HomeMy WebLinkAboutC-1966 - Soils report of Balboa Island Bridge0 at CITY OF NEWPORT BEACH CALIFORNIA City Halt 3300 W. Newport blvd. Area Code 714 DATE March 4() 1978 TO: FINANCE DIRECTOR FROM: City Clerk SUBJECT: Contract No. 1966E Description of Contract Amended contract - Balboa Island Bridge Report Authorized by Resolution No. 9301 adopted on March 27, 1978 Effective date of Contract March 29. 1978 `. Contract with Converse. Davis , Diaon Associates, Consulting Br Address 1440 State College Blvd. Anaheim, CA 92806 Amount of Contract See contract City Clerk . 6 Geologists March 27, 1978 TO: CITY CLERK FROM: Public Works Department SUBJECT: AMENDED AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES - SOILS REPORT ON THE BALBOA ISLAND BRIDGE DORIS: Attached for your signature and execution by the Mayor are three copies of the subject agreement. Please return two copies to this Department. Thank you. c� S eve Bucknam, Jr. Civil Engineer SB:em Att. AMENDED AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES SOILS REPORT ON BALBOA ISLAND BRIDGE THIS AGREEMENT is made and entered into this a zczd)v day of 1978, by and between the -.City of Newport Beach, a municipal corporation, hereinafter referred to as "CITY" and the firm of Converse, Davis, Dixon Associates, Geotechnical Consultants, hereinafter referred to as ENGINEER. W I T N E S S E T H WHEREAS, CITY entered into an Agreement for professional engineer- ing services - -Soils Report on Balboa Island Bridge -- hereinafter referred to as AGREEMENT, dated August 19, 1977; and WHEREAS, during the field drilling operations to collect data for the said report,unforeseen difficulties were encountered in collecting said data due to unusual working conditions at the site; and WHEREAS, additional time was spent collecting said data that was not anticipated by ENGINEER in making the proposal for AGREEMENT; and WHEREAS, the cost of authorized additional work is Three Thousand Dollars($3,000.00) in excess of the agreed to fee under the AGREEMENT; and WHEREAS, CITY agrees to a fee increase of Three Thousand Dollars; NOW THEREFORE, in consideration of the foregoing, the parties hereto agree as follows: ENGINEER and CITY agree to a revised total fee for work under said AGREEMENT of Nineteen Thousand Three Hundred and Twenty -five Dollars ($19,325.00) arrived at as follows: Original Fee per AGREEMENT $14,825.00 Authorized Amendment per AGREEMENT $ 1,500.00 Additional Unforeseen work 1 $ 3,000.00 Total - I - $19,325.00 IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT on the day and year first above written. ATTEST: 'City Clerk APPROVED AS'1TO FORM: 0 CITY OF NEW ORT BEACH By:. M o CITY CONVERSE, DAVIS, DIXON ASSOCIATES By: Title Vice Presi end' t ENGINEER B Y• _ T' e Vibe res' "' ent v MAR 7 7 1978 By the CITY COUNCIL CITY OF NAWWRT UACM RESOLUTION NO. 93 01 0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AMENDED AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES BETWEEN THE CITY OF NEWPORT BEACH AND CONVERSE, DAVIS DIXON ASSOCIATES FOR SOIL REPORT ON BALBOA ISLAND BRIDGE WHEREAS, there has been presented to the City Council of the City of Newport Beach a certain amended Agreement For Professional Engineering Services between the City of Newport Beach and Converse, Davis Dixon Associates in connec- tion with a soil report on Balboa Island Bridge; and WHEREAS, the City Council has reviewed the terms and conditions of said agreement and finds them to be satisfactory and that it would be in the best interest of the City to authorize the Mayor and City Clerk to execute said agreement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Newport Beach that said agreement above described is approved, and the Mayor and City Clerk are hereby authorized and directed to execute the same on behalf of the City of Newport Beach. ADOPTED this 27th day of March , 1978. ATTEST: City Clerk DDO /bc 3/20/78 CITY OF NEWPORT BEACH CALIFORNIA DATE Anaust 19. 1977 TO: FINANCE DIRECTOR FROM: City Clerk SUBJEM Contract No. 1966E City Flan 3300 W. Newport Blvd, Area Code 714 Description of Contract $epon of structural condttion of Balboa 9 _ Island Bridge. Authorized by Resolution No. 9162 , adopted on 8-8 -77 Effective date of Contract 8 -19 -77 Contract with Converse Davis Dixon Associates Consulting Bngrs 6 Geologists. Address 1440 StataCollexe Blvd Anaheim CA 92806 Amount of Contract R.s on reef City Clerk is a.Y Vic- _ °4, 3 � c. �. YM � kz r's1.:. 4 AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES SOILS REPORT ON BALBOA ISLAND BRIDGE THIS AGREEMENT is made and entered into this day of 1977, by and between the City of Newport Beach, a municipal corporation, hereinafter referred to as "CITY" and the firm of Converse, Davis, Dixon Associates, Consulting Engineers and Geologists, hereinafter referred to as "ENGINEER ". WITNESSETH WHEREAS, CITY is contracting with the firm of Boyle Engineering Corporation, hereinafter referred to as " BOYLE" for the preparation of a "Report on the Structural Condition of Balboa Island Bridge ", hereinafter referred to as "BRIDGE REPORT "; and WHEREAS, CITY intends to have a soils report, hereinafter referred to as "SOILS REPORT ", prepared to provide input to BOYLE during preparation of said BRIDGE REPORT; and WHEREAS, ENGINEER has submitted a proposal to CITY to perform engineering services in connection with the preparation of said SOILS REPORT; and WHEREAS, CITY desires to accept said proposal; NOW THEREFORE, in consideration of the foregoing, the parties hereto agree as follows: I. General A. CITY engages ENGINEER to perform the services hereinafter described for the compensation herein stated. B. ENGINEER agrees to perform said services upon the terms hereinafter set forth. II. Services to be Performed by ENGINEER ENGINEER agrees to perform the following services: 1. Prepare a soils report to contain the following: A. Complete boring logs of six (6) bore holes. Locations to be set by CITY and /or BOYLE. B. Allowable pile capacity for existing piles. C. Allowable lateral load on piles. D. Probable cause of pile settlement at Bents #2 and #3. E. Recommendations for increasing load capacity of piles at Bents #2 and #3, including construction methods. - 1 - F. Recommendations on new pile types including method of determining driving resistance, pile capacity curves, and group efficiency. If drilled piles are feasible recommendations will be included 2. Coordinate SOILS REPORT preparation with BOYLE's prepara- tion of BRIDGE REPORT. III. Duties of CITY CITY hereby agrees to supply ENGINEER with the following: 1. Permission from The Irvine Company to launch drilling barge from a parking area adjacent to the bridge. 2. Permits for work from pertinent agencies. 3. Available as -built drawings of existing bridge piles and channel profile information. 4. Any additional information available which the parties hereto agree may be beneficial to the preparation of the SOILS REPORT. IV. Ownership of REPORT Documents Original drawings, reports, notes, maps, and other documents shall become the property of the CITY and may be reproduced and utilized as deemed necessary by the Public Works Director. V. Engineer in Charge Thomas D. Lake, RCE No. 14721 shall be the Engineer in charge of SOILS REPORT preparation. VI. Completion of REPORT Two (2) copies of a draft SOILS REPORT shall be completed and submitted to CITY by September 15, 1977.. Five (5) copies of the final SOILS REPORT shall be submitted to CITY for incor- poration into BOYLE's BRIDGE REPORT by October 15, 1977. VII. Fee Schedule and Payment In consideration of the performance of the above described engineering services, CITY hereby agrees to pay ENGINEER an amount based upon the hourly rate schedule set forth below. In no event shall said amount be greater than Fourteen Thousand Eight Hundred and Twenty Five Dollars ($14,825.00), except as otherwise provided herein. - 2 - 0 0 A. Hourly rates for office and field personnel shall be as follows: Staff Supervision and Consultation $38.00 /hr Engineering and Geology $34.00 /hr Foundation Services $28.00 /hr Grading Services $25.00 /hr Compaction Testing $22.00/hr Laboratory Testing $22.00 /hr Geotechnical Drafting $20.00 /hr B. Rates for drilling costs, including the cost of a field engineer will be as follows: Mobilization and demobilization $2,525.00 Lump Sum Drilling $1,075.00 /day (8 hours) Overtime Rate (Drilling) 155.00 /hr C. The contract amount shall be paid to ENGINEER as follows: 1. Monthly partial payments shall be based on the amount earned each month, as determined by the fee schedule. The sum of the monthly partial payments shall not exceed ninety percent (90 %) of the maximum fee; 2. Balance of the total amount earned to be paid upon completion of work specified in Section II (Services to be Performed by ENGINEER), or by January 1, 1978 whichever occurs first; 3. In addition CITY agrees to reimburse ENGINEER for the actual cost of reproduction of copies of said SOILS REPORT and related documents, as well as computer costs, plus ten percent (10 %) overtime costs at twenty - five percent (25 %) of hourly rates if authorized by CITY, and other related costs authorized by the Public Works Director and advanced by ENGINEER. VIII. Right of Termination CITY reserves the right to terminate this agreement at any time by giving ENGINEER three (3) days prior written notice; notice shall be deemed served upon deposit in the United States Mail, postage prepaid, addressed to any of ENGINEER's business offices. In the event of termination due to fault of ENGINEER, CITY shall be relieved of any obligation to compensate ENGINEER. if - 3 - 0 this agreement is terminated for any reason other than fault of ENGINEER, CITY agrees to compensate ENGINEER for the actual services performed up to the effective date of the notice of termination, on the basis of the fee schedule contained herein. IX. Amendment The scope of services to be furnished by ENGINEER may be changed and the maximum fee amended upon prior written approval of the Public Works Director, except that any increase in the maximum fee exceeding Fifteen Hundred Dollars ($1500.00) shall be approved by City Council. X. Assignment This agreement or any portion thereof shall not be assigned without the written consent of the CITY. XI. Hold Harmless ENGINEER shall assume the defense of and indemnify and save harmless the CITY, and its officers and employees, from all claims, loss, damage, injury, and liability, directly arising from any errors, omissions, or negligence in ENGINEER's per- formance of this agreement or from the engineering work and services herein provided. ATTEST: f ity Clerk - 4 - CITY 0 NE PORT BEACH By: Mayor CONVERSE, 3-- , DI) By: t ecre ASSOCIATES By: �i/1Nlt4 Title: Vice P res dent CITY ENGINEER RESOLUTION NO. 9162 0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE PROFESSIONAL ENGINEERING SERVICES AGREEMENTS WITH BOYLE ENGINEERING CORPORATION, AVI DIXON W H. V. L,AWMAS 'R TESTING EE AS IN CONNECTION WITH A REPORT ON STRUCTURAL CONDITION OF BALBOA ISLAND BRIDGE WHEREAS, there has been presented to the City Council of the City of Newport Beach certain professional engineering services agreements between the City of Newport Beach and Boyle Engineering Corporation; Converse, Davis, Dixon Associates; and H. V. Lawmaster Testing Engineers for the preparation of a Report on Structural Condition of the Balboa Island Bridge; and WHEREAS, the City Council has reviewed the terms and conditions of said agreements and finds them to be satisfactory and that it would be in the best interest of the City to authorize the Mayor and City Clerk to execute said aforementioned agreements; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Newport Beach that said agreements above described are hereby approved, and the Mayor and City Clerk are authorized and directed to execute the same on behalf of the City of Newport Beach. ADOPTED this 8th day of August , 1977 ATTEST: City Clerk DDO:yz 8/2/77