minimum flow rate of 80 gpm and a maximum intermittent rate of 7,.000 gpm. In parallel, the two valves will provide a maximum capacity of 14,000 gpm. The demand in Zone II will always be greater than the minimum flow rate of the valves. • - 16 - To insure the assumed operating conditions are • not exceeded, the valves should include both pressure- reducing and pressure- sustaining capabilities. The Clayton #92 valve shown will serve such a dual function by maintain- ing a pressure of approximately 10 psi in Zone II, which . corresponds to a reservoir elevation of 302 feet, and maintaining a minimum pressure of 40 psi upstream in the 24" Zone III line. • VI. ZONE III PUMPING STATION • A. OPERATIONAL CRITERIA . Based on the James A. Montgomery.report, the ultimate peak hour demand for Zone III will be 13,540 gpm, and the maximum day plus fire flow will be 11,700 gpm. In addition, the water requirements for Zone IV will have to be supplied from Zone III facilities. The demand for Zone IV will be supplied by the Zone IV pumping station which will be designed to meet the maximum daily requirements. The ultimate capacity of this pumping station will be 2,400 gpm as previously indicated in Section IV of this report. The total requirement, therefore, to meet a peak hour demand in Zone III and a maximum day demand in Zone IV is 16.,000 • gpm. The primary function of the Zone III pumping station is.to provide a back -up source of supply for Zone III and for Zone IV, which is normally supplied from San Joaquin reservoir. The most vulnerable link in the primary source -of supply is the 43" MWD cross feeder. In the event of a failure of this line, the proposed Zone III pumping station should be able to meet the entire demand of 16,000 gpm. If the station is designed for a capacity of 5,000 gpm as previously contemplated, then only average day demands could be satisfied, in our opinion, the pumping station should be designed to provide maximum day .demands plus fire flows or peak hour demand, whichever is greater, since this is the criteria that will • � - 18 - be used by the Board of Fire Underwriters in evaluating the • reliability of the system. Zone III contains the major portion of Newport Center which, in future evaluations by the Underwriters, will be considered the "high value area" and the entire rating of the City could be seriously affected if this portion of the system did not meet the reliability requirements. However, since the Zone III pumping station is an alternate source of supply it is not necessary that standby pumps be provided. To insure flexibility and to provide for changes in future water demands or other criteria it is recommended that the full 36-inch header from the Big Canyon Reservoir control station be extended in the first phase, and that outlets be provided to accommodate a minimum of four pumps. • The highest service elevation in Zone III is approximately 355 feet. The pumping station should be designed to provide a minimum pressure of 40 psi at this location (455 feet H.G.) Since the water surface elevation of Big Canyon Reservoir fluctuates between 300 feet and 270 feet, the maximum total dynamic pumping head for the pumping station will be 185 feet. B. ELECTRIC MOTOR ALTERNATE Plate 3 shows a preliminary layout of the Zone III pumping station using electric motors to drive the pumps. Pumps No. 1 and No. 2 each would have a capacity of 2,700 gpm and be driven by 150 HP motors. Since Zone III is a closed system, it is recommended that pump No. 1 be equipped with a • variable speed drive in order to accommodate the varying - 19 - No. 4 would each have a capacity of 5,500 gpm and be driven by .350 HP constant -speed electric motors. It is recommended that the first phase of construc- tion include the installation of pumps No. 1 and No. 2, which would provide a capacity -of 5,400 gpm. This would enable the pumping station to deliver the 5,000 gpm fire flow of Zone III. C. NATURAL GAS INTERNAL COMBUSTION ENGINE ALTERNATE A preliminary layout of the Zone III pumping station using natural gas engines to drive the pumps is,. shown on Plate 4. In this gas engine alternate it is recommended that the total demand of 16,000 gpm be delivered • with three units. Each of the units would be driven by a 300 HP natural gas engine. It is possible to use three pumps in.this alternate, rather than the four recommended for the electric motor alternate, due to the variable speed operation possibilities with the natural gas engines. This capability will allow even the large 5,400 gpm pump to be reduced in speed to meet low water demands of the system. The operation of the three pumps would be governed by a pressure- sensing control, and each engine would have an individual control panel to permit automatic operation of tie unit. The first phase of construction would include only - 20 water demands without excessive line surges and pressure . fluctuations. In this particular layout, pumps No. 3 and No. 4 would each have a capacity of 5,500 gpm and be driven by .350 HP constant -speed electric motors. It is recommended that the first phase of construc- tion include the installation of pumps No. 1 and No. 2, which would provide a capacity -of 5,400 gpm. This would enable the pumping station to deliver the 5,000 gpm fire flow of Zone III. C. NATURAL GAS INTERNAL COMBUSTION ENGINE ALTERNATE A preliminary layout of the Zone III pumping station using natural gas engines to drive the pumps is,. shown on Plate 4. In this gas engine alternate it is recommended that the total demand of 16,000 gpm be delivered • with three units. Each of the units would be driven by a 300 HP natural gas engine. It is possible to use three pumps in.this alternate, rather than the four recommended for the electric motor alternate, due to the variable speed operation possibilities with the natural gas engines. This capability will allow even the large 5,400 gpm pump to be reduced in speed to meet low water demands of the system. The operation of the three pumps would be governed by a pressure- sensing control, and each engine would have an individual control panel to permit automatic operation of tie unit. The first phase of construction would include only - 20 the installation of pump No. 1 providing a capacity of 5,400 • gpm, which as in the electric motor alternate would meet the 5,000 gpm fire flow requirement. D. TYPE OF PUMP.. Both Plate 3 and Plate 4 contemplate the use of turbine -type pumps rather than centrifugal -type pumps. The initial cost of centrifugal pumps is substantially less than turbines but, because of the relationship of the ground elevation at the pumping station site to the water surface elevation in Big Canyon Reservoir, it will be possible to maintain a positive suction on the pumps over a wider range of fluctuation of the reservoir water surface using turbine- type pumps. I - 21 - VII. PUMP STATION ZONE IV A. OPERATIONAL CRITERIA The water requirements of Zone IV:were previously established in Section IV of this report as 800 gpm initially, I d and 2,400 gpm ultimately. The suction line for Zone IV would have a varying hydraulic gradient due to the operation of San . Joaquin Reservoir. The normal water level is at elevation 460 feet. Every two years.the reservoir is lowered to 400 feet for inspection and cleaning of the sides. It takes about two months to lower the water to this.elevation. The operation conditions for the Zone IV pump station are shown in Table 4. TABLE NO. 4 PUMP STA. ZONE IV Water Elev. ----------- ----------------- San Joaquin.Demand in Demand in Positive Required Total Reservoir Zone III, Zone IV, Suction Discharge Dynamic • (Level) GPM GPM Mead Head Head Norma Max Day Max Day = 465' 6,770 2,400 160' 400' 240' Normal Night Night- 465' 0 filling 185' 402" 217' Res. Low Max Day Max Day 400' 6,770 2,400 95' 400' 305' ' The operating range of the pumps will be between 217' and 305' total dynamic head, depending on the demand in Zone III and the elevation of the San Joaquin Reservoir. The average operating head of. the pumps will be between 217' and 2401. The pumps i world be'designed for a. capacity of 800 gpm at 305' TDH and a speed of 1,800 rpm, At the lower head of 217',_capacity will increase to 1,000 .,gpm: At the anticipated normal operating • i - 22 - I d • • head of 2401, it is recommended that the capacity of the pumps will be about 900 gpm.. First phase construction should include two 800 gpm pumps. This will provide sufficient capacity for the initial development. B. ELECTRIC MOTORS AS PRIME MOVERS A constant speed electric motor of 75 HP driving a vertical turbine pump will satisfy the criteria for the Zone IV pump station. The electric motors will not be overloaded at the lower head operation due to the flat horsepower curve of the turbined. C. NATURAL GAS INTERNAL COMBUSTION ENGINES AS PRIME MOVERS Natural gas engines are presently used by many water companies for booster or deep -well pumping. The most significant advantage of using a natural gas engine is favor- able fuel economy. Also, its flexibility in speed and horse- power makes it easily adaptable to changing pumping require- ments. With a regular maintenance program, many years of service can be expected. Several oil companies use natural gas engines in outdoor installations, but to increase the reliability of the engines, they should have at least a metal weather enclosure or roof. Heavy rain may short circuit the ignition system. Most water companies and /or municipalities have their natural gas engines inside an inexpensive corrugated metal or concrete -block building. A different selection of pumps is possible with gas engines. Besides the turbine recommended for the - 23 - electric motor operation, a centrifugal pump could meet • the hydraulic requirements for the station. The horsepower requirements will increase to 100 HP at the lower dynamic head condition. The cost of the centrifugal pump is approximately two - thirds the cost of a vertical turbine pump, but the efficiency of the centrifugal pumps is approximately 708 compared to 808 of the turbines. In a continuous pumping operation, the higher efficiency of the turbine will result in better fuel economy so turbines are proposed.for the pump station in Zone IV. - 24 - 0 0 0 VIII. COST COMPARISON OF ELECTRIC MOTORS VS. GAS ENGINES A study was made to determine whether electric motors or gas engines should be used as prime movers for the Zone III and IV pumping stations. In order to compute the annual energy cost, the following ultimate operating conditions were assumed: Zone III Station - Standby only. Operate 5 days a year. Zone IV Station - 2 pumps continuous operation. 1 pump intermittent, 6.hr /day. The annual energy charges based on the above assumptions are as follows: Annual Energy Charge Electric Motors, PA -1 rate --- - - - - -$ 26,131 Electric Motors, PA -2 rate --7 ----- 18,931 Gas Engines G -51 interruptible - - -- 81155 Gas Engines G -46 firm ------- - - - - -- 8,318 The estimated costs of the pumping stations used in the economic analysis were as follows:. Electric Motors Zone III -------------------- - - - - -- $130,474 Zone IV --------------------- - - - - -- 52,185 Site Work ------------------- - - - - -- 3,800 Total Cost $186,459 Gas Engines - Interruptible Supply Zone III -------------------- - - - - -- $176,688 Zone IV --------------------- - - - - -- 78,631 LPG System ------------=----- - - - - -- 12,300 ,. , .. Site Work "`�----- 's�:�- +�-- ---- - - - --- 3,800 Total Cost $271,419 - 25 0 Gas Engines - Firm Supply • Zone III $176,688 i i Zone IV 78,631 Site Work 3,800 Total Cost $259,119 Based on the above energy and capital costs, a i station life of 20 years and an interest rate of 7 %, the total I annual cost of the combined Zone III and Zone IV pumping i station is-estimated as follows: i Gas Engines Gas Engines. Electric Motors _Interruptible Firm Capital Recovery Cost $17,600 $25,619 $24,458 i I' Energy Cost 18,931 8,155 8,318 is f Maintenance Cost 600 3,400 3,400 • Total Annual Cost $37,131 $37,174 $36,176 It appears from the above that the most economical solution would be the use of gas engines as prime movers with a firm gas supply. However, the relatively.small difference of approximately $1,000 between the use of the gas engines j and electric motors must be weighed against several other intangibles which have not been included in the above costs. The electric motors are certainly more reliable and their �. operation simpler than gas engines. The maintenance cost of electric motors is relatively small and any error we have made in estimating.the mainteriance.cobts will not have a substantial I I effect on the total annual cost. In the gas engines the i annual maintenance cost is a substantial item and is more . difficult to estimate. The cost information that we used,for it the maintenance of gas engines was obtained from the Gas -. 26 - �; Company and the engine manufacturers and may or may not • be indicative of the actual costs to be encountered. For instance, most of the gas engine installations that we observed were in some type of an enclosed building. In the cost estimate we prepared, metal engine enclosures were provided, but the engines will not be in an enclosed structure The salt air exposure at Big Canyon without the engines in a building could result in higher than average maintenance costs. Gas engines, however, do have the distinct advant- age over the constant speed electric motors in that the speed can be varied to meet varying demand conditions. This feature would be more advantageous on the Zone III pumping station, which is a closed system. In order to accommodate the fluctuating demand a variable speed drive has been included on one unit of the Zone III pumping station for the electric motor alternate. This results in an added cost of $4,000. If natural gas engines with the on -site LPG system were used, the overall reliability in the event of an earthquake would probably be greater than for either electric motors or natural gas engines without the LPG system. This does not seem particularly important for the Zone III pumping station because the station is functioning only as a standby. The Zone IV pumping station, however, will be a primary source of supply. The above cost estimates for the electric motor alternate for this station were based - 27- of the pumping station could be increased substantially if the electric motor alternate is selected, and if a 1,500 gpm capacity pump driven by a gas engine equipped with an LPG system is substituted for the fourth 800 gpm electric- driven pump. The fourth unit would function as a standby for the three electric- driven pumps and in the event of an electric power outage, would be capable of delivering a full fire flow. Based on the foregoing economic analysis and the other factors which have been discussed, it is recommended that both the Zone III and Zone IV pumping stations be equipped with electric motor prime movers, and that prior to • the installation of the fourth pumping unit for the Zone IV pumping station, consideration be given to installing a 1,500 gpm gas engine- driven pump in lieu of the electric motor - driven unit. • - 28 - on four electric motor - driven pumps all of equal size, • with one functioning as a stand -by unit. The reliability of the pumping station could be increased substantially if the electric motor alternate is selected, and if a 1,500 gpm capacity pump driven by a gas engine equipped with an LPG system is substituted for the fourth 800 gpm electric- driven pump. The fourth unit would function as a standby for the three electric- driven pumps and in the event of an electric power outage, would be capable of delivering a full fire flow. Based on the foregoing economic analysis and the other factors which have been discussed, it is recommended that both the Zone III and Zone IV pumping stations be equipped with electric motor prime movers, and that prior to • the installation of the fourth pumping unit for the Zone IV pumping station, consideration be given to installing a 1,500 gpm gas engine- driven pump in lieu of the electric motor - driven unit. • - 28 - 0 • IX. COST ESTIMATES Detailed cost estimates which were prepared for the various segments of the master plan facilities are included in the Appendix of this report. The following is a summary of these estimates, including an allowance of 258 for engineering and contingencies: Ultimate Pumping Station Capacities: Zone III Pumping Station, electric motors -------------------------- - - - - -- $130,500 Zone IV Pumping Station, electric * motors ------- ---- -------- ---- --- - - - - -- 62,200 1.0 MG Prestressed Concrete Reservoir - 162,000 Pressure Reducing Station ------- - - - - -- 10,000 16" Transmission Main ----------- - - - - -- 56,400 24" Transmission Main ----------- - - - - -- 14,100 Total Estimated Cost $435,200 * (Includes allowance of $10,000 for 1,500 gpm .gas engine- driven pump in lieu of 800 gpm electric motor - driven pump.) Phase I Pumping Station Capacities: Zone III Pumping Station, electric motors ---- ---- ---- -- ------ --- --- --- --- $ 87,000 Zone IV Pumping Station, electric motors ---- ----- --------- --------- - - - --- 40,300 1.0 MG Prestressed Concrete Reservoir - 1621000 Pressure Reducing Station ------- - - - - -- 10,000 16" Transmission Main -- _ -- - - - -^ 56,400 24" Transmission Main -- ------- -- - -- --- 14,100 Total Estimated Cost $3690800 0. - 29 - The foregoing estimates provide for a reservoir • backfilled to the top of walls, but not covered with earth. If it is desired to increase the capacity of the reservoir to 1.5 MG, then the estimated costs should be increased by $22,000. • e • OPERATING COST FOR ELECTRIC MOTORS ZONE III AND IV A. Annual Power Cost Operating conditions: Zone III, standby only, operating 5 days a year 1,000 HP. Zone IV, 2 pumps continuous operation, 1 pump intermittent, 6 Hr /Day. Yearly KW Hours consumedi: Zone III r1L 1,000 HP x .745 KW /HP x 5 DAYS /YR x 24 HRS /DAY - 89,500 KWHR /YR Zone IV 150 HP x .745 KW /HP x 365 /DAYS /YR x 24 HRS /DAY = 978,930 KWHR /YR 75 HP x .745 KW /HP x 365 DAYS /YR x 6 HRS /DAY = 122,366 KWHR /YR Zone III and IV Total 1,190,796 KWHR /YR Cost per Schedule No. PA -1 Annual Service Charge: 1,225 HP x $6.75/HP $ 8,269/YR KWHR /HP 4 1,190,796/1225 KWHR /HP = 972 Energy Charge = 1,190,796 KWHR x $0.015 /KWHR $17,862/YR Annual Total $26,131 Cost per Schedule No. PA -2 Estimated Demand: 1 month, 1225 HP x 0.745 KW /HP = 910 KW 11 month, 225 HP x 0.745 KW /HP = 168 KW Demand Charge: For 11 month, demand = 168 KW. Charges are • based on at least 508 of the highest demand established in the 31 1 • preceding 11 months, which is 50% of 910 KW = 455 KW 11 x ($75 + (455 - 75) x $0.90) _ $4,587 r 1 x ($75 + (910 - 75) x $0.90) _ $ 827 ' i i Total $5,414 /YEAR Energy Consumption: 1st Month Zone 111 1,000 HP x 0.7.45 KW /HP x 5 DA /MO x 24 HR /DA= 89,500 KWHR /MO Zone IV 150 HP x 0.745 KW /HP x30 DA /MO x 24 HR /DA= 80,640 KWHR /MO 75 HP x 0.745 KW /HP x30 DA /MO.x 6 HR /DA= 10,080 KWHR /MO Total 180,220 KWHR /MO Next 11 Months 150 HP x 0._745 KW /HP x30 DA /MO x 24 HR /DA= 80,640 KWHR /MO 75 HP x 0.745 KW /HP x30 DA /MO x 6 HR /DA= 10,080 KWHR /MO • Total 90,720 KWHR /MO Energy Charge: 1st Month Total Energy Consumption = 180,220 KWHR/MONTH 910 KW Demand x 150 KWHR = - 136,500 KWHR /MONTH - 32 - Remainder 43,720 KWHR/MONTH 15,000 KWHR x $0.015 = $ 225 121,500 KWHR x $0.012 = $1,458 43,720 KWHR x $0.008 = $ 350 180,220 KWHR Total $2,033 /MONTH . - 32 - • Energy Charge: (cont'd) Next 11 Months Total Energy Consumption = 90,720 KWHR /MONTH 455 KW Demand x 150 KWHR =-r68:,250 KWHR /MONTH Remainder = 22,470 KWHR /MONTH 15,000 KWHR x $0.015 = $ 225 53,250 KWHR x $0.012 = $ 639 22,470 KWHR x $0.008 = $ 180 90,720 KWHR Total $1,044 Estimated Annual Power Cost: Demand Charge $51414 1st Month Energy $2,033 Next 11 Months Energy $11,484 Annual Total $18,931 r Schedule PA -2 will be used in the operation cost estimate. If the Zone III station is not operated to its full capacity, the demand charges will be less than assumed above for the following 11 months and will, therefore, result in a more favorable yearly power cost. 0 33 - I • OPERATING COST FOR NATURAL GAS ENGINES ZONE III AND IV A. Operating Conditions - same as electric motors. B. Energy Demand 1st Month 1,000 HP x 10 CF /HP -HR x 24 HR /DA x 5 DA /MO = 12.0 x 105 CF /MO 150 HP x 10 CF /HP -HR x 24 HR /DA x 30 DA /MO = 10.8 x 105 CF /MO 75 HP x 10 CF /HP -HR x 6 HR /DA x 30 DA /MO = 1 ..35x 105 CF /MO 24.15x 105 CF /MO Next 11 Months /Month 150 HP x 10 CF /HP -HR x 24 HR /DA x 30 DA /MO = 10.8 x 105 CF /MO 75 HP x 10 CF /HP -HR x 6 HR /DA x 30 DA /MO = 1.35x.105 CF /MO 12.15x 105 CF /MO C. Estimated Annual Energy Cost • Schedule No. G -46, firm service 1st Month 1.0 x 105 CF x $0.0619/100 CF =$ 61.93 4.0 x 105 CF x $0.05623/100 CF =$ 224.92 5.0 x 105 Cr x $0.05103/100 CF =$ 255.15 14.15 x 105 CF x $0.04813/100 CF =$ 681.04 24.15 x 105 CF Total $1,223. Next 11 Months /Month 1.0 x 105 CF x $0.06193/100 CF = $ 61.93 4.0 x 105 CF x $0.05623/100 CF = $ 224.92 5.0 x> 105 Cr x $0.05103/100 CF = $ 255.15 2.15x 105 CF x $0.04813/100 CF = $ 103.48 . 12.15 x 105CF Total $ 645 ANNUAL ENERGY COST - $8,318 - 34 - • OPERATING COST FOR NATURAL GAS ENGINES ZONE III AND IV A. Operating Conditions - same as electric motors. B. Energy Demand 1st Month 1,000 HP x 10 CF /HP -HR x 24 HR /DA x 5 DA /MO = 12.0 x 105 CF /MO 150 HP x 10 CF /HP -HR x 24 HR /DA x 30 DA /MO = 10.8 x 105 CF/MO 75 HP x 10 CF /HP -HR x'6 HR /DA x 30 DA /MO = 1.35x 105 CF /MO 24.15x 105 CF /MO Next 11 Months /Month 150 HP x 10 CF /HP -HR x 24 HR /DA x 30 DA /MO = 10.8 x 105 CF /MO 75 HP x 10 CF /HP -HR x 6 HR /DA X.30 DA /MO = 1.35x 105 CF /MO 12.15x 105 CF /MO C. Estimated Annual Energy Cost • Schedule No. G -46, firm service 1st Month 1.0 x 105 CF x $0.0619'/100 CF =$ 61.93 4.0 x 105 CF x $0.05623/100 CF =$ 224.92 5.0 x 105 CF x $0.05103/100 CF =$ 255.15 14.15 x 105 CF x $0.04813/100 CF =$ 681.04 24.15 x 105 Cr Total $1,223. Next 11 Months /Month 1.0 x 105 CF x $0.06193/100 CF = $ 61.93 4.0 x 105 CF x $0.05623/100 CF = 224.92 5.0 x 105 CF x $0.05103/100 CF = $ 255.15 2.15x 105 CF x $0.04813/100 CF = $ 103.48 12.15 x 105CF Total $ 645 ANNUAL ENERGY COST = $8,318 34 - • D. Estimated Annual Energy Cost Schedule No. G -51, Interruptible gas service 1st Month 2.0 x 105 CF x $0.05578/100 CF = $ 111.56 8.0 x 105 CF x $0.05148/100 CF = $ 411.84 14.15 x 105 CF x $0.04958/100 CF = $ 701.56 24.15 x 105 CF Total $1,225. Next 11 Months /Month 2.0 x 105 -CF x $0.05578/100 CF = $ 111.56 8.0 x 105 CF x $0.05148/100 CF =.$ 411.84 2.15 x 105 CF x $0.04958/100 CF = $ 106.60 12.15 x 105 CF Total $ 630. ANNUAL ENERGY COST TOTAL • f -. 35 $8,155 PUMP STATION ZONE III, ELECTRIC MOTORS • COST ESTIMATE I i h Item Unit Total No. Description Quantity Cost Cost 1 14" Gate Valve 2 725 $1,450 1 18" Butterfly Valve 2 700 1,400 2 Precast Manhole 4 600 2,400 3 2700 gpm Turbine Pump, 150 HP Motor 2 4,900 9,800 4 10" Flexible Coupling 2 35 70 4 16" Flexible Coupling 2 40 80 4 14" Flexible Coupling C.I. 2 93 186 4 18" Flexible Coupling C.I. 2 130 260 5 Check Valve, Clayton #81 C 10" 2 1,360 2,720 • 5 Check Valve, Clayton #81 C 16" 2 3,400 6,400 6 10" Gate Valve 2 335 670 6 .16" Gate Valve 2 970 1,940 8 24" Flexible Coupling, Steel 1 63 63 11 36" Intake Header L.S. 8,000 8,000 12 12" Dia.Pipe L.S. 1,920 1,920 13 12" Gate Valve 3 435 1;305 14 36" Flexible Coupling 1 115 115 15 36" Butterfly Valve 1 3,100 3,100 16 24" Discharge Header Z.S. 4,300 4,300 17 24" Butterfly Valve 3 700 2,100 19 18" Can 4 800 3,200 • - 36 - I i h • I • • PUMP STATION ZONE III, ELECTRIC MOTORS - CONTINUED COST ESTIMATE Item Unit Total No. Description Quantity Cost Cost 20 24" Meter 1 3,200 3,200 21 Control Panel L.S. 3,000 3,000 37 Residential Lighting Standard 1 700 700 38 5500 gpm, Turbine Pump, 350 HP Motor 2 11,000 22,000 Variable Speed Drive 1 4,000 4,000 Installation L.S. .20,000. 20,000 $104,379 Engineering and Contingencies 25% $ 26,095 $130,474 37 - PUMP STATION ZONE IV, ELECTRIC MOTORS COST ESTIMATE Item No. Description Quantity Unit Cost Total Cost 22 800 gpm Turbine with 75 HP Electric Motor 4 3,300 13,200 24 8" Coupling C.I. 4 30 120 25 6" Coupling 4 23 92 26 6" Check Valve Clayton #81C 4 600 21400 27 6" Gate Valve 4 136 544 28 24" Intake Header L.S. 1,480 1,480 29 16" Discharge Header L.S. 1,200 1,200 30 Conc. Pad ..L.S. 800 800 31 Conc. Vault 1 300 300 • 32 8" Gate Valve 4 210 840 33 12" Can 4 400 1,600 34 24" Flexible Coupling, Steel 1 63 63 35 16" Meter 1 1,940 .1,940 36 16" Gate Valve 1 969 969 37 Residential Lighting Standard 1 700 700 Control Panel L.S. 6,000 Installation L.S. 9,500 9,500 $41,748 Engineering and Contingencies 25% $10,437 Total* $52,185 *Add $10,000 for substituting a 1500 gpm Turbine powered by Internal Combustion Engine for one of the 800 gpm Electric Motor driven Turbines. • - 38 - • PUMP STATION ZONE III, NATURAL GAS ENGINES COST ESTIMATE Item 11 36" Intake Header 1 Unit Total No. 12 Description Quantity Cost Cost • 1 18" Butterfly Valve 3 700 $ 2,100 2 Precast Manhole 3 600 1,800 3 5500 gpm Turbine with Drive 3 8,000 .24,000 4 18" Flexible Coupling, C.I. 3 130 390 5 16" Check Valve 3 1,300 3,900 6 16" Gate Valve 3 970 2,910 8 24" Flexible Coupling, Steel 1 63 63 11 36" Intake Header 1 L.S. 8,000 12 16" Pipe 18 ft. 20 360 • 13. 16" Flexible Coupling 3 40 120 14 36 "Flexible Coupling 1 115 115 15 36" Butterfly Valve 1 3,100 3,100 16 24" Discharge Header 1 L.S. 4,300 17 24" Butterfly Valve 2 700 1,400 Weatherproof Enclosure for Engines 3 1,000 3,000 19 18" Can 3 800 2,400 20 24" Meter 1 3,200 3,200 21 300 HP Natural Gas Engine 3 .16,400 .49,200 22 Residential Lighting Standard 1 700 700 23 . Standard Fire Hydrant 1 500 500 24 18" Pipe 36 ft. 22 792 • -. 39 - ' • PUMP STATION ZONE III, NATURAL GAS ENGINES - CONTINUED S COST ESTIMATE 0 Item Unit Total No. Description Quantity Cost Cost Control Device for I.C. Engines 1 L.S. 2,000 Installation L.S. 27,000 $141,350 Engineering and Contingencies 25% 35,338 Total $176,688 STAND BY L.P.G. SYSTEM 5,000 gal system With vaporizer, installed $ 12,300 - 40 - • r 1 \J ZONE IV NATURAL GAS ENGINES COST ESTIMATE Item Unit Total No. Description Quantity Cost Cost 27 800 gpm Pump 4 1,200 4,800 28 100 HP Natural Gas Engine 4 5,500 22,000 29 8" Gate Valve 4 210 840 30 8" Flexible Coupling 4 30 120 31 6" Flexible Coupling 4 23 92 32 6" Check Valve 4 210 840 34 12" Discharge Header L.S. 3,100 3,100 35 12" Gate Valve 2 435 870 36 6" Pipe L.S. 400 400 37 8" Pipe L.S. 200 200 38 24" Intake Header L.S. 1;480 1,480 39 24" Meter 1 3,200 3,200 40 24" Flexible Coupling 1 63 63 Residential Lighting Standard 1 700 700 Right Angle Drive 4 800 3,200 Installation L.S. 13,000 13,000 Weatherproof Enclosure for Engines 4 1,000 4,000 Pump Controls L.S. 4,000 4,000 Engineering and Contingencies 25% - 41 - $62,905 15,726 $78,631 "PHASE.I" CONSTRUCTION ESTIMATE li • Item Unit Total No. Description Quantity ,Cost Cost Pump Station Zone III; 1 18" Butterfly Valve 3 700 2,100 2 Precast Manhole 3 600 1,800 3 2700 gpm Turbine Pump, 150 HP Motor 1 4,900 4,900 3 2700 gpm Turbine Pump 150 HP Variable Speed Motor 1 8,900 8,900 4 10" Flexible Coupling 2 35 70 4 14" Flexible Coupling C.I. 2 93 186 4 18" Flexible Coupling C.I: 2 130 260 5 Check Valve, Clayton #81 C 2 1,360 2,720 • 6 10" Gate Valve 2 335 670 8 24" Flexible Coupling, Steel 1 63 63 11 36" Intake Header L.S. 8,000 8,000 12 12" Pipe L.S. 1,920 1,920 13 12" Gate Valve 3 435 1,305 14 36" Flexible Coupling 1 115 115 15 36" Butterfly Valve 1 3,100 31100 16 24" Discharge Header L.S. 4,300 41300 17 24" Butterfly Valve 3 700 2,100 19 18" Can 4 800 3,200 20 24" Meter 1 3,200 3,200 21 Control Panel L.S. 3,000 3,000 37 Residential Lighting Standard 1 700 700 • installation L.S. 15,000 15,000 .42 - • • E "PHASE I" CONSTRUCTION ESTIMATE - CONTINUED Item Unit Total No. Description Quantity Cost Cost Sitework L.S. 1,900 1,900 $69,509 Engineering and Contingencies 25% 17,380 Total $87,000 - 43 - 6,600 60 46, 1,200 272 1,480 1,200 800 300 420 800 63 1,940 969 700 6,000 7,500 Pump Station Zone IV 22 800 gpm Turbine, 75 HP Motor 2 3,300 24 8" Coupling C.I. 2 30 25 6" Coupling 2 23 26 6" Check Valve, Clayton #SIC 2 600 27 6" Gate Valve 2 136 28 24" Intake Header L.S. 11480 29 16" Discharge Header L.S. 1,200 30 Conc. Pad L.S. 800 31 Conc. Vault 1 300 32 8" Gate Valve 2' 210 33 12" Can .2 400 34 24" Flexible Coupling 11 63 35 16" Meter 1 1,940 36 16" Gate Valve 1 969 37 Residential Lighting Standard 1 700 Control Panel L.S. 6,000 Installation L.S. 7,500 - 43 - 6,600 60 46, 1,200 272 1,480 1,200 800 300 420 800 63 1,940 969 700 6,000 7,500 • "PHASE I" CONSTRUCTION ESTIMATE - CONTINUED Item Unit Total No. Description Quantity Cost Cost Site Work L.S. 1,900 1,900 $32,250 Engineering and Contingencies 25% 8,060 Total $40,300 i • 44 SITEWORK PUMP STATION ZONE III AND IV • - 45 - Unit Total Description Quantity Cost Cost Grading 2,000 c.yds. 0.50 $1,000 A.C. Paving 6,500 s.ft. 0.20 1,300 Slope Planting 3,000 s.ft. 0.50 1,500 $3,800 • - 45 - J PRESSURE REDUCING STATION ZONE III TO ZONE II COST ESTIMATE Item Unit Total No. Description Quantity Cost Cost 7 12" Pressure Reducing Valve, Clayton #92 2 2,100 4,200 9 12" Gate Valve 4 435 1,740 10 12 Flexible Coupling, Steel 2 20 40 12" Pipe L.S. 500 500 Installation L.S.. 1,500 .1,500 $7,980 Engineering and Contingencies 25$ 1,995 $10,000 - 46 - 0 RESERVOIRS Cost Estimate 1.0 MG Reservoir 25' high, 83' diameter Steel Tank, 2 coats of paint, above ground $100,000 Prestressed Concrete Tank, above ground $140,000 Prestressed Concrete Tank, buried to top of tank $162,000 Prestressed Concrete Tank, buried with 3'. earth cover $181,000 1.5 MG Reservoir 25' high, 101' diameter Steel Tank, 2 coats of paint, above ground $114,000 Prestressed Concrete Tank, above ground $156,000 Prestressed Concrete Tank, buried to top of tank $184,000 Prestressed.Concrete Tank, buried.with 3' earth cover $209,000 • The above estimates include inlet and outlet valves and structures, backfilling and a 25% allowance for engineering and contingencies, but do not include site preparation or landscaping. • - 47 - • TRANSMISSION MAINS Cost Estimate $70,450 • • 48 Unit Total Description Quantity Cost Cost 24" Water Pipe Class 150 500 ft. 20.50 $10,250 16" Water Pipe Class 200 2,000 ft. 14.00 28,000 16" Water Pipe Class 150 1,200 ft. 12.50 15,000 18" Butterfly Valve 1 1,000 1,000 16° Gate Valve Class 200 1 1,400 1,400 12" Gate Valve 1 700 700 $56,350 Engineering and Contingencies 256 $14,100 $70,450 • • 48 17J 0 s bUuidERN CAW- Ui(NiA EUISON COMPANY Edison Building Los Angeles, California Revised Cal. P.U.C. Sheet No. 4186 -E Cancelling Revised Cal. P.U.C. Sheet No. 4064 -E Schedule No. PA -1 POWER — AGRICULTURAL AND PUMPING CONNECTED LOAD BASIS APPLICABILITY Applicable to power service for general agricultural purposes or for general water or sewerage pumping. TERRITORY Within the entire territory served, excluding Santa Catalina Island. RATES Annual Service Charge Horsepower of Connected Load Per Hp 2 to AN .......... ............................... $9.25 5 to 14. 9 .......... .......................... . .... 8.25 15 to 49. 9 ...... _ ....... .. ........ _.............. 7.75 50 to 99.9.......... ............. 7.25 100 and Over ....................... _ .......... .. 6.75 Energy Charge to Be Added to Service Charge Rate per Kwhr for Annual Consumption of, First 1000 Next 1000 All Over 2000 Kwhr per Hp Kwhr per His Kwhr per Hp 2.00 0.900 0.600 1.80 0.900 0.600 .1.70 0.900 0.600. 1.60 0.900 0.600 1.50 0.900 0.600 Minimum Charge: The annual minimum charge shall be the annual Service Charge. SPECIAL CONDITIONS 1. Voltage: Service will be supplied at one standard power voltage. 2. Connected Load: Connected load is the sum of the rated capacities of all of the customer's equipment that it is possible to connect to the utility's lines at the same time, determined to the nearest 1 /10 hp. In no case will charges be based on less than 2 hp for single -phase service or on less than 3 hp for three -phase service. The rated capacity of the customer's equipment will be the rated horsepower output of standard rated motors, the rated horsepower of welders determined in accordance with the section designated Welder Service in Rule No. 2, and the rated kilovolt- ampere input capacity of other equipment, with each kilovolt- ampere of input considered equal to one horsepower. Normally such ratings will be based on the manufacturer's rating as shown on the nameplate or elsewhere but may, at the option of the utility, be based on tests or other reliable information. 3. Overloaded Motors: Whenever, upon test, any motor under normal operating conditions is found to be delivering more than 115 per cent of its capacity as indicated by its nameplate rating, the utility may disregard the nameplate rating and base its charges upon the output as calculated from test. Any motor which is billed on a basis in excess of its nameplate rating in accordance with this special condition shall be tested at intervals to be determined by the utility or upon notification by the customer of a permanent change in operating conditions. 4. Guarantee of Larger Connected Load: Any customer may obtain the rates for a larger connected load by guaranteeing the service charges and energy charges applicable to the larger connected load. 5. Temporary Reduction of Connected Load: Where the use of energy is seasonal or intermittent, no adjustment will be made for any temporary reduction of connected load. Any customer resuming service on such connected load within 12 months after it was disconnected,. will be required to pay all charges which would have been billed if the temporary reduction of connected load had not been made. - 6. Payment of Service Charges: The annual service charge will be payable in six equal monthly install- ments beginning with the first month of each contrar,,t year. (CanNnwd) (To be inserted by utility) . Issued by (To be incited by W. P.U.C.) Advice Letter No. 351 -E Decision No. 77700 William M. Marriott Nsrot Manager of Reventu Requiremients Date Filed September 11, 1970 Effective September 11, 1970 Reodutioa No. 9 • J Suv+rmRN CAUfQRNVA WlSON COMPANY Edison Building Los Angeles, California Revised . Cal. P.U.C. Sheet No. 4187 -E Cancelling Revised Cal. P.U.C. Sheet No. 4065 -E Schedule No. PA -1 POWER — AGRICULTURAL AND PUMPING CONNECTED LOAD BASIS (Continued) SPECIAL CONDITIONS (Continued) 7. Contracts: A contract for a period of one year will be required for service under this schedule and will remain in effect from year to year thereafter unless cancelled. When service is first rendered under this schedule, the contract year and billing basis shall commence with the first regular meter reading date after the date service is begun. 8. Change of Customer: Any customer taking over service on a premises which has previously been served under this schedule shalt have the option of (a) assuming the benefits and liabilities of the former customer's contract by paying all charges which would have accrued for continuous service, in which case the beginning date of the contract year and billing basis shall remain the same as that established in the former customer's contract, or (b) the new customer may elect to have the contract year and billing basis commence with the first regular meter reading date after the date service is changed to his account. 9. Change of Connected Load: When there is an increase or decrease in connected load during a contract year, no adjustment in billing to date of change will be made. For the period subsequent to date of change, billing shall be made on the following basis: (a) Any remaining service charge installments shall be based on the new connected load, and (b) energy charge billing will be based on the new connected load using the full annual energy blocks less the adjusted kilowatt -hour use to date of change. The adjusted kilowatt -hour use to date of change is determined by multiplying the kilowatt -hours to date of change by the ratio of the new connected load to the old connected load. 10. Change of Contract Year: Any contract may, at the customer's option, be superseded by a new con- tract beginning with the regular meter reading date in April of any year and covering the balance of the original contract period, in which case the annual service charge and the size of the energy blocks will be prorated according to the proportion that the number of days from date of beginning of the contract year to the April reading date bears to 365 days, and credit for any excess payments will be applied in the new contract year. (To be formal by utility) luacd by (To be inurted by Cil. P.U.C.) Advice Letter No. 351 -E Decision No. 77700 William M. Marriott eme Manager of Revenue Requirements Date Filed September 11, 1970 Effective September 11, 1970 Raclud= No. .: • • • cdi,i CAWURNIA EUISON COMPANY Edison Building Los Angeles, California Revised Cal. P.U.C. Sheet No. 4188 -E Cancelling Revised CaL P.U.C. Sheet No. 4066 -E Schedule No. PA -2 POWER —AGRICULTURAL AND PUMPING DEMAND BASIS APPLICABILITY Applicable to power service for general agricultural .purposes or for general water or sewerage pumping. TERRITORY Within the entire territory served, excluding Santa Catalina Island. RATES Per Motor Demand Charge: Per Month First 75 kw or less of billing demand ....................... ............................... $75.00 All excess kw of billing demand, per kw .................... ............................... 0.90 Energy Charge (to be added to Demand Charge): First 150 kwhr per kw of billing demand: First 15,000 kwhr, per kwhr ..................................... ............................... 1.50¢ All excess kwhr, per kwhr ....................................... ............................... 1.20¢ Next 150 kwhr per kw of billing demand, per kwhr. ............................... 0.80¢ Allexcess kwhr, per kwhr ................. _ .... _.................................................... 0.60¢ Minimum Charges The monthly minimum charge shall be the monthly Demand Charge. SPECIAL CONDITIONS 1. Voltage: Service will be supplied at one standard voltage. 2. Billing Demandt The billing demand shall be the kilowatts of maximum demand but not less than SOgb of the highest maximum demand established in the preceding eleven months, however, in no case shall the billing demand be less than 75 kw. Billing demand shall be determined to the nearest 1/10 kw. 9. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the utility, during any 15- minute metered interval in the month, but not less than the diversified resistance welder load computed in accordance with the section designated Welder Service in Rule No. 2. Where demand is intermittent or subject to violent fluctuations, a 5- minute interval may be used. 4. Power Factor Adjustment; When the billing demand has exceeded 200 kw for three consecutive months, a kilovar -hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than ISO kw for twelve consecutive months, the charges will be adjusted each month for power factor, as follows: The charges will be decreased by 20 cents per kilowatt of measured maximum demand and will be increased by 20 cents per kilovar of reactive demand. However, in no case shall the number of kilovare used for the adjust- ment be less than one -fifth the number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar -hours to the kilowatt- hours. Demands in kilowatts and kilovars shall be determined to the nearest one -tenth (0.1) unit. iA ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. S. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjust- ments will be made for a temporary discontinuance of service. Any customer resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. (To be inrened br UWAT) Advice Letter No. 351 -E Decision No. 77700 laced ar M be fnwftd br Cal. P.U.G) William M. Marriott Date Filed September 11, 1970 Neae Effective September 11, 1970 Manager of Revenue Requirements +fps 40 • Revised CAL. P.U.C. SHEET NO. 11777 -G SOUTHERN CALIFORNIA GAS COMPANY LOS ANGELES. CALIFORNIA CANCELING. Original CAL. F.U.C. SHEET NO. 1.1429 -G loft) Schedule No. G-46 GAS ENGINE NATURAL GAS SERVICE Applicable to firm service for stationary internal combustion engines only. Within Rate Areas 12 thru 28 as specified on rate area maps. Commodity Charge Per Meter Per Month First 1,000 thermal units, per unit........... 6.1930 Next 4,000 thermal units, per unit........... 5.623 Next 5,000 thermal units, per unit........... 5.103 Over 10,000 thermal units, per unit........... 4.813 The number of thermal units to be billed shall be determined in accordance with Rule 2 (1). Minimum Charge Initial meter installation, per month.......... $7.00 To be made cumulative only when total billing exceeds $84.00 per meter at any time during the contract year. 1. All gas consumed during the entire year at all meter locations, by any customer may be aggregated, provided (15 in addition to the rate quoted above an annual meter charge of $25.00 will be made for each meter installation in excess of one, and (2) the minimum charge will be $100.00 per customer per month, to be made cumulative only when total billing . exceeds $1)200.00 per customer at any time during the contract year. Meter readings will not be aggregated for associations or combinations of customers, where, in the judgment of the Company, the operation of one or more plants has been transferred from one customer to another customer for this purpose. 2. Customers served ufider this schedule shall have priority in the use of gas over customers served under interruptible schedules, at.timee when there is insufficient gas to supply the demands of all customers. (continued) (TO BE INSERTED BY UTILITY) (TO BE INSERTED BY CAL F.U.C.) ADVICE LETTER NO 813 DATE FILED December 41 1970 HARVEY A. PROCTOR DECISION NO. .77976 EXECUTIVE VICE PRESIDENT EFFECTIVR December 8. 1910 ►.bI Ap. 11 /M RESOLUTION NO r� L.J • • Original CAL. P.U.C. SHEET NO. 1143O-G SOUTHERN CALIFORNIA GAS COMPANY LOS ANGELES. CALIFORNIA CANCELING Revised CAL. P.U.C. SHEET NO. So-Co. 5420 -G (Sheet 2 of 2) Schedule No. G-46 GAS ENGINE NATURAL GAS SERVICE Continued ECIAL CONDITIONS (Continued) 3. A contract (Form 881 -L) covering the fuel requirements of the customer for a period of at least one (1) year will be required as a condition precedent to service under this schedule and shall continue in force and effect thereafter until either the Company or the customer shall give the other party thirty (30) days' written notice.of a desire to terminate same, whereupon at the expiration of said thirty (30) days it shall cease and determine; provided, however, if the customer permanently ceases operations at any time such contract shall not thereafter continue in force. 4. Contingent Offset Charges Related to F.P.C. Dockets The rates include offset charges as shown below related to increases and decreases in cost of gas from El Paso Natural Gas Company and Pacific Lighting Service Company (including California gas) as a result of F.P.C. Dockets Nos. RP69 -6, RP69 -20 and RP70 -11 of E1 Paso Natural Gas Company and RP69 -27 and RP70 -19 of Transwestern Pipeline Company. F.P.C. Docket Offset Charge 0.202¢ per thermal unit 0.084 per thermal unit 0.079¢ per thermal. unit 0.185¢ per thermal unit 0.188¢ per.thermal unit To the extent that the F.P.C. in these dockets orders reduction in the rates for E1 Paso or Transwestern gas with the resulting effect on cost of gas from the above -noted sources, the offsets will be reduced related, to the reduction in cost of gas from these sources. 5. Refunds of Contingent Offset Charges Related to F.P.C. Dockets Nos. RP69 -6, RP69 -2o, RP69 -27, RP70-11 and RP70 -19 Refunds received from E1 Paso Natural Gas Company and Pacific Lighting Service Company as related to these dockets will be made to various customer classes in proportion to the contingent offset charges collected during the periods tQ,VAd cb tbq, roftift apply. ADVICE LETTER NO 810 DECISION NO. 1 6/ 1 1./010 860.1, 11". 11/60 HARVEY A. PROCTOR EXECUTIVE VICE PREE1DENT DATE FILED October 29, 1970 EFFECTIVE November 28, 1970 RESOLUTION NO • 0 Revised CAL, F.U.C. SNEET NO. 11782 -G SOUTHERN CALIFORNIA GAS COMPANY LOS ANGELES. CALIFORNIA CANCELING Original CAL. IsM.C. SHEET NO. 11433 -G Schedule No. G-51 I (Sheet 1 of 3) INTERRUPTIBLE NATURAL GAS SERVICE Applicable, subject to interruptions in supply, to natural gas service to commercial and industrial customers, exclusive of retail service for utility steam - electric generating stations and cement plants, where such customers are located near existing mains having a delivery capacity and supply in excess of the then existing requirements of present customers. Within Rate Areas 12 thru 28 as specified on rate area maps. Commodity Charge Regular Usage: First 21000 thermal. units, Next 8,000 thermal units, Next 20,000 thermal units, Next 30,000 thermal units, Next 401000 thermal units, Next 100,000 thermal. units, Over 200,000 thermal units, Per Meter Per Month per unit........... per unit........... per unit........... per unit........... per unit........... per unit........... per unit........... 5.578¢ 5.148 4.958 4.777 4.59T 4.457 4.347 First Z,000 thermal units, per. unit........... 4.1741 Next 8,000 thermal units, per unit........... 3.804 Over 10,000 thermal units, per unit........... 3.714 Upon application, customers who have installed and are using gas air conditioning equipment will be billed under the air conditioning rate for monthly consumption up to 53 thermal units per rated hill ton of such equipment. The number of thermal units to be billed shall be determined in accordance with Rule 2 (i). Minimum Charge Per Meter Per Month .... ....... ................$100.00 To be made cumulative only when total billing exceeds $1,200.00 per meter at any time during the contract year. In the event of curtailment, the foregoing monthly minimum charge and the rate blocks will be prorated in the proportion of the number of equivalent.days gas is offered during the billing period to the total number of days in the billing period. • (continued) (TO BE INURTED BY UTILITY) ADVICE LETTER NO 813 HARVEY A. PROCTOR DATE FILM _ December 4 1970 DECISION NO. TT6 axaCUTIVa VICE►RaSIDaNT EFFECTIVE December 8, 1970 •M.F REF. IVN .. RESOLUTION NO • 0 • original CAL. P.U.C. SHEET NO 11434 -G SOUTHERN CALIFORNIA GAS COMPANY LOS ANGELES. CALIFORNIA CANCELING Revised CAL. P.U.C. SHEET NO. SO.Co' 55160 -G Schedule No. G -51 INTERRUPT23LE NATURAL GAS SERVICE Continued SPECIAL CONDITIONS (Sheet 2 of 3) 1. Service under this schedule is subject to discontinuance without notice in case the Company has an insufficient quantity of natural.gas produced directly from oil wells and /or purchased from out -of -state sources to satisfy its requirements of gas for underground storage and to supply with natural gas (a) customers under all its Firm Natural Gas Service, General Service, Firm Industrial and Gas Engine schedules, (b) customers under special contracts other then those for interruptible service, and (c) other public utilities, and if the supplying of such gas under this schedule shall, in the opinion of the Company, jeopardize or threaten the supply to any of said customers or said public utilities, then the Company shall have the right, without notice, to discontinue such gas supplied under this schedule in whole or in part until it again has an amount of such gas sufficient to supply all of said customers and said public utilities in addition to supplying the gas provided under this schedule. Curteilment of interruptible gas service shall be made in compliance with Rule 23., 2. Except upon an application made to the California Public Utilities Commission and approval first obtained; (a) No customer (except as to a.plant on an interruptible gas rate during all or a portion of the year ended December 16, 1941), applying for gas service hereunder subsequent to December 16, 1941, shall be entitled to such gas service, unless such customer shall have adequate standby fuel and equipment, and qualified attendants ready at all times to effect mediate change -over from gas to other fuel in the, event that the supply of gas hereunder-shall be discontinued. (b) No existing customer using gas hereunder subsequent to December 16, 1941, shall be permitted to increase usage of gas hereunder for additional equipment (except as to equipment on an interruptible gas rate during all or a portion of the year ended December 16, 1941) unless such customer shall have adequate standby fuel and equipment, and qualified attendants ready at all times to effect mediate change -over from gas to other fuel in the event that the supply of gas hereunder shall be. discontinued. 3. Service may be supplied under this.scheduie at the option of the Company f, short -term operations that are started and completed during the "off- peak" demand season (May 1 to October 1) without the provisions for standby fuel and equipment as required in Special Condition 2. ADVICE LETTER NO 810 DECISION No. 77010 I N•F REE. 11/N HARVEY A. PROCTOR EXECUTIVE VICE PRESIDENT DATE FILED .October 29, 1970 November 28, 1970 EFFECTIVE RESOLUTION 110 1 U • • SOUTHERN CALIFORNIA GAS COMPANY LOB ANGELES. CALIFORNIA Original tAL. P.U.C. SHEET No 11435-G CANCELING Revised CAL. P.U.C. SHEET NO. So-Co. 5422 -G (Sheet 3 of 3) Schedule No. G-51 INTERRUPTIBLE NATURAL GAS SERVICE Cont ued ECIAL CONDITIONS (Continued) 4. A contract* covering the fuel requirements of the customer during the operation of his plant, for a period of at least one (1) year, will be required as a condition precedent to service under this schedule, except as otherwise provided in these Special Conditionsp and shall continue in force and effect thereafter until either the Company or the customer shall give the other party thirty (30) days' written notice of a desire to terminate same, whereupon at the expiration of said thirty (30) days it shall cease and determine. If the customer permanently ceases operations, such contract shall not thereafter continue in force. 5. In the application of this schedule, gas delivered to the various premises of a customer can not be aggregated. 6. Customers may receive service under this schedule (a) separately, or (b) in combination with a firm natural gas service schedule through a single meter installation. The minimum charge for combination service will be the minimum charge specified in this schedule. 7. Contingent Offset Charges Related to F.P.C, Dockets The rates include offset charges as shown below related to increases and decreases in cost of gas from E1 Paso Natural Gas Company and Pacific Lighting Service Company (including California gas) as a result of F.P.C. Dockets Nos. RP69 -6, RP69 -20 snd.RP70 -11 of El Paso Natural Gas Company and RP69 -27 and RP70 -19 of Transwestern Pipeline Company. F.P.C. Docket Offset Charge RP69 6-6 0.202¢ per thermal unit RP69 -20 0.088¢ per thermal unit RP69 -27 0.0790 per thermal.unit RP70 -11 0.1850 per thermal unit RP70 -19 0.184 per thermal unit To the extent that the F.P.C. in these dockets orders reduction in the rates for El Paso or Transwestern gas with the resulting effect on cost of gas from the above -noted sources, the offsets will be reduced related to the reduction in cost of gas from these sources. 8. Refunds of Contingent Offset Charges Related to F.P.C. Dockets Nos. RP69- 6.. RP69.20, RP69 -27, RP70 -11 and RP70 -19 Refunds received from Ei Paso Natural Gas Company and Pacific Lighting Service Company as related to these dockets will be made to various customer classes in proportion to the contingent offset charges collected during the periods to which the refunds apply. +rSa Interruptible Service -- Form 1438 -H (b; Combination Firm and Interruptible Service -- Form 623 -F ITO BE ADVICE LETTER NO 810 DATE FILED October 292 1970 HARVEY A. PROCTOR DECISION No. 77010 EXECUTIVE VICE PRgID[NT ErreerrvE November 28, 1970 1 [... RSV. N /BE RESOLUTION No el t 1,41 tie D '� - i /�'`_ . . Ai 6jN,6 _ r •/% .-rte l��a.6s':• LU � � � �/ _� �r �Id. /"sue � � % � /_.. r � � -- •• I _ �'SS +�' y•�T �' \91 ky/ J FN aC ,°/ Lli goo. 0 a ,.,�••••• - III___ �� •mod• l �� ��-- ----�� i 1 r. /! / � -� rH-I d� .:A r• k •. < - : .� P _ CO) W1 i Lit tp DL Via �s LA Ap n - y inr7 �� n r// s �� �•... £6 Ovi At W � _ d s--� 7_� d w Q' w Ol N ei, \� PIS . - j � (i/ / tf, �. j �• ! � �• Lyra• � `r �\ l \,� it 1,�0�' y ��:. \� �\ �1� 1,� �K .. ;( R 1 py .r C -1332 See Contract File for Pump Station — Zones III & IV Electric Motors Diagram MC, CAPACtT'( .. ...... .. OPEIZATir->WAL. C-jTCIZAC.,S FlrZE 'ST�r-,-Ar.E: SL- EL tc-040 CP30 INT. PL AT F - ----------- z C -1332 See Contract File for Pump Station — Zones III & IV Natural Gas Engines Diagram o F •4' 1 W j O 7 rll I � � N! I y �Yb�\ �b v d fj i L L � 7 J \d LL Ul 77 e Ul S{' ] Q �7 LLJ u1 i I �\ l Lv s LN 7 C? _1 li 1 �I g I 7 4 s 4 W �r w 3'� d N U a0 �I�F� III uj ,Q m 8 , Z:z Q V I d � �I nI ZI �I �I r'I w --may PURCHASE ORDER NO. 4 d 5 2 T} 'ry�N�N T NTH INVOICE IN DPLIC+ATE "�i OF NEVROR.i' B� -" _ /A TN18 ORDER NtlA�#IUBT .= APPEAR ON AL{ INY BNIP -' 0 0 December 28, 1970 Wyp �+ v 05 KI E=- 1EERING STUDY WATER SERVICES HARBOR VIEW HILLS, SECTOR IV Enclosed are two copies of subject agreement for Shuirman- Simpson, Civil Engineers, and for your files. Please forward one copy to Shuirman- Simpson. LL:. wk enc. cc: City Attorney Finance Dept. ,� -7337 ii- )./-7v 1C 1] 1� 1° 14 1° 1( 11 IF 1S 2C 2] 24' 2< 24 2: 2( 2S 2£ 2S 3( 3: 3< 9 0 AGREEMENT FOR ENGINEERING SERVICES e- /33s- (Preliminary study of Pressure Zone III and IV Water Master Plan Facilities and a pressure reducing station connecting Pressure Zone III to II) THIS AGREEMENT is made and entered into this ;23jV0 day of DEC 1Z , 1970, by and between the CITY OF NEWPORT BEACH, a (municipal corporation hereinafter referred to as "City ", and the firm of SHUIRMAN- SIMPSON, CIVIL ENGINEERS, hereinafter referred to as "Engineer "; WHEREAS, City recently annexed a hillside area known as j Harbor View Hills, Section IV, and; WHEREAS, City proposes to provide domestic water service to this area which is partially located in three undeveloped water (pressure zones (Master Plan Zones III, IV, and V), and; WHEREAS City further proposes to increase the operational (flexibility of the present water system with a connection from Water Pressure Zone III to II and a pumping facility from Big Canyon Reservoir to Water Pressure Zone III, and; WHEREAS, engineering services are necessary to study and +analyze various alternatives of providing domestic water service to iZones IV and V and increasing existing operational flexibility in iorder to identify the alternative with greatest merit, and; WHEREAS, Engineer has submitted a proposal to make the ,needed study and are well qualified to furnish such services; NOW, THEREFORE, the parties agree as follows: I 1. SERVICES TO BE FURNISHED BY ENGINEER A. Review the existing schematic designs for the Zone III and the Zone IV pumping stations to be located adjacent to Big Canyon Reservoir. B. Investigate alternative designs for the two stations, Iusing Big Canyon Reservoir as a suction for the Zone III station, and the Zone III pumping station and /or existing 24 -inch Zone III line as suction for the -1- ,I 1 Zone IV pumping station. 21 C. Recommend the capacities and the number of pumps for 3 each pumping station that would allow for stage 4j construction to meet the required demand as the area 5 to be served increases. i 6 D. Prepare a preliminary layout for a pressure regulated 7 interconnection between Pressure Zones III and II at 8 Big Canyon Reservoir. 9 E. Prepare preliminary cost estimates for the pressure 10 regulated interconnection and the Zone III and Zone IVI, 11 pumping stations. 12 F. Prepare an economic analysis of electrical motors 13; versus natural gas engines for the pumping station 14'� pumps. 15 G. Determine the capacity and investigate alternative 16 designs for the Zone IV reservoir, including 17' coordination with developer and land owner. 18 H. Prepare cost estimates and preliminary layouts for the 19 16 -inch transmission main and the Zone IV reservoir 20 required to serve Section IV of Harbor View Hills. 2111 I. Prepare alternative preliminary layouts showing the I� 22111 relationships of the pumping stations, pressure i1 23: transmission main, and reservoir which 24!, will permit a specific alternative to be chosen. 25i 2. PREPARATION OF REPORT I 261; Engineer agrees to submit a written report which shall 27 include background information, cost estimates, exhibits, 28 and recommendations, within 60 days after execution of 291 this agreement. City will reimburse Engineer for the 3011 cost of reproducing said report. 3111 3. PAYMENT FOR SERVICES 3211 City agrees to pay Engineer for its services on the basis I h -2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 of 2 -1/2 times the direct labor costs, at the direct labor rates as shown in the following fee schedule, but not to exceed the sum of $6,500.00. Principal $10.00 per hour Engineers $7.00 to $8.00 per hour Designers and Draftsmen $5.00 to $7.00 per hour Typist $3.50 per hour Partial payment shall be made each month during the course of the study, up to a total of 90% of the maximum, with the balance due upon receipt of the final printed report. 4. The scope of the services to be furnished by Engineer may be changed and the maximum fee increased upon prior written approval of the Public Works Director. 5. TERMINATION This agreement may be terminated at any time by City upon three (3) days written notice to Engineer by placing said notice in the United States mail, postage prepaid, addressed to Engineer's business office. In the event of termination due to the fault of Engineer, City shall be relieved of any obligation to compensate Engineer. If this agreement is terminated for any reason other than the fault of Engineer, City agrees to compensate Engineer for the actual services performed up to the effective date of the notice of termination on the basis of the fee schedule contained in this agreement. IN WITNESS WHEREOF, the parties hereto have executed this -3- 2� 31 4; 51 6 7 8 9 10 11 i2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 THS:adw 32 12/16/70 rI agreement as of the date and year first above written. APPROVED AS TO FORM: (City A orney CITY OF NEWPORT BEACH By: C. . � Mayor By' 3 unit. yam" 1��3itca� Cty Clerk CITY SHUIRMAN- SIMPSON, CIVIL ENGINEERS ENGINEER