HomeMy WebLinkAboutC-1403(B) - Traffic Signal Installation!' - ±f!- 13 1973 P,, .:L TO: CITY COUNCIL FROM: Public Works Department August 13, 1973 CITY COUNCIL AGENDA ITEM NO. H -9 SUBJECT: ACCEPTANCE OF FEDERAL AID TOPICS PROJECT - INSTALLATION OF TRAFFIC SIGNALS AT (A) BAYSIDE DRIVE - JAMBOREE ROAD- MARINE AVENUE (B) NEWPORT CENTER DRIVE - NEWPORT CENTER DRIVE EAST AND WEST (C) PLACENTIA AVENUE - SUPERIOR AVENUE (CONTRACT NO. 1403) RECOMMENDATIONS: 1. Accept the Work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the bonds 35 days after Notice of Completion has been filed. DISCUSSION: The contract for the construction of the subject traffic signals has been completed to the satisfaction of the Public Works Departm &nt. The bid price was $141,787:00 Amount of unit price items constructed 141,787.00 Amount of change orders - 144.76 Total contract cost 141;642.24 Amount budgeted in Gas Tax and Contribution Funds: 141,787.00 (Account No. 25- 5607 -056) Two change orders were issued. Change Order 1 (- $442.00) provided for a 5 -foot shorter pole at the Bayside Drive - Jamboree Road intersection in deference to the view homes on top of the bluff. Change Order 2 ($297.24) pro- vided for additional louvers and hoods at the Placentia Avenue - Superior Avenue intersection. Due to the skewed intersection the louvers and hoods were necessary to prevent the motorist from being confused by seeing the cross street signal lights. The design engineering was performed by Herman Kimmel and Associates of Newport Beach. The contractor is Steiny and Company of Anaheim, California. The contract date of completion was December 18, 1972. While the contractor was delayed by the prolonged rainy weather, the signals were all in operation by December 21, 1972. Acceptance has been delayed pending correction of minor electronic malfunctions. J se ph T. vlin P blic Wo Director PD:hh JUN 111973 By the CITY COUNCIL CITY OF MOW8ORT REACH TO: CITY COUNCIL FROM: Public Works Department June 11, 1973 CITY COUNCIL AGENDA ITEM NO. H -2 SUBJECT: TRAFFIC SIGNAL INSTALLATIONS AT THE FOLLOWING LOCATIONS: 1. N ort -eat r D im and Newport Center _Dtiye_E&s_"j1d L West 2. Newport Center Drive and Santa Rosa Drive. 3. San Joaquin Hills Road and Santa Cruz Drive -Big Canyon Drive RECOMMENDATION: Adopt a resolution authorizing the Mayor and City Clerk to execute a reimbursement and right of entry agreement with The Irvine Company for the subject traffic signal installations. DISCUSSION: The City Council Policy Number F -9 covering the financing of Capital Improvements provides in General Provision No. 3, the following: "Where private streets or private entrances occur at the intersection of two arterial streets, the developer will be required to pay only for the additional signal work re- quired to signalize his entrance ". The subject three signal installations each have one private roadway or entrance belonging to The Irvine Company. The reimbursement agreement pro- vides for The Irvine Company to pay the following amounts for the signalization of the private entrances or roadways: Location 1 $ 6,300 Location 2 7,110 Location 3 9,035 Total 22,455 These amounts are the estimated costs of installing the additional signal equipment necessary to serve the private leg of the intersections. The right of entry portion of the agreement allows the City to install, operate and maintain the traffic signal equipment installed on Irvine Company property. The subject three traffic signals are part of the traffic signals being installed through the Federal Aid TOPICS Program. t• oseph T. vlin ublic Wor Director DLW:hh � Matching Total ✓� $5,900 $20,700 NOV 13 1972' By the CITY COUNCIL CITY 00 NlMi 07 4404CH TO: CITY COUNCIL FROM: Public Works Department . 1^4- November 13, 1972 // - 3- :�2 SUBJECT: TRAFFIC SIGNAL INSTALLATION AT PLACENTIA AVENUE AND SUPERIOR AVENUE - C -1403 RECOMMENDATION: Adopt a resolution accepting a TOPICS fund assignment from the County of Orange for the County's share of the subject installation. DISCUSSION: On November 22, 1971 the City Council authorized the execution of a cooperative agreement with the County of Orange to cover the County's share of the cost of installing a traffic signal at Placentia Avenue and Superior Avenue. This signal installation is one of the three signals presently being installed using TOPICS funds. The agreement with the County did not provide for an assignment of County TOPICS funds to the City for a portion of their share of the in- stallation. On November 7, 1972 the County Board of Supervisors adopted a resolution assigning $20,700.00 more or less of County funds to the City for the subject installation. The State Division of Highways and FHWA require that the City accept the County's assignment of TOPICS funds by resolution. Below is a breakdown of the funding of the Placentia Avenue - Superior Avenue traffic signal. TOPICS Matching Total County $14,800 $5,900 $20,700 City 24 470 39,2 O 9 730 $ 5�,63� 342200. 54,900* *Includes 15% for engineering, administration, and inspection. oseph T evlin ublic WbAs Director DLW:hh z RESOLUTION No, 7 87 0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH ACCEPTING A TOPICS. FUND ASSIGNMENT FROM THE COUNTY OF ORANGE FOR ITS SHARE OF THE TRAFFIC SIGNAL INSTAL- LATION AT PLACENTIA AVENUE AND SUPERIOR AVENUE, CONTRACT No. C -1403 WHEREAS, on November 22, 1971, the City Council authorized the execution of a cooperative agreement with the County of Orange to cover the County's share of the cost of installing a traffic signal at Placentia Avenue and Superior Avenue; and WHEREAS, said signal installation is one of three signals presently being installed using TOPICS funds; and WHEREAS, the Orange County Board of Supervisors have authorized the assignment of $20,700 more or less of County funds to the City of Newport Beach as the County's share of the cost of said installation, and the State Division of Highways requires that the City accept the assignment of said TOPICS funds by resolution; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Newport Beach that it hereby accepts the as- signment of TOPICS funds from the County of Orange in the approximate amount of $20,700, as the County's share of the cost of the traffic signal installation at Placentia Avenue and Superior Avenue. ADOPTED this 13th day of November , 1972. ATTEST: City Clerk Mayor DON dm 11/8/72 v- - TO: CITY COUNCIL FROM: Public Works Department L.77-, MAY 2 2 1972 By fhe CITY COUNCIL CITY GA NFMxror R;ACH May 22, 1972 SUBJECT: FEDERAL AID TOPICS PROJECT - INSTALLATION OF TRAFFIC SIGNALS AT (A) BAYSIDE DRIVE - JAMBOREE ROAD - MARINE AVENUE: (B) NEWPORT CENTER ,DRIVE - NEWPORT CENTER DRIVE EAST AND WEST; AND (C) PLACENTIA AVENUE - SUPERIOR AVENUE (CONTRACT 1403) RECOMMENDATION: Adopt a resolution awarding the contract to Steiny and Company, Inc. for $141,787.00 and authorizing the Mayor and the City Clerk to execute the contract subject to the approval of this award by the Federal Highway Administration (FHWA). DISCUSSION: Four bids for the installation contract were received and opened in the office of the City Clerk at 11:00 A.M., May 16, 1972. Contractor Amount Bid Steiny and Company, Inc.,Los Angeles $141,787 Grissom and Johnson, Inc.,Santa Ana $146,187 Baxter - Griffin Co., Stanton $152,980 Smith Electric Supply, Stanton $159,161 The low bid was 15.7% below the engineer's estimate of $168,000. The low bidder is well qualified and has satisfactorily performed similar work for the City in the past. This project is to be the City's first Federal Aid TOPICS project. This contract cannot be executed until the FHWA has approved the bids and authorized the award of the contract. However, the City has been directed to award the contract subject to the approval of the FHWA. The traffic signals to be installed on this project are at the following locations: Location 'A' Bayside Drive - Jamboree Road - Marine Avenue Location 'B' Newport Center Drive - Newport Center Drive East and West Location 'C' Placentia Avenue - Superior Avenue The funding breakdown based on the low bid follows: Traffic Signal TOPICS City Gas Tax Orange County Total Location 'A' $35,609 $14,166 $ 49,775 Location 'B' $31,660 $12,592 $ 44,252 Location 'C' $21,355 $ 8,495 $17,910 $ 47,760 8 ,62 $R;3 $TT,Td 1 8 May 22, 1972 Page 2 Subject: Federal Aid TOPICS Project Sufficient funds remain in the Gas Tax Fund account for matching TOPICS funds. The estimated time of completion is November 18, 1972. in iirector r Misses and Junior Dresses Sportswear and Swintwear 1 May 1972 City Council City Hall Newport Beach Gentlemen I ` "'1 b 197" ('t 'lie CiIY C;") "I C;L of Newport Beach CA 92660 0 GENERAL OFFICES: 1852 Kaiser Avenue Santa Ana, Calif. 92705 (714) 549 -13339 7 Dale ,`; q.. ^- ,Y.....2.......197........ COPIES SENT T0: Mayor iiP9H8Ct 1uoraey Puhnr Workr Direct0lt lhanninp Oirectur Ulh er Kindly accept the following comments on the proposed traffic signal installation at the Intersection of Bayside Drive and Jamboree Road and the bridge approach to Balboa Island as an expression of sincere personal opinion. I do not tihink that this particular Installa- tion is needed. My observation is based on use of this intersection continually over a period of more than twenty years, ever since I purchased the store at 204 Marine Avenue, Balboa Island. The signal is not needed because at this Intersection the "rule of courtesy" has worked so beautifully. With few exceptions, each motorist defers to the driver on his left until one or two have made the crossing, then he asserts his rights in turn. It seems to work as smoothly as the shuffling of a deck of cards. As you know, signals are costly. Furthermore, It is very possible that the rigid operation of a signal at this point will back up the traffic over the bridge and create a problem. If I had a vote in this case, it would be negative. 3aTe$ eke, Pres t C'ry CF IIE40H, L:;LIr SEVEN SOUTHLAND LOCATIONS #_ 1( ) El Segundo Laguna Beach The City, Orange St. Huntington Center South Coast Plaza ,t TO: CITY COUNCIL FROM: Public Works Department ri 10, 1972 N"`'`� 1'! ". f �� �G %% rG�+I/YLL,,�i��1c4�.x/�.r.,dd° ,,L, ✓� CITY SUBJECT: FEDERAL AID TOPICS PROJECT - INSTALLATION OF "TRAFFIC "SIGNALS AT (A) BAYSIDE "DRIVE - JAMBOREE ROAD - MARINE AVENUE; (B) NEWPORT CENTER DRIVE .- NEWPORT CENTER DRIVE E ST AND WEST; AND (C) PLACENTIA AVENUE - SUPERIOR AVENUE (CONTRACT 1403) % tf& ,., 2ccZ �' 7Go� / /�L,.✓ S �(o RECOMMENDATIONS: APR P4 197r 1, Approve the plans and specifical omrp& CITY COUNQ, CITY of Nrwf)D^QT BC-AC' 2. Authorize the City Clerk to advertise for bids to be opened at 10:00 A.M., May 2, 1972. DISCUSSION: This project provides for the installation of three traffic signals at the following locations: Location "A" - Bayside Drive - Jamboree Road - Marine Avenue Location "B" - Newport Center Drive - Newport Center Drive East and West Location "C" - Placentia Avenue - Superior Avenue The plans were prepared by a private engineer. This project is to be the City's first Federal Aid TOPICS project. Plans and specifications have been submitted and approved by both the State Division of Highways and the Federal Highway Administration. They have authorized the City to advertise for bids. TOPICS funds will pay for 71.3% of the improvements. Three eights of the Placentia Avenue - Superior Avenue signal will be funded by the County of Orange through cooperative financing agreement executed December 14, 1971, The engineer's estimate and funding breakdown follows: TOTALS $108,821 $ 43,804 $ 15,375 $168,000 The amount remaining in the Gas Tax Fund project account for matching TOPICS funds is $37,562.89. Additional monies required will be transferred from funds presently allocated to other Gas Tax projects. A budget amendment will be submitted for Council consideration at the time a recommendation to award is made. The estimat d time of completion is November 15, 1972. eph T. evlin lic r s Director CITY ORANGE TRAFFIC SIGNAL TOPICS GAS TAX COUNTY TOTAL Location A $ 54,901 $ 22,099 $ $ 77,000 Location B 35,650 14,350 50,000 Location C 18,270 7,355 15,375 41,000 TOTALS $108,821 $ 43,804 $ 15,375 $168,000 The amount remaining in the Gas Tax Fund project account for matching TOPICS funds is $37,562.89. Additional monies required will be transferred from funds presently allocated to other Gas Tax projects. A budget amendment will be submitted for Council consideration at the time a recommendation to award is made. The estimat d time of completion is November 15, 1972. eph T. evlin lic r s Director AFFIDAVIT OF PUBLICATION NEWPORT MVIBOR ENSIGN STATE OF CALIFORNIA County of Orange ss' I, ._ .... ARVO ... F. .NAAP,4 ........................ being first duly sworn, and on oath depose and say that I am the printer and publisher of the Newport Harbor Ensign, a weekly newspaper printed and published in the City of Newport Beach, County of Orange, State of California, and that the. ........ NOT.1CF....I ?V.L.T7N..G...BLDS ........... .. ..... ........... ........ ..................... - .................. I .... . -.... of which copy attached hereto is a true and complete copy, was printed and published in the regular issue(s) of said newspaper, and not in a supplement, .....1............ consecu- tive times: to -wit the issue(s) of Arr' 1 2'7, 1972 ....................................................... ............................... (Signed)..L..a,�c:. Subscribed and sworn to before me this 28 th....day of ..................p?....1......, 19.7' .. Notaryublic :n and for the Counts of Orange, State of California. � CA H IAL sF,AL q MARY _ j� %�• IPkI�GU t' AAPrnio A GRANGE CCL,TyiN � .Y C Acv Sc pN EX"ES OECEI-t, 2c.i'I'!5 i t _ LEGAL NOTICE _ LEGAL NOMS CITY OF NEWPORT BEACH, CALIFORNIA NOTICE INVITING BIDS SEALED BIDS will be received at the office of the City Clerk, City Hall, Newport Beach, California, until 11:00 A.M. on the 16th day of *ay, 1972, at which time they will be opened and read, for performing work as follows: ROAD IMPROVEMENTS, INSTALLATION OF TRAFFIC SIGNALS AND SAFETY LIGHTING AT BAYSIDE DRIVE - JAMBOREE ROAD- MARINE AVENUE INTERSECTION: NEWPORT CENTER DRIVE - NEWPORT CENTER DRIVE EAST AND WEST INTERSECTION: SUPERIOR AVENUE PLACENTIA AVENUE INTERSECTION CONTRACT NO. 1403 Bids must be submitted on the proposal form attached with the contract documents furnished by the Public Works Depart- ment. The additional copy of the proposal form is to be retained by the bidder for his records. Each bid must be accompanied by cash, certified check or Bidder's Bond, made payable to the City of Newport Beach, for an amount equal to at least 10 percent of the amount bid. The title of the project and the words `SEALED BID" shall be clearly marked on the outside of the envelope containingi the bid. The proposal documents that must be completed, executed, and returned in the sealed bid are: Sheet No. D -1 Title Sheet D -2 & 3 Bidding Sheet D -4 Signature Sheet and Affidavit D -5 Bidder's Bond D -6 Designation of Subcontractors D -7 Non - Collusion Affidavit D -8 Certification with regard to Performance of Pre- vious Contracts or Subcontracts subject to the Equal Opportunity Clause and the filingof Required Reports. These documents shall be affixed with the signature and titles of the persons signing on behalf of the bidder. For corporations, the signatures of the President or Vice President and Secretary or Assistant Secretary are required and the Corporate Seal shall be affixed to all documents requiring signatures. In the case of a Partnership, the signature of at least one general partner is required. No bids will be accepted from contractors unless they have been prequalified in accordance with Section 2 -1.11 "Com- petency of Bidders" andSection7_I.01E "Contractor'sLicens- ing Laws," of the State of California, Standard Specifications. Forms to be filed are available from the City of Newport Beach, Public Works Department. The City shall not furnish proposal forms for bidding purposes to any person who is required to submit and has not submitted a questionnaire and financial statement for prequalificationto the State of California at least FIVE working days prior to the date fixed for publicly opening sealed bids and been prequaliffed by the State of California for at least ONE day prior to that date. Plans and I Contract Documents, including Special Provisionsand Proposal may be obtained at the Public Works Department, City Hall, Newport Beach, California. It is requested that the Plans and Contract Documents be returned within 2 weeks after the bid opening. The City has adopted the Standard Specifications for Public Works Construction (1970 Edition and Supplements) as prepared by the Southern California Chapters of the American Public Works Association and the Associated General Contractors of America. Copies may be obtained from Building News, Inc., 3055 Overland Avenue, Los Angeles, California 90034, (213) 870 -9871. The City has adopted Standard Special Provisions and Standard Drawings. Copies of these are available at the Public Works Department at a cost of $2.00 per set. The City reserves the right to reject any and all bids and to waive any informality in such bids. In accordance with the provisions of Article 2, Chapter 1, Part 7 of the California Labor Code (Sections 1770 at seq.), the City Council of the City of Newport Beach has ascertained the general prevailing rate of per diem wages in the locality' in which the work is to be performed for each craft, classifica- tions, or type of workman or mechanic needed to execute the contract and has set forth these items in Resolution No. 9423 adopted May 17, 1971. A copy of said resolution is available in the office of the City Clerk, All parties to the contract shall be governed by -all provisions of the- California Labor Code relating to prevailing wage rates (Sections 1770 -1781 inclusive). ari + r The rate of compensation for any classification not listed in the schedule, but which may be required to execute the proposed contract, shall be commensurate and in accord with the specified rates for similar or comparable classifica- tions or for those performing similar or comparable duties. This project will be partially financed with Federal funds under the TOPICS program. If there is a difference between the minimum Federal, State, or City wage rates for similar classifications of labor, the contractor and his subcontractors shall pay not less than the highest wage rate. The improvement contemplated in the performance of this contract is a TOPICS improvement over which the State of California shall exercise general supervision; and, the State of California therefore shall have the right to assume full and direct control over this contract whenever the State of California, at its sole discretion, shall determine that its responsibility to the United States so requires. In such cases, the State Contract Act will govern. SPECIAL INSTRUCTIONS TO BIDDERS: Bidders must satisfy themselves by personal examination of location of the proposed work and by such other means as they may prefer as to the actual conditions and requirements of the work, and shall not at any time after submission of the bid dispute, complain, or assert that there was any misunderstanding in regard to the nature or amount of work to be done. Approved by the City Council of the City of Newport Beach, State of California on this 24th day of April, 1972. Laura Laglos, City Clerk Publish: April 27, 1972, in the Newport Harbor Ensign." Auth-ihzed N.' Publish Advertisements of all kinds, including legal notices by Decree of the Superior Court of Orange County, California, Number A-6214, dated 29 September, 1961, and A- 24831, dated 11 June, 1963. STATE OF CALIFORNIA Legal Advertising covered by this affidavit is set In 6 point County of Orange with 11 pica column width. I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the below entitled matter. I am a principal clerk of the Orange Coast DAILY PILOT, with which is combined the NEWS- PRESS, a newspaper of general circulation, printed and published in the City of Costa Mesa, County of Orange, State of California, and that a Notice of_ of which copy attached hereto is a true and complete copy, was printed and published in the regular Costa Mesa, Fountain Valley, Huntington Beach, Laguna Beach, Newport Beach, Saddlebac!<, San Clemente/ Capistrano and Irvine issue (s) of said newspaper for L i) confecStiJe week`sS�orwil "iii issue (s) of l -- 197-L--- 197— 197______ 197 —_ 197— I declare, under penalty of perjury, that the foregoing is true and correct. Executed on " i'L 197_',__ at Costa Mesa, California.' (Signature) LEGAL NOM M This . CITY OF _NEWPORT B'1E A C N r +g Stamp SEALED BIDS Will be received at the Office of the City Clerk, City Hall, Newport Beach, California, until 11:O0 A.M. On the lath day of May, 1M,, at which time they will be opened and read, I for performing work as follows: cw,an DRIVE EAST AND TERSECTION! 'SUPERIOR AVENUE- PLAC PLACEN AVENUE INTERSECTION CONTRACT NO. n th Bids must ed submitted on the proposal loan attached with the c o n t r o c t documents furnished it the 'Public Works Department. is to b re coed of the Proposal form to be retained by the bidder for his must be records. Each bid must be accompanletl by cash, certified check or Bidder's Bond, made payable to the City of Newport Beach, for an amount equal t0 at least 10 Percent of the amount bid- . proof c' The title of the Project and the - words PSEALED.BID" shall be clearly mark#d on the outside of the envelope containing the bid. The proposal documents that must be _completed, executed, and returned In the D-2 & 3 Bidding Sheet D -4 Signature Sheet and Affidavit P -S Bidder's Bond D -a Designation of subcontractors D -7 Non -Collusion Affidavit D-a Certification with regard to Performance of Previous Contracts or Subcontracts 'subject to the .Equal Op. portunity Clause and the filing of Re- quired Reports. These documents shall be affixed with the signature and titles of the persons signing on behalf of the bidder. For cor• porations, the signatures Of the Rmidegt or Vice President and Secretary or Assisi Cant Secretary are required and' the Corporate Seal shall be affixed to all documents requiring signatures. In the Case of a Partnership, the signature of at least one general Partner is required. No bids will be accepted from Co.- tractors unless they have been pre -. qualified In accordance with Section 2.1.71 ':Competency. of Bidders" and Section 7- LAIE "Contractor's licensing Laws;' of the State of California, Standard Specifications. Forms to be filed are available from me City of Newport Beach, Public Works' Department. The City shall not furnish proposal forms for bidding, Purposes to any person who is required to submit and has not submitted a ques- tionnaire and financial statement for pre - nuallfication to the State of California at least FIVE working days prior to the date fixed for Publicly opening sealed bids and been prequalified by the State of California for at least ONE day prior to that date. Plans and Contract Documents, including Special Provisions and Propose) may 'be obtained at the Public Works Department, City Hall, Newport Beach, California. It is requested that the Plana and Contract Documents be feturned within 2 weeks after the bid opening. The City has adopted the standard Specifications for Public Works construe. prepared by the 'Southern Canmrnia Chapters of the American Public Works Association and the Associated General Contractors of America. Copies maybe The City has adopted Standard Special Provisions and Standard Drawings. Copies of these are available at the Public Works Department at a cost of $200 Per set. The City reserves the right to reject any and all bids and to waive any in. formality in such bids. to accordance with the provisions of Article 2, Chapter I, Part 7 of the California Labor Code (Sections 177D at ^eq ), the a City C„unCil ass Y ceriained the of May 17, 1971. A copy of Said resmunon rs available In the office M the City Clerk. PROOF OF PUBLICATIll go parties to the contract Sat be governed by all provisions of the Call Mr Labor Co0e relating to l- ing wage 8e rates (Sections 1770.1781 1 incl inCIW sive). A The rate of compensation for anv classification not listed in the SchadVIC, but which may be required to execute the Proposed Contract, shall be commensurate and in accord with the Specified rates for similar or comparable classifications or for those Performing similar or com. Parable duties This project will be' partially financed with federal funds under the TOPICS pro. gram. If there is a difference between the minimum Federal, State, or City wage rates for similar classifications of labor, the contractor and his subcontractors shall pay not less than the highest wage rate. The Improvement contemplated in the Performance of this Contract is a TOPICS Improvement over which the State of California Shall exercise g e n a r a I supervision; and, the State of California therefore shall have the right to assume lull and direct control over this contract whenever the State of California, at its sole discretion, shall determine that its responsibility to the United States so re� quires. In such cases, the State Contract Act will govern. SPECIAL INSTRUCTIONS TO BID- DERS: Bidders must satisfy themselves by Personal examination of location of the Proposed Work and by such other means as they may Prefer as to the actual con- ditions and requirements of the work. and shall not at any time after submission of the bjd dispute, complain, or assert that there was any misunderstanding in regard to the nature or amount of work to be done. Approved by the City Council of the Ch 1y of Newport Beach, State of California on this 24th day of April, 1972. Laura Lagios, City Clerk PVp.�i:a�„ Oran:1• CeJ•I nyi) pl„ _ t __ AAM -limed to- %biish Advertisements of all kinds, including legal notices by Decree of the Superior Court of Orange County, California, Number A6214, dated 29 September, 1961, and A- 24831, dated 11 June, 1963. STATE OF CALIFORNIA lepaV Adve flung wvaad by this affidavit is set in 6 point County of Orange with 11 piw column width. I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the below entitled matter. I am a principal clerk of the Orange Coast DAILY PILOT, with which is combined the NEWS - PRESS, a newspaper of general circulation, printed and published in the City of Costa Mesa, County of Orange, State of California, and that a Notice of- T.n�ritin;; ^r, llsornia of which copy attached hereto is a true and complete copy, was printed and published in the regular Costa Mesa, Fountain Valley, Huntington Beach, Laguna Beach, Newport Beach, Saddleback, San Clemente/ Capisfrano and Irvine issue (s) of said newspaper for a ^ (1)df#�cu �S1e6T�a lei w issue (94of ?T'i1 - —, 197? 197_ 197_ 197_ 197_ I declare, under penalty of perjury, that the foregoing is true and correct. Executed on -_)ril 25 at Costa Mesa, California. r\ (Signature) This-: AVE LEN' ORR TER: PLAT Bids n t a° e a oe4ptcax�� 1 an amount. oapp, eat tg el proof c 'TThe Y°t # protect and ihe word2 ' SEALED.BID' shall be clearly mdrkpd on theout5r4a al the envelo" mate" the bid. ,Tho Proposal deevmenta "Mal nglSf ' , :seomplaled, 4X*Cuted, and uaW;%WIeata id firej 54 ETONO. opf Title Sheet. ' D-2 a 3. Bidding -4 Sheet. D Signature StwYend AMl" D-s eldaere Bond D6 Deslgnafkn of SgNaettactora 0.7 NonColluden APoOvit Certification lw[Wl erY➢Nd -to Performance of Previous Cantractit, a Subcantracts blmieq'ta £aual- ob. pertunity clause and no ..Mile'- of ,Re. quire! Remn-le. These doamaMS shall bsii�Wl the signature and titles of Own 4,�?o�M4 signing on behalf of the car• porattons, the signatunt of tM1lIYlSSnt or Via President and SecMary 'car Pant Secretary are reaulred and We corporate Seal shall be affixed_ to all 6ocuments reoulring signatures. to the case of a Partnership, the stsmwra'W at PROOF OF PUBLICATIll Aen.- adopted Standard Spedal, Standard Drawhma. C'Pies ariabie at the Public Works a cost of a2.01) Par set. erves the right to select ids and to waive any In- ch bids. e with the Provisions of Inter 1, Part 7 of the e Code (sections 1770 04 council of the City of h has asarerta1M11 Me- Sq stamp I The rate of compensation for any classification not listed in the schedule, but which may be, �gqui {ed to execute the. proposed contract, shaOi e c Xecutuurak and in accord with the specified rates for similar or comparable classifications or for those Performing similar or com- parable duties This protect will be' partially financed with federal funds under the TOPICS pro. green. If there is a differepce between the minimum Federal, State, or City wage rates for similar classifications of labor, the contractor and his subcontractors shall pay not less than the highest wage rate. The Improvement contemplated In the pertormaMe of this contract is a TOPICS Improvement over which the State of California shall exercise general the U cases, the bid dispute, oampem, or assert cox there was any misulderstandhe in regard to the nature or amount of Work to be done. Approved by the City Council of the Ci- ty of Newport Beach, State of California on this 24th day of WI, 'ML Laura Logee, City Clerk Published Orange Coast -Daily Pilot, April 0, 1771 948 -72 j , Ir NOV 2 2 1971 November 22, 1971 By the CITY COUNCIL �i — 3 -6) CITY OF NEWp®1iT BEACH TO:, CITY COUNCIL FROM: Public Works Department SUBJECT: COOPERATIVE FINANCING AGREEMENT FOR THE INSTALLATION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF PLACENTIA AVENUE AND SUPERIOR AVENUE RECOMMENDATION: Adopt a resolution authorizing the Mayor and City Clerk to execute the subject agreement with the County of Orange. DISCUSSION: The intersection of Placentia Avenue and Superior Avenue is approximately 3/8 in unincorporated county area. The subject agreement provides for the county to pay for 3/8 of the cost of the design and installation of a traffic signal at this intersection It is proposed to include this intersection signalization with the projects to be funded with TOPICS monies. If the project is approved by the State Division of Highways and Federal Highway Administration for TOPICS funding the project will be funded as follows: city City Gas Tas Funds $ 7,900 TOPICS Funds 19,600 County Funds 16 500 TOTAL COST 44,000 The plans and specifications will be prepared by a consultant retained by the aph Tl D�vl i n lic Wo Director W /bg CITY OF NEWPORT BEACH Date Daowbef 29, 1971 TO: Public Works Department FROM: City Clerk SUBJECT: Contract No. 1403 -F -1 Project 1t+effic Signal Lwtallation Placentia Avenue at Superior Attached are .t6P executed copies of subject contract for your files and for transmittal to the contractor. Contractor:. Q=ty of Orange Address: 515 N. Sycaames Smta Am Amount: $ sn Pap 3 Effective Date: 12 -14 -71 Resolution No. 7587 . adopted on Novater 22+,1971 Laura I�agicv LL:dg Att. cc: Finance Department ❑ MINUTES OF THE BOAR.OXF SUPERVISORS OF ORANGE COU1Y, CALIFORNIA December 14, 1971 IN RE: AGREEMENT TRAFFIC SIGNAL INSTALLATION PLACENTIA AVENUE AND SUPERIOR.AVENUE CITY OF NEWPORT BEACH On motion of Supervisor Caspers, duly seconded and unanimously carried by Board members present, the Chairman and the Clerk are authorized to sign the Agreement dated December 14, 1971, between the County of Orange and the City of Newport Beach providing for reimburse- ment to the City of Newport Beach for the County's share of the cost of traffic signal installation at the intersection of Placentia Avenue and Superior Avenue. IN RE: AGREEMENT ARTERIAL HIGHWAY FINANCING PROGRAM PROJECT N0, 564 LOS ALAMITOS BOULEVARD CITY OF LOS ALAMITOS On motion of Supervisor Baker, duly seconded and.unanimously carried by Board members present, the Chairman and the Clerk are authorized to sign the Arterial Highway Financing Program Agreement dated December 14, 1971, between the County of Orange and the City of Los Alamitos, for the construction of Los Alamitos Boulevard, from 290' south of Cerritos Avenue to Howard Avenue, Project No. 564. IN RE: ASSESSMENT ROLL CORRECTIONS On motion of Supervisor Clark, duly seconded and unanimously carried by Board members present, the request for the following Corrections in the 1971 -72 Assessment Roll is granted and. so ordered. Assessment Roll Corrections Nos. B -2873, 37261 37631 3764, 3766 through 3769, 3772, 3774, 3777, 3778, 3780 through 3783, 4262, 4266 through 4268, 4270 through 4272 and 4350. rto�a -a.a <::d 401 AGREEMENT /f THIS AGREEMENT, made and entered into this,,---day 1971, by and between the CITY OF NEWPORT BEACH, a municipal corporation, hereinafter designated as "City," and the COUNTY OF ORANGE, a political subdivision of the State of California, hereinafter designated as "County;" W I T N E S S E T H• WHEREAS, a considerable volume of traffic presently exists and is progressively increasing at the intersection of Placentia Avenue and Superior Avenue; and WHEREAS, City and County have determined that a traffic signal and highway lighting system at the intersection of Placentia Avenue and Superior Avenue is warranted; and WHEREAS, City and County contemplate the installation of a traffic control signal system and highway lighting at said intersection which is partially within the boundaries of the City of Newport Beach and is partially within unincorporated County area, hereinafter referred to as the "project," and wish to specify the proportionate share of the costs that are to be borne by City and County and provide for maintenance following completion of the project; and WHEREAS, the provisions of Title 1, Division 7, Chapter 5, Article 1, of the California Government Code entitled "Joint Powers Agreements" authorize two or more public agencies to jointly exer- cise any power common to the contracting parties; -1- C -1403 i follows: 1i NOW, THEREFORE, IT IS AGREED by the parties hereto as I. City shall prepare detailed plans, specifications and cost estimates for the project. The project shall include the installation of a traffic signal and highway lighting system at the intersection of Placentia Avenue and Superior Avenue. The controller at said installation shall be modular solid state type 90 or type 100 with five phases and shall be capable of being ex- panded to six phases by addition of plug -in solid state modules. II. City is designated as the agent of County for the purposes of administering, contracting, and constructing the pub- lic improvements called for in this agreement and is authorized by the County to perform all acts necessary or required in order to construct the improvement in accordance with the plans and specifications. On completion of the plans, specifications and cost estimates for the project, City shall transmit the same to the appropriate County department for approval. After written approval has been obtained from the County, City shall proceed to advertise for bids for the project pursuant to the public bid re- quirements of the City Charter and upon receipt of bids acceptable to the City, award a contract. III. Upon completion of the Project, County's share of the traffic signal and intersection lighting system installation will be determined in the same ratio to the total cost of such sys- tem as the number of legs under County jurisdiction entering the intersection are to the total number of legs entering the inter- section. IV. For the purpose of determining the proportionate share of the traffic signal costs to be borne by the respective parties hereto, the City limits shall be established as those existing on the day which City advertises the project for construc- tion bids. -2- I V. All construction and installation costs shall be based on the contract costs. The total construction and instal- lation cost to County is presently estimated to be $15,000.00 and the total construction and installation cost to City is presently estimated to be $25,000.00 based on the fact that one and one -half (1 -1/2) legs of the intersection presently lie in County area and two and one -half .(2 -1/2) legs of the intersection presently lie in City area. VI. County's share of design, engineering and inspection costs shall be based upon a percentage equivalent to the ratio which County's share of the project construction costs bears to the total construction costs and shall include a charge not to exceed fifteen percent (15 %) of County's share of project construc- tion costs to cover City's overhead cost. The estimated cost for the entire project is $44,000.00 and the total cost to County is estimated at $16,500.00. The actual amount of the County's share shall be determined after completion of the work covered by the construction contract. VII. Upon completion of the Project, said traffic signal shall be maintained and operated by City. The maintenance and operational costs for said traffic signal shall be borne by the parties hereto in accordance with provisions in the Standard Traffic Signal Maintenance Agreement No. 169 -310 executed February 18, 1969, by and between the City and the County. VIII. It is mutually understood and agreed: (a) That neither County nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by City under or in connection with any work, authority or jurisdiction delegated to City under this agreement. It is also understood and agreed that pursuant to Government Code Section 895.4, City shall fully indemnify -3- 0 0 and hold County harmless from any liability imposed for injury (as defined by Government Code Section 810.8) occurring by reason of anything done or omitted to be done by City under or in connection with any work,authority or jurisdiction delegated to City under this agreement. (b) That neither City nor any officer or employee thereof is responsible for any damage or liability occurring by reason of anything done or omitted to be done by County under or in connection with any work, authority or jurisdiction not dele- gated to City under this agreement. It is also understood and agreed that, pursuant to Government Code Section 895.4, County shall fully indemnify and hold City harmless from any liability imposed for injury (as defined by Government Code Section 810.8) occurring by reason of anything done or omitted to be done by County under or in connection with any work, authority or juris- diction not delegated to City under this agreement. IN WITNESS WHEREOF, City has caused this agreement to be executed by its Mayor and attested by its Clerk and County has caused this agreement to be executed by the Chairman of its Board of Supervisors and attested by its Clerk, all thereunto duly autho- rized by resolution of the City Council and minute order of the Board of Supervisors, respectively, on the date written opposite their signatures. Dated: N0V 2 4 1971 1971. APPROVED AS TO FORM: Sa -e City Attorney ATTEST: �t ity Clerk CITY OF NEWPORT BEACH, a municipal corporatio ' By: Mayor ;A cy \fo a`P IM ki L Date /411, 1971. APPROVED AS TO FORM: ADRIAN KUYPER, COUNTY COUNSEL ORANGE COUNTY, CALIFORNIA to 0 COUNTY OF ORANGE, a political subdivision of the State / of.Cali By: Ch i man, Board of Supe visors ATTEST: W. E. ST. JOHN -, County Clerk and ex- of €icio,Clerk of the Board of_;Supervisors -5- DO'N dm 11/16/71 CITY CLERK November 24, 1971 PUBLIC WORKS EEPARTIENT Attention: Don Webb CITY CLERK COOPERATIVE FINANCING AGRE MiT FOR INSTALLATION OF TRAFFIC SIGNALS AT SUPERIOR AND PLACENTIA Attached are seven copies of the cooperative financing agreement between the City of Newport Beach and the County of Orange for execution by the County. After the contract has been returned, ;Tease see that a copy is sent to this office for filing. 'This agreement was authorized by the City Council on November 22, 1971 by the adoption of Resolution No.7567. -aura Lagios City Clerk LL:swk • • RESOLUTION No. 7567 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH AUTHORIZING THE EXECUTION OF A COOPERATIVE AGREEMENT WITH THE COUNTY OF ORANGE PROVIDING FOR THE INSTALLATION OF A TRAFFIC SIGNAL AT PLACENTIA AVENUE AND SUPERIOR AVENUE WHEREAS, there has been presented to the City Council of the City of Newport Beach a certain agreement between the City of Newport Beach and the County of Orange providing for the installation of a traffic signal at Placentia Avenue and Superior Avenue; and WHEREAS, the City Council has considered the terms and conditions of said cooperative agreement and found them to be fair and equitable; NOW, THEREFORE, BE IT RESOLVED that said cooperative agreement above described is approved, and the Mayor and City Clerk are hereby authorized and directed to execute the same on behalf of the City of Newport Beach. ADOPTED this 22nd day of November , 1971 . Mayor ATTEST: City Clerk DO'N dm 11/16/71