HomeMy WebLinkAboutC-1878 - Professional Engineering Services; Water Pressure Zone III - Service Capacity Study0
TO: FINANCE DIRECTOR
FROM: City Clerk
et -
CITY OF NEWPORT BEACH
CALIFORNIA
City Hall
3300 W. Newport Blvd.
Area Code 714
673 -2110
DATE November 15, 1976
SUBJEM Contract No. 18785
Description of Contract Study/Water Pressure Zone III
Authorized by Resolution No. 8933 , adopted on November 8, 1976
Effective date of Contract November 15, 1976
Contract with isms M. Montgomery, Conenitin8.En8iemers
Address 1786 Sky Park Cirele
Irvine, CA 9$715
Amount of Contract Sae Contract
City Clerc
Cl
TO: XrSISTANT CITY ATTORNEY
FROM: Public Works Department
0
November 11, 1976
SUBJECT: AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES- -
WATER PRESSURE ZONE III -- SERVICE CAPACITY STUDY
HUGH:
Attached for your approval as to form are four (4)
copies of the subject agreement which are executed
by the Engineers. Council approved the agreement
on November 8, 1976. Please forward the agree-
ment and copies to the City Clerk for execution.
Thank you.
C9Steve iuc knam Jr.
Project Engineer
SB:jd
Att.
�� G ��7 '
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
WATER PRESSURE ZONE III- SERVICE CAPACITY STUDY
THIS AGREEMENT is made and entered into this /S -4day of
1976, by and between the City of Newport Beach, a
municipal corporation, hereinafter referred to as CITY; and the firm of
James M. Montgomery, Consulting Engineers Incorporated, hereinafter referred
to as ENGINEER.
WITNESSETH
WHEREAS, CITY desires a study of water pressure Zone III
connections to the Metropolitan Water District's (hereinafter referred to
as MWD) Feeder Distribution System to determine if modifications to
existing connections or new connections are required to meet future water
service demands; and
WHEREAS, ENGINEER has submitted a proposal to CITY to perform
engineering services in connection with the study; and
WHEREAS, CITY desires to accept said proposal;
NOT THEREFORE, in consideration of the foregoing, the parties
hereto agree as follows:
I. General
A. CITY engages ENGINEER to perform the services
hereinafter described for the compensation herein
stated.
B. ENGINEER agrees to perform said services upon the
terms hereinafter set forth.
II. Services to be Performed by ENGINEER
ENGINEER hereby agrees to perform the following services:
1. Review water demand requirements for Pressure
Zones III through VIII. In order to facilitite the
review and comparison of the alternatives, a
computer model of the "backbone" water delivery
system for Zone III would be prepared.
2. Prepare preliminary piping and valving sketches
for new or modified MWD connection alternati:ves.
3. Prepare preliminary cost estimates of the required
facilities for each alternative.
4. Obtain preliminary construction schedules from
- 1 -
0
Pi
MWD for those alternatives that would require that
they provide new or modified facilities.
5. Make recommendations concerning the selection of an
alternative for construction.
6. Prepare a letter type report to include the results
of the study.
7. The alternatives to be studied are as follows:
(a) Enlargement of connection CM -11 and possible
main extension to the San Joaquin Reservoir outlet.
(b) New connection to Orange County Feeder at Bison
Avenue.
(c) New connection to outlet of the San Joaquin Reser-
voir.
(d) Modification of connection CM -9 at Jamboree Road
and Bristol Street.
(e) New connection to Orange County Feeder at exten-
sion of Eastbluff Drive at the time the proposed
relocation of the Orange County Feeder is accom-
plished due to proposed freeway construction.
(f) New connection at the MWD- Corona del Mar Reservoir
along New MacArthur Boulevard.
(g) Enlargement of the Zone III Pump Station at Big
Canyon Reservoir.
III. Duties of CITY
CITY agrees to supply ENGINEER with the following infor-
mation and materials:
A. Water System Atlas Maps of Zones III through VIII
existing systems.
B. Proposed water system backbone system in CITY's
downcoast sphere of influence.
C. Land Use data for existing and potential service
areas.
D. Any other additional information available which
the parties hereto agree may be beneficial to the
study.
IV. Ownership of Study Documents
Original drawings, reports, notes, maps and other docu-
ments shall become the property of the CITY and may be
reproduced and utilized as deemed necessary by the Public
Works Director.
- 2 -
0
V. ENGINEER in Cha
DuWayne R. Lidke, RCE No. 13888, shall be the Engineer
in charge of the INVESTIGATION.
VI. Right of Termination
CITY reserves the right to terminate this agreement at
any time by giving ENGINEER three (3) days prior written
notice; notice shall be deemed served upon deposit in the
United States Mail, postage prepaid, addressed to any of
ENGINEER's business offices. In the event of termination
due to fault of ENGINEER, CITY shall be relieved of any
obligation to compensate ENGINEER. If this agreement is
terminated for any reason other than fault of ENGINEER,
CITY agrees to compensate ENGINEER for the actual services
performed up to the effective date of the notice of termina-
tion, on the basis of the fee schedule contained herein.
VII. Completion of Study
The study in preliminary form shall be completed within
90 calendar days following authorization by CITY to proceed
with the work. Two (2) copies of the preliminary study
shall be provided to CITY. Ten (10) copies of the final
report shall be submitted to CITY within fifteen (15) days
of ENGINEER's receipt of CITY's comments on the preliminary
report.
VIII. Fee Schedule and Payment
In consideration of the performance of the above described
engineering services, CITY hereby agrees to pay ENGINEER
an amount based upon the hourly rate schedule set forth
below. In no event shall said amount be greater than
Eleven Thousand Dollars ($11,000.00), except as otherwise
provided herein.
A. Hourly rates for office and field personnel shall be
as follows:
- 3 -
F,
IX
P
9 0
Senior Company Officer
$60.00 /hour
Principal Engineer
$48.00 /hour
Supervising Engineer
$36.00 /hour
Senior Engineer
$30.00 /hour
Engineer
$25.00 /hour
Associate Engineer
$21.00 /hour
Senior Designer
$26.00 /hour
Designer
$20.00 /hour
Drafters
$15.00 /hour
Clerical
$11.00 /hour
Computer
$50.00 /meter hour
The contract amount shall be paid to ENGINEER as
follows:
1. Monthly partial payments shall be based on the amount
earned each month, as determined by the fee schedule.
The sum of the monthly partial payments shall not
exceed ninety percent (90 %) of the maximum fee;
2. Balance of the total amount earned to be paid upon
completion of the work specified in Section II (Services
to be Performed by ENGINEER).
3. In addition, CITY agrees to reimburse ENGINEER for
the actual cost of reproduction of copies of said
report and related documents as well as computer costs,
filing fees, checking fees, vehicle mileage, and other
related costs authorized by the Public Works Director
and advanced by ENGINEER.
Additional Work
Should ENGINEER complete any additional work not outlined in
the agreement, but authorized by CITY, the extra work shall
be performed on an hourly basis in accordance with the
hourly rate standard fee schedule set forth in Section X
(Fee Schedule and Payment) above.
Study Scope Revisions
The scope of the study may be changed and the maximum fee
revised upon prior written approval of the Public Works
Director if the increase in the maximum fee does not exceed
Eleven Hundred Dollars ($1100.00). If the revisions to the
scope of the study would result in an increase in the maxi-
mum fee exceeding Eleven Hundred Dollars ($1100.00), an
amendment providing for such revisions shall be processed
and executed by the parties hereto.
- 4 -
XI. Hold Harmless
ENGINEER shall assume the defense of and indemnify and
save harmless, the CITY, and its officers and employees,
from all claims, loss, damage, injuries, or liability;
directly or indirectly arising from any errors, omissions,
or negligence in the ENGINEER's performance of this
Agreement or from the professional services herein provided.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
as of the date first above written.
ATTEST:
ity Clerk
CITY OF NEWPORT BEACH
By.
or
CITY
JAMES M. MONTGOMERY
CONCULTING ENGINEERS INCORPORATED
By:2cc��o�c Gti" Kam.
Title jr oti s. _
tie GxEc. 11,cE
ENGINEER
- 5 -
iov 8 1976
By the QfY COUNCIL
CITY_ G?F pMFWiQRT %4CH
RESOLUTION NO. 8 93 3
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF NEWPORT BEACH AUTHORIZING THE MAYOR AND
CITY CLERK TO EXECUTE AN ENGINEERING SERVICES
AGREEMENT BETWEEN THE CITY OF NEWPORT BEACH
AND JAMES M. MONTGOMERY, CONSULTING ENGINEERS,
INC., FOR PREPARATION OF A SERVICE CAPACITY
STUDY OF WATER PRESSURE ZONE III
WHEREAS, there has been presented to the City Council
of the City of Newport Beach a certain engineering services
agreement between the City of Newport Beach and James M.
Montgomery, Consulting Engineers, Inc., in connection with the
preparation of a Service Capacity Study of Water Pressure Zone
III; and
WHEREAS, the City Council has reviewed the terms and
conditions of said agreement and finds them to be satisfactory
and that it would be in the best interest of the City to authorize
the Mayor and City Clerk to execute said agreement;
NOW, THEREFORE, BE IT RESOLVED by the City Council
of the City of Newport Beach that said agreement above described
is approved, and the Mayor and City Clerk are hereby authorized
and directed to execute the same on behalf of the City of
Newport Beach.
ADOPTED this 8th day of November , 1976.
Mayor
ATTEST:
City Clerk
DDO /bc
11/2/76