Loading...
HomeMy WebLinkAboutC-1488(A) - Consulting Services for Spyglass Hill Pumping Station - Zone VCITY OF NEWPORT BEACH CALIFORNIA City Hall 3300 W. Newport Blvd. Area Code 714 673 -2110 DATE October 27, 1972 TO: FINANCE DIRECTOR FROM: City Clerk SUBJECT: Contract No. 1488 Description of Contract Engineering services agmement in eamection with '.nne V Tlr ping, Station Authorized by Resolution No. 9842 , adopted on October 10, 1972 Effective date of Contract October 26, 1972 Contract with Raub Bein Frost and Associates Address 136 Rochester Costa Mesa, ^A 92627 Amount of Contract See Pam 4 of contract City 6letk ` M AGREEMENT FOR ENGINEERING SERVICES (Design of Zone V Pumping Station for Harbor View Hills, Sector IV) THIS AGREEMENT is made and entered into this`t day of �!.��� �_ 1972, by and between the CITY OF NEWPORT BEACH, a municipal corporation hereinafter referred to as "CITY," and the firm of RAUB, BEIN, FROST AND ASSOCIATES, Civil Engineers, hereinafter referred to as "ENGINEER." WHEREAS, CITY proposes to provide domestic water ser- vice to a hillside area known as Harbor View Hills, Sector IV, which is partially located in three water pressure zones (Master Plan Zones III, IV and V); and WHEREAS, engineering services are necessary to design and prepare plans and specifications for a pumping station to deliver domestic water to the water pressure Zone V portion of Harbor View Hills, Sector IV; and WHEREAS, ENGINEER has submitted a proposal to design and prepare plans and specifications for the proposed pumping station. NOW, THEREFORE, the parties hereto agree as follows: 1. General CITY engages ENGINEER to furnish the services hereinafter specified for the compensation herein stipulated, and ENGINEER agrees to perform such services upon said terms. 2. Duties of Engineer ENGINEER SHALL: A. Investigate alternative designs (above ground and below ground) for the pump station located adjacent to Spy- glass Hill Reservoir. This investigation shall be based upon -1- the following two general operating conditions: 1. Provisions for a domestic water service to a closed system serving the water pressure Zone V service area to Harbor View Hills, Sector IV. a. Suction from Spyglass Hill Reservoir. b. Suction directly from the Zone IV main while Spyglass Hill Reservoir is out of service. 2. Conversion with only minor modification to provide pumping capability of 1,500 GPM to a potential Zone V storage reservoir, including an allowance for a Zone V transmission loss of 40 PSI. The elevation established for the Zone V reservoir will include an allowance of about 10 feet for head losses when supply is from only the ZoneiV reser- voir. B. Investigate the potential use of both vertical and horizontal pumps driven by electric motors, and recommend the types, capacities and the number of pumps required to meet the operating conditions. C. After selection of a design concept in consul- tation with CITY, prepare detailed plans and specifications for construction of the pump station including: 1. Provisions for operation of pump station from the control building at Big Canyon Reservoir. 2. Coordination with utility companies to provide service to the pump station. 3. Provisions for rapid external hookup of a portable emergency generator in case of power failure. -2- • 0 4. Provisions for external hookup of a pumper fire truck from Zone IV suction to Zone V dis- charge line. 5. Provisions for connecting electrical and telephone service of Spyglass Hill Reservoir to the Zone V pump station. 6. Site preparation for items 1 through 5 above. D. Perform all field surveys, if any, required for the preparation of the plans and specifications. E. Perform detailed checking of shop drawings required in Item C. F. Prepare a manual describing in detail the operation of the Zone V pump station. G. Provide consultation, as required, during the construction of the Zone V pump station. H. Consult and maintain liaison with CITY during the engineering design project. project. project. 3. Duties of CITY CITY agrees to provide ENGINEER with the following: A. Consultation as needed to accomplish the B. Standard sheets for preparation of plans. C. Any soils data required for design of the 4. Completion of Services ENGINEER agrees to complete the preliminary investi- gation phase specified in 2 A and 2 B above within 21 days after execution of this Agreement and to complete final plans and speci- fications within 30 days after receipt of written authorization -3- 0 ! to proceed with final design. 5. Payment by CITY A. CITY agrees to pay ENGINEER for all services re- quired under the provisions of this Agreement on the basis of the hourly rate schedule set forth below, but not to exceed the sum of Four Thousand Two Hundred Dollars ($4,200.00): Consultation and Registered Engineer $25.00 per hour Engineering Design Calculations and Supervision $21.00 per hour Drafting $19.00 per hour Field Survey Crew (3 -man) $54.00 per hour The hourly rates shown above will be subject to an eight percent (8 %) increase each ensuing August 1, beginning August 1, 1973, until completion of the project. B. ENGINEER shall be compensated as follows: 1. Monthly partial payments shall be based upon the amount earned in each month as determined by the fee schedule. The sum of the monthly partial payments shall not exceed ninety percent (900%) of the above maximum fee. 2. The balance of the total amount to be paid upon acceptance of the construction work by the City Council but, in any event, not later than twelve (12) months after the signing of the plans by the Public Works Director. C. CITY shall reimburse ENGINEER for the actual cost of reproduction of copies of plans, specifications and related documents and other related costs authorized by the Public Works Director and advanced by Engineer. 6. Termination This Agreement may be terminated at any time by CITY upon three (3) days written notice to ENGINEER. Notice M 0 E shall be deemed served by placing a copy thereof in the United States mail, postage prepaid, addressed to ENGINEER=S business office. In the event of termination due to the fault of ENGINEER, CITY shall be relieved of any obligation to com- pensate ENGINEER. If this Agreement is terminated for any reason other than the fault of ENGINEER, CITY agrees to com- pensate ENGINEER for the actual services performed up to the effective date of the notice of termination on the basis of the fee schedule contained in this Agreement. 7. Amendment The scope of services to be furnished by ENGINEER may be changed and the maximum fee revised upon prior written approval of the Public Works Director if the increase in the maximum fee specified does not exceed $800.00. If a change in the scope of services to be furnished by ENGINEER would result in an increase in the specified maxi- mum fee exceeding $800.00, a written amendment to this Agree- ment providing for such change shall be prepared and executed by the parties to the Agreement. 8. Assignment This Agreement or any portion thereof shall not be assigned without the written consent of CITY. 9. Hold Harmless ENGINEER shall assume the defense of and indemnify and save harmless the CITY, and its officers and employees, from all claims, loss, damage, injury and liability, directly arising from any errors, omissions, or negligence in ENGINEER'S performance of this Agreement or from the engineering work and services herein provided. -5- 0 0 IN WITNESS WHEREOF, the parties hereto have executed this Agreement this date first above written. APPROVED AS TO FORM: Assistant City ttorney DRB dm 10/13/72 W C M- CITY OF NEWPORT BEACH By Mayor By:_ U, I City Clerk CITY RAUB, BEIN, FROST AND ASSOCIATES, CIVIL ENGINEERS By: By: ENGINEER RESOLUTION NO. 7842 A RESOLUTION OF THE CITY COUNCIL, OF THE CITY OF NEWPORT BEACH AUTIiORIZING THE ;;:�ECUTION OF AN AGREEMENT BETWEEN THE CITY OF NEWPORT B1]ACII AND RAUB, REIN, FROST & ASSOCIATES TO PERFORM TI1E DESIGN OF TIME ZONE V PUMPING STATION, SPYGLASS HILL WHEREAS, there has been presented to the City Council of the City of Newport Beach a certain engineering services agreement between the City of Newport Beach and Raub, Bein, Frost & Associates, Civil Engineers, to perform the design of c7ie Zone V pumping station for Spyglass Hill; and WHEREAS, the City Council has considered the to ms and. conditions of said agreement and found them to be fair and equitable; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Newport Beach that said agreement for the engineering services above described is approved, and the Mayor and City Clerk are hereby authorized and directed to execute the su,.,: on behalf of the City of Newport Beach. ADOPTED this 10th day of October, 1972. Mayor ATTEST: City Clerk nuz 10/6/72