HomeMy WebLinkAboutC-1352(A) - Engineering services, Transmission main, Master Plan, Water supply facility, Zones 3 & 4INVOICE
OAU13, BEIN, FROST &
E . P.O. SDE 117 .136 ROCHESTER STREET, COSTA MESA, CALW13RNIA 99647
To: CITY OF NEWPORT BEACH
3300 Newport Boulevard
Newport Beach, CAlifornia
Attn: William B. Dye
DAY. May 31. .19 71
YOUR ORDER 5584
JOB NO 11972
PROGRESS BILL
INVOICE NO. 5077
INVOICE DUE WHEN RENDERED . INTEREST CHARGED ON PAST DUE ACCOUNTS
PLEASE RETURN DUPLICATE COPY WITH REMITTANCE
Progress Bill No. 1 for the month of May, 1971, covering the
engineering and surveying services completed in accordance
with your Purchase Order No. 5584 and our Contract No E 1352
for the preparation of construction drawings and specations
for the proposed 16 -inch Water Main from Big Can Re rvoir
to the intersection of San Joaquin Hills Road an glass
Hill Road, Harbor View Wills Sector IV, Newpe ch, California
as outlined below:
I. Preliminary Right -of -Way lnvestigatid4nd Site Survey
A. Registered Engineer 5 hA& @ 25.00 $ 125.00
B. Field Survey Crew 1 fV9 46.00 736.00
C. Supervision t s. @ 19.00 76.00
II. Preparation of improveme+lans
A. Registered Engin 11 Rrs. @ 25.04 $ 275.00
B. Design b Caic u
,jaqRK 35 hrs. @ 19.00 665.00
C. Drafting 37 hrs. @ 17.00 629.00
Blueprints
tc�
91*-*
PLEASE PAY FROM THIS INVOICE. NO STATEMENT WILL BE MAILED
$ 937.00
1569.00
$ 2506.00
4.50
$ 2510.50
INVOICE
AU.' BElhl:
P.C. obt 117 . 126 RCCHEVER WREST. CWTA MESA. CA WOW NIA 91627
To: CITY OF NEWPORT BEACH
3300 Newport Blvdd
Newport Beach, California
Attn: William B. Dye
DAY• June 330, ,e 71
YOUR ORDER 5584
Joe NO 11972
PROORWS 131LL NO 2
INVOICE NO. 6050
INVOICE DUE WHEN RENDERED . INTEREST CHARGED ON PAST DUE ACCOUNTS
PLEASE RETURN DUPLICATE COPY WITH REMITTANCE.
Progress Bill No. 2 for the month of June. 1971, covering the
engineering and, surveying services completed in accordance
with your Purchase Order No. 5584 and our Contract No E, 1352
for the preparation of construction drawings and speeications
for the proposed 16 -inch Water Main fray Bt9 Ca alL ReeTervoir
to the intersection of San Joaquin Hills Road a yglass
H111 Road, Harbor View Hills Sector IY, Newpq/h,
Ca lifonGia, as outlined below:
I. Peeparstion of Improvement Plans
A. Registered Engineer 6#r 25.00 S 125.00
B. Design A Calculations 1 9 19.00 342.00'
C. Drafting . 0 17.00 306.00 S 773,.00
9/F
PLEAS€ PAY FROM THIS INVOICE • NO STATEMENT WILL.BEi
0 PURCHASE ORDER
CITY OF NEWPORT BEAH
3300 NEWPORT BOULEVARD
NEWPORT BEACH, CALIFORNIA 92660
PHONE: (714) 673-2110
VENDOR
Raub, Bein Frost & Associates
136 Rochester
Costa tiesa, Calif.
SHIP TO
(SAME WN-LE � i �THIRI— -� Nl,�rEt))
No. 5584
INVOICE IN DUPLICATE
THIS ORDER mum SER MUST
APPEAR ON ALL INVOICES, SHIP-
11*9 NOTICE$, BILLS OF LAD-
ING, EXPRESS RECIE IPTS AND
PACKAGES.
DELIVERY TIC GETS SMALL IN-
.LUM UNIT PRICE.
DATE May 5, 1971
DEPT City Kanager
QUANTITY
DESCRIPTION OF ARTICLES OR SERVICES REQUIRED
UNIT PRICE
TOTAL
Transmission Main For ','aster Plan
Water Supply Facilities Zones Ilf, IV & V
Engineering on the Transmission Main As Per Contract
NOT TO EXCEED
3,700.00
Contract E135:2
kgIIcmj"t4A§ )94City Mrgr. V-25-108)
FOR CITY
USE ONLY
IMPORTANT
CODE
AMOUNT
0-9297-075
3700.00
CITY OF NEWPORT BEACH
The Articles covered by t�i, P.reh.se Order or Contract must mas-
to. with the SJety O,de,,, I do, Stat� of California, Division
of Irol"�t,u,l S,fety.
Show as a separate iters soy r�tail sab,a tax, ua- bx or Federal
Lix applicable to this purc.haa,.
Thi, s.bjt to caliboo:. sales tas�
D. W. MEANS
All .11.,ahl, fi,.r,p.H:1fie� raiit be eepaid aud 'h.wn as
PURCHASING AGENT
a ep.ral� uh,na o�' the Uo o.t is,luh, F,dend tr�.,�,la-
ban tax.
DEPARTMENT COPY
TO:
i
CITY OF NEWPORT BEACH
Public Works Department
FROM: City Clerk
SUBJECT: Contract No. 1352 -E
0
Date May 4. 1971
Project Transmission t4ain for Master Plan Water Supply
Facilities ?apes M, IV & V
Engii1gm�l71& m the 1mismissim Main
Attached are 2 executed copies of subject contract for your files and for
transmittal to the contractor.
Contractor: Faub, Bein & Ernst & Associates
Address: 136 Rochester, Costa A!esa
Amount: $ ltot to exceed $3,700.00
Effective Date: 4 -30 -71
City F4T• Auth
Resolution No.V25 -108 adopted on 446 -71
LL:dg
Att.
Finance Department ❑
cc:
/Ii.,...�.
.,
AGREEMENT FOR ENGINEERING SERVICES
(Design of Master Plan Water Supply Transmission
Main for Harbor View Hills, Sector IV)
THIS AGREEMENT is made and entered into this ,JO TK
day of apRiL , 1971, by and between the CITY OF NEWPORT
BEACH, a municipal corporation hereinafter referred to as "City ",
and the firm of RAUB, BEIN AND FROST, AND ASSOCIATES, Civil
Engineers, hereinafter referred to as "Engineer ".,
WHEREAS, City proposes to provide domestic water service
to a hillside area known as Harbor View Hills, Sector IV, which is
partially located in three undeveloped water pressure zones
(Master Plan Zones III, IV and V); and
WHEREAS, engineering services are necessary to design
and prepare plans and specifications for a Master Plan Water
supply transmission main to deliver domestic water to this area; and
WHEREAS, Engineer has submitted a proposal to design and
prepare plans and specifications for the proposed transmission main;
NOW, THEREFORE, the parties agree as follows:
1. General
City engages Engineer to furnish the services
hereinafter specified for the compensation herein
stipulated, and Engineer agrees to perform such
services upon said terms.
2. Duties of Engineer
The Engineer shall:
a. Perform a preliminary investigation of the overall
project right of way, including contact with
property owners and adjacent property owners.
-1-
0
b. Perform all field survey work necessary for
design of the 16 -inch water transmission main,
including data to tie water main into the Zone
IV pumping station.
c. Design and prepare detailed plans and specifi-
cations for construction of approximately 3,000
feet of 16 -inch water transmission main from
the proposed Zone IV pumping station along the
westerly property line of Pacific View ;Memorial
Park and San Joaquin Hills Road to the inter-
section of proposed Spyglass Hill Road. The
plans shall be prepared on sheets supplied by
City with a plan view scale of 1" = 40'.
d. Prepare construction specifications, bid proposals
and contract documents on multilith masters for
the project suitable for use by City in calling
for competitive bids.
e. Prepare final quantity estimate and related cost
estimate for project.
f. Consult and maintain liaison with City during
the engineering design project.
3. Duties of City
City agrees to provide Engineer the following:
a. Consultation as needed to accomplish the project.
b. Standard sheets for preparation of plans.
C. Any soils data required for design of the project.
4. Completion of Services
Engineer agrees to complete all of the services
specified herein within 45 days after execution
of this agreement.
-2-
Ci
5. Payment by City
City agrees to pay Engineer for all services called
for under the provisions of this agreement on the
basis of the hourly rate schedule set forth below,
but not to exceed the sum of Thirty -seven Hundred
Dollars ($3,700.00).
Consultation and Registered Engineer
$25.00
per
hour
Engineering Design Calculations
and Supervision
$19.00
per
hour
Drafting
$17.00
per
hour
Field Survey Crew
$46.00
per
hour
Typist
$10.00
per
hour
The hourly rates shown above will be subject to an
eight percent (8 %) increase each ensuing August 1st,
beginning August 1, 1971, until completion of the
project.
The amount to be paid Engineer shall be payable as
follows:
a. Monthly partial payments, each payment to be
the amount earned as determined by the fee
schedule. The sum of the monthly partial payments
shall not exceed ninety percent (90 %) of the above
maximum fee.
b. The balance of the total amount to be paid upon
acceptance of the construction work by the City
Council but in any event not later than twelve
(12) months after the signing of the plans by
the Public Works Director.
In addition, City shall reimburse Engineer for the
actual cost of reproduction of copies of said plans,
-3-
specifications and related documents and other
related cost authorized by the Public Works
Director and advanced by Engineer.
6. Termination
This agreement may be terminated at any time by
City upon three (3) days written notice to Engineer
by placing said notice in the United States mail,
postage prepaid, addressed to Engineer's business
office. In the event of termination due to the
fault of Engineer, City shall be relieved of any
obligation to compensate Engineer. If this agree-
ment is terminated for any reason other than the
fault of Engineer, City agrees to compensate
Engineer for the actual services performed up to
the effective date of the notice of termination
on the basis of the fee schedule contained in this
agreement.
7. Amendment
The scope of the services to be furnished by
Engineer may be changed and the maximum fee revised
upon prior written approval of the Public Works
Director
8. Assignment
This agreement or any portion thereof shall not be
assigned without the written consent of City.
9. Hold Harmless
Engineer shall assume the defense of and indemnify
and save harmless the City, and its officers and
!M,
0
employees, from all claims, loss, damage, injury
and liability, directly arising from any errors,
omissions, or negligence in Engineer's performance
of this agreement or from the engineering work and
services herein provided.
IN WITNESS WHEREOF, the parties hereto have executed
this agreement this date first above written.
APPROVED 0 FORM /
Afty ney
CITY OF NEWPORT BEACH
By!
City Ma ager
CITY
RAUB, BEIN, FROST AND ASSOCIATES,
CIVIL NGINEERS
By:
ENGINEER
-5-