Loading...
HomeMy WebLinkAboutC-1350(A) - Engineering services, Reservoir & pump station5 VENDOR ' PURCHASE ORDER CTPY..OF NEWPORT BEACH Shuirman- Simpson 359 San Miguel Drive Suite 200 Newport Beach, Calif. 92660 .,3300 NEWPORT BOULEVARD NEWPORT BEACH, CALIFORNIA 92660 PHONE: (714) 673 -2110 SHIP TO E'• (SAME -UNLP OTNFr r. !i;E NOTED) No. 558 !N DUPLICATE IRIS ORDER NUMBER MUST APPEAR ON ALL INVDIOES, SNIP- PING NDTICES, BILLS OF LAD- ING, EXPRESS RECEIPTS AND PACKAGES. UN TICKETS SMALL !M- CLYDE CLUDE UNIT PRICE. , DATE MAY S. 1971 DEPT CitY comncil QUANTITY DESCRIPTION OF ARTICLES OR SERVICES REQUIRED UNIT PRICE TOTAL Engineering Services Master Plan Water Supply Facilities, Harbor View Hills Sector IV Pressure Zones III, IV & V Engineering Services for Reservoir (C1351) and Pumping Station (C -1350) As Per Contract 24,000.00 Contract E1350 and E1351 Resolution 7408 FOR CITY USE ONLY IMPORTANT CITY OF NEWPORT BEACH CODE AMOUNT )- 9297 -075 24,000,00 The Artic!.:c : :e:i .':: 0,z, Order Or Crn!:aci mu,t mn- [nrm ., thun .. '+ryOrxhr. nE 160, Siate of Cr,i iior ia, Division of :r,du�ir al :i: +foh. Federal ,+.pplicz L" ble to lhi< D. W. MEANS .Ohi^'t v, c:d;c.T:..., -, . +,. PURCHASING AGENT DEPARTMENT COPY 0 CORRECrFD COPY OF CITY OF NEWPORT BEACH TO: Public 'Works Department FROM: City Clerk . SUBJECT: Contract No. 1350 R. E P - E 0 Date May 4, 1971 Project Master Plan .later Supply Facilities Pressure. Zones III, IV & V Ptrnpinp Station Attached are 2 executed copies of subject contract for your files and for transmittal to the contractor. Contractor: ShuirnumSjyga, Nidl I2iainaam 359 San t°i¢uel Drive, Suite 200 Address: 14ewport Beach, CA 92660 Amount: $ toot to exmed $24,000 Effective Date: April 28, 1971 Resolution No. 7408 adopted on ,,_6_.F Laura Lagic LL:dg Att. cc: Finance Department ❑ S P 0 AGREEMENT FOR ENGINEERING; SERVICES (Design of Pumping and Storage Master Plan Water Supply Facilities for Harbor View Hills, Sector IV and a pressure reducing station connecting Pressure Zone III to II) THIS AGREEMENT is made and entered into this 2 g iI/ day of AP R11. , 1971, by and between the CITY OF NEWPORT BEACH, a municipal corporation hereinafter referred to as "City ", and the firm of SHUIRMAN- SIMPSON, Civil Engineers, hereinafter referred to as "Engineer". WHEREAS, City proposes to provide domestic water service to a hillside area known as Harbor View Hills, Sector IV which is partially located in three undeveloped water pressure zones (Master Plan Zones III, IV and V); and WHEREAS, City further proposes to increase the operational flexibility of the present water system with a connection from Water Pressure Zone III to II and a pumping facility from Big Canyon reservoir to Water Pressure Zone III; and WHEREAS, engineering services are necessary to design and prepare plans and specifications for the proposed facilities, and engineering relating to them; and WHEREAS, Engineer has submitted a proposal to design and prepare plans and specifications for the proposed facilities; NOW, THEREFORE, the parties agree as follows 1. General City engages Engineer to furnish the services hereinafter specified for the compensation herein stipulated, and Engineer agrees to perform such services upon said terms. -1- • 2. Duties of Engineer Engineer shall: a. Design and prepare detailed plans and specifi- cations for construction of: (1) Buried, prestressed concrete 1.5 MG Zone IV Storage Reservoir. (2) Zone III Pumping Station with 2 turbine- type pumps driven by electric motors with provision for 2 future pumps. (3) Zone IV Pumping Station with 2 vertical turbine -type pumps driven by electric motors with provision for 2 future pumps. (4) Zone III to Zone II Pressure Reducing Station. (5) Primary 24 -inch suction line for Zone IV Pumping Station. (6) Site preparation for Items (1) through (4). Plans and specifications shall be prepared to permit one construction contract for the reservoir (Item 1) and another for Pumping Station, Pressure Reducing Station, and 24 -inch Suction Line (2), (3), (4) and (5). b. All field survey work required to complete Items (1) through (6). C. Coordination with Southern California Edison Company and Pacific Telephone Company on extension of their facilities. d. Preparation of a manual describing in detail the operation and maintenance of the facilities listed in Items (1) through (4). WX • 0 e. Prepare construction specifications, bid proposals and contract documents for each contract suitable for use by City in calling for competitive bids. f. Prepare a final quantity estimate and related cost estimate for contract described above. 3. Duties of City City agrees to provide Engineer the following: a. Necessary information regarding existing facilities at Big Canyon Reservoir. b. Soils information which is necessary to the design of the pumping stations and the storage reservoir. C. Standard sheets for the preparation of plans. d. Consultation as needed to accomplish the project. 4. Completion of Services Engineer agrees to complete all of the services specified herein within ninety (90) days after execution of this agreement. 5. anent by City City agrees to pay Engineer for under the provisions of basis of 2 -1/2 times the di direct labor rates as shown schedule, but not to exceed thousand dollars ($24,000). Principal for all services called this agreement on the -ect labor costs, at the in the following fee the sum of twenty -four $11.00 per hour Engineers $7.00 to $8.50 per hour Designers and Draftsmen $5.00 to $7.00 per hour 2 -man Survey Crew 3 -man Survey Crew Typist -3- $14.40 per hour $19.20 per hour $3.40 per hour • 0 The amount to be paid Engineer shall be payable as follows: a. Monthly partial payments, each payment to be the amount earned as determined by the fee schedule. The sum of the monthly partial payments shall not exceed ninety percent (90 %) of the above maximum fee. b. The balance of the total amount to be paid upon acceptance of the construction work by the City Council but in any event not later than twelve (12) months after the signing of the plans by the Public Works Director. In addition, City shall reimburse Engineer for the actual cost of reproduction of copies of said plans, specifications and related documents and other related cost authorized by the Public Works Director and advanced by Engineer. 6. Termination This agreement may be terminated at any time by City upon three (3) days written notice to Engineer by placing said notice in the United States mail, postage prepaid, addressed to Engineer's business office. In the event of termination due to the fault of Engineer, City shall be relieved of any obligation to compensate Engineer. If this agreement is terminated for any reason other than the fault of Engineer, City agrees to compensate Engineer for the actual services performed up to the effective date of the notice of termination on the basis of the fee schedule contained in this agreement. • 0 7. Amendment The scope of the services to be furnished by Engineer may be changed and the maximum fee amended upon prior written approval of the Public Works Director. 8. Assignment This agreement or any portion thereof shall not be assigned without the written consent of City. 9. Hold Harmless Engineer shall assume the defense of and indemnify and save harmless the City, and its officers and employees, from all claims, loss, damage, injury and liability directly arising from any errors, omissions, or negligence in Engineer's performance of this agreement or from the engineering work and services herein provided. IN WITNESS WHEREOF, the parties hereto have executed this agreement. CITY OF NEWPORT BEACH By: e Mayor By: APPROVED - TQ FORM: City Clerk CITY SHUIRMAN-SIMPSON, CIVIL ENGINEERS City Attorney By: ENGINEER -5- RRSOLUTI 7408 A. WOLUTION OF THE CITY COOPCIL, og TEE CITY NEWPORT BEACH �VW� , eTM EXECUTI(W OF 1tM WITH 9 SIMPSON, CIVIL ENGI $, FOR EL�Ci NG SERVICES IN CONNECTION WITH MASTER PLAN WATER SUPPLY FACILITIES WBEREAS, there has been presented to the Citj_'Council of the City of Newport Beach a certain contract betviin the City of Newport Beach and Shuirman- simpson, Civil Engineers, for the design of pumping and storage master plan eater supply facilities;, #or 'Harbor View Hills, Sector IV, and a pressure reducing station eonnecting.,,pressure Zone III to III and WHERXASto the City Council has considered the terms and conditions o!' said agreement and found them to be fair and -ignitable; NOWe TRUVOMRE, BE IT RESOLVED that said agreement for the engineering services above described is apprarved, and the Mayor and City Clerk are hereby authorized and directed to execute the same on behalf of the City of Newport beach. ADOPM) this 26th day of April, 1971. C ' . Mayor ATTEST. City Clerk THSsadw 4/26/71 ve