August 11, 1975
ay tl,o CITY COiJi,�I::IL CITY COUNCIL AGENDA
C:TY of Nr'W-Pou esa.r' ITEM N0. H-2 c
TO: CITY COUNCIL
FROM: Public Works Department
SUBJECT: PROFESSIONAL ENGINEERING SERVICES AGREEMENT - -WATER TRANSMISSION
MAIN IMPROVEMENTS IN ALLEY SOUTHERLY OF EAST COAST HIGHWAY FROM
MARGUERITE AVENUE TO HAZEL DRIVE (C -1663)
RECOMMENDATION:
Adopt a resolution authorizing the Mayor and the City Clerk to
execute the subject agreement with Alderman, Swift and Lewis,
Consulting Engineers
DISCUSSION:
This project will provide for the installation of a water transmission
main in the alley southerly of East Coast Highway from Marguerite Avenue to
Hazel Drive. The facility will connect on the west to the recently completed
18" transmission main in Bayside Drive. The proposed project will also con-
nect to and be built in conjunction with the East Coast Highway water trans-
mission main from Hazel Drive to the easterly City limits, which is currently
under design.
The combined project will complete the installation of a trunkline
supply system in eastern Corona del Mar. It will provide a source of water
supply independent of the 30" Laguna Beach County Water District Feeder, which
presently serves Cameo Highlands and portions of Shorecliffs, Cameo Shores
and Corona Highlands. Increased fire protection and domestic service flexi-
bility will result from this project.
A proposal has been received from the engineering firm of Alderman,
Swift and Lewis for design and preparation of plans, specifications, and esti-
mates for the project. The principal services to be furnished by the engineer
include the following:
1. Prepare detailed construction drawings, special provisions
and construction estimate.
Assist the City in establishing parameters for soils in-
vestigation.
Establish traffic control criteria.
Consultation as required during construction.
August 11, 1975
Subject: Professional Engineering Services Agreement- -Water Transmission
Main Improvements in Alley Southerly of East Coast Highway from
Marguerite Avenue to Hazel Drive (C -1663)
Page 2
The firm of Alderman, Swift and Lewis is well qualified to perform
this work and is currently designing the East Coast Highway transmission main
from Hazel Drive to the easterly City limits.
Compensation will be based on standard hourly rates with a maximum
fee not to exceed $11,500. (Rate schedule is attached.)
Sufficient funds are available in the Water Fund for this project.
As a part of this project, the City will reconstruct the existing
alleys through which the new transmission main passes. The alley improve-
ments will be designed by the City.
4
eph(T. Devlin
lic ks Director
:jd
Att.
'r
IiJ
't:�.',, , ter, i �' ,/ i'- , ; •�•!+ { `'
`ISSI A �.._�i V b T-� y • 0•
1 m�✓'15�.'\nG\Nt1 ' 1
.1 Ile
I5� i
••••• PROPOSED I8" 'HATER LINE
(INC. VALVES, CONNECTIONS.
ETC.).
-- EXISTING WATER LINE.
• FIRE HYDRANT ASSEMBLY.
Q/ CONNECT TO EXISTING WATER
SYSTEM.
Q
Ij
N'',
c>
ABANDON EXISTING CONNECTION
TO LAGUNA BEACH CO. WATER
DISTRICT 30" FEEDER.
r�
9
�4
S
en-
EX /4 T. 30" WATER
iEX H l
CITY OF NEWPORT BEACH DRAWN.M, EXTER DATE
PUBLIC WORKS DEPARTMENT APPROVED A A
EAST COAST HIGHWAY WATER TRANSMISSION MAIN
IMPROVEMENTS
MARGUERITE AVE. TO THE EASTERLY CITY LIMITS
# #A q
.485'7. PUBLIC WORKS DIRECTOR
R.E. NO. 128"0
DRAWING NO. W—
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
Alderman, Swift and Lewis
Consulting Engineers
Salary Schedule (7/21/75)
Principals
$35.00 /hour
Registered C.E.
$25.00 /hour
Designer
$20.00 /hour
Draftsman
$16.50 /hour
Typist $10.50 /hour
Re: Water Transmission Main Improvements - Alley
Southerly of East Coast Highway (SH 1), Marguerite
Avenue to Hazel Drive. (C -1663)
EXHIBIT "B"
7/31/75
S. B.
--A�2
RESOLUTION NO. 8 5 G 9
AuG
A RESOLUTION OF THE CITY COUNCIL OF THE
By the CITY COUNCIL CITY OF NEWPORT BEACH AUTHORIZING THE MAYOR
CITY PF 01400 tbv gr-gCH AND CITY CLERK TO EXECUTE A PROFESSIONAL
ENGINEERING SERVICES AGREEMENT BETWEEN THE
CITY OF NEWPORT BEACH AND ALDERMAN, SWIFT AND
LEWIS IN CONNECTION WITH WATER TRANSMISSION
MAIN IMPROVEMENTS IN ALLEY SOUTHERLY OF EAST
COAST HIGHWAY FROM MARGUERITE AVENUE TO HAZEL
AVENUE
WHEREAS, there has been presented to the City Council
of the City of Newport Beach a certain professional engineering
services agreement between the City of Newport Beach and
Alderman, Swift and Lewis in connection with water transmission
main improvements in alley southerly of East Coast Highway from
Marguerite.Avenue to Hazel Avenue; and
WHEREAS, the City Council has considered the terms
and conditions of said agreement and found them to be fair and
equitable, and in the best interests of the City;
NOW, THEREFORE, BE IT RESOLVED by the City Council
of the City of Newport Beach that said agreement above described
is approved, and the Mayor and City Clerk are hereby authorized
and directed to execute the same on behalf of the City of Newport
Beach.
ATTEST:
City Clerk
ADOPTED this 11th day of
yor
st
1975.
DDO /bc
8/8/75
NOV 2 5 I ,
TO: CITY COUNCIL
FROM: Public Works Department
November 25, 1974
CITY COUNCIL AGENDA
ITEM N0. H -2 (a)
SUBJECT: PROFESSIONAL ENGINEERING SERVICES AGREEMENT- -
WATER TRANSMISSION MAIN IMPROVEMENTS
EAST COAST HIGHWAY (SH NO. 1) FROM POPPY AVENUE
TO THE EASTERLY CITY LIMITS
RECOMMENDATION:
Adopt a resolution authorizing the Mayor and the City Clerk
to execute the subject agreement with Alderman, Swift and
Lewis, Consulting Engineers.
DISCUSSION:
This project will provide for the design of a water trans-
mission main to allow a direct connection to the City water system for
domestic and fire protection service to Cameo Highlands, and to portions
of Shorecliffs, Cameo Shores, and Corona Highlands. The above areas
are presently wholly or partially dependent on the 30 -inch Laguna Beach
County Water District line as their source of supply. The project will
also give increased operational flexibility to the City's water system
in eastern Corona del Mar. A sketch is attached delineating the limits
of the work.
A proposal has been received from:the engineering firm of
Alderman, Swift and Lewis for design and preparation of plan and speci-
fications for the project. The principal services to be furnished by
the engineer include the following:
Preliminary Design Phase
Prepare a preliminary project report to study
1211, 16 ", and 18" transmission main alternatives.
(Includes: cost comparison, schematic drawings,
and narrative report.)
B. Final Design Phase
Perform horizontal and vertical control, and
topographic surveys.
2. Assist the City in establishing parameters for a
soils investigation.
.:�o *
November 25, 1974
Subject: Professional Engineering Services Agreement
Water Transmission Main Improvements
East Coast Highway (SH N0. 1) from Poppy Avenue
to the Easterly City Limits
Page 2
3. Prepare detailed construction drawings, special
provisions, and construction estimate.
4. Establish traffic control criteria required by
Caltrans.
5. Consultation as required during construction.
The firm of Alderman, Swift and Lewis is well qualified in
this field of work.
Compensation will be based on standard hourly rates with a
maximum fee not to exceed $16,000.
Sufficient funds have been budgeted in the Water Fund for
this project.
oseph T. Devlin
ublic W ks Director
JSB:jd
Att.
r
y hP-n
A�0 e
FJ /
Ji„J .4�a,
?\ �cSl;7 L r
c
Ler
�`arGaeAruca�7
I.
• �A�N I / C
9Z \�
t
-� 1 0 I 1,
•.r1•. `� -�1 1 I � � � IYy'
wF�¢ �� �.. � i 1 \ ii ✓i
1
f
i
i
m
.SIIf/ b
LEGEND I
BULKHEAD LINES
�„fyr PIERNEAD UME9 - - - - - --
CHANNEL LINES --------- --'---
NEWPORT BEACH BOUNOARY LINE
,OITA MESA BOUNDARY LINE
—
DEPTH AT M.LL.W. 0
CABLE CROSSING
PIPE CROSSING CROSSING —P
ANCHORAGE AREAS—.._.......
BUILDINGS MGM
PUBLIC PEN
PUBLIC DOCK
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
-vATER TRANSM /SS/ON111.9/N'COi9S7 NWX
7*0 EASTERLY C /TY l /M /TS
DRAWN .7.14 • DATE ` 4 -#Y Z fg
APPROVED
PUBLIC WORKS DIRECTOR
R.E. NO.
DRAWING NO. yxASrlslr „wi,
zoGo
RESOLUTION No. 8395
I /
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF NEWPORT BEACH AUTHORIZING THE EXECUTION OF
AN AGREEMENT BETWEEN THE CITY OF NEWPORT BEACH
NOV 25 1974 AND ALDERMAN, SWIFT & LEWIS FOR ENGINEERING
SERVICES IN CONNECTION WITH WATER TRANSMISSION
MAIN,IMPROVE_MENTS -- EAST COAST HIGHWAY FROM
POPPY AVENUE TO THE EASTERLY CITY LIMITS
WHEREAS, there has been presented to the City Council
of the City of Newport Beach a certain engineering services
agreement between the City of Newport Beach and Alderman, Swift
& Lewis in connection with water transmission main improvements --
East Coast Highway from Poppy Avenue to the easterly City limits;
and
WHEREAS, the City Council has considered the terms
and conditions of said engineering services agreement and found
them to be fair and equitable, and in the best interests of the
City;
NOW, THEREFORE, BE IT RESOLVED by the City Council
of the City of Newport Beach that said engineering services
agreement for the services above described is approved, and
the Mayor and City Clerk are hereby authroized and directed to
execute the same on behalf of the City of Newport Beach.
ATTEST:
City Clerk
ADOPTED this 25th day of November , 1974.
Mayor
DDO /bc
11/19/74
CITY OF NEWPORT BEACH
CALIFORNIA
DATE Auguntl6, 1975
TO: FINANCE DIRECTOR
FROM: City Cleric
SUBJECT: Contract No. 1663E
City Nall
3300 W. Newport 131vd.
Area Cud, 714
673 -2110
Description of Contract professional Engineering Services Agreement
for transmission main improvementa Al ey sout er y
of E. Coast Hwy /Marguerite to Hazel
Authorized by Resolution No. 8569 , adopted on August 11, 1975
Effective date of Contract August 12, 1975
Contract with Alderman, Swift and Lewis
Address 2921 S. Main
Santa Ana, CA 92707
Amount of Contract see contract
City e c
0
A#Suot 14, 1975
Public Works Department
Attention: Don Webb
Professional Engineering Services Agrecomot for
Transmission Main Improvements Alloy Southooly of
East Coast Highway, Marguerite Avenue to Basel Drive
C-1663B 2'
Attached are two fully executed copies of subject
agreement. Please transmit one to the Consulting
Engineers, Alderman, Swift and Lewis and retain one
copy for your files.
The City Council authorized this agreement an August 11
by the adoption of Resolution No. 8569.
Laura Lagios
City Clark
t •
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES _
WATER TRANSMISSION MAIN IMPROVEMENTS
ALLEY SOUTHERLY OF EAST COAST HIGHWAY (SH 1)
MARGUERITE AVENUE TO HAZEL DRIVE
THIS AGREEMENT is made and entered into this ►x rH day of q ✓ G up 7 ,
1975, by and between the City of Newport Beach, a municipal corporation, hereinafter
referred to as "CITY" and the firm of Alderman, Swift and Lewis Consulting Engineers,
hereinafter referred to as "ENGINEER ".
WITNESSETH:
WHEREAS, CITY intends to install a water transmission main including
appurtenances and connections to existing distribution systems in the alley
southerly of East Coast Highway (SH 1) from Marguerite Avenue to Hazel Drive,
hereinafter referred to as "PROJECT "; and
WHEREAS, ENGINEER has submitted a proposal to CITY to perform engineer-
ing services in connection with the design of PROJECT: and
WHEREAS, CITY desires to accept said proposal,
NOW, THEREFORE, in consideration of the foregoing, the parties hereto
agree as follows:
I. General
A. CITY engages ENGINEER to perform the services hereinafter
described for the compensation herein stated.
B. ENGINEER agrees to perform said services upon the terms
hereinafter set forth.
II. Services to be Performed by ENGINEER
ENGINEER hereby agrees to perform the following services:
1. Assist the CITY in establishing the parameters of a soils
investigation for the PROJECT;
2. Prepare detailed construction drawings on City furnished
standard plan and profile sheets to a plan view scale of
1" = 20', horizontally;
3. Prepare special provisions and contract documents on Xerox
masters in conjunction with City's Standard Specifications
(Standard Specifications for Public Works Construction,
1973 Edition including supplements);
4. Coordinate plans, special provisions and contract documents
with the East Coast Highway Water Transmission Main Improve-
ment Project from Hazel Avenue to the Easterly City Limits,
to provide for a single construction contract with this PROJECT:
- 1 -
0
5. Design traffic control implementation for the construction
phase of the PROJECT.
6. Calculate the construction quantities and estimate their
cost. Provide a final ENGINEER'S estimate in bid proposal
format.
7. At key milestones present design solutions for review by
CITY.
8. Provide consultation and /or interpretation of plans and
specifications during the construction phase of the PROJECT,
including review of shop drawings.
III. Duties of CITY
CITY hereby agrees to supply ENGINEER with the following infor-
mation and materials:
A. Record and pothole information regarding the location of
existing underground utilities.
B. Horizontal and vertical control, and topographic surveys
for the PROJECT.
C. As -built construction drawings of surface improvements in
the PROJECT area.
D. Soils investigation report.
E. Mylar plan and profile and standard sheets for preparation
of original PROJECT drawings.
F. Field measurements to reflect "as- built" condition of work
(CITY will also make "as- built" amendments to the drawings).
G. Any other additional information available which the parties
hereto agree may be beneficial to the final design of the
PROJECT.
IV. Ownership of Project Documents
Original drawings, reports, notes, maps and other documents
shall become the property of the CITY and may be reproduced
and utilized as deemed necessary by the Public Works Director.
V. Engineer in Charge
William D. Lewis, RCE No. 11543, shall be the engineer in
charge of PROJECT design.
- 2 -
0 0
VI. Right of Termination
CITY reserves the right to terminate this agreement at any
time by giving ENGINEER three (3) days' prior written notice;
notice shall be deemed served upon deposit in the United States
Mail, postage prepaid, addressed to any of ENGINEER's business
offices. In the event of termination due to fault of ENGINEER,
CITY shall be relieved of any obligation to compensate ENGINEER.
If this agreement is terminated for any reason other than fault
of ENGINEER, CITY agrees to compensate ENGINEER for the actual
services performed up to the effective date of the notice of
termination, on the basis of the fee schedule contained herein.
VII. Completion of Final Design
Final design, including all plans and other documents for the
PROJECT shall be submitted to the Public Works Director of CITY
for final review within ninety (90) calendar days following
authorization by CITY to proceed with final design.
VIII. Fee Schedule and Payment
In consideration of the performance of the above - described
engineering services, CITY hereby agrees to pay ENGINEER an
amount based upon the hourly rate schedule set forth below.
In no event shall said amount be greater than Eleven Thousand
Five Hundred Dollars ($11,500.00), except as otherwise provided
herein.
A. Hourly rates for office and field personnel shall be as follows:
Principal
$35.00 /hour
Registered Civil Engineer
$25.00 /hour
Designer
$20.00 /hour
Draftsman
$16.50 /hour
Typist
$10.50 /hour
B. The contract amount shall be paid to ENGINEER as follows:
1. Monthly partial payments shall be based on the amount
earned each month, as determined by the fee schedule.
The sum of the monthly partial payments shall not exceed
ninety percent (90%) of the maximum fee;
2. Balance of the total amount earned to be paid upon
completion of work specified in Section II (Services to
be Performed by ENGINEER), or by September 1, 1976,
whichever occurs first;
- 3 -
3. In addition, CITY agrees to reimburse ENGINEER for
the actual cost of reproduction of copies of said plans
and related documents, as well as computer costs, filing
fees, checking fees, cost of aerial photography,
materials cost related to survey work plus ten percent (10Y),
and other related costs authorized by the Public Works
Director and advanced by ENGINEER.
IX. Additional Work
Should ENGINEER complete any additional work not outlined in this
agreement, but authorized by CITY, such as legal descriptions,
revisions to final plans, design of off -site facilities, additional
topography, additional utility design or construction staking, the
extra work shall be performed on an hourly basis in accordance with
the hourly rate standard fee schedule set forth in Section VIII
(Fee Schedule and Payment) above.
X. PROJECT Scope Revisions
The scope of the PROJECT may be changed and the maximum fee revised
upon prior written approval of the Public Works Director if the
increase in the maximum fee does not exceed One Thousand Two Hundred
Dollars ($1,200.00). If revisions to the scope of the PROJECT would
result in an increase in the maximum fee exceeding One Thousand Two
Hundred Dollars ($1,200.00), an amendment providing for such revisions
shall be processed and executed by the parties hereto.
XI. Hold Harmless
ENGINEER shall indemnify and save harmless CITY and its officers and
employees from any damage or liability arising from any errors, omissions
or negligence in the ENGINEER's performance of this agreement, or in
the engineering work and services herein provided.
IN WITNESS WHEREOF, the parties hereto have executed this agreement
on the date first above written.
ATTEST: CITY OF NEWPORT BEACH
By zwew�
f `.t•
Cit Clerk Mayor
CITY
APPROVED AS TO RM: \:c1'Lr,�,: ;ALDERMAN, SWIFT & LEWIS
CONSULTING ENGINEERS
Ass a i y Atto ney
SECRETARY — TREASURER/ ENGINEER
-4-
0 0
RESOLUTION NO. R 5 G 9
A RESOLUTION OF THE CITY COUNCIL OF THE
`L CITY OF NEWPORT BEACH AUTHORIZING THE MAYOR
AND CITY CLERK TO EXECUTE A PROFESSIONAL
r. •.: ,� �- �;-.•,, ENGINEERING SERVICES AGREEMENT BETWEEN THE
u 1` CITY OF NEWPORT BEACH AND ALDERMAN, SWIFT AND
By },» C?TY COUNCIL LEWIS IN CONNECTION WITH WATER TRANSMISSION
ultY pg k#AjWW Wf q'a _y) MAIN IMPROVEMENTS IN ALLEY SOUTHERLY OF EAST
COAST HIGHWAY FROM MARGUERITE AVENUE TO HAZEL
AVENUE
WHEREAS, there has been presented to the City Council
of the City of Newport Beach a certain professional engineering
services agreement between the City of Newport Beach and
Alderman, Swift and Lewis in connection with water transmission
main improvements in alley southerly of East Coast Highway from
Marguerite Avenue to Hazel Avenue; and
WHEREAS, the City Council has considered the terms
and conditions of said agreement and found them to be fair and
equitable, and in the best interests of the City;
NOW, THEREFORE, BE IT RESOLVED by the City Council
of the City of Newport Beach that said agreement above described
is approved, and the Mayor and City Clerk are hereby authorized
and directed to execute the same on behalf of the City of Newport
Beach.
ADOPTED this 11th
ATTEST:
City Clerk
day of August , 1975.
DDO /bc
8/8/75