Loading...
HomeMy WebLinkAboutP2020-0124 - Permits¢w,r,4 City of Newport Beach - Building Division *P2020-0124* y^3 100 Civic Center Drive, Newport Beach, CA 92660 ,p '`x Permit Counter Phone (949)644-3288 t 2-o 2-0 - 0' 2-4 r%filYY]ikNY� C-0 UVO a\ 1 i/ Y Job Address: 7 COLONIAL DR Bldg: 1 Floor: Suite: Description of Work: PLUMB - GAS LINE TO BBQ & FIRE PIT Inspector Area: 4 Code Edit 2019 Legal Description: N TR 15389 LOT 54 Owner: DAILY BILL Contractor: PREMIER POOLS ORANGE CTY Address: 7 COLONIAL DR Address: 22 SAN RAPHAEL NEWPORT BEACH, CA 92660 E DANA POINT CA 92629 Phone: Phone: 626-422-5426 ese• Con State Lic:798298 Issued Date:09/11/2020 Lic Expire: 03/31/2022 .. Bus Lic: BT30071442 Processed By: Lic Exp Date: 03/31/2021 PLUMBING Permit: P2020-0124 Project No: 1593-2020 Inspection Requests Phone (949)644-3255 Worker's Compensation Insurance - Carrier : STATE COMP Policy No:9158204 Expire : 05/03/2021 BEeO J E mmmE E e o• e•emc� a e • ° ese• Bathroom Fixtures Kitchen Fixtures o ° c FEES oe o • em•a°a o PERMITS EXPIRE 180 DAYS AFTER ISSUANCE OR LAST VALID INSPECTION Construction Hours: Monday- Friday 7:00 a.m. to 6:30 p.m. and Saturday from 8:00 a.m. to 6:00 p.m. Bathroom Fixtures Kitchen Fixtures Misc. FEES Misc. omev•m. Other uoce • ° • ° ° Toilet: 0 $0.00 Kitchen Sink: 0 $0.00 Water Piping: 0 $0.00 Roof Drain: 0 $0.00 A0-09 o •' Bidet 0 $0.00 Garbage Disp: 0 $0.00 Water Softener: 0 $0.00 Grease Trap: 0 $0.00 =$@.�1P• ° Urinal 0 $0.00 Bar Sink: 0 $0.00 Water Heater: 0 $0.00 Grease Interceptor:0 $0,00 Bath Tub: 0 $0.00 Vegetable Sink: 0 $0.00 Gas up to 4 outlets: 1 $7.00 P -Trap: 0 $0.00 Record Mgmt Fee! o o y§9!00 ° •' =' Shower Stall: 0 $0.00 Ice Maker: 0 $0.00 Gas over 4 outlets: 0 $0.00 Sewer Investigation: $0.00 Wash Basin: 0 $0.00 Dishwasher: 0 $0.00 Backflow up to 2": 0 $0.00 Sewer: 0 $0.00 Plan Check: $0.00 Hydro -Mass Tub:O $0.00 Lndry/Trap: 0 $0.00 Backflow over 2": 0 $0.00 Sewer Alter/Repair:0 $0.00 Issuance: $37.00 Floor Sink: 0 $0.00 Regulator: 0 $0.00 Hose Bibb: 0 $0.00 Sewer Abandon: 0 $0.00 Supplemental F ee: $0.00 Floor Drain: 0 $0.00 Lawn Sprinkler: 0 $0.00 Drinking Fountain: 0 $0.00 Additional Fee : $0.00 TOTAL: $44.00 Plan Check Fee: $0.00 Fee Due at Permit Issuance: $44.00 PERMITS EXPIRE 180 DAYS AFTER ISSUANCE OR LAST VALID INSPECTION Construction Hours: Monday- Friday 7:00 a.m. to 6:30 p.m. and Saturday from 8:00 a.m. to 6:00 p.m.