Loading...
HomeMy WebLinkAboutC-1472 - Architect, Police substation facility0 4� CITY OF NEWPORT BEACH CALIFORNIA City Hall 3300 W. Newport Blvd. Area Code 714 673 -2110 DATE September 14, 1972 TO: FINANCE DIRECTOR FROM: City Clerk SUBJECT: Contract No. C -1472 Description of Contract Architectural and Engineering Services for Authorized by Resolution No. 7781 , adopted on August 21, 1,972 Effective date of Contract August 31, 1972 Contract with Robinson- 'hompson Associates Address 17875 Sky Park Circle, Suite 0 P. 0. Box BF, Irvine, rA 92664 Amount of Contract $55,50.00 -city C1�en -, ' 9 August 14, 1972 Mr. Robert L. Wynn City Manager City of Newport Beach Subject: Proposal to perform ARCHITECTURAL AND ENGINEERING SERVICES for the JAMBOREE ROAD POLICE FACILITY Dear Mr. Wynn: We wish to thank you for this opportunity to submit our proposal to perform the subject A & E Services. We are very proud to be considered for such an important municipal project and we look forward, with pleasure, to the opportunity to work with the City of Newport Beach. Our proposal includes a Project Description, Scope of Work, Schedule of Fees and a Project Schedule. PROJECT DESCRIPTION: A new police facility for the City of Newport Beach to be located on a two and one half (2.5) acre parcel of land located at the inter- section of Jamboree Road and Santa Barbara Drive. The site is gene- rally flat and sloping upward to the southeast, away from Jamboree Road. The project budget is One million dollars ($1,000,000.00) which in- cludes land cost, building construction cost, on site improvements and A & E fees for all items contained in the scope of work. Not included in the project budget are off site improvements. SCOPE OF WORK: The proposed A & E Services will include complete architectural and engineering design, drawings, calculations and specifications normal to and ordinarily found in connection with such a construction project. The following are the basic services we propose to render in four (4) phases: ROBINSON o THOMPSON ASSOCIATES ■ PLANNING o ARCHITECTURE o ENGINEERING 17875 SKY PARK CIRCLE o SUITE 0 o PO. BOX BF o IRVINE. CALIFORNIA 92BB4 • [714) 54B-7091 August 14, 1972 Page Two Proposal to perform ARCHITECTURAL AND ENGINEERING SERVICES OUTLINE OF ARCHITECTURAL and ENGINEERING SERVICES This program will serve to approximate the percentage of total effort required to complete each phase of the service. PERCENT ELEMENTS of the SERVICES of EFFORT SCHEMATIC DESIGN PHASE 15 Program Development Research Site Plan Studies Parking Studies Building Plan Studies Building Section Studies Building Elevation Studies Project Description Statement of Probable Cost DESIGN DEVELOPMENT PHASE 20 Building Plans Building Elevations Materials Selection Structural System Mechanical System Electrical System Outline Specifications Statement of Probable Cost ROBINSON o THOMPSON ASSOCIATES • PLANNING o ARCHITECTURE o ENGINEERING 17875 SKY PARK CIRCLE o SUITE 0 o PO. BOX BF n IRVINE, CALIFORNIA 92664 (714) 546 -7051 August 14, 1972 Page Three Proposal to perform ARCHITECTURAL AND ENGINEERING SERVICES OUTLINE of ARCHITECTURAL and ENGINEERING SERVICES (continued) PERCENT ELEMENTS of the SERVICE of EFFORT CONSTRUCTION DOCUMENTS PHASE 40 Architectural Working Drawings Structural Working Drawings Mechanical Working Drawings Electrical Working Drawings Construction Specifications General and Special Conditions Statement of Probable Cost File for Plan Check CONSTRUCTION ADMINISTRATION PHASE 25 Assist with List of Bidders Bid Forms Assist with Receiving Bids Assist with Award of Contract Assist with Contract Preparation Assist with Schedule Preparation Interpret Contract Documents Check Shop Drawings Check Samples and Colors Prepare Change Orders Conduct Scheduled Job Meetings Periodic Visits to the Site Issue Certificates of Payment Assemble Required Guarantees Conduct Completion Inspection Obtain Occupancy Permit TOTAL 1OCP /o ROBINSON o THOMPSON ASSOCIATES • PLANNING o ARCHITECTURE o ENGINEERING 17875 SKY PARK CIRCLE o SUITE 0 o PO. [BOX EF o IRVINE, CALIFORNIA 92664 • (714) 546 -7091 • August 14, 1972 Page Four Proposal to perform ARCHITECTURAL AND ENGINEERING SERVICES SCOPE OF WORK (continued): Services in addition to the scope of work as outlined, herein above, shall be performed by the Architect and /or his consultants at a rate per hour to be determined as two and one half (2.5) times direct personnel payroll plus cost of materials for the work assigned. All such additional services will 'be billed on a monthly basis and are due and payable within thirty (30) calendar days of the date of billing. Excluded from the scope of work will be Soil testing and engineering On site improvements Off site improvements And all work normal to a scope of work under the heading of "Civil Engineering ". SCHEDULE OF FEES: We propose to perform the Elements of the Service as outlined in the scope of work for a FIXED SUM of Fifty five thousand Five hundred dollars ($55,500.00). We further propose that the FIXED SUM be paid as follows: 15% due on completion of the Schematic Design Phase. _ $ 8,325.00 an additional 20/ due on completion of the Design Development Phase. _ $11,100.00 an additional 45% due on completion of the Construction Documents Phase. _ $24,975.00 an additional 5% due on Bid Opening = $ 2,775.00 the final 150/. due in monthly installments during the Construction Administration Phase. _ $ 8,325.00 100% $55,500.00 ROBINSON o THOMPSON ASSOCIATES ■ PLANNING o ARCHITECTURE ENGINEERING 17875 SKY PARK CIRCLE o SUITE 0 c PO. BOX BF n IRVINE, CALIFORNIA 92664 (714) 546-7091 -t 0 August 14, 1972 Proposal to perform ARCHITECTURAL AND ENGINEERING SERVICES Page Five TERMINATION OF AGREEMENT: It is agreed that either party, Owner or Architect, may terminate this agreement upon seven (7) days written notice to the other party should the other party fail to perform in accordance with the terms of the agreement through no fault of the party seeking to terminate. It is further agreed that the Architect shall be paid the full amount of the fees due him at the time of termination, which will be 100% of each completed phase of work and an appropriate percentage of the phase then in effect plus any approved additional services. It is further agreed that in the event the construction contract bids for the subject project, as outlined in the PROJECT DESCRIPTION, exceed the project budget the Architect will make any and all necessary revisions to the plans and specifications required to bring the con- struction contract bids within the approved budget and that such revisions will be accomplished within sixty (60) calendar days of the conclusion of BID REVIEW PERIOD shown in the PROJECT SCHEDULE. PROJECT SCHEDULE: We propose to complete the scope of work as follows: (from date of authorization to proceed) SCHEMATIC DESIGN PHASE DESIGN DEVELOPMENT PHASE WORKING DRAWINGS PHASE PLAN CHECK PERIOD BID PERIOD BID REVIEW PERIOD CONSTRUCTION CONTRACT AWARD PERIOD CONSTRUCTION PERIOD 7 weeks 5 weeks 11 weeks 6 weeks 4 weeks 4 weeks 4 weeks ROBINSON o THOMPSON ASSOCIATES ■ PLANNING o ARCHITECTURE o ENGINEERING 17875 SKY PARK CIRCLE o SUITE 0 o PO. BOX BF o IRVINE, CALIFORNIA 92664 • (714) 546-7091 August 14, 1972 Page Six Proposal to perform ARCHITECTURAL AND ENGINEERING SERVICES This concludes our proposal to perform ARCHITECTURAL AND ENGINEERING SERVICES for the proposed JAMBOREE ROAD POLICE FACILITY. The appropriate signatures, affixed to this proposal, will signify accep- tance of the terms of the proposal and will be the basis of agreement upon which we are prepared to begin work immediately. We wish to thank you for your kind attention and assistance during the preparation of our proposal. Sincerely, J s Karl Robinson, A.I.A. JKR:b Date: AI)G 31 1972 ACCEPTED ON BEHALF OF THE CITY: Mayor , City Clerk v � U c_'C7F APP D AS TO FORM i City Attorney ROBINSON o THOMPSON ASSOCIATES ■ PLANNING o ARCHITECTURE a ENGINEERING 17675 SKY PARK CIRCLE o SUITE 0 o PO. 13OX BF o IRVINE, CALIFORNIA 92664 • (714) 546 -7091 U 0 RESOLUTION NO. 7 74 X A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH AUTHORIZING THE EXECUTION OF A LETTER AGREEMENT BETWEEN THE CITY OF NEWPORT BEACH AND ROBINSON - THOMPSON ASSOCIATES FOR ARCHITECTURAL AND ENGINEERING SERVICES FOR JAMBOREE ROAD POLICE FACILITY WHEREAS, there has been presented to the City Council of the City of Newport Beach a certain letter agreement between the City of Newport Beach and Robinson - Thompson Associates for architectural and engineering services for Jamboree Road police facility; and WHEREAS, the City Council has considered the terms and conditions of said letter agreement and found them to be fair and equitable; NOW, THEREFORE, BE IT RESOLVED that said letter agreement for the services above described is approved, and the Mayor and City Clerk are hereby authorized and directed to execute the same on behalf of the City of Newport Beach. ADOPTED this day of P110 `� 1 1972 , 1972. Mayor ATTEST: > City Clerk DON dm 8/8/72 4'7v