Loading...
HomeMy WebLinkAboutS2021-0195 - Soils$611 Engineering September 23, 2021 Geology Project File No. 218132-106 Material Testing 19mviroameatot BUILDING DIVISION Mr. Brian; Stern 2$ Burning Tree Cin,ft Canyon. SEP 3 0 2021 Newport Beach, CA 92660 W. SAG. Subject. Response 10 C4 of Newport Beach Geotoohminal Report Review Checklist, Vt Review, SFR -N0wfoal ,664 sf & Spa 121 sf,, Now Caissons (12),25 Burning Tm Cir, Newport Beach, California. References. Appendix D Plan Check No.: 1,978-2021 Dwif Mr, Sterm (ITEM 1) RESPONSE: OTEM 10 RESPONSE: (ITEM 111) RESPONSE: Please refer rose to the City 1. $oil values are acceptable Beach for the. slope Cheat: M rrr, i3rion Sero ' Project File No. 21801-106 Project: 25 furning'1'ree Newport Beach, California (ITEM x RESPONSE.. We have viewed to Gtading, Foundation, and lonxiscape Plazas and feud these to be in compliance -with esu' go t-mbuical ;teoommerd4or s.= Ropeetfill%lyr P4 & Associates, Inc.: 't via'�- . Azar, M,91; ,PE Ptiucipal Enoeet P"\mR)zrazs2-ses"jrr P.A. & Associates, znG 2 Client: Mr. Brian Stern Project: 25 Burning Tree Newport Beach, California APPENDIX A Project File No. 218132-106 City of Newport Beach Geotechnical Report Review Checklist P.A. & Associates, Inc Project Description: Title & Pate of Report .Project Address. Permit App. Pate CY cut/Fill: Consultant: Applic-antfContAot GEOTECEWHNICAL REPORT RMCHEC"T SFR NEW I POOL 664 SF & SPA 121 SF,; NEW CAISSONS (12}, 25 BURNING TREE Plan Check No.- *78.2021 0812712021 PeftitV41yatiph: '1ii20Q,000 PA & ASSOCIATES, INC, PETROV PLAMEN Plan Check Engineer. Sergio Gutierrez Engineer small: egutiorrez@newportboachea.gov P1atReview: 91212021 2nd Review: Italic Comments Permit.App. Expires! 2/23/2022 Adjusted Valuation: Phone, 949-679-7474 Phone. Phone: 040-044-3213 31d Review: F -113y Appointment The are from the 2010 COO, unless otherwise stated. • TO EXPEDITE PROJECT APPROVAL Please :pri?vide.awritten response indfoetinghow BndwhPrO each comment was resolved on , the plans. • Resubmit all previously reviewed plans, updated plans and supporting documents with each subsequent review: • AF115P, 0111 PLAN REVIEW Please call the geologist listed above to schedule a plan review appointment, to, expedite oofect Approval. For clarification �of any plan review comment, please call the, plan check engineer listed above. Plan review status- is available online 4= Qftamv: Project status is also available using the interactive voice response system at 94MMM43255, or by speaking With a permit technician PRIOR TO APPROVAL OF THE REPORT ATTEND TO THE ITEMS BELOW: 1. Please provide explanation why the pool caisson pile embedment differs in depth as it goes higher in elevation at the site. Please see Foundation Plan Caisson # 5,6, 7 and 8 sheet SP -2. 2. Please provide scaled cross-section perpendicular to slope between pool caissons 5 and 6. Show layers of subsoil and Geologic bedding interpretation. 3. Please address the seismic and static stability of existing slope. 4. Please review the Grading, Foundation and Landscape Plans for compliance with geotechnical recommendations of this report. Limitations of Review: Our review is intended to determine if the submitted report(s) comply with City Codes and generally accepted geotechnical practices within the local area. The scope of our services for this third party review has been limited to a brief site visit and a review of the above -referenced report and associated documents, as supplied by this City of Newport Beach. Re -analysis of reported data and/or calculations and preparation of amended construction or design recommendations are specifically not included within our scope of services. Our review should not be considered as a certification, approval or acceptance previous consultant's work, or is meant ad an acceptance of liability for final design or construction. CorrLists\GeotechnimiReportReviewChecklist 09/0212021 Client: Mr. Brian Stern Project: 25 Burning Tree Newport Beach, California Project File No. 218132-106 Structural Engineer's Response to Item I P.A. & Associates, Inc. PMA CONSULTING, INC. CONSULTING STRUCTURAL ENGINEERS 28161 Casitas Ct. PH. (714) 717-7542 Laguna Niguel, CA 92677 e-mail: consulting@pma-bg.com September 22, 2021 PMA Job # 41821 25 Burning Tree Road Newport Beach, CA 92660 RESPONSE TO GEOTECHNICAL REPORTREVIEW COMMENTS No.: 1978-2021 1. Depth of embedment is a function of the gravity loads and lateral forces acting on each caisson. All depths have been transferred to caissons schedule from structural calculations accordingly. 2. Please see the attached cross section by the Geotechnical Engineer. 3. The slope stability has been addressed in the building plan check. Attached please find a copy of the response by P.A. & Associates, Inc. dated January 10, 2019. 4. Complied. END OF RESPONSE Client: Mr. Brian Stern Project: 25 Burning Tree Newport Beach, California APPENDIX C Cross Section AA' P.A. & Associates, Inc Project File No. 218132-106 Client: Mr. Brian Stern Project: 25 Burning Tree Newport Beach, California APPENDIX D References P.A. & Associates, Inc. Project File No. 218132-106 Client: Mr. Brian Stern Project: 25 Burning Tree Newport Beach, California REFERENCES Project File No. 218132-106 1. Addendum Engineering Calculations for Proposed ABC Slot Cut Method, 25 Burring Tree Road, Newport Beach, California, by P.A. and Associates, Project File No. 218132- 105, dated July 26, 2021 2. Response to City of Newport Beach Geotechnical Review Checklist, 1 st Review, New Single -Family Residence with Attached Garage, 8165 SF & 958 SF, 25 Burning Tree Cir., Newport Beach, California, by P.A. and Associates, Project File No. 218132-104, dated May I9, 2021 3. Update Geotechnical Investigation Report, Proposed Single -Family 2 -Story Residence with Swimming Pool & Associated Improvements, 25 Burning Tree, Big Canyon, Newport Beach, California, by P.A. and Associates, Project File No. 218132-103, dated April 9, 2021 4. Response to City of Newport Beach Geotechnical Review Checklist, 1 st Review, SFR Addition 1152 SF & Remodel 2150 SF, 25 Burning Tree Cir., Newport Beach, California, by P.A. and Associates, Project File No. 218132-102, dated January 10, 2019 5 Preliminary Geotechnical Investigation, Single -Family Residence Remodel, Proposed First and Second Story Room Additions & Backyard Swimming Pool, 25 Burning Tree, Big Canyon, Newport Beach, California, by P.A. and Associates, Project File No. 218132-101, dated July 24, 2018 6. Geotechnical hivestigation, Tract 7638, Newport Beach, California, by Evans, Goffman & McCormick, Job No. 71-98, dated May 12, 1972 7. Interim Report of Inspection & Testing, Lots 1 through 5, Tract 7638, Big Canyon Project, Newport Beach, California, by Evans, Goffman & McCormick, Job No. C72-75, dated August 4, 1972 8. Final Report of Inspection & Testing, Tract 7638, Big Canyon Project, Newport Beach, California, by Evans, Goffman & McCormick, Job No. C72-75, dated November 16, 1972 P.A. & Associates, Inc.