Loading...
HomeMy WebLinkAboutC-1517 - Design water transfer main to old City dump siteM TO: Public Works Department FROM: City Clerk Date Mwch 15, 1973 SUBJECT: Contract No. 1517E Project WatW Twaflissim Main - 19th and Whittier Attached,iw signed copy of subject contract for transmittal to the contractor. Contractor: MwirM— Sig"on, F.r� Address: 359 San Miguel_ rz4ve, °teaport Beach Amount: $ fly Tute Effective Date: Horeb 14, 1973 Resolution No. 7948 LL-dg Att. cc: Finance Department [� Laura Lagios 0 L] AGREEMENT FOR ENGINEERING SERVICES Design of Water Transmission Main to Provide Water Service to Old City Dump Site) THIS AGREEMENT is made and entered into this y 7 day of y >4 jq n H , 1973, by and between the CITY OF NEWPORT BEACH, a municipal corporation, hereinafter referred to as "CITY ", and SHUIRMAN- SIMPSON, Consulting Civil Engineers, hereinafter referred to as "ENGINEER ": W I T N E S S E T H WHEREAS, CITY intends to provide water service to the old city dump site located at 19th Street and Whittier Avenue in the City of Newport Beach; and WHEREAS, said water service will require the design and construction of a water transmission main from the 16th Street reservoir to the site; and WHEREAS, engineering services are necessary to design and prepare plans and specifications for said transmission main; Ii .°1 WHEREAS, ENGINEER has submitted a proposal to CITY to design and prepare plans and specifications for the proposed transmission main which proposal CITY desires to accept; NOW, THEREFORE, IN CONSIDERATION of these premises, the parties hereto agree as follows: 1. GENERAL A. CITY engages ENGINEER to perform the services hereinafter described for the compensation herein stated. B. ENGINEER agrees to perform said services upon the terms hereinafter set forth. -1- services: 0 u 2. SERVICES TO BE PERFORMED BY ENGINEER ENGINEER hereby agrees to perform the following A. Coordination with the City of Costa Mesa, as required, to obtain existing information and data and the necessary approvals and City permits required for the project. B. Preparation of plan and profile sheets, detail sheets as required, and the specifications. C. All field survey work necessary to complete Item B. Traverse control will be referenced for use in future construction staking. D. Coordination with private and public utilities, as required, to identify and locate any exis- ting utilities which might be affected by the project. E_ Review of any required stop drawings. F. Consultantion, as needed, during construction. 3. DUTIES OF CITY CITY hereby agrees to supply ENGINEER with the following information and material: A. Consultation, as needed, to accomplish the project. B. Standards sheets for preparation of plans. C. Any soils data required for design of the project. 4. OWNERSHIP OF PROJECT DOCUMENTS Original drawings, reports, notes, maps, and other documents shall become the property of the CITY and may be repro- duced as deemed necessary by the Public Works Director. 5. ENGINEER IN CHARGE Donald C. Simpson, RCE No. 10595, shall be the Engineer in charge of the project design. 6. RIGHT OF TERMINATION CITY reserves the right to terminate this agreement at any time by giving ENGINEER three (3) days= prior written notice; notice shall be deemed served upon deposit in the United States mail, postage prepaid, addressed to any of ENGINEER's -2- 0 0 business offices. In the event of termination due to fault of ENGINEER, CITY shall be relieved Rfiany obligation to compensate ENGINEER. If this Agreement it "terminated for any reason other than fault of ENGINEER, CITY agrees to compensate ENGINEER for the actual services performed up to the effective date of the notice of termination, on the basis of the fee schedule contained herein. 7. COMPLETION OF PRELIMINARY DESIGN ENGINEER agrees to complete the plans and specifications for the project on or before April 30, 1973. S. FEE SCHEDULE AND PAYMENT A. In consideration of the performance of the above described engineering services, CITY hereby agrees to pay ENGINEER an amount based upon the hourly rate schedule set forth below. In no event shall said amount be greater than Nine Thousand Dollars ($9,000.00): (1) Hourly Rate for Office Personnel shall be 2.25 Times the Following Salary Cost: Principal $ 15.50/hr. Project Designer 9.40 /hr. Designers & Draftsmen 7.20-8.40/hr- Jr. Draftsmen 4.00- 4.80/hr. Typist 4.50/hr (2) Hourly Rate for Field Surveys: 3 Man Crew 2 Man Crew 56.00 /hr. 42.00 /hr. (3) The contract amount shall be paid to ENGINEER as follows: a. Monthly partial payments shall be based on the amount earned in each month, as determined by the fee schedule. The sum of the monthly partial payments shall not exceed ninety percent (90%) of the maximum fee. b. Balance of the total amount earned to be paid upon acceptance, by the City Council, of the construction work on the water transmission main, but, in any event, it shall be paid not later than twelve (12) months after signing of the plans by the Public Works Director. -3- c.. In addition, CITY agrees to reimburse ENGINEER for the actual cost of reproduction of copies of said plans, and related documents, as well as filing fees, checking feeart cost of aerial topographic mapping, and other related costs authorized by the Public Works Director and advanced by ENGINEER. 9. AMENDMENTS The scope of the services to be furnished by ENGINEER may be changed and the maximum fee revised upon prior written approval of the Public Works Director if the increase in the maximum fee does not exceed $900.00. If revisions to the scope of the services would result in an increase in the maximum fee exceeding $900.00, an amendment to this Agreement providing for such revisions shall be processed and executed by the parties hereto. 10. HOLD HARMLESS ENGINEER shall indemnify and hold harmless CITY, and its officers and employees, from any damage or liability arising from any errors, omissions, or negligence in ENGINEER's performance of this Agreement, or in the engineering work and services herein provided. IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and year first above written. �C7Pp CITY OF NEWPORT BEACH, ATTEST: a municipal corporation T City Clerk Mayor APPROVED AS TO FORM: X154.1. City Attorney SHUIRMAN- SIMPSON, Consulting Civil Engineers / '�i 0 RESOLUTION NO. 7 9 4 C i A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT BETWEEN THE CITY OF NEWPORT BEACH AND SHUIRMAN- SIMPSON, CONSULTING CIVIL ENGINEERS, FOR DESIGN OF WATER TRANSMISSION 14AIN TO PROVIDE WATER SERVICE TO OLD CITY DUMP SITE WHEREAS, there has been presented to the City Council of the City of Newport Beach a certain engineering services agreement between the City of Newport Beach and Shuirman- Simpson, Consulting Civil Engineers, for design of water transmission main to provide water service to old City dump site; and WHEREAS, the City Council has considered the terms and conditions of said engineering services agreement and found them to be fair and equitable; NOW, THEREFORE, BE IT RESOLVED that said agreement for the engineering services above described is approved, and the Mayor and City Clerk are hereby authorized and directed to execute the same on behalf of the City of Newport Beach. ADOPTED this 12th day of March , 1973. Mayor ATTEST: City Clerk dm 3/8/73 o?a 8