Loading...
HomeMy WebLinkAboutX2017-2099 - Soils (3)G3Soi[Works GEOLOGY• GEOTECH -GROUNDWATER A&R Corporation, Inc. 19600 Fairchild, Suite 110 Irvine, California 92612 Attention: Mr. Ali R. Fadavi Subject: Rough Grade Compaction Report 420 Poinsettia Avenue Corona del Mar, California References: See attached List of Selected References Dear Mr. Fadavi, xU,T_ 2001ci U N ?Diin.4emf fwe: March 30, 2022 Project No. 1-1105 This report presents a summary of our geotechnical field observations and results of testing performed during shoring installation and site grading for the property located at 420 Poinsettia Avenue in Corona del Mar, California. Limits of Report The geotechnical services performed during this phase of construction consisted of observations during the shoring installation and observations / testing during the remedial grading/ back -fill operations for the planned residence. Our services were provided on an as - requested basis between July 23, 2018 and June 10, 2019. The approximate limits of grading addressed in this report are shown on the attached Figure 1. Shoring Installation A total of 20 soldier piles were installed between July 23 and August 2, 2018 along the east and west property lines at the locations shown on Sheet SH-1 of the approved Shoring Plan. • Soldier beams 1 thru 13 were excavated along the northerly side of the property and soldier beams 21 thru 27 were excavated along the southerly side of the property (Note: soldier beams 14 thru 20 were eliminated on the approved plans); • The excavations for these soldier beams were accomplished using a track -mounted drill rig equipped with 18 and 24-inch diameter helical augers, and extended to at least the planned depths; • Following the installation of steel beams, the annulus around these beams were backfilled with concrete / slurry; 350 Fischer Ave. Front • Costa Mesa, CA 92626 > P: 714 668 5600 - www.G3SoilWorks.com A&R Corporation March 30, 2022 Rough Grade Compaction Report Project No. 1-1105 420 Poinsettia Avenue Page 2 of 4 Corona del Mar. California Excavation and Lagging Installation Following shoring installation, excavations to planned site grade elevations were performed along the northern, southern, and eastern portion of the property with the eastern side sloped to the grade of the rear alley. Soil materials generated from the excavation were hauled offsite. Timber lagging was placed as the excavation proceeded and voids behind the installed lagging were backfilled with cement sand slurry. Earthwork Observations and Testing The following observations were made and testing performed: • Prior to the date of our initial field observations, existing structures and foundation elements were demolished and hauled off -site; • The building pad was overexcavated 3.5 feet (minimum) below planned site grades. This overexcavation was performed in stages and generally extended laterally about 5 feet beyond the outside footing edges; • Overexcavated bottoms were scarified, moisture conditioned, and recompacted prior to the placement of engineered compacted fills; and • Engineered compacted fills comprised of onsite materials were subsequently placed and compacted to achieve approximate rough grade elevations. • Backfill materials comprised of Class II Permeable Base material were placed in the basement area and behind the rear retaining wall along the eastern side of the site. Soil type and laboratory maximum density / optimum moisture content test results are presented in Table I, and field density test results are summarized in Table II. The approximate locations of field density tests are shown on the attached Field Density Test Location Map (Figure 1), utilizing an excerpted portion of the referenced Precise Grading Plan as a base. Fill Placement and Compaction Fills consisting of native soil materials and imported Class II Permeable Base were placed in lifts, moisture -conditioned to wet of optimum moisture contents and compacted to at least 90 percent relative compaction, based on the laboratory maximum dry density (ASTM: D1557). Equipment used during the fill placement and compaction included excavators, a front loader wit compaction wheel, and hand-held compactors. Moisture conditioning was accomplished using a water source. Test Procedures Laboratory maximum dry density / optimum moisture content testing was performed in accordance with ASTM: D1557 test procedures. The results of this testing are summarized in Table I. 350 Fischer Ave. Front + Costa Mesa, CA 92626 - P: 714 668 5600 • www.G3SoilWorks.com A&R Corporation Rough Grade Compaction Report 420 Poinsettia Avenue Corona del Mar, California March 30, 2022 Project No. 1-1105 Page 3 of 4 In -situ density tests were performed using the nuclear density (ASTM: D6938) test method. Test results are presented in Table H. Conclusions and Comments Based upon our Feld observations and the results of testing, it is our opinion that the shoring installation and remedial grading operations observed by our firm described herein were performed in substantial accordance with the recommendations presented in the referenced report, project plans, and grading requirements of the City of Newport Beach. Completed work under the purview of this report is considered suitable and acceptable for the intended use as of the date of our last observations/ testing. LIMITATIONS This report presents information and data relative to our geotechnical observations and testing performed during the shoring installation and rough grading for the planned construction at 420 Poinsettia Avenue, in Corona del Mar, California. A representative of this firm conducted periodic tests and made observations during the grading operations performed as of the date of our testing. During this time, our field personnel did not direct or supervise the contractor or his work forces. Professional and technical advice and suggestions were provided to the owner and/or his designated representative based on the results of the testing and observations. The results of field density tests reported herein are valid at the locations and depths tested and at the time of testing only. Changes in the condition and properties of compacted fill can occur with the passage of time, whether they be due to natural processes or human activities (such as soil expansion, shrinkage, rainfall, landscape irrigation, rodent activity, and other factors) at or adjacent to the property. Accordingly, the findings of this report may be invalidated wholly or partially by changes outside our control. Our observations and testing services as well as the findings and conclusions presented in this report are in accordance with the generally accepted principles and local practice in the field of geotechnical engineering. No other warranty, express or implied, is made as to the conclusions and professional opinions provided herein. 350 Fischer Ave. Front • Costa Mesa, CA 92626 + P: 714 668 5600 • www.G3Soi]Works.com A&R Corporation Rough Grade Compaction Report 420 Poinsettia Avenue Corona del Mar, California March 30, 2022 Project No. 1-1105 Page 4 of 4 This report is subject to review by the controlling authorities for the subject project. If you have any questions or require additional information, please do not hesitate to call. Sincerely, G3SOILWORKS, INC. Attachments: List of Selected References Table I — Summary of Laboratory Test Results Table II — Summary of Field Density Test Results Figure 1 — Field Density Test Location Map 350 Fischer Ave. Front > Costa Mesa, CA 92626 • P: 714 668 5600 - www.G3Soi]Works.com A&R Corporation March 25, 2022 Final Report - Geotechnical Observation and Testing Project No. 1-1105 420 Poinsettia Avenue Page 5 of 4 Corona del Mar, California LIST OF SELECTED REFERENCES 1. Gouvis Engineering, Pacific Residence, Shoring Plans, Sheet SH-1, Rev. 3, dated 6/29/18, Project Number 64433. 2. Toal Engineering, Inc., Pacific Residence, Precise Grading Plan, Revision 1, Sheet C-02, dated 6/22/18, Job No. 17172. 3. G3SoilWorks, Inc., Shoring and Retaining Wall Criteria, 420 Poinsettia Avenue, Corona Del Mar, California, dated October 3, 2017 (Amended October 12, 2017), Project No. 1-1105-A. 4. G3SoilWorks, Inc., Preliminary Geotechnical Investigation Report, 420 Poinsettia Avenue, Corona del Mar, California, dated May 17, 2017, Project No. 1-1105-A. 350 Fischer Ave. Front • Costa Mesa, CA 92626 + P: 714 668 5600 • www.G3SoilWorks.com m A and R Corporation, Inc. Final Report- Geotechnical Observationss and Testings 420 Poinsettia Avenue Corona del Mar, California Table I Maximum Dry Density / Optimum Moisture Content Test Results Laboratory Standard March 25, 2022 Project No. 1-1105 Soil Type Description Optimum Moisture (%) Maximum Dry Density (Pcf) Test Method A Sandy Clay 9.5 127.0 ASTM: D1557 B Class 2 Permeable Base 4.0 134.0 ASTM: D1557 Table II Summary of Field Density Test Results RELATIVE RELATIVE COMP. PASS TEST TEST DEPTH / MOIST UNIT DRY COMP. STD SOIL or DATE NO. LOCATION ELEV.(FT.) (%) WEIGHT (%) (%) TYPE FAIL 8/23/2018 1 Building Pad 103 11.2 115.3 91 90 A PASS 8/24/2018 2 Building Pad 104 10.1 116.5 92 90 A PASS 8/24/2018 3 Building Pad 104 9.9 116.7 92 90 A PASS 8/24/2018 4 Building Pad 105 10.8 116.0 91 90 A PASS 8/24/2018 5 Building Pad 106 11.3 115.4 91 90 A PASS 8/27/2018 6 Building Pad 106 11.2 115.9 91 90 A PASS 8/27/2018 7 Building Pad 107 10.8 116A 91 90 A PASS 8/27/2018 8 Building Pad 108 9.9 116.5 92 90 A PASS 8/27/2018 9 Building Pad 108 11.6 115.3 91 90 A PASS 8/29/2018 10 Building Pad 109.08 10.4 116.7 92 90 A PASS 8/29/2018 11 Building Pad 109.08 10.7 116.3 92 90 A PASS 8/29/2018 12 Building Pad 109.08 11.4 115.4 91 90 A PASS 6/7/2019 13 Garage 111 8.0 119.0 89 90 B FAIL 6/7/2019 13R Garage 111 4.0 127.5 95 90 B PASS 6/7/2019 14 Garage 111 4.3 127.3 95 90 B PASS 6/7/2019 15 Garage 112 6.2 128.6 96 90 B PASS 6/7/2019 16 Garage 112 4.4 124.8 93 90 B PASS 6/7/2019 17 Garage 113 4.0 128.0 96 90 B PASS 6/7/2019 18 Garage 113 4.8 127.5 95 90 B PASS 6/7/2019 19 Garage 114 5.5 128.3 96 90 B PASS 6f7/2019 20 Garage 114 4.0 128.5 96 90 B PASS 6/8/2019 21 Garage 115.8 4.5 130.0 97 90 B PASS 6/8/2019 22 Garage 115.8 4.7 127.7 95 90 B PASS 6/8/2019 23 Garage 115 4A 130.0 97 90 B PASS 6/8/2019 24 Garage 115 4.8 126.5 94 90 B PASS 6/8/2019 25 Garage 115.4 4.8 127.7 95 90 B PASS 6/8/2019 26 Garage 115.4 4.0 124.1 93 90 8 PASS 6/8/2019 27 Garage 114.7 6.5 127.0 95 90 B PASS Elevations estimated from project plans 350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 > www.G3SoilWarks.com k rt-its �ii aflV � III496' DO- G3SORWorks GEOLOGY• GEOTECH -GROUNDWATER A&R Corporation, Inc. 19600 Fairchild, Suite 110 March 30, 2022 Irvine, California 92612 Project No. 1-1105 Attention: Mr. Ali R. Fadavi Subject: Final Report — On -site Construction Phase 420 Poinsettia Avenue Corona del Mar, California References: See attached List of Selected References Dear Mr. Fadavi, This report presents a summary of our geotechnical field observations and results of testing performed during the on -site construction phase for the property located at 420 Poinsettia Avenue in Corona del Mar, CA. Limits of Report The geotechnical services performed during this phase of construction consisted of observations of the foundation excavations and slab subgrade. Our services were provided on an as -requested basis between April 30 and August 19, 2019. Footings and Slab Subgrade Foundation excavations for the planned residence and rear retaining wall were observed and noted to be embedded into and on the engineered fill placed as part of the rough grading; The floor slab subgrade was observed to consist of the engineered compacted fill placed as part of the rough grading and in a firm and unyielding condition. Exterior Hardscape Areas Southwest Inspection and Testing, Inc. was retained by the Client to test the relative compaction of the exposed subgrade soils for the front and sideyard hardscape areas on March 23, 2022. The results of their testing are included as an attachment to this report. Conclusions and Comments Based upon our field observations, it is our opinion that the foundation excavations and floor with the recommendations presented in the referenced report, projeslab subgrade soils observed by our firm and described herein are in substantial accordance ct plans, and grading 350 Fischer Ave. Front - Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3SOilWorks.com A&R Corporation Final Report — On -site Construction 420 Poinsettia Avenue Corona del Mar, California March 30, 2022 Project No. 1-1105 Page 2 of 4 requirements of the City of Newport Beach. Completed work under the purview of this report is considered suitable and acceptable for the intended use as of the date of our observations. LIMITATIONS This report presents information relative to our geotechnical services performed during this final phase of construction for the subject residence. A representative of this firm conducted periodic made observations to substantiate acceptability with the project requirements. During this time, our Feld personnel did not direct or supervise the contractor or his work forces. Professional and technical advice and suggestions were provided to the owner and/or his designated representative based on the results of the testing and observations. Changes in the condition and properties of compacted fill can occur with the passage of time, whether they be due to natural processes or human activities (such as soil expansion, shrinkage, rainfall, landscape irrigation, rodent activity, and other factors) at or adjacent to the property. Accordingly, the findings of this report may be invalidated wholly or partially by changes outside our control. Our observations as well as the findings and conclusions presented in this report are in accordance with the generally accepted principles and local practice in the field of geotechnical engineering. No other warranty, express or implied, is made as to the conclusions and professional opinions provided herein. This report is subject to review by the controlling authorities for the subject project. If you have any questions or require additional information, please do not hesitate to call. Sincerely, G3SOILWORKS, INC. 0 Attachments: List of Selected References Southwest Inspection and Testing, Inc., Daily Compaction Report dated 3123/22. 350 Fischer Ave. Front - Costa Mesa, CA 92626 • P: 714 668 5600 > www.G3SoilWorks.com A&R Corporation March 25, 2022 Final Report — On -site Construction Phase Project No. 1-1105 420 Poinsettia Avenue Page 3 of 4 Corona del Mar, California LIST OF SELECTED REFERENCES 1. Gouvis Engineering, Pacific Residence, Shoring Plans, Sheet SH-1, Rev. 3, dated 6/29/18, Project Number 64433. 2. Toal Engineering, Inc., Pacific Residence, Precise Grading Plan, Revision 1, Sheet C-02, dated 6/22/18, Job No. 17172. 3. G3SoilWorks, Inc., Shoring and Retaining Wall Criteria, 420 Poinsettia Avenue, Corona Del Mar, California, dated October 3, 2017 (Amended October 12, 2017), Project No. 1-1105-A. 4. G3SoilWorks, Inc., Preliminary Geotechnical Investigation Report, 420 Poinsettia Avenue, Corona del Mar, California, dated May 17, 2017, Project No. 1-1105-A. 350 Fischer Ave. Front - Costa Mesa, CA 92626 > P: 714 668 5600 • www.G3SoilWorks.com Southwest Inspection and Testing, Inc. 441 Commercial Way, La Habra, Ca 90631 (562) 941-2990 • (714) 526-8441 9 Fax (562) 946-0026 DAILY COMPACTION REPORT Job Name PACIFIC RESIDENCE Date 3-23-2022 IJobNo. 190168 Job Address 420 POINSETTA LN City CORONA DEL MAR Permit No. Issued By General Contractor Grading Contractor Area of Inspection CONCRETE SECTION Soils Inspector/ Technician ANDRE URIBE Equipment Used LAB DATA Proctor No. Sample Source Soils Description and USCS I Optimum Moisture I Maximum Density 1 NATIVE BROWN SILTY SAND 10.5!j__j 126.0 PCF SUMMARY OF OPERATIONS ARRIVED ON SITE PER DISPATCH TO OBSERVE, REPORT AND TEST THE COMPACTION OF THE CONCRETE SECTION IN THE FRONT AND SIDE YARDS. FIRST COMPACTION WAS COMPLETE UPON ARRIVAL. THEN THE AREA WAS PROBED AND FIRM TIGHT AND UNYIELDING. THEN IT WAS TESTED WITH A NUKE GAUGE. MOISTURE IN TOLERANCE AND COMPACTION EXCEEDED 90% TEST PLOT LOCATION(S) '_ 7e g �. � DENSITY TEST DATA Test No. Test Location Approximate Elevation Approximate Fill Thickness Proctor No. Dry Density Percent Moisture Percent Compaction Specified Compaction Pass/ Fail 1 CONCRETE SECTION FSG 1 116.0 11.8 92.1 90% P 2 CONCRETE SECTION FSG 1 118.8 12.0 94.3 90% P 3 CONCRETE SECTION FSG 1 115.7 11.5 91.8 90% P CERTIFICATION OF COMPLIANCE I HEREBY CERTIFY THAT I HAVE OBSERVED TO THE BEST OF MY KNOWLEDGE ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE NOTED. I HAVE FOUND THIS WORK TO COMPLY WIT HE APE.5LOYED PLANS, SPECIFICATION, AND APPLICABLESECT OF G E BUILDING LAWS. Q SIGN OFS O /TECHNICIAN SOILS TECH, EIT raCIANwa CONTINUED ON NEXT PAGE Li PAGE OF TIME IN TIME OUT SAMPLES 1:00PM 4:OOpm APPROVED BY PROJECT SUPERINTENDENT P.B.L.A SURVEYING, INC. PROFESSIONAL LAND SURVEYING OUT OF SCOPE AUTHORIZATION TO DATE PROJECT p W.O. CREW The Client or Clients representatives hereby authorize the Consultant to proceed with the following field survey services and acknowledges the actual or estimated time show hereon: DESCRIPTION OF WORK t COMPENSATION shall be adjusted hourly per the rate schedule in the contract agreement. 2 MAN CREW 3 MAN CREW �.•d. Hours OFFICE SUPPORT Hours Hours AUTHORIZE these additional services with your signature below and return the original of this form to Consultant. APPORVED BY (PLEASE PRINT) APPORVED BY (SIGNATURE) COMPANY NAME DATE SIGNEE'S NOTES 4790 Irvine Blvd, Suite 105-262 1096 Calimesa Blvd, Suite C Irvine, CA 92620 Calimesa, CA 92320 (888)714-9642 (888)714-9642