Loading...
HomeMy WebLinkAboutX2021-1565 - Misc (2)STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS �p21 lS (I SJ 131� �eSan CEC-NRCA-MCH-03-A lRevfsed 01120) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 1 of 4) protect Name: Panda Express Newport Beach Dept o Enforcement Agency: Permit Number: Proied Address: 1316 Bison Ave a": Newport Beach ZIP Code: 92660 System Name or Identification/Tag: RTU-2 I System Location or Area Served: Dining 9 Compliance Results: Enforcement Agency Use: Checked by/Date Complies 0 Does NOT Comply Intent: I Submit one Certificate of Acceptance for each room, area, or zone that is directly or indirectly served by a thermostatic controls I. A. Construction Inspection - Building: Retail Floor: Single Room/kea/Zone. Sales Control/System'. Local/Honeywell Prior to Functional Testing, verify and document all of the following Required Documentation (check all of the following): a. NRCC-MCH-E as approved by the authority having jurisdiction is available for reference. (410-103(a)2A) A printed copy of the OpenADR 2.Oa or OpenADR 2.Ob Virtual End Node (VEN) certificate for the demand response control system (§110.12(a 1A); OR b. A certificate from the manufacturer stating that the demand response control system is capable of responding to a demand response signal from a certified OpenADR 2.Ob Virtual End Node by automatically implementing the control functions requested by the Virtual End Node for the equipment it controls. §110.12 a 1B) Note: Demand responsive controls may incorporate and use protocols in addition to (not instead of) the protocols listed above. (4110.12(a)3) Thermostatic controls for each zone served by the system (check one of the following): a. Thermostat is located within the space -conditioning zone that is served by the HVAC system (NA 7.5.2.1(a), §120.2(a)). b An Energy Management Control system Is installed to comply with the requirement of one or more thermostatic controls. 120.2 a An independent perimeter heating or cooling system that serves more than one zone without individual thermostatic controls is C. installed (check all ofthe following):(Exceptionto4120.21a)1 i All zones served by the perimeter system are also served by an interior cooling system; and Ii The perimeter system is designed solely to offset envelope heat losses or gains; and lii The perimeter system has at least one thermostatic control for each building orientation of 50 feet or more; and Iv The perimeter system is controlled by at least one thermostat located in one of the zones served by the system. 3. rlteria for Thermostatic zone controls (check all of the following): a. Set Points and Dead -band (check one of the following): ® The thermostatic control is used to control comfort heating only and is capable of being set, locally or remotely, down to 55°F or lower. (§120.2(b)11 ® ii The thermostatic control is used to control comfort cooling only and is capable of being set, locally or remotely, up to 85°F or higher. (§120.2(b12) III The thermostatic control is used to control both comfort heating and comfort cooling and requires manual changeover between heating and cooling modes. (Exception to §120.2(b)3) • iv The thermostatic control is used to control both comfort heating and comfort cooling and does NOT require manual changeover between heating and cooling modes and is capable of all of the following: (§120.2(b)3) )A A minimum heating setpoint of 55°F or lower; and t B A maximum cooling setpoint of 85°F or higher; and C Atemperature range or dead band of at least 5°Fwithin which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. b. ADDITIONAL THERMOSTATIC CONTROLS (check one of the following): The heating or cooling systems is NOT a heat pump system and is NOT controlled by an Energy Management Control r • i System, and has a clock mechanism that allows the building occupant to program the temperature setpoints for at least four periods within 24 hours (a setback thermostat). (§120.2(b)4, §110.2(ci1) Thermostatic control NOT required. ii The heating or cooling system is NOT a heat pump system and is NOT controlled by an Energy Management Control System, and is one of the following (check one of the following): (Exception to §110.2, c(c A I Gravity gas wall heater CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) 49 AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised 01/20 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 2 of 4) Project Name: Panda Express Enforcement Agency: Newport Beach Dept o Permit Number: Project Address:1316 Bison Ave cityNewport Beach Zip code:92660 system Name or Identification/Tag: RTU-2 System Location .,A,.. Served: Dining A. Construction Inspection eulldim Retail Poo: Single Raom/Aas/Zone. Sales C°n o/Sy em. Local/Honeywell Prior toFu alTesting,verifyand document all ofthe following B Gravity floor heater C Gravity room heater Non -central electric heater, fireplace or decorative gas appliance, wood stove, room air conditioner, or room air - D conditioner heat pump. The heating or cooling system is a heat pump with supplementary electric resistance heaters and has all of the following controls (check all of the following): The cut -on temperature for compression heating is higher than the cut -on temperature for supplementary ElA heating, and the cut-off temperature for compression heating is higher than the cut-off temperature for supplementary heating. 110.2 b 2 Verify that supplementary heater operation is prevented when the heating load can be met by the heat pump alone (§110.2(bll). UNLESS the thermostatic controls provide preferential rate control, intelligent recovery, staging, ramping or another control mechanism designed to preclude the unnecessary operation of ❑ B supplementary heating; supplementary heater operation is limited the following conditions: • Defrost Transient Periods (i.e., start-ups or following thermostat setpoint advance) (Exception to 110.2 b 1 4. Demand Response Controls & Demand Responsive Zonal HVAC Controls (check all of the following) Verify that the demand responsive controls are capable of communicating using one or more of the following for a' communications that occur within the building: Wi-Fi, ZigBee, BACnet, Ethernet, or hard -wiring. 110.12 a 2) Wl b Verify that when the demand responsive control communications are disabled or unavailable, all demand responsive controls continue to perform all other control functions provided by the control. (§110.12(a14) C. Verify that the demand response control system has been certified to the Energy Commission as meeting all of the requirements in Joint Appendix 5 (Occupant Controlled Smart Thermostat). (§110.12(a)51 hngs://ww2.energy.ca.gov/title24/equipment certocst index.html d Verify that the controls are programmed to provide an adjustable rate of change for the temperature setup increase, decrease, and reset. (§110.12(b)4) Verify that the controls have the following features: (check all of the following) (§110.121b1S1 1. Disabled. Disabled by authorized facility operators; (§110.121a15A) ✓ II' Manual control. Manual control by authorized facility operators to allow adjustment of heating and cooling set points globally from a single point in the EMCS. ( 110.12 a 5B Zill. Automatic Demand Shed Control. Upon receipt of a demand response signal, the space conditioning systems conduct a centralized demand shed for non -critical zones during the demand response period. (§110.12(b)1 §310.12(b)2. and 110.12 a 5C OCCUPANCY AND PRE -OCCUPANCY PROGRAMMING (check all of the following) a. Occupied, unoccupied, and holiday schedules have been programmed perthe schedule provided. (NA7.5.2.1L ✓ b Pre -occupancy purge has been programmed forthe 1-hour period immediately before the building is normally occupied to provide ventilation by (check one of the following). NA7.5.2.1 d 120.1 d 2 6)1 1 The minimum CFM specified by design forthe heating or cooling unit; reference NRCC-MCH-E, Section J. (§120.1(d12) Three complete air changes to the zone served by the heating or cooling unit as specified by design; reference II NRCC-MCH-E, Section J 120.2 d 2 6. If an economizer is installed that is certified to the Energy Commission (check all of the following): (NA7.5.4.1) Verifythat the economizer has been certified to the Energy Commission at the Energy Commission website: NA7.5.4.1 a - e h & I 140.4 e 2 httwww.ener .ca. ov title24 a ui ment certae index.html Vb Economizer damper moves freely without binding.(NA7.5.4.1(fl)Unitary systems with an economizer have control systems, including two -stage or electronic thermostats, that cycle compressors off when economizers can provide partial cooling NA7.5.4.1 d System has return fan speed control, relief dampers, or dedicated relief fans to prevent building over pressurization in full economizer mode. (N87.S.4.1(ii1 e. For systems with DDC controls, sensor used for economizer lockout has been factory orfield calibrated. (NA7.5.4.1(il) CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS As CEC-NRCA-MCH-03-A (Revised 01/20) CALIFORNIA FNFRGV COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 3 of 4) Project Name: Panda Express NeEnforcement Agency: wport Beach Dept Permit Number: Proect AEdre : 1316 Bison Ave CI": Newport Beach Zip code' 92660 System Name or Identification/Tag: RTU-2 System mcaticn or Area Served: Dining A. Construction Inspection Building: Retail Floor: Single Room/Area/Zone: Sales Control/System: Local/Honeywell ' rto Functional Testing, verify and document all of the following f. I For systems with non-DDC controls manufacturer's startup and testing procedures have been applied. (NA7.5.4.1(kl) Construction Inspection Compliance Results: • Complies :Does NOT Comply B. Functional Testing Building: Retail Floor: Single Roam/Area: Sales Control/system'. Local/Honeywell Step 1: Disable economizer control and demand -controlled ventilation (if applicable) to prevent unexpected interactions. (N67.5.2.2 Step 1) Occupied Mode Step 2: Heating load during occupied condition (N67.5.2.2 Step 21 Step 3: No-load during occupied condition (N67.5.2.2 Step 31 Step 4: Cooling load during occupied condition (N67.5.2.2 Step 41 Unoccupied Mode Step 5: No-load during unoccupied condition (NA7.5.2.2 Step 5) Step 6: Heating load during unoccupied condition (NA7.5.2.2 Step61 Step 7: Cooling load during unoccupied condition (N67.5.2.2 Step 71 Step 8: Manual override (NA7.5.2.2 Step 81 As each test applies, enter in the box either Pass (P), Fail (F), or Does Not Apply (X) 8 7 6 5 4 3 2 a. Supply fan operates continuously(NA7.5.2.2 Step 2(a), Step 3(e), Step 41hR P '�' P P P b. Supply fan turns off (N67.5.2.2 Step 5JI2 P C. Supply fan cycles on and off (NA7.5.2.2 Step 6101, Step 7(s)) P P d. System operates in "occupied" mode (NA7.5.2.2 Step 8(w)1 P <, e. System reverts back to "unoccupied" mode when manual override time period expires (NA7.5.2.2 Step 8lx)) P f. The unit provides heating (NA7.5.2.2 Step 2(b), Step 6(p)) j P P g. No heating is provided by the unit (NA7.5.12 Step 3(f), Step 4(i), Step 5(n), Step 7(u)) P 1, P P P ' h. No cooling is provided by the unit (NA7.5.2.2 Step 2(c), Step 3(fl Step Sri Step 6(q)1 P P ':': P P i. Cooling is provided by the unit (NA7.5.2.2 Step 4(i), Step 7(t)) p IF ' j. Outside air damper is at minimum position(NA7.5.2.2 Step 2(d); Step 3(eh Step4(kl) PP P k. Outside air damper closes completely (NA7.5.2.2 Step 5(m)1 �'.. P I. Outside air damper is either closed or at minimum position 1NA7.5.2.2 Step 6(r), Step 7(v)) P P Step 9: Functional Testing Results (N67.5.2.2 Step 9) Enter: P/F/X P P P P P P P Step 10: System returned to initial operating conditions after all tests have been completed. Functional Test Compliance Results: Complies Q Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, AIR CONDITIONER AND HEAT PUMP CEC-NRCA-MCH-03-A Revised 01120 UNITARY (PACKAGED AND SPLIT) SYSTEMS CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 4 of 4) Protect Name: Panda Express Enforcement Agency: Newport Beach Dept o Permit Number: Project Addrex:1316 Bison Ave City. Newport Beach Zip Code:92660 System Name or Identifiratf.r/Tag: RTU-2 System Location or Area Served: Dining DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: James Conboy Documentation Author Signature: Documentation Author Company Name: Superior Test & Balance Date Signed: 3/29/22 Address:861 E Leadora Ave ATT Certification Identification (If applicable): city/State/zip: Glendora / CA / 91741 Phone: 626-771-1012 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed bythe responsible builder/installerand has been posted or made available with the building permits) issued forthe building. ' "- Field Technician Name: James Conboy Field Technician Signature: Field Technician Company Name: Superior Test & Balance Position with Company (Title): Vice President Address:861 E Leadora Ave ATT Certification Identification (if applicable): city/state/Zip: Glendora / CA / 91741 Phone: 626-771-1012 Date signed: 3/29/22 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved bythe enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. S. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: James Conboy Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Su erior Test &Balance Position with Company (Title): Vice PreSi ent Address:861 E Leadora Ave CSLB License:911916 City/State/Zip: Glendora / CA / 91741 Phone: 626-771-1012 Date Signed: 3/29/22 CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised OIJ2D CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 1 of 4) Project Name: Panda Express Enforoement Agency: Newport Beach Dept o Permit Number: Project Address: 1316 Bison Ave City: Newport Beach Zip Code: 92660 System Name or Idendfication/Tag: RTU-t System Location or Area Served: Kitchen Compliance Results: Enforcement Agency Use: Checked by/Date Complies 0 Does NOT Comply Intent: Submit one Certificate of Acceptance foreach room, area, or zone that is directly or indirectly served by a thermostatic controls system. Includes construction inspection for an optional economizerthat has been certified to the Fnerev Commission. A. Construction inspection Building: Retail Floor Single Room/Area/Zone. Sales Control/System: Local/Honeywell Prior to Functional Testing, verify and document all of the following Required Documentation (check all of the following): a. NRCC-MCH-E as approved by the authority having jurisdiction is available for reference. (§10-103(a12A) A printed copy of the OpenADR 2.Oa or Operl 2.Ob Virtual End Node (VEN) certificate for the demand response control system (§110.121aL_); OR W b. A certificate from the manufacturer stating that the demand response control system is capable of responding to a demand response signal from a certified OpenADR 2.Ob Virtual End Node by automatically implementing the control functions requested by the Virtual End Node for the equipment it controls. (§110.12(a)1B) Note: Demand responsive controls may incorporate and use protocols in addition to (not instead of) the protocols listed above. (§110.12(a)3) Thermostatic controls for each zone served by the system (check one of the following): a. Thermostat is located within the space -conditioning zone that is served by the HVAC system (NA 7.5.2.1(a), §120.2(a)1. - b An Energy Management Control system is installed to comply with the requirement of one or more thermostatic controls. 120.2 a C. An independent perimeter heating or cooling system that serves more than one zone without individual thermostatic controls is installed (check all of the following): (Exception to §120.2(a)) i All zones served by the perimeter system are also served by an interior cooling system; and li The perimeter system is designed solely to offset envelope heat losses or gains; and lii The perimeter system has at least one thermostatic control for each building orientation of 50 feet or more; and Iv I The perimeter system is controlled by at least one thermostat located in one of the zones served by the system. 3. rlteria for Thermostatic zone controls (check all of the following): a. Set Points and Dead -band (check one of the following): i The thermostatic control is used to control comfort heating only and is capable of being set, locally or remotely, down to 55°F or lower. 0120.2(b)1) 0ii The thermostatic control is used to control comfort cooling only and is capable of being set, locally or remotely, up to 85OF or higher. (§120.21b12) Q i The thermostatic control is used to control both comfort heating and comfort cooling and requires manual changeover between heating and cooling modes. (Exception to §120.2(b)3) IV The thermostatic control is used to control both comfort heating and comfort cooling and does NOT require manual changeover between heating and cooling modes and is capable of all of the following: (§120.2(b13) A A minimum heating setpoint of 550F or lower; and V B A maximum cooling setpoint of 85°F or higher; and ✓ C Atemperature range or dead band of at least S°F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. b. ADDITIONAL THERMOSTATIC CONTROLS (check one of the following): • i The heating or cooling systems is NOT a heat pump system and is NOT controlled by an Energy Management Control System, and has a clock mechanism that allows the building occupant to program the temperature setpoints for at least four periods within 24 hours (a setback thermostat). (§120.2(b)4 §110.2(c)1) ii Thermostatic control NOT required. The heating or cooling system is NOT a heat pump system and is NOT controlled by an Energy Management Control System, and is one of the following (check one of the following): !Exception to §110.2(c.0 A I Gravity gas wall heater CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised 01120 CALIFORNIA ENERGY COMMISSION �' J CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 2 of 4) Project Name: Panda Express Enforcement Agency: Newport Beach Dept o Permit Number: Project Address: 1316 Bison Ave City: Newport Beach Zip Gode:92660 System Name or Identification/Tag: RTU-1 System Location or Area Served: Kitchen A. Construction Inspection Bullding: Retail Floor: Single Room/Area/Zone: Sales Control/System: Local/Honeywell Prior to Fu gUo al Testing, verify and document all of the following B Gravityfloorheater C Gravity room heater Non -central electric heater, fireplace or decorative gas appliance, wood stove, room air conditioner, or room air- D conditionerheat pump. The heating or cooling system is a heat pump with supplementary electric resistance heaters and has all of the following controls check all of the following): cut -on temperature for compression heating is higher than the cut -on temperature for supplementary A IThe heating, and the cut-off temperature for compression heating is higher than the cut-off temperature for supplementary heating. J11L2 b 2 Verify that supplementary heater operation is prevented when the heating load can be met bythe heat pump alone (§110.2(bll). UNLESS the thermostatic controls provide preferential rate control, intelligent recovery, ❑ B staging, ramping or another control mechanism designed to preclude the unnecessary operation of supplementary heating; supplementary heater operation is limited the following conditions: Defrost Transient Periods (i.e., start-ups or following thermostat setpoint advance) (Exception to 110.2 b 1 4. Demand Response Controls & Demand Responsive Zonal HVAC Controls check all of the following) Verifythatthe demand responsive controls are capable of communicating using one or more of the following for a' communications that occur within the building: Wi-Fi, ZigBee, BACnet, Ethernet, or hard -wiring. 110.12 a 2) W b Verify that when the demand responsive control communications are disabled or unavailable, all demand responsive controls continue to perform all other control functions provided by the control. (§110.12(a141 Verify that the demand response control system has been certified to the Energy Commission as meeting all of the C. requirements in Joint Appendix 5(Occupant Controlled Smart Thermostat). (§110.12(a)5) htt s: ww2.ener .ca. ov title24 a ui ment certocst index.html d Verify that the controls are programmed to provide an adjustable rate of change for the temperature setup increase, decrease, and reset. ( 110.12 b 4 Verify that the controls have the following features: (check all of the following) (§110.121b15) 1. Disabled. Disabled by authorized facility operators; (§110.12(a15A1 ✓ ii. Manual control. Manual control by authorized facility operators to allow adjustment of heating and cooling set points globally from a single point in the EMCS. (§110.12(a158) Automatic Demand Shed Control. Upon receipt of a demand response signal, the space conditioning systems conduct a centralized demand shed for non -critical zones during the demand response period. (§110.121b11 §110.12(b)2. and 110.12 a SC OCCUPANCY AND PRE -OCCUPANCY PROGRAMMING (check all of the following) Occupied, unoccupied, and holiday schedules have been programmed per the schedule provided. (NA7.5.2.1(cl) ✓ b Pre -occupancy purge has been programmed for the 1-hour period immediately before the building is normally occupied to provide ventilation by (check one of the following). NA7.5.2.1 d 120.1 d 2 i The minimum CFM specified by design for the heating or cooling unit; reference NRCC-MCH-E. Section J. (§120.1(d121 Three complete air changes to the zone served by the heating or cooling unit as specified by design; reference u NRCC-MCH-E Section J 1§120.2(d12) 6. If an economizer is installed that is certified to the Energy Commission (check all of the following): NA7.5.4.1 ✓a' Verify that the economizer has been certified to the Energy Commission at the Energy Commission website: NA7.5.4.1 a - e h & I 140.4 e 2 http://www.energy.ca.govltitle24/eciulpmenL-certLaeLindexhtmi b. Economizer damper moves freely without binding.(NA7.5.4Af)) C. Unitary systems with an economizer have control systems, including two -stage or electronic thermostats, that cycle compressors off when economizers can provide partial cooling (N67.5.4.11¢I1 v_ d System has return fan speed control, relief dampers, or dedicated relief fans to prevent building over pressurization in full economizer mode. (NA7.5.4.11i1) �/ e. For systems with DDC controls, sensor used for economizer lockout has been factory or field calibrated. (NA7.5.4.1(il) CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A (Revised 01/20) nAl MnPKIIA PKIFGfry ennngnJQQIMl CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 3 of 4) Project Name: Panda Express NeEnforcement Agency: wport Beach Dept Permit Number: Project Address: 1316 Bison Ave Of,: Newport Beach ZIP Code: 92660 System Name or Identification/Tag: RTU-1 System tocatlon or Area Served: Kitchen B. Functional Testing Bufldmg. Retail Floor: Single Room/Area: Sales Contml/system. Local/Honeywell Step 1: Disable economizer control and demand -controlled ventilation (if applicable) to prevent unexpected interactions. (N67.5.2.2 Step 11 Occupied Mode Step 2: Heating load during occupied condition (NA7.5.2.2 Step 21 Step 3: No-load during occupied condition (N67.5.2.2 Step 3j Step 4: Cooling load during occupied condition iN87.512.2 Step 4) Unoccupied Mode Step 5: No-load during unoccupied condition tNA7.5.2.2 Step 51 Step 6: Heating load during unoccupied condition (N67.5.2.2 Step 61 Step 7: Cooling load during unoccupied condition JN67.5.2.2 Step 71 Step 8: Manual override (NA7.5.2.2 Step 8) As each test applies, enter in the box either Pass (P), Fail (F), or Does Not Apply (X) 8 7 6 5 4 3 2 a. Supply fan operates continuously (NA7.5.2.2 Step 2(a)Step 3(el Step 4(MI p r. P P P b. supply fan turns off (NAZ5.2.2 Step 5(1 - IF C. Supplyfan cycles on and off (NA7.5.2.2 Step 6(o) Step 7(s)) P P ' d. System operates in "occupied" mode (N67.5.2.2 Ste n 8{w11 P ' e' System reverts back to "unoccupied" mode when manual override time period expires (NA7.5.2.2 Step 8(xl) P C The unit provides heating (NA7.5.2.2 Step 2(b), Step 61p)) ''' P P g. No heating is provided by the unit (NA7.5.2.2 Step 3(f), Step 40), Step 5(n), Step 7(u)) F, P P P h. No cooling is provided by the unit (NA7.5.2.2 Step 2(c), Step 31fl Step 5(n)Step 6(g)1 . P P ". P P 1. Cooling is provided by the unit (NA7.5.2.2 Step 4(i), Step 7(t)) p p j. Outside air damper is at minimum position(NA7.5.2.2 Step 2(d), Step 31a), Step 4(kll P P P k. Outside air damper closes completely NA7.5.2.2 Step 5(mll P 1. Outside air damper is either closed or at minimum position (NA7.5.2.2 Step 6(r), Step 7(vl) P P Step 9: Functional Testing Results (NA7.5.2.2 Step 9) Enter: P/F/X p. p p p p p p Step 10: System returned to Initial operating conditions after all tests have been completed. Functional Test Compliance Results: • Complies Q Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised 01120 (PACKAGED AND SPLIT) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 4 of 4) Project Name: Panda Express Enforcement Agency: Newport Beach Dept o Permit Number: Project Address: 1316 Bison Ave Cary: Newport Beach zip code: 92660 System Name or Identificstion/Tag: RTU-1 System Location or Area Served: Kitchen DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. 1 Documentation Author Name: James Conboy Documentation Author Signature: Documentation Author Company Name: Superior Test & Balance Date Signed: 3/29/22 Address:861 E Leadora Ave ATT Certification Identification (If applicable): City/State/Zip: Glendora / CA 191741 Phone: 626-771-1012 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified In Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: James Conboy Field Technician Signature: Field Technician Company Name: Superior Test & Balance Position with Company (Title): Vice President Address: 861 E Leadora Ave ATT Certification Identification (if applicable): City/state/zip: Glendora / CA / 91741 Phone: 626-771-1012 Date Signed: 3/29122 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: James Conboy Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Sup u erior Test &Balance Position with Company (Title): Vice PreSl ent Address:861 E Leadora Ave CSLB License:911916 City/state/Zip: Glendora / CA / 91741 Phone: 626-771-1012 Date Signed: 3/29/22 CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A (Revised 01120) CALIFORNIA FNFRGV COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 1 of 3) Project Name: Panda Express Enforcement Agency: City of Newport Beach Building & Saf Permit Number: Project Add rem 1316 Bison Ave City: Newport Beach Zip Code: 92660 System Name or Identifcation/rag: RTU-2 System tocadw or Area Served: Dining Compliance Results: Enforcement Agency Use: In Complies O Does NOT Comply Verify measured outside airflow sensor reading is within 10% of the total required outside airflow. Required for all newly installed HVAC units. Reference NRCC-MCH-E. Intent: Submit one Certificate of Acceptance for each system that must demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with NRCA-MCH-07-A Supply Fan VFDAcceptance (if applicable) since testing activities overlap. A. Construction Inspection Beliding: Retail Floor: Single Room/Area/Zane: Sales Control/System: Local ! Honeywell Prior to Functional Testing, verify and document all of the following Required Documentation (all must be checked). a. I NRCC-MCH-E as approved by the authority having jurisdiction. (§10-103(a)2A) 2. System type —Select either Constant Air Volume (CAV) or Variable Air Volume (VAV) below: a. VAV only: I. I Outside airflow is either factory calibrated or field calibrated (check one of the following). A factory calibrated. MA 7.5.1.1.1(a)) B I field calibrated. (NA 7.5.1.1.11(b)) Damper Control (check all of the following): A Dynamic damper control is being used to control outside air. (NA 7.5.1.1.1 fc)) B Dynamic damper is NOT a fixed minimum damper. (NA 7.5.1.1.1, §120.1(f)2) Identify the dynamic control being utilized to control outside air. (NA 7.5.1.1.1 (d)) Describe control: JL�CAV only (check all of the following): i. System is designed to provide a fixed minimum outside air when the unit is on. (NA 7.5.1.2.1 (a)1 ii. Minimum position is marked on the outside air damper. (NA 7.5.1.2A (d)) III. The system has means of maintaining the minimum outdoor air damper position. (NA 7.5.1.2.1(e)) 3. ethod of delivering outside air to the heating or cooling unit (select one of the following): (NA 7.5.1.1.1(e), NA 7.5.1.2.1 (b)) a. Return Plenum Ducted: Confirm that outside air is ducted to within 5 or 15 ft. (with direction and velocity requirement) of the heating or cooling unit as specified byNRCC-MCH-E. Section H. (§120.11e)1 &21 ( b Direct Unit Ducted. Return air plenum is NOT used to distribute outside air to the heating or cooling unit. (i.e. outside air is ducted directly to the unit, outside air is provided independent of the unit, or economizer). 4. Pre -occupancy Purge a. Verify that the pre -occupancy purge has been programmed forthe 1-hour period immediately before the building is normally occupied to provide ventilation as indicated on NRCC-MCH-E. VAV - NA 7.5.1.1.1 f CAV - NA 7.5.1.2.1 c 120.1(d)2) Construction Inspection Compliance Results: W Complies O Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 CALIFORNIA ENERGY COMMISSION STATE OF CALIFORNIA OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A JRevised 01120 CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 2 of 3) Project Name: Panda Express Enfomement Agency: City of Newport Beach Building & Safi Permit Number: Pm,rt Address. 1316 Bison Ave City. Newport Beach zip code: 92660 System Name or Identification/r'ag: RTU-2 System Location or Area Served: Dining B. Functional Testing Building: Floor: Room/Am./Zone: control/System: Retail Single Sales Local / ReliaTei Steps: CAV VAV 1 Disable demand control ventilation (if applicable) heck if NA 2 Verify unit is not in economizer mode during test (economizer disabled) Check if NA ❑ VAV - NA 7.5.1.1.2 Step 1 CAV — NA 7.5.1.2.2 Ste 1 3 CAV and VAV testing at full supply airflow Adjust supply air to achieve design airflow or maximum airflow at full cooling. ❑ a. NA 7.5.1.1.2 Step 2 b Measured outdoor airflow reading (cfm) 1125 VAV - NA 7.5.1.1.2 Ste 2a CAV — NA 7.5.1.2.2 Ste 2a cfm cfm Required outdoor airflow (cfm) 1174 C. (refer to NRCC-MCH-E Section J). cfm cfm Time for outside air damper to stabilize after full supply airflow is achieved (minutes): d NA7.5.1.1.2 Ste 2b min 4 VAV testing at reduced supply airflow a. Adjust supply airflow to eitherthe sum of the minimum zone airflows, full heating, or El of the total design airflow. (NA 7.5A.1.2 Step 3) ,... - .. b. Measured outdoor airflow reading (cfm). [NA 7.5.1.1.2 Step 3a] cfm Required outdoor airflow (cfm) c. (refer to NRCC-MCH-E, Section 1). cfm Time for outside air damper to stabilize after reduced supply airflow is achieved d. (minutes): NA 7.5.1.1.25te 3b min 5 Return to initial conditions (NA 7.5.1.1.2 Step 41 6 Calculations Determine Percent Outside Air at full supply airflow (%OAFA) for Step 3. (§120.1U1) %OAFA= Measured outdoor airflow reading/Required outdoor airflow. 96 % % a' 100x(Step3b/Ste 3c b. %OAFA is within 10% of design Outside Air. (90%5%0APA5110%) P / F{ P / F C. Outside air damper position stabilizes within 5 minutes. (Step 3d <5 minutes) VAV only: Determine Percent Outside Air at reduced supply airflow (%OAR,) for Step 4. (§120.1L 21 %OAm= Measured outdoor airflow reading/Required outdoor airflow reading. a' 100 x (Step4b/Step4c) b. %OAm is within 10% of design Outside Air. (90% 5 %OAm 5 110%) P / F c. Outside air damper position stabilizes within 5 minutes. (Step 4d < 5 minutes) Functional Testing Compliance Results: • `Complies ( Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A (Revised 01201 cAl IFnRN1A FNFRry CnrdAAMcZinN CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 3 of 3) Project Name: Panda Express Enforcement Agency: City of Newport Beach Building & Saf Permit Number: ProjeatAddress:1316 Bison Ave `I"' Newport Beach Zip code: 92660 System Name or Identificatmr/rag: RTU-2 System Location cr Area Served: Dining DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: James COnboy Documentation Author Signature: Documentation Author Company Name: Superior Test Bt Balance Date Signed: 03/29/22 Address: 861 ELeadora Ave ATT Certification Identification (if applicable): City/state'ziP: Glendora / CA / 91741 Phone:626-771-1012 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements Indicated in the plans and specifications approved bythe enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: James COdbOy Field Technician Signature: Field Technician Company Name- Test 8L Balance Position Position with Company (Title): Vice P esldent Address:861 ELeadoraAve ATTCertlficationIdentification (if applicable)! City/State/zip: Glendora / CA / 91741 Phone:626-771-1012 Date signed: 03/29/22 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: James Conboy Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Superior Test & Balance Position with Company (Title{: Vice Presided Address:861 E Leadora Ave CSLR License:911916 cey/state/ziP: Glendora / CA / 91741 Phone` 626-771-1012 Date Signed: 03/29/22 CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance _ January 2020 STATE OF CALIFORNIA OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A (Revised 01r2D) CAI IF(1RNIA FNFRrV COMMIRRInN CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 1 of 3) Pmlect Name: Panda Express Enforcement Agency: City of Newport Beach Building & Saf permit Number: ProiectAddraaa:1316 Bison Ave City: Newport Beach Zip caae:92660 System Name or Idendflcation/rag: RTU-1 System Location.Nvea Served: Kitchen Compliance Results: Enforcement Agency Use: Initial/Date Complies ()Does NOT Comply Verify measured outside airflow sensor reading is within 10% of the total required outside airflow. Required for all newly installed HVAC units. Reference NRCC-MCH-E. Intent: Submit one Certificate of Acceptance for each system that must demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with NRCA-MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities overlap. A. Construction Inspection Building: Retail Floor: Single Roam/Area/Zone: Sales Control/System: Local / Honeywell Prior to Functional Testing, verify and document all of the following Documentation (all must be checked). rkRequired e a. I NRCC-MCH-E as approved by the authority having jurisdiction. (§10-103(a)2A) 2. System type —Select either Constant Air Volume (CAV) or Variable Air Volume (VAV) below: a. VAV only: I. Outside airflow, is either factory calibrated or field calibrated (check one of the following). A factory calibrated. (NA 7.5.1.1.1 (all B field calibrated. INA 7.5.1.1.1(b)) Damper Control (check all of the following): A Dynamic damper control is being used to control outside air. (c)) B I Dynamic damper is NOT a fixed minimum damper. (NA 7.5.1.1.1, §120.1(f)2) Identify the dynamic control being utilized to control outside air. (NA 7.5.1.1.1 (dll Describe control: • CA only (check all of the following): All I. System is designed to provide a fixed minimum outside air when the unit is on. (NA 7.5.1.2.1 all ii. Minimum position is marked on the outside air damper. (NA 7.5.1.2.1 (d)) (ii. The system has means of maintaining the minimum outdoor air damper position. (NA 7.5.1.2.1 (e)) 3. Method of delivering outside air to the heating or cooling unit (select one of the following): (NA 7.5.1.1.1 (e), NA 7.5.1.2.1 (b)) a. Return Plenum Ducted: Confirm that outside air is ducted to within 5 or 15 ft. (with direction and velocity requirement) of the heating or cooling unit as specified byNRCC-MCH-E. Section H. (§120.1(e11 &2) b Direct Unit Ducted. Return air plenum is NOT used to distribute outside air to the heating or cooling unit. (i.e. outside air is ducted directly to the unit, outside air is provided independent of the unit, or economizer). 4. Pre -occupancy Purge a' Verify that the pre -occupancy purge has been programmed for the 1-hour period immediately before the building is normally occupied to provide ventilation as indicated on NRCC-MCH-E. (VAV - NA 7.5.1.1.1 (f) CAV - NA 7 5.1 2 11c) §320 1(d12) Construction Inspection Compliance Results: ©' Complies 0 Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 f CALIFORNIA ENERGY COMMISSION STATE OF CALIFORNIA OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A Revised 01/20 CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 2 of 3) Project Name: Panda Express Enforcement Agency: City of Newport Beach Building & Saf Permit Number: Prolect Add real. 1316 Bison Ave CI": Newport Beach ziPcode: 92660 System Name or Identiflcationtrag: RTU-1 System L eloo or Area Served: Kitchen B. Functional Testing Building: Floor: Room/Area/Lone: Control/System: Retail Single Sales Local / ReliaTei Steps: CAV VAV 1 Disable demand control ventilation (if applicable) heck if NA 2 Verify unit is not in economizer mode during test (economizer disabled) ❑Check if NA VAV - NA 7.5.1.1.2 Step 1 CAV—NA 7.5.1.2.2 Ste 1 3 CAV and VAV testing at full supply airflow Adjust supply air to achieve design airflow or maximum airflow at full cooling. a. NA 7.5.1.1.2 Ste 2 ❑ b Measured outdoor airflow reading (cfm) 524 VAV - NA 7.5.1.1.2 Ste 2a CAV — NA 7.5.1.2.2 Ste 2a cfm cfm Required outdoor airflow (cfm) 550 C. (refer to NRCC-MCH-E, Section 11. cfm cfm Time for outside air damper to stabilize after full supply airflow is achieved (minutes): d NA7.5.1.1.25te 26 min 4 VAV testing at reduced supply airflow a. Adjust supply airflow to either the sum of the minimum zone airflows, full heating, or 1❑ 30% of the total design airflow. (NA 7.5.1.1.2 Step 31 b. Measured outdoor airflow reading (cfm). [NA 7.5.1.1.2 Step 3a] cfm Required outdoor airflow (cfm) C. (refer to NRCC-MCH-E, Section 11. ern Time for outside air damper to stabilize after reduced supply airflow is achieved d. (minutes): NA7.5.1.1.2 Ste 36 min 5 Return to initial conditions jNA 7.5.11.2 Step 4) 6 Calculations Determine Percent Outside Air at full supply airflow (%OAFA) for Step 3. 1§120.1/fill %OAFA = Measured outdoor airflow reading /Required outdoor airflow. 95 ,% % a' 100 x (Step3b/Ste 3c) b. %OAFA is within 10% of design Outside Air. (90% <_ %OAFA 5 110%) P / F P / F C. Outside air damper position stabilizes within 5 minutes. (Step 3d <5 minutes) P / F VAV only: Determine Percent Outside Air at reduced supply airflow (%OARA) for Step 4. 14120.1(f)21 %OARA = Measured outdoor airflow reading /Required outdoor airflow reading. % a' 100 x (Ste 4b/Step4c) b. %OAm is within 10% of design Outside Air. (90% <%OARA 5 110%) P / F c. Outside air damper position stabilizes within 5 minutes. (Step 4d < 5 minutes) P / F Functional Testing Compliance Results: • Complies Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A Revised 01/20 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 3 of 3) Project Name: Panda Express Enforcement Agency: City of Newport Beach Building & Saf Permit Number: Proiectnaaress:1316 Bison Ave `oy Newport Beach Zip Code:92660 System Name or Identifcatlon/rag: RTU-1 System Ibbatlon or Area Sa,.d: Kitchen DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: James Conroy Documentation Author Signature: Documentation Author Company Name: Superior Test & Balance Date Signed: 03/29/22 Address: 861 E Leadora Ave ATT Certification Identification (if applicable): CRy"tate"zp: Glendora / CA / 91741 Phone` 626-771-1012 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. - Field Technician Name: James Conroy Field Technician Signature: Field Technician Company Name: 'Superior Test&Balance Position with Company(Title): Vic .President Address:861 ELeadora Ave ATTCertificationidentification ifapplicable): CRyistateizip:Glendora / CA / 91741 Phone:626-771-1012 Date Signed: 03/29/22 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, underthe laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved bythe enforcement agency, and conforms tothe applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permits) issued for the building. S. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: James Conboy Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Superior Test &Balance Positlonwith Company(Title): Vice President Address:861 E Leadora Ave CSLD License:911916 City/State/Zip: Glendora / CA / 91741 Phone' 626-771-1012 Date Signed: 03/29/22 CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEO-NRCA-MCH-05-A (Revised: 01/20) CAI IFCRNIA FNFRGV COMMIRRInN CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 1 of 3) Project Name: Panda Express Enforcement Agency: Newport Beach Dept E Permit Number: Project Address: 1316 Bison Ave City: Newport Beach Zip Code: 92660 System Name or IdentificatioNTag: RTU-2 System Location or Area Served: Dining Compliance Results: Enforcement Agency Use: Checked by/Date Q Complies ()Does NOT Comply Construction inspection and functional testing for an air economizer to verify that the HVAC system can use outdoor air to satisfy Intent: space -cooling loads. Intended for air economizers that are NOT already certified to the Energy Commission. Submit one Certificate of Acceptance for each system that must demonstrate compliance. (NA7.5.4, §140.4(e)) A. Construction Inspection Building: Retail Floor.Single Single RoSales Control/System: Local/Honeywell Prior to Functional Testing, verify and document all of the following 1. Required documentation must be available for review (check all of the following). W/ a. I All documentation shipped with the economizer including manuals and performance curves. 2. Verify the economizer is set to the Required High Limit setting according to the economizer Device Type and Climate Zone where installed (check one compliance path and all applicable NO Es). (Table 140.4-E, NA7.5.4.1(a) §140.4(e12C) Required High Limit Setting (Economizer off when :) Equation Description Device Type Climate Zone 1, 3, 5, 11-16 TcA>75OF Outdoor air temperature exceeds 75°F. 2, 4, 10 TOA> 73°F Outdoor air temperature exceeds 73°F. w Fixed Dry Bulb 0 6, 8, 9 TOA> 71°F Outdoor air temperature exceeds 71°F. 'r v 7 Toa>69°F Outdoor air temperature exceeds 69°F. 1, 3, 5, 11-16 Toa > TRA Outdoor air temperature exceeds return air y„ temperature. ❑ E 2, 4, 10 Toa>TRA-2°F Outdoor air temperature exceeds return air m Differential Dry Bulb temperature minus 2°F. P =i 6,8,9 TOA>TRA-4°F Outdoor air temperature exceeds return air temperature minus 4°F. 7 T°A �' >T 60F Outdoor air temperature exceeds return air temperature minus 6°F. w ❑ Fixed Enthalpy and All h0A> 28 Btu/Ib or Outdoor air enthalpy exceeds 28 Btu/Ib of dry air or = Fixed Dry-bulb ToA> 75'F Outdoor air temperature exceeds 75°F. aOthers such as Dew Point, Fixed Enthalpy, May not be used in any Climate Zone in California unless approval for use Electronic Enthalpy, and Differential Enthalpy is provided by the Energy Commission Executive Director. m Controls APPROVAL MUST BE ATTACHED. a E NOTE: Devices with selectable (rather than adjustable) setpoints must be set to within 2°F and 2 Btu/Ib of the setpoint listed. NOTE for Fixed Enthalpy At altitudes substantially different than sea level, the Fixed Enthalpy limit value must be set to the and Fixed Dry-bulb devices enthal value at 757 and 50% relative humidity. As an example, at a pY Y p approximately 6,000 foot elevation, the fixed enthalpy limit is approximately 30.7 Btu/Ib. 3. Economizer reliability features are present as specified in the Energy Code (check all of the following): (NA 7.5.4.1(h). §140.4(e)2D) �/ a. 5-year manufacturer warranty of economizer assembly (§140.4Ie12Di) The economizer assembly (including but not limited to outdoor air damper, return air damper, drive linkage, and actuator) W1b. have been tested and are able to open and close against the rated airflow and pressure of the system for 60,000 damper opening and closing cycles. (§140.4(e12Dii) Wl C. The outdoor air and return air dampers have a maximum leakage rate of 30 cfm/sf at 250 Pascals (1.0 inch of water) when tested in compliance with AMCA Standard 500-D.1§140.4(e12Diii) d If the high -limit control is fixed dry-bulb or fixed enthalpy + fixed dry-bulb, then it must have an adjustable setpoint. (NA7.5.4.1(b), §140.4(e12Div) CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A Revised: 01120 k CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 2 of 3) Project Name: Panda Express gnPorcementAgency: Newport Beach Dept E Permit Number: Project Address;1316 Bison Ave Cite Newport Beach Zip Code:92660 System Name or Identilication/Fag: RTU-2 System location or Area Served: Dining A. Construction Inspection awlding : Retail Floor: Single Room/Area/Zone: Sales Control/5ystem: Local/Honeywell e. Outdoor air, return air, mixed air, and supply air sensors must be calibrated as follows (check all of the following): 1140A e12Dv) I. Dry-bulb and wet -bulb temperatures accurate to±2°F overthe range of 40°F to 80°F ii. Enthalpy accurate to ±3 Btu/Ib overthe range of 20 Btu/Ib to 36 Btu/lb III. Relative humidity (RH) accurate to±5°%over the range of 20%to 80% RH Wl f Sensor performance curve(s) is provided with the economizer instruction materials that plotted data used for economizer control as well as plotted sensor output value measurements during calibration. NA7.5.4.1 d & e 140.4 e 2Dvi g' Sensors used for high limit control shall be located to prevent false readings, including but not limited to being properly shielded from direct sunlight. NA7.5.4.1 c 140.4 a 2Dvii Economizer additional features (check all of the following): a. Economizer damper moves freely without binding. (NA7.5.4.1(f)l ✓ b Unitary systems with an economizer have control systems, including two -stage or electronic thermostats, that cycle compressors off when economizers can provide partial cooling NA7.5.4.1 C. System has return fan speed control, relief dampers, or dedicated relief fans to prevent building over pressurization in full economizer mode. NA7.5.4.1 i (Check one of the following): d. For systems with CDC controls, sensor used for economizer lockout has been factory or field calibrated. (NA7.5.4.1(11) • e. I For systems with non-DDC controls, manufacturer's startup and testing procedures have been applied. (N67.5.4.1(1k)1 Construction Inspection Compliance Results: ®' Complies C) Does NOT Comply B. Functional Testing Building: Retail Floor: Single Room/Area/Zone: Sales Control/System: Local/Honeywell Step 1: Disable demand control ventilation systems (if applicable) (NA7.5.4.2 Step 1) Step 2: Enable the economizer and simulate a cooling demand large enough to drive the economizer fully open (record all of the following): NA7.5.4.2 Ste 2 a Economizer damper modulates 100°% open and that the return air damper modulates 100°% closed. NA7.5.4.2 Ste 2a • P / F b. All applicable fans and dampers operate as intended to maintain building pressure. (NA7.5.4.2 Step 2b) CH C. The unit heating is disabled (if applicable). (NA7.5.4.2 Step 2c) Step 3: Disable the economizer and simulate a cooling demand (record all of the following): (N67.5.4.2 Step 3) a. Economizer damper closes to its minimum position. (NA7.5.4.2 Step 3dl • P / F b. All applicable fans and dampers operate as intended to maintain building pressure. (NA7.5.4.2 Step 3e) k1mi•' P / F C. The unit heating is disabled (if unit has heating capability). (N67.5.4.2 Step 3f1 • P / F Step 4: If unit has heating capability, simulate a heating demand and set economizer so that it is capable of operating (i.e., actual outdoor air conditions are below lockout setpoint). record all of the following): NA7.5.4.2 Ste 4 a. Economizer is at minimum position. fN87.5.4.2 Step 4J •) (C)F (DNA b. Return air damper opens. (NA7.5.4.2Step 4h) • C)F N Step 5: Turn off the unit. tNA7.5.4.2 Step 51 Record if the Economizer damper closes completely. (NA7.5.4.2 Step 5il • P / F Step 6: Restore demand control ventilation systems if applicable) and remove all system overrides initiated. (N67.5.4.2 Step 61 Functional Test Compliance Results .• omplies T ones NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A (Revised: 01/20) CALIFORNIA ENERGY COMMISSION 0 CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 3 of 3) Pmlect Name: Panda Express Enforcement Agency: Newport Beach Dept I Permit Number: PreledAddre.s.1316 Bison Ave `1ty. Newport Beach ZIP Code:92660 System Name or Identiflration/Tag: RTU-2 System Location or Area Served: Dining DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. - Documentation Author Name: James Conroy Documentation Author Signature: Documentation Author Company Name: Superior Test &Balance Date Signed: 03/29/22 Address:861 E Leadora Ave ATTCertification Identification (If applicable): city/State"lP: Glendora / CA / 91741 phone: 626-771-1012 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: James Conroy Field Technician Signature: Field Technician Company Name: Superior Test &Balance Position with Company (Title): Vice President Address:861 ELeadora Ave ATTCertification Identification (if applicable): city/state/zip: Glendora / CA / 91741 Phone` 626-771-1012 Date Signed: 03/29/22 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occu pancy. Responsible Acceptance Person Name: James Conroy Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Superior Test & Balance Position with Company (Title): Vice President Address:861 E Leadora Ave CSLB License:911916 City/stat"P Glendora / CA / 91741 Phone` 626-771-1012 Date Signed: 03/29/22 CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CEC-NRCA-MCH-12-A (Revised 01 /20) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics (FDD) for Packaged Direct Expansion Units (Page 1 of 3) Project Name: Panda Express Enfamement Agency: Newport Beach Dept. of B & S Permit Number: P.jectAddre:s.1316 Bison Ave ci" Newport Beach Zip Code: 92660 System Name or Identifiwtion/rag: RTU-2 System Location or Area Served: Dining compliance Remits: Enforcement Agency Use: Checked by/Date • omplies Does NOT Comply Intent: Submit one Certificate of Acceptance for each system that must demonstrate compliance. NA7.5.11 120.2 i ) This acceptance test is recommended to be performed simultaneity with NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer Controls). A. Construction Inspection Biding: Floor Rao./Area/Zane: crttml/System: Retail Single Dining I Local/Honeywell 1I Required Documentation (check all of the following): a. NRCC-MCH-E designs, specification sheets, and schedules as approved by the authority having jurisdiction. (10-103(2)2A) b. NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer controls); recommended to be completed simultaneously. 1 2 1 Prior to functional testing (check all of the following): ( r/ a. Verify that the Fault Detection and Diagnostics (FDD) hardware is installed on the unit. (NA7.5.11A al) [Lb . Verify the FDD system matches the make and model reported on the design drawings. (N67.5.11.1(b)) 3 IF the manufacturer HAS certified the FDD to the Energy Commission (check the following): 120.2 i 8) a. Verify that the FDD is currently listed with the Energy Commission approved list: (NA7.5.11.1(c), (d), and (e), 120.2 i 8„ http:/1www.enerzy.ca.zov/title24/equipment cert/fdd/index.html 4 IF the manufacturer HAS NOT certified the FDD tothe Energy Commission, reference the Required Documentation la. and lb (check all the following): (Exception to §120.2(i)8) Verify that the following temperature sensors are permanently installed: outside air, supply air, and when required for di a' economizer operation. a return air sensor. (NA7.5.12.11a). 6120.21i111 b. Verify that the temperature sensors have an accuracy of±2°F over the range of 40GF to 80°F. NA7.5.1 c. Verify that the controller has the capability of displaying the value of each sensor. §120.2 i 3) Verify that the controller provides a system status by indicating the following conditions: 120.2 i 4) • Free cooling available; • Economizer enabled; d' • Compressor enabled; • Heating enabled, if the system is capable of heating; and • Mixed air low limit cycle active. ❑Verify e' that the unit controller allows manual initiation of each operating mode so that the operation of cooling systems, economizers, fans, and heating systems can be independently tested and verified. 0120.2 i 5) Verify that the faults are reported in one of the following ways: §120.2i6) • Reported to an Energy Management Control System regularly monitored by facility personnel. • Annunciated locally on one or more zone thermostats, or a device within five (5) feet of zone thermostat(s), clearly visible, at eye level, and meeting the following requirements: f o On the thermostat, device, or an adjacent written sign, display instructions to contact appropriate o building personnel or an HVACtechnician; and o In buildings with multiple tenants, the annunciation shall either be within property management offices or in a common space accessible by the property or building manager. • Reported to a fault management application which automatically provides notification of the fault to remote HVAC Construction Inspection Compliance Results: tJ Complies U Does NOT Comply I CA Building Energy Efficiency Standards— 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA FAULT DETECTION AND CEC-NRCA-MCH-12-A Revised 01120 DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics (FDD) for Packaged Direct Expansion Units (Page 2 of 3) Project Name: Panda Express Enforcement Agency: Newport Beach Dept. of B & S Permit Number: Project Address: 1316 Bison Ave CityNewport Beach Zip Code;92660 System Name or Identification/Tag: RTU-2 System mcation or Area Served: Dining B. Functional Testing;: Steps: For each HVAC unit to be tested, complete the following: (NA7.5.11.2) Results 1 Air Temperature Sensor failure/fault: (NA7.5.11.2.1,§120.2(1)7A) a. Verify the FDD system indicates normal operation. (NA7.5.11.2.1 Step 11 •: P/F b Disconnect outside air temperature sensor from unit controller. Verify that the FDD system reports a fault. �P/F� (NA7.5.11.2.1 Ste 2a C. Connect outside air temperature sensor to unit controller. Verify that the FDD system indicates normal operation. P/Ffeae� (NA7.5.11.2.1 Step 36) 2 Excess Outside Air Sensor failure/fault: Coordinate this test with NRCA-MCH-02-A (Outdoor Air) (NA7.5.11.2.2. §120.407B) a. IF NRCA-MCH-02-A indicates "pass" THEN verify that the FDD system indicates normal operation. P/F� (NA7.5.11.2.2 Ste la Economizer Operation Sensor failure/fault: Coordinate this test with NRCA-MCH-05-A (Air Economizer Controls) 3 (NA7.5.11.2.3 120.2 i 7C) a. Simulate failure by immobilizing the outdoor air economizer damper according to the manufacturer's instructions. CAUTION: the economizer from operating can cause damage to the equipment as well as �P/F� physically preventing severe personal injury. Verify that the FDD system reports a fault. NA7.5.11.2.3 Stee 1a b' Successfully complete and pass NRCA-MCH-05-A and verify that the FDD system report normal operation. • P/F (NA7.5.11.2.2 Step 2bl Functional Testing Compliance Results • omplies Does NOT Comply CA Building Energy Efficiency Standards— 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CEC-NRCA-MCH-12-A Revised 01/20 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics (FDD) for Packaged Direct Expansion Units (Page 3 of 3) Project Name: Panda Express Enforcement Agemq: Newport Beach Dept. of B & S Permit Number: Project Mdress.1316 Bison Ave City: Newport Beach Zip coac: 92660 System Name or Identification/rag: RTU-2 System Location crArea Served: Dining DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: James Conboy Documentation Author Signature: Documentation Author Company Name: Superior Test & Balance Date Signed: 03/29/22 Address:861 E Leadora Ave ATT Certification Identification (If applicable): City/State/ZIP: Glendora / CA / 91741 Phone: 626-771-1012 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. ', Field Technician Name: James Conboy Field Technician Signature: Field Technician Company Name: Superior Test & Balance Position with Company (Title): Vice President Address:861 E Leadora Ave ATT Certification Identification (if applicable): City/State/Zip : Glendora / CA / 91741 Phone: 626-771-1012 Date Signed:03/29/22 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued forthe building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Person Name: James Conboy Responsible Acceptance Person Signature: pAccee�ptaance JUppe°ric�lr ll 25[ & tts818fP1C@on Company Name: Position with Company (Title): VICE PreSld nt Address:661 E Leadora Ave CSLB License: 91 1916 city/State/Zip: Glendora / CA / 91741 Phone: 626-771-1012 Date Signed:03/29/22 CA Building Energy Efficiency Standards— 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CEC-NRCA-MCH-12-A (Revised 01120) CAI IF(1RNIA FNFR(:V Cr1MM1.CRil1N CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics (FDD) for Packaged Direct Expansion Units (Page 1 of 3) Project Name: Panda Express Enfomement Agency: Newport Beach Dept, of B & S Permit Number: PmertAddraw 1316 Bison Ave CityNewport Beach zipCoda 92660 System Name or Identifimtion/Tag: RTU-1 System Locatlon or Area Served: Kitchen mpliance Re Its: Enforcement Agency Use: Checked by/Date 1,• omplies Does NOT Comply Intent: Submit one Certificate of Acceptance for each system that must demonstrate compliance. NA7.5.11 120.2 i ) This acceptance test is recommended to be performed simultaneity with NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer Controls). A. Construction inspection Building: Floor. Room/Area/2one: Control/system: Retail Single Kitchen Local/Honeywell 1 1 Required Documentation (check all of the following): �/ a. NRCC-MCH-E, designs, specification sheets, and schedules as approved by the authority having jurisdiction. (10-103(a12A) b. I NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer controls); recommended to be completed simultaneously. 1 2 1 Prior to functional testing (check all of the following): I a. Verify that the Fault Detection and Diagnostics (FDD) hardware is installed on the unit. (NA7.5.11.11al) [Lb . Verify the FDD system matches the make and model reported on the design drawings. (N67.5. 11.1(bl) 1 3 1 IF the manufacturer HAS certified the FDD to the Energy Commission (check the following): 1120.2 i 8) 1 191 Verify that the FDD is currently listed with the Energy Commission approved list: (NA7.5.11.1(c), (d) and (e) 120.2 i S, JA6.3) a. fittp://www.energy.ca.gov/title24/equipment cert/fdd/index.html 4 IF the manufacturer HAS NOT certified the FDD to the Energy Commission, reference the Required Documentation 1a. and Ib (check all the following): (Exception to §120.2(il8) Verify that the following temperature sensors are permanently installed: outside air, supply air, and when required for differential a. economizer operation, a return air sensor. (NA7.5.12.1(a), §120.21011 b. Verify that the temperature sensors have an accuracy of±2°F over the range of 40°F to 80°F. (NA7.5.12.1(a), §120.2(i)2) c. Verify that the controller has the capability of displaying the value of each sensor. (§120.2 1 3) Verify that the controller provides a system status by indicating the following conditions: (120.2 i 4) • Free cooling available; ❑ • d' Economizer enabled; • Compressor enabled; • Heating enabled, if the system is capable of heating; and • Mixed air low limit cycle active. ❑ e' Verify that the unit controller allows manual initiation of each operating mode so that the operation of cooling systems, economizers, fans, and heating systems can be independently tested and verified. §120.2 i 5) Verify that the faults are reported in one of the following ways: 120.2 i 6) • Reported to an Energy Management Control System regularly monitored by facility personnel. • Annunciated locally on one or more zone thermostats, or a device within five (5) feet of zone thermostat(s), clearly visible, at eye level, and meeting the following requirements: ❑ f 0 On the thermostat, device, or an adjacent written sign, display instructions to contact appropriate 0 building personnel or an HVACtechnician; and 0 In buildings with multiple tenants, the annunciation shall either be within property management offices or in a common space accessible by the property or building manager. • Reported to a fault management application which automatically provides notification of the fault to remote HVAC service provider. Construction Inspection Compliance Results: @ Complies 0 Does NOT Comply CA Building Energy Efficiency Standards— 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS 10 CEC-NRCA-MCH-12-A Revised 01/20 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics (FDD) for Packaged Direct Expansion Units (Page 2 of 3) Project Name: Panda Express Enforcement Agency: Newport Beach Dept. of B & S Permit Number: Project Address: 1316 Bison Ave City: Newport Beach Zip code. 92660 System Name or Identification/Tag: RTU-1 System tncation or Area Sewed: Kitchen B. Functional Testing,` Steps: For each HVAC unit to be tested, complete the following: (NA7.5.11.2) Results 1 Air Temperature Sensor failure/fault: (NA7.5.11.2.1.§120.26)7A) a. Verify the FDD system indicates normal operation. (NA7.5.11.2.1 Step 1) P/F b Disconnect outside air temperature sensor from unit controller. Verify that the FDD system reports a fault. P— % (NA7.5.11.2.1 Ste 2a C. Connect outside air temperature sensor to unit controller. Verify that the FDD system indicates normal operation. (W'�P/F� (NA7.5.11.2.1 Step 2 Excess Outside Air Sensor failure/fault: Coordinate this test with NRCA-MCH-02-A (Outdoor Air) (NA7.5.11.2.2. §120.2(i)7B) IF NRCA-MCH-02-A indicates "pass" THEN verify that the FDD system indicates normal operation.-. P/F� a' (NA7.5.11.2.2 Ste 1a Economizer Operation Sensor failure/fault: Coordinate this test with NRCA-MCH-05-A(Air Economizer Controls) 3 (NA7.5.11.2.3 120.2 i 7C) a. Simulate failure by immobilizing the outdoor air economizer damper according to the manufacturer's instructions. CAUTION: the economizer from operating can cause damage to the equipment as well as • P/F0 physically preventing severe personal injury. Verify that the FDD system reports a fault. (NA7.5.11.2.3 Ste la b Successfully complete and pass NRCA-MCH-05-A and verify that the FDD system report normal operation. �P/F0 (NA7.5.11.2.2 Step 261 Functional Testing Compliance Results • omplies ODoes NOT Comply CA Building Energy Efficiency Standards-2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CEC-NRCA-MCH-12-A (Revised 01120) CAI IFn RN1A FNPPrY CnMM1.CAInm CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics (FDD) for Packaged Direct Expansion Units (Page 3 of 3) Project Name: Panda Express Enforcement Agency: Newport Beach Dept. of B & S Permit Number: Project Address;1316 Bison Ave City: Newport Beach Zip Cade: 92660 System Name or Identificatiion/Tag: RTU-1 System Location or Area Served: Kitchen DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: James Conboy Documentation Author Signature: Documentation Author Company Name: Superior Test & Balance Date Signed: 03/29/22 Address: 861 E Leadora Ave ATT Certification Identification (If applicable): City/State/Zip: Glendora / CA / 91741 Phone: 626-771-1012 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NAT 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. -; Field Technician Name: James Conboy Field Technician Signature: Field Technician Company Name: Superior Test & Balance Position with Company (Title): Vice President Address:861 E Leadora Ave ATT Certification Identification (if applicable): City/State/Zip: Glendora / CA / 91741 Phone: 626-771-1012 Date Signed: 03/29/22 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation forthe construction or installation Identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. S. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: James Conboy Responsible Acceptance Person Signature: Res ons ble A a ance Per on Company Name: Position with Company (Title): Vice Presid nt Address:861 E Leadora Ave CSLB License: 91 1916 city/state/zip: Glendora / CA / 91741 Phone: 626-771-1012 Date Signed: 03/29/22 CA Building Energy Efficiency Standards — 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A (Revised: 011201 CAI IFORNIA FNFR(;Y COMM1.MnN CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 1 of 3) Project Name: Panda Express Enforcement Agency: Newport Beach Dept E Permit Number: Project Address 1316 Bison Ave City:Newport Beach Zip Code: 92660 System Name or Identific stion/rag: RTU-1 System Location or Area Served: Kitchen Compliance Results: Enforcement Agency Use: Checked by/Date ®' Complies Q Does NOT Comply Construction inspection and functional testing for an air economizer to verify that the HVAC system can use outdoor air to satisfy Intent: space -cooling loads. Intended for air economizers that are NOT already certified to the Energy Commission. Submit one Certificate of Acceptance for each system that must demonstrate compliance. (NA7.5.4, §340.4(e)) A. Construction. Inspection Buliding: Retail Floor: Single Room/Area/Zone Sales Control/System: Local/Honeywell Prior to Functional Testing, verify and document all of the following 1. Required documentation must be available for review (check all of the following). / a. I All documentation shipped with the economizer including manuals and performance curves. 2 Verify the economizer is set to the Required High Limit setting according to the economizer Device Type and Climate Zone where installed (check one compliance path and all applicable NOTES). Table 140.4-E NA7.5.4.1LaJJ140.4Le12CJ Required High Limit Setting (Economizer off when :) Equation Description Device Type Climate Zone 1, 3, 5, 11-16 ToA>75°F Outdoor air temperature exceeds 75°F. 2, 4, 10 TOA> 73°F Outdoor air temperature exceeds 73°F. ary Fixed Dry Bulb 6,8,9 ToA>71°F Outdoor air temperature exceeds 71°F. d v w 7 ToA>69°F Outdoor air temperature exceeds 69°F. 1, 3, 5, 11-16 ToA> Tm Outdoor air temperature exceeds return air temperature. ❑ £ � 2, 4, 10 ToA> TxA- 2°F Outdoor air temperature exceeds return air ❑ Differential Dry Bulb temperature minus 2°F. = 6, 8, 9 T > T 4°F °A Outdoor air temperature exceeds return air ! 7 ToA>TRA-6°F temperature minus 4°F. Outdoor air temperature exceeds return air ❑ y temperature minus 6°F. wFixed Enthalpy and All hoA> 28 Btu/Ib or Outdoor air enthalpy exceeds 28 Btu/Ib of dry air or s Fixed Dry-bulb ToA> 75°F Outdoor air temperature exceeds 75°F. as Others such as Dew Point, Fixed Enthalpy, May not be used in any Climate Zone in California unless approval for use Electronic Enthalpy, and Differential Enthalpy is provided by the Energy Commission Executive Director. a m Controls APPROVAL MUST BE ATTACHED. ENOTE: Devices with selectable (rather than adjustable) setpoints must be set to within 2°F and 2 Btu/Ib of the setpoint listed. NOTE for Fixed Enthalpy altitudes substantially different than sea level, the Fixed Enthalpy limit value must be set to the ❑At and Fixed Dry-bulb devices enthalpyvalue at 75°F and 50% relative humidity. As an example, at a Y p approximately 6,000 foot elevation, the fixed enthalpy limit is approximately 30.7 Btu/Ib. 3. Economizer reliability features are present as specified in the Energy Code (check all of the following): (NA 7.5.4.1(h), §140.4(e)2D) 9a. 5-year manufacturer warranty of economizer assembly (§140.4(e 12Di)) Rb. The economizer assembly (including but not limited to outdoor air damper, return air damper, drive linkage, and actuator) have been tested and are able to open and close against the rated airflow and pressure of the system for 60,000 damper opening and closing cycles. (§140.4(e12Dii) C. The outdoor air and return air dampers have a maximum leakage rate of 10 clm/sf at 250 Pascals (1.0 inch of water) when tested in compliance with AMCA Standard 500-D. (040.4(e12Diiij d If the high -limit control is fixed dry-bulb or fixed enthalpy + fixed dry-bulb, then it must have an adjustable setpoint. (NA7.5.4.1(b), §140.4(e)2Div) CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A Revised: 0120 CAI IFORNIA ENERGY COMMISSION As 'c CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 2 of 3) Project Name: Panda Express Enforcement Agency. Newport Beach Dept t Permit Number: Project Address: 1316 Bison Ave City: Newport Beach Zip Code: 92660 System Name or Identiflcatioq/rag: RTU-1 System Incatian or Area Served: Kitchen Istruction Inspection Floor: Roam/Area/Zone: Control/System: Retail Single Sales Local/Honeywell Outdoor air, return air, mixed air, and supply air sensors must be calibrated as follows (check all of the following): I. Dry-bulb and wet -bulb temperatures accurate to±2°F over the range of 40°F to 80°F ii. Enthalpy accurate to±3 Btu/Ib overthe range of 20 Btu/Ib to 36 Btu/Ib Ill. Relative humidity (RH) accurate to±5% over the range of 20%to 80%RH f Sensor performance curve(s) is provided with the economizer instruction materials that plotted data used for economizer control as well as plotted sensor output value measurements during calibration. NA7.5.4.1 LLLeJJ140.4 e 2Dvi Sensors used for high limit control shall be located to prevent false readings, including but not limited to being properly 9- 1.,— � n. r_\ ua en a. Economizer damper moves freely without binding. (NA7.5.4.1(f)) b Unitary systems with an economizer have control systems, including two -stage or electronic thermostats, that cycle compressors off when economizers can provide partial cooling N67.5.4.1 System has return fan speed control, relief dampers, or dedicated relief fans to prevent building over pressurization C. economizer mode. (NA7.5.4.1(i)) ( d. For systems with DDC controls, sensor used for economizer lockout has been factory or field calibrated. (NA7.5.4.1..L e. For systems with non-DDC controls, manufacturer's startup and testing procedures have been applied. (NA7.5.4.1(k)1 Construction Inspection Compliance Results: I(, Complies IU Does NOT Comply B. Functional Testing Building Floor: Room/Area/Zone: Control/System: Retail Single Sales Local/Honeywell Step 1: Disable demand control ventilation systems (if applicable) (NA7.5.4.2 Step 1) Step 2: Enable the economizer,and simulate a cooling demand large enough to drive the economizer fully open (record all of the 11 a Economizer damper modulates 100%open and that the return air damper modulates 100°% closed. NA7.5.4.2 Ste 2a • P / F b. All applicable fans and dampers operate as intended to maintain building pressure. (NA7.5.4.2 Step 2b) •.. P / F C. The unit heating is disabled (if applicable). (NA7.5.4.2 Step 2c) • P / F Step 3: Disable the economizer and simulate a cooling demand (record all of the following): (N87.5.4.2 Step 31 a. Economizer damper closes to its minimum position. (NA7.5.4.2 Step 3d1 • P / F b. All applicable fans and dampers operate as intended to maintain building pressure. (NA7.5.4.2 Step 3e) • P / F C. The unit heating is disabled (if unit has heating capability). (N67.5.4.2 Step 3f1 • P / F Step 4: If unit has heating capability, simulate a heating demand and set economizer so that it is capable of operating (i.e., actual outdoor air conditions are below lockout setpoint). (record all of the following): JN6Z.5.4.2 Ste 4 a. Economizer is at minimum position. JEA7.5.4.2 Step 4a) On C)F (C)NA b. Return air damper opens. (N67.5.4.2 Step 4h1 • ®F(ONA Step 5: Turnoff the unit. (NA7.5.4.2 Step 51 Record if the Economizer damper closes completely. (NA7.5.4.2 Step 5il • P / F Step 6: Restore demand control ventilation systems if applicable) and remove all system overrides initiated. (N87.5.4.2 Step 61 Functional Test Compliance Results •)complies oes NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A (Revised: 01/20) I Liv1. one o CERTIFICATE OF ACCEPTANCE V NRCA MCH-05-A Air Economizer Controls Acceptance (Page 3 of 3) Project Name: Panda Express Enforcement Agency: Newport Beach Dept f Permit Number: Project Address: 1316 Bison Ave city: Newport Beach �° Code: 92660 System Name or Identiffcaticn/7ag: RTU-1 System Location or Area Served: Kitchen DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: James Conboy Documentation Author signature: Documentation Author Company Name'Superior Test &Balance Date Signed: 03/29/22 Address: 861 E Leadora Ave ATE Certification Identification (If applicable): City/state/zip: Glendora / CA / 91741 Phone: 626-771-1012 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation forthe construction or installation identified on this Certificate of Acceptance has been completed and signed bythe responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: James Conboy Field Technician Signature: Field Technician Company Name: Superior Test & Balance p Position with Company (Title): Vice P esident Address: 861 E Leadora Ave ATT Certification Identification (if applicable): Cit"state/Zipc Glendora / CA / 91741 Phone` 626-771-1012 Date Signed: 03/29/22 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility forthe system design, construction or installation of features, materials, components, or manufactured devices forthe scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued forthe building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued forthe building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: James Conboy Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Test&Balance Position Position with Company(Tkle): Vice PYeSlden Address: 861 E Leadora Ave CSLB License:911916 CR'atenlpGlendora / CA/91741 Phone:626-771-1012 Date Signed:03/29/22 CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 T TEST AND BALANCE REPORT PROJECT: PANDA EXPRESS LOCATION: 191 6 BISON AVE, NEWPORT BEACH, CA 92660 REPORT DATE: MARCH 24, 21322 CONTRACTOR: TEMPERATURES UNLIMITED ARCHITECT: MARY WANE Bc ASSOCIATES ENGINEER: JT ENOINEERINO JAMES CONBOY CERTIFICATION 3504 ` Exp. 3131124 .— — M� /IIYS( James Conboy SupemiTestnntlaokn[o TABS Sup Mwr TB1094607S March 31, 2023 861 E LEADORA AVENUE, GLENDORA CA 91741 TEL: 626.771.1012 SITE: WWW.SUPERIORTAB.COM EMAIL: SUPERIORTAB@GMAIL.COM INSTRUMENTATION: DIGITAL MANOMETER FLOWHOOD TACHOMETER DIGITAL VOLT -AMP METER ROTATING VANE ANEMOMETER THERMOMETER DESCRIPTION OF TERMS: SHORTRIDGE ADM-BGOC SHORTRIDGE DIGITAL FLOWHOOD EXTECH 461891 FLUKE 322 EXTEcH AN31 O FLUKE 5211 AK- FREE AREA OF REGISTER, IN SQUARE FEET ATM- ATMOSPHERIC PRESSURE CD- CEILING DIFFUSER, SUPPLY CE- CEILING REGISTER, EXHAUST CFM- CUBIC FEET PER MINUTE CR- CEILING REGISTER, RETURN DD- DIRECT DRIVE MOTOR FH- READINGS TAKEN WITH FLOWHOOD, NO AK FACTOR FLA- FULL LOAD, AMPERAGE FPM- FEET PER MINUTE FR- FLOOR REGISTER, SUPPLY FRR- FLOOR REGISTER, RETURN GPM- GALLONS PER MINUTE HP- HORSE POWER LD- LINEAR DIFFUSER, SUPPLY LR- LINEAR REGISTER, RETURN N/A- NOT AVAILABLE OR NOT APPLICABLE NL- NOT LISTED NVL- NO VALID LOCATION OSA- OUTSIDE AIR PSIG- POUNDS PER SQUARE INCH, READ BY GAUGE PSP- PERFORATED SUPPLY PLENUM RPM- REVOLUTIONS PER MINUTE SF- SERVICE FACTOR, AMPERAGE - SP- STATIC PRESSURE, IN INCHES OF WATER SWE- SIDE -WALL REGISTER, EXHAUST SWR- SIDE -WALL REGISTER, RETURN SWS- SIDE -WALL REGISTER, SUPPLY TP- THERMALLY PROTECTED, AMPERAGE RELATED RATING VEL- VELOCITY (FEET PER MINUTE) AP- DIFFERENTIAL PRESSURE (INCHES OF WATER OR PSI) Fan Test Report Project: Panda Express - Newport Beach 1316 Bison Ave, Newport Beach, CA 92660 EQUIPMENT DATA EQUIPMENT DATA EQUIPMENT DATA Unit Name RTU-1 RTU-2 MA-1 Location / Area Served Roof Kitchen Area Roof Dining Area Roof Hoods 1 & 2 Manufacturer/Model Lennox KGB074H4TQ1G Lennox KGA1201-14MM1G CaptiveAire A3-24D-MPU Serial Number 5621J01654 5621J02085 Job # 4918505 Motor Make U.S. Motors Interlink Teco Westinghouse Motor HP / RPM / Frame 2 1740 1 56HZ 3 1750 56HZ 5 1165 215T Volts / Phase / Hertz 460 3 60 460 3 60 460 3 60 F.L. Amps / S.F. 2.9 1.00 4.0 1.15 7.15 1.15 Motor Sheave Diam./Bore VL40 x 7/8" VL44 x 7/8" Direct Drive Fan Sheave Diam./Bore MBL77 x 1" 7.2"O.D. x 1" - Direct Drive Belt Size / # of Belts A53 1 AX58 1 Direct Drive Sheave Closed % 40% 70%" Direct Drive Sheaves Center to Center 19 1/8" 21 3/8" Direct Drive TEST DATA DESIGN I ACTUAL DESIGN % DESIGN ACTUAL DESIGN % DESIGN ACTUAL DESIGN % Total Fan Airflow 2400 NVL 4000 NVL 5476 NVL Total Outlet Airflow 2400 2361 98% 4000 3836 96% 5476 5202 95% Return Airflow 1850 1837 99% 2826 2711 96% Minimum Outside Air 550 524 95% 1174 1125 96%, 5476 5202 95% S.P. Supply/ Return 0.56"10.50" 0.66"/0.54" NVL External S.P. 0.88" 1.06" 1.24" 1.20" 0.75" Total S.P. 1.25" 1.53" Fan Speed RPM 734 912 68.4 Hz Voltage 460 46714661466 460 46714671466 460 4671467/466 Am era a Tt/T2/T3 2.9 2.312.312.2 4.0 3.4/3.3/3.3 7.15 5.715.6/5.6 NOTES: `�N CiSUPERIOR - TEST & B A L A N C E Exhaust Fan & Make -Up Air Fan Test Report Project: Panda Express - Newport Beach 1316 Bison Ave, Newport Beach, CA 92660 EQUIPMENT DATA EQUIPMENT DATA EQUIPMENT DATA Unit Name EF-1 EF-2 EF-3 Location / Area Served Roof Hood 1 Roof I Hood 2 Roof Restrooms Manufacturer/Model Ca tiveAlre DU180HFA iCaptiveAlrel DU180HFA Ca tiveAire DR33HFA Motor Make Teco Westinghouse Teco Westinghouse Telco Green Motor HP / RPM / Frame 2 1165 184T 2 1165 184T 1/3 Variable N.L. Volts / Phase / Hertz 460 3 60 460 3 60 115 1 60 F.L. Amps / S.F. 3.76 1.15 3.76 1.15 4.3 T.P. Motor Sheave Diam./Bore Direct Drive Direct Drive Direct Drive Fan Sheave Diam./Bore Direct Drive Direct Drive Direct Drive Belt Size / # of Belts Direct Drive Direct Drive Direct Drive Sheave Closed % Direct Drive Direct Drive Direct Drive Sheaves Center to Center Direct Drive Direct Drive Direct Drive TEST DATA DESIGN I ACTUAL DESIGN % DESIGN ACTUAL DESIGN % DESIGN ACTUAL DESIGN % Total Fan Airflow (CFM) 3425 NVL 3425 NVL 250 NVL Total Inlet Airflow (CFM) 3425 3425 100% 3425 3382 99% 250 262 105% S.P. Discharge / Suction NVL NVL I I NVL Total Static Pressure 1.25" 1.25" 0.25' Fan Speed RPM 58.9 Hz 59.9 Hz 53% Volta a 460 46614661465 460 467/466/465 115 118 Am erage T1/T2/T3 3.7E 1 2.612.612.E 1 3.7E 2.712.612.6 4.3 2.9 NOTES: 2 c�UPERIOR TEST & BALANCE Air Distribution Test Report Project: Panda Express - Newport Beach 1316 Bison Ave, Newport Beach, CA 92660 SYSTEM NAME / AREA SERVED OUTLET DESIGN PRELIMINARY I FINAL % of DESIGN Note # # TYPE SIZE AK VEL IFLOW VEL IFLOW1 VEL FLOW RTU-1 Mop Sink 1 CD 24" x 24" FH - 200 - 218 109% Kitchen 2 CD 24" x 24" FH - 400 - 361 90% Hood 1 3 PSP 140" x 6" 4.70 110 515 104 489 1 95% Kitchen 4 CD 24" x 24" FH - 500 - 499 100% Hood 2 5 PSP 157" x 6" 5.22 99 515 1 1 101 527 102% Restroom 6 CD 12" x 12" FH - 150 - 135 90% Hallway 7 CD 12" x 12" FH - 120 - 132 110% 2400 2361 98% Kitchen R1 CR 24" x 24" FH - 925 - 833 90% Kitchen R2 CR 24" x 24" FH - 925 - 1004 109% 1850 1837 99% RTU-2 Dining Area 1 CD 20" x 20" FH - 570 - 396 - 514 90% Dining Area 2 CD 24" x 24" FH 570 - 399 - 513 90% Dining Area 3 CD 24" x 24" FH - 570 - 518 - 577 101% Dining Area 4 CD 20" x 20" FH - 570 - 462 - 520 91% Dining Area 5 CD 24" x 24" FH 570 - 765 - 541 95% Dining Area 6 CD 24" x 24" FH - 570 - 547 - 622 109% Dining Area 7 CD 20" x 20" FH - 570 - 490 - 549 96% 3990 3577 3836 1 96% NOTES: Notes correspond to Note # above. 1 2 3 3 t�UVERIOR ®\+\\ TEST & BALANCE: Air Distribution Test Report Project: Panda Express - Newport Beach 1316 Bison Ave, Newport Beach, CA 92660 SYSTEM NAME / AREA SERVED OUTLET DESIGN PRELIMINARY FINAL % of oesicN Note n # TYPE SIZE AK VEL FLOW VEL FLOW VEL FLOW RTU-2 (Cont.) Dining Area R1 CR 24" x 24" FH - 942 - 928 - 973 103% Dining Area R2 CR 24" x 24" FH - 942 - 859 - 890 94% Dining Area R3 CR 24" x 24" FH - 942 - 695 - 848 90% 2826 2482 2711 96% MA-1 Hood 1 PSP 157"x12" 10.4441 262 2738 223 2329 262 2736 100% 1 Hood 2 2 PSP 140" x 12" 9.41 291 2738 225 2117 262 2465 90% 1 5476 4446 5202 95% 1 EF-1 Hood 1 Shaft 18" Round 1.766 1939 3425 2290 4044 1939 3425 100% 2 Hood 1 1 Filter 20" x 16" 2.076 - - 181 376 155 322 - 2 Hood 1 2 Filter 20" x 16" 2.076 - 224 1 465 1 171 355 2 Hood 1 3 Filter 20" x 16" 2.076 - - 260 540 221 459 - 2 Hood 1 4 Filter 20" x 16" 2.076 - - 319 662 277 575 - 2 Hood 1 5 Filter 20" x 16" 2.076 - - 335 695 264 548 - 2 Hood 1 6 Filter 20" x 16" 2.076 - - 254 527 218 453 - 2 Hood 1 7 Filter 20" x 16" 2.076 - - 197 409 196 407 - 2 Hood 1 8 Filter 20" x 16" 2.076 178 370 1 148 307 2 3425 1 4044 1 1 3425 1 100% 2 NOTES: Notes correspond to Note # above. 1 lPreliminary readings were taken with the VFD at 54.4 hertz, final readings at 68.4 hertz. 2 Preliminary readings were taken with the VFD at 68.9 hertz, final readings at 58.9 hertz. *UVERIOR TEST & B.ALANC.E Air Distribution Test Report Project: Panda Express - Newport Beach 1316 Bison Ave, Newport Beach, CA 92660 SYSTEM NAME / AREA SERVED OUTLET DESIGN PRELIMINARY FINAL % of DESIGN Note # # TYPE SIZE AK VEL FLOW VEL FLOW VEL FLOW EF-2 Hood 2 1 Shaft 18" Round 1.766 1939 3425 2249 3971 1915 3382 99% 1 Hood 2 1 Filter 20" x 16" 2.076 - - 187 388 155 322 - 1 Hood 2 2 1 Filter 1 20" x 16" 2.076 - - 203 421 153 318 - 1 Hood 2 3 Filter 20" x 16" 2.076 - 257 1 534 1 211 438 - 1 Hood 2 4 Filter 20" x 16" 2.076 - - 313 650 270 561 - 1 Hood 2 5 Filter 20" x 16" 2.076 - - 321 666 1 296 612 1 Hood 2 6 Filter 20" x 16" 2.076 - - 249 517 211 438 1 Hood 2 7 Filter 20" x 16" 2.076 - - 209 434 175 363 1 Hood 2 8 Filter 20" x 16" 2.076 - - 174 361 159 330 1 3425 3971 3382 99% 1 EF-3 Restroom 1 CE 12" x 12" FH - 250 262 105% NOTES: Notes correspond to Note # above. 1 Preliminary readings were taken with the VFD at 68.9 hertz, final readings at 59.9 hertz. 2 3 N 6 m Compliance Results: COMPLIES AUTOMATIC DAYLIGHTING CONTROL ACCEPTANCE DOCUMENT Intent: This document Is used to demonstrate compliance with acceptance requirements In §130.4(a)3 and Reference Nonresidential Appendix NA7.6.1 for automatic dayllghting controls. Attach additional sets of pages 2 through 5, as required, for all controls that must be tested. Indicate all control methods used for this project: P Continuous dimming controls (Sections A and B-1 of this document should be completed) r Stepped Switching / stepped dimming controls (Sections A and B-2 of this document should be completed) A-1. Automatic Time Switch Lighting Control Construction Inspection (NA7.6.2.4) F a. The general lighting in skylit and primary sidellt daylit zones, or the general lighting in the combined primary and secondary sidelit davit zones In parking garages, Is controlled by automatic dayllghting controls. (§330.1(d)) F7 b. The daylit zones are shown on page(s) _E-101_ of plans; OR The daylit zones are drawn in on page(s) _E-SOS_ of as - built plans (attached). (§130.1(d)1) P c. The automatic dayllghting controls provide separate control for luminaires In each type of dayllt zone. Luminaires that fall In both a skylit and primary sidelit daylit zone are controlled as part of the skyllt zone. (§130.1(d)2) P d. For photosensors located within a daylit zone, at least one photosensor Is not readily accessible to unauthorized personnel. (§130.1(d)4) r e. The location where calibration adjustments are made to the automatic dayllghting controls Is readily accessible to authorized personnel, Including Inside a locked case or under a cover that requires a tool for access. (§130.1(d)5) Construction Inspection Compliance: G Complies C Does Not Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 1 of 5 B-1. Continuous Dimming Control Systems Functional Testing (NA7.6.1.2.1) Building: 1 Floor: I Room: Dining Area _ Control: Automatic Daylight 1% Control Is representative of sample. (NA7.6.1.2) If sampling method Is used, attach a page listing untested controls In sample. Step 1: Identify the reference location (the minimum dayllghting location In the controlled zone). (NA7.6.1.2.1(a)) For parking garages, Illuminance levels should be measured at the farthest edge of the secondary sldellt zone away from the glazing or opening. (§330.1(d)3D) Dfc a. Specify the power estimation method to be used: default ratio of power to light (Dfc), cut sheet ratio of power to light (CSfc) - cut sheet must be attached, measured Amps multiplied by Volts (VA), or measured watts (W). Step 2: No daylight test. Simulate or provide conditions without daylight. (NA7.6.1.2.1(d)) Night b. Indicate the method used to simulate or provide conditions without daylight: night time manual measurement (Night), night time Illuminance logging (Log), cover fenestration (CF), or cover photosensor (CP). 38 C. Enter the reference Illuminance value In footcandles (fc), as measured at the reference location. (NA7.6.1.2.1(d)2) This Is the electric lighting Illuminance without any daylight. (N/A) d. Enter the measured full load power In Volt -Amps (VA) If power estimation method (line a) = VA or In watts (W) If power estimation method = W. OR Indicate not applicable (N/A) If power estimation method (line a) = Dfc or CSfc. Y e. Automatic daylight control system provides appropriate control so that the electric lighting system Is providing full light output unless otherwise specified by design documents. (NA7.6.1.2.1(d)1) Enter yes (Y) or no (N). Y f. Light output Is stable with no discernable flicker. (NA7.6.1.2. 1(d)3) Enter yes (Y) or no (N). Step 3: Full daylight test. Simulate or provide bright conditions where the daylight Illuminance Is greater than 150% of the reference Illuminance measured In Step 2. (NA7.6.1.2.1(e), §130.1(d)3C, §130.1(d)3D) 72 g. Enter the daylight Illuminance (light level with the electric lighting turned off) value In footcandles (fc) measured at the reference location. 189.47 h. Calculate the ratio of daylight illuminance to the reference Illuminance In %. ([line g / line c] x 100) Y I. The ratio of daylight Illuminance to the reference illuminance (line h) Is greater than 150%. (§130.1(d)3C, §130. 1(d)3D) Enter yes (Y) or no (N). 77 J. Enter the total Illuminance (combined daylight and electric light Illuminance) In footcandles (fc) measured at the reference location If power estimation method (line a) - Dfc or CSfc. OR Enter the measured power in Volt -Amps (VA) If power estimation method (line a) = VA, or In watts (W) If power estimation method (line a) = W. 5 k. Calculate the electric lighting Illuminance in footcandles (fc) at the reference location If power estimation method (line a) = Dfc or CSfc. (line j - line g) OR indicate not applicable (N/A) If power estimation method (line a) - VA or W. 13.16 1. Calculate the fraction of rated light output In % If power estimation method (line a) = Dfc or CSfc. ([line k / line c] x 100) OR Indicate not applicable (N/A) If power estimation method (line a) = VA or W. 14 m. Enter the dimmed luminalre fraction of rated power In % If power estimation method (line a) = Dfc or CSfc, and label the control system being tested on the manufacturer's cut sheet or the default graph on page 3. OR Indicate not applicable (N/A) if power estimation method (line a) = VA or W. CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 2 of 5 CERTIFICATE oFACCEPTANCE ca.ln-03-a 'eat Nemo: Fantle Eapreea on:®ent Aaemy: Crry OFNEWPORTBEACH amitNtmbec XMI-1565 'eataddmev: 3316 Bieaa Aw .Newport ReerL Ca1x926W 86 n. Calculate the system power reduction In %. If power estimation method (line a) = Dfc or CSfc, system power reduction = [1 - dimmed luminaire fraction of rated power (line m)]. OR If power estimation method (line a) = VA or W, system power reduction = [i - measured power (line j)/full load power (line d)]. Y o. For areas other than parking garages, the system lighting power reduction of controlled luminaires (line o) Is at least 65%. (NA7.6.1.2.1(e)1, §130.1(d)3C) OR For parking garages, the controlled lighting power consumption Is zero. (§330. 1(d)3D) Enter yes (Y) or no (N). Y p. Dimmed lamps are stable with no discernable flicker. (NA7.6.1.2.1(e)1) Enter yes (Y) or no (N). Y q. Only the luminaires In the dayllt zones are affected by daylight control. (NA7.6.1.2.1(e)2) Enter yes (Y) or no (N). N/A r. If a PAF is claimed for daylight dimming plus OFF controls, the system automatically turns off the luminaires that are receiving this credit. (NA7.6.1.2.1(e)3, §140.6(a)2H) Enter yes (Y), no (N), or not applicable (N/A). Step 4: Partial daylight test. Simulate or provide daylight conditions where Illuminance (fc) from daylight only at the reference location Is between 60 and 95% of the reference illuminance measured In Step 2. (NA7.6.1.2.1(f)) There are 0 control steps between ON and OFF. (Indicate not applicable (N/A) for Imes s through aa.) NO S. Indicate method used to simulate or provide conditions with partial daylight: natural daylight manual measurement (NO), light logging (Log), partially cover fenestration (PCF), open loop setpolnt adjustment (OLSA). 31 t. Enter the daylight Illuminance (light level without electric light) In footcandles (fc) measured at the reference location. 81.58 u. Calculate the ratio of daylight Illuminance to the reference illuminance In %. ([line t / line c] x 100) Y V. The ratio of daylight Illuminance to the reference Illuminance (line u) Is between 60 and 95%. (NA7.6.1.2.1(f)) Enter yes (Y) or no (N). 44 w. Enter the total illuminance (combined daylight and electric light Illuminance) in footcandles (fc) measured at the reference location. If X. The total Illuminance (line w) is greater than or equal to the reference Illuminance (line c). (NA7.6.1.2.1(f)1, §130.1(d)3B) Enter yes (Y) or no (N). 115.79 y. Calculate the ratio of total Illuminance to the reference illuminance In %. ([line w / line c] x 100) Y Z. The ratio of total illuminance to the reference Illuminance (line y) Is less than or equal to 150%. (NA7.6.1.2.1(f)2) Enter yes (Y) or no (N). Y aa. The light output Is stable with no discernable flicker. (NA7.6.1.2.1(f)3) Enter yes (Y) or no (N). Functional Testing Compliance: f Complies n Does Not Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance T11is is page 3 of 5 Default fraction of rated power to fraction of light output (used on line m on page 2) 100% -- _ - ---------- Y E 1 90% f .F 1 1 , 80 :._--..t_..-._.._-- ____r_ _-t--_-__.�.y__.!r�____ "J�: PLf i il'li•D 1 w T 70% f 1 ! !P'�"� 0 Al 60% a/� �uorescent4-40% -- X----- •+'; -Y _ f k C LED 1 1 1 1 V V �t— 30% - _-__-r_±_n 20% T - ` 1 4 1 1 • V 1 1 LL 10% 1. 1 f _ _ _ _ _ 1 __ ___ 1 1 1 1 1 1 1 1 t I S 1 i 1 f 091a 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Fraction of rated light output CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 4 of 5 CERTIFICATE OF ACCEPTANCE-LT1-03-a aUOMB payegbtn¢coned Pmjact Nam¢: Pmde apsesv Agency: CM OF NBWPORT BEACH emBNumben XMl-1565 hoj.AddgW:13I6Hudm Aw City: Newport BparL 'Coda: 92660 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Acceptance documentation Is accurate and complete. Documentation Author NamO Company Name David KorneR Advanced Compliance Address City/State/Zip PO Box 5255 Whittler, CA 90602 phone CEA/ATT Certification (562)254-52 0 Identification (If applicable) Author Signature Date of Signature: 04/06/2022 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of Califomla: 1. The Information provided on this Certificate of Acceptance Is true and correct. 2. I am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or Installation Identified on this Certificate of Acceptance compiles with the applicable acceptance requirements indicated In the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA2. 4. 1 have confirmed that the Certlficate(s) of Installation for the construction or Installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) Issued for the building. Field Technician Name Company Name David Komeff Advanced Compllenc¢ Address: City/State/Zlp PO Box 5255 Whittier, CA 90602 Phone ATT Certification (562)254-5250 Identification TC-A813611 Positlo parry (Title) Field Technician Signature Own Date of Signature: 0 22 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. I am the Field Technician, or the Field Technician Is acting on my behalf as my employee or my agent and I have reviewed the Information provided on this Certificate of Acceptance. 2. I am eligible under Division 3 of the Business and Professions Code In the applicable classification to accept responsibility for the system design, construction or Installation of features, materials, components, or manufactured devices for the scope of work Identified on this Certificate of Acceptance and attest to the declarations In this statement (responsible acceptance person). 3. The Information provided on this Certificate of Acceptance substantiates that the construction or Installation Identified on this Certificate of Acceptance complies with the acceptance requirements Indicated In the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified In Reference Nonresidential Appendix NA2. 4. I have confirmed that the Certificates) of Installation for the construction or Installation Identified on this Certificate of Acceptance has been completed and Is posted or made available with the building permit(s) issued for the building. S. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permlt(s) issued for the building, and matle available to the enforcement agency for all applicable Inspections. I understand that a signed copy of this Certificate of Acceptance Is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Company Name Person Name David Kerney Advanced Compliance Address: City/State/21p PC Box 5255 Whittler, CA 90602 Phone CSLB License (562)254-5250 Position with Company (Title) Owner Responslbl cceptance Person Sig Cure Date of Signature: - 022 CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance T11is is page 5 of 5 Compliance Results: COMPLIES Enforcement Agency Use: Checked by/Date SHUT-OFF LIGHTING CONTROL ACCEPTANCE DOCUMENT Intent: This document is used to demonstrate compliance with acceptance requirements In §130.4(a)4 and Reference Nonresidential Appendix NA7.6.2 for shut-off lighting controls. Attach additional sets of pages 1 through 2, as required, for all controls that must be tested. Indicate all types of shut-off controls tested for this project: Automatic time switch lighting controls (Sections A-1 and B-1 of this document should be completed) Occupant sensing lighting controls (including occupant sensors, partial -ON occupant sensors, partial -OFF occupant sensors, and/or vacancy sensors) (Sections A-2 and B-2 of this document should be completed) A-1. Automatic Time Switch Lighting Control Construction Inspection (NA7.6.2.4) W. a. Automatic time switch controls are programmed with acceptable weekday, weekend, and holiday (If applicable) schedules. (NA7.6.2.4(a), §110.9(b)1Aii, §130.1(c)IA, §130.1(c)4) FF b. Document for the owner weekday, weekend, and holidays schedules, as well as all set-up and preference program settings. (NA7.6.2.4(b)) r✓. c. The correct time and date are properly set in the time switch. (NA7.6.2.4(c)) d. The battery backup (if applicable) is installed and energized. (NA7.6.2.4(d), §110.9(b)1) e. Override time limit is no more than 2 hours. (NA7.6.2.4(e), §110.9(b)IAi, §130.1(c)3B) OR The automatic time switch control's override time is exempt from the 2-hour limit. (EXCEPTION to §330.1(c)3B) R f. Override switches remote from area with controlled luminaires have annunciator lights. (NA7.6.2.4(f), §130.1(c)3A, §130.1(a)) OR The manual override switch is exempt from being in the same enclosed area with the lighting it controls. (EXCEPTION 1 to §130.1(a)2) Construction Inspection Compliance: f?: Complies Does Not Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 1 of 6 6-1. Automatic Time Switch Lighting Control Functional Testing (NA7.6.2.5) Confirm compliance (Y - yes / N - no) for the control being tested. Building: 1 Floor: 1 Room: Kitchen Control: Automatic Time Switch Step 1: Simulate Occupied Condition. (NA7.6.2.5(a)) 17 a. All lights can be turned on and off by their respective area control switch. (NA7.6.2.5(a)1) b. The switch only operates lighting in the enclosed space (ceiling -height partitioned area) in which the switch is located. (NA7.6.2.5(a)2, §130.1(c)iC) 17 c. For the area controlled by an automatic time switch control with a time override located in and for the area, the lighting can be turned on manually by initiating the time override. The lighting is configured to remain on for no more than 2 hours, unless the area Is exempt from the 2-hour time override limit. (NA7.6.2.5(a)3, §110.9(b)IAI, §130.1(c)3B, EXCEPTION to §130.1(c)3B) d. For the area controlled by an automatic time switch control with an automatic holiday shut-off feature, the lighting in the area can be turned off automatically by initiating the holiday shut-off. (NA7.6.2.5(a)4, §110.9(b)1Aii, §330.1(c)4) OR The automatic time switch control is exempt from incorporating an automatic holiday shut-off feature. (EXCEPTION to §130.1(c)4) it e. For the area controlled by an automatic time switch control with manual -on mode configured, the lighting in the area can be turned on manually when it is manually activated. (NA7.6.2.5(a)5, §130.1(c)SE) OR The automatic time switch control does not include or utilize a manual -on mode. (§130.1(c)IE) Step 2: Simulate unoccupied condition. (NA7.6.2.5(b)) F? a. All non-exempt lighting turns off in accordance with the programmed time switch schedules. (NA7.6.2.5(b)1, §130.1(c)SA) b. Manual override switch allows only the lights in the enclosed space (ceiling height partitioned) where the override switch is located to turn on or remain on until the next scheduled shut off occurs. (NA7.6.2.5(b)2, §330.1(c)1C, §130.1(c)3) Functional Testing compliance: G2 Complies IT Does Not Comply Building: 1 Floor: 1 Room: Dining Area Control: Automatic Time Switch CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 2 of 6 Step 1: Simulate Occupied Condition. (NA7.6.2.5(a)) a. All lights can be turned on and off by their respective area control switch. (NA7.6.2.5(a)1) b. The switch only operates lighting in the enclosed space (ceiling -height partitioned area) in which the switch is located. (NA7.6.2.5(a)2, §130.1(c)1C) c. For the area controlled by an automatic time switch control with a time override located in and for the area, the lighting can be turned on manually by initiating the time override. The lighting is configured to remain on for no more than 2 hours, unless the area is exempt from the 2-hour time override limit. (NA7.6.2.5(a)3, §310.9(b)lAi, §130.1(c)3B, EXCEPTION to §130.1(c)3B) d. For the area controlled by an automatic time switch control with an automatic holiday shut-off feature, the lighting in the area 17 can be turned off automatically by initiating the holiday shut-off. (NA7.6.2.5(a)4, §310.9(b)SAii, §130.1(c)4) OR The automatic time switch control is exempt from incorporating an automatic holiday shut-off feature. (EXCEPTION to §130.1(c)4) e. For the area controlled by an automatic time switch control with manual -on mode configured, the lighting in the area can be 17 turned on manually when it is manually activated. (NA7.6.2.5(a)5, §330.1(c)lE) OR The automatic time switch control does not include or utilize a manual -on mode. (§330.1(Q1E) Step 2: Simulate unoccupied condition. (NA7.6.2.5(b)) a. All non-exempt lighting turns off in accordance with the programmed time switch schedules. (NA7.6.2.5(b)l, §130.1(c)1A) 17 b. Manual override switch allows only the lights in the enclosed space (ceiling height partitioned) where the override switch is F located to turn on or remain on until the next scheduled shut off occurs. (NA7.6.2.5(b)2, §130.1(c)IC, §130.1(c)3) Functional Testing Compliance: r Complies O Does Not Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 3 of 6 A-2. Occupant Sensing Lighting Control Construction Inspection (NA7.6.2.2)) • a. Occupant sensors have been located to minimize false signals. (NA7.6.2.2(a)) • b. Occupant sensors are located no closer than four (4) feet from any HVAC diffuser. (NA7.6.2.2(b)) • c. Passive infrared sensor pattern does not enter into adjacent zones. (NA7.6.2.2(c)) • d. Occupant sensors do not encounter any obstructions that could adversely affect desired performance. (NA7.6.2.2(d)) • e. Ultrasonic occupant sensors do not emit audible sound. (NA7.6.2.2(e), §110.9(b)6Bii) I Construction Inspection Compliance: O CompliesO Does Not Comply B-2.Occupant Sensing Lighting Control Functional Testing (NA7.6.2.3) Confirm compliance (Y - yes I N - no) for the control being tested. Building: 1 Floor: 1 Room: Restroom Control: Occupant Sensing <T• 1 Control Is representative of sample. (NA7.6.2.3) if sampling method is used, attach a page listing untested controls in sample. Step 1: Simulate an unoccupied condition. (NA7.6.2.3(a)) a. Lights controlled by occupant sensing control turn off or partially off, if applicable, within a maximum of 20 minutes from start of an unoccupied condition. (NA7.6.2.3(a)1, §110.9(b)4A) In the partial off state, partial -OFF occupant sensors automatically reduce lighting power by at least 50% (§130.1(c)6A-C, §130.1(c)7A), OR: • For metal halide or high pressure sodium lighting in warehouses, automatically reduce lighting power by at least 40% (EXCEPTION 2 to §130.1(c)6A). • In aisle ways and open areas in warehouses in which the installed lighting power is 80% or less of the value allowed under the Area Category Method, automatically reduce lighting power by at least 40% (EXCEPTION 1 to §130.1(c)6A). • In corridors and stairwells in which the installed lighting power is 80% or less of the value allowed under the Area Category Method, automatically reduce lighting power by at least 40% (EXCEPTION to §330.1(c)7A). Occupant sensing controls in parking garages, parking areas, and loading and unloading areas have at least one control step between 20 to 50% of design lighting power (§130.1(c)7B). OR Occupant sensing controls for metal halide luminaires with a lamp plus ballast mean system efficacy of 75 lumens per watt in parking garages, parking areas, and loading and unloading areas have at least one control step between 20 to 60% of design lighting power (EXCEPTION to §330.1(c)7B). b. The occupant sensing control does not trigger a false "on" from movement in an area adjacent to the controlled space or from HVAC operation. (NA7.6.2.3(a)2) r c. Signal sensitivity is adequate to achieve desired control. (NA7.6.2.3(a)3) For library book stacks or warehouse aisles, activity beyond the stack or aisle shall not activate the lighting In the stack or aisle. (§130.1(c)6A, §130.1(c)6B) Step 2: Simulate an occupied condition. (NA7.6.2.3(b)) r a. Status indicator or annunciator operates correctly. (NA7.6.2.3(b)1, §110.9(b)4C) 17 b. Immediately upon an occupied condition (NA7.6.2.3(b)2): • Lights controlled by an occupant sensor or a partial -OFF occupant sensor turn on; OR: • A vacancy sensor indicates a space is "occupied" and lights may be turned on manually; OR: • The first stage of a partial -ON occupant sensor automatically activates between 50 to 70% of the lighting. (§130.1(c)SA)OR: After the first stage occurs for partial -ON occupant sensors, manual switches allow an occupant to activate the alternate set of lights, activate 100% of the lighting power, and manually deactivate all of the lights. Functional Testing Compliance: CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 4 of 6 f+ Complies f' Does Not Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Tiiis is page 5 of 6 CEBTIRCATEOFACCEPfANCE NRDA-I.T1-0zA LWdie¢Cbnhol WajaotNama: Fantle eap - Agway: CITY OFNH0.TORTBRACR aoW Nrmba:=14565 Pmjeot Addoes: 1316 Braun, Ave Cby:Newpost Beech V4 Cade: 92W DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Acceptance documentation Is accurate and complete. Documentation Author David Kormff Company Name Advanced Compliance Name Address PO Box 5255 City/State/Zip Whittier, CA 90602 Phone CBA/ATT Certification (562)254-52 Identification (If applicable) Author Signature 4 Date of Signature: 04/06/2022 - FIELD TECHNICIAN'S DECLARATION STATEMENT r certify the following under penalty of perjury, under the laws of the State of California: 1. The Information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or Installation Identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated In the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA2. 4. 1 have confirmed that the Certlficate(s) of Installation for the construction or Installation Identified an this Certificate of Acceptance has been completed and signed by the responsible bullder/Installer and has been posted or made available with the building permit(s) Issued for the building. Field Technician Name David Korneff Company Name Advanced Compliance Address: PO Box 5255 City/State/Zlp Whittier, CA 90602 Phone ATT Certification (562)254-5250 Identification TC-AS13611 Position with Company Owner Field Technician Signature (Title) Date of Signature: 04/06/2022 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician Is acting an my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. I am eligible under Division 3 of the Business and Professions Code In the applicable classification to accept responsibility for the system design, construction or Installation of features, materials, components, or manufactured devices for the scope of work Identified on this Certificate of Acceptance and attest to the declarations In this statement (responsible acceptance person). 3. The Information provided on this Certificate of Acceptance substantiates that the construction or Installation Identified on this Certificate of Acceptance complies with the acceptance requirements Indicated In the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified In Reference Nonresidential Appendix NA]. 4. 1 have confirmed that the Certlficate(s) of Installation for the construction or Installation Identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) Issued for the building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) Issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance David Kgrneff Company Name Advanced Compliance Person Name Address; PO Box 5255 Clty/State/Zlp Whittier, CA 90607 Phone CSLB License (562)254-5250 Position with Company (Title) Owner re Responsible A k04/06/2022 Data of CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance T11is is page 6 of 6 INDOOR LIGHTING NRCI_LTI_02LE Panda Express Orange General Information Building Type: FF Nonresidential r High -Rise Res (Common Area) r Hotel/Motel (Common Area) Phase of Construction: r New Construction r Addition U Alteration 17= Unconditioned Scope of Responsibility Enter the date of approval by enforcement agency of the Certificate of Compliance that provides the specifications for the energy efficiency measures for the scope of responsibility for this Installation Certificate. Date: 9/21/2021 12:00:00 AM §130.4(b) Before an Energy Management Control System (EMCS), or Lighting Control System can be recognized for compliance with the lighting control requirements in Part 6 of Title 24, the person who is eligible under Division 3 of the Business and Professions Code to accept responsibility for the construction or installation of features, materials, components, or manufactured devices shall sign and submit this Installation Certificate. If any of the requirements in this Installation Certificate fail the Energy Management Control System or Lighting Control System installation requirements, these options for controlling lighting shall not be recognized for compliance with the Building Energy Efficiency Standards. Check all that apply PART 1 What type of Lighting Control System has been installed? r A. Energy Management Control System (EMCS) - Is a computerized control system designed to regulate the energy consumption of a building by controlling the operation of energy consuming systems, such as the heating, ventilation and air conditioning (HVAC), lighting, and water heating systems, and is capable of monitoring environmental and system loads, and adjusting HVAC operations in order to optimize energy usage and respond to demand response signals. r The Energy Management Control System has been installed to function as a lighting control required by Part 6 and functionally meets all applicable requirements for each application for which it is installed, in accordance with Sections 110.9, 130.0 through 130.5, 140.6 through 150.0, and 150.2; and complies with Reference Nonresidential Appendix NA7.7.2. r The EMCS has been separately tested for each respective lighting control system for which it is installed to function as. B. Lighting Control System - Requires two or more components to be installed in the building to provide all of the functionality required to make up a fully functional and compliant lighting control. This is page 1 of 5 The installed Lighting Control System complies with the requirements checked below; and all components of the system considered together as installed meet all applicable requirements for the application for which they are installed as required in Sections 130.0 through 130.5, Sections 140.6 through 140.8, Section 141.0, and Section 150.0(k). PART 2 Lighting Control Functional requirements: Check all that apply when verifying the installation of an EMCS or Lighting Control System. FT A. All lighting controls and equipment have been installed in accordance with the manufacturer's instructions. Ft B. The manufacturer has provided Instructions for calibration. r C. If indicator tights are integral to any components, such indicator lights consumes no more than 1 watt of power per indicator light. D. Components that are regulated by the Title 20 Appliance Efficiency Regulations have been certified to the Energy Commission. 17-5 E. The EMCS or Lighting Control System functions as one or more of the Time -Switch Lighting Controls checked below, and complies with all of the following requirements: r 1. Automatic Time -Switch Controls meeting all requirements for Automatic Time Switch Control devices in the Title 20 Appliance Efficiency Regulations, including the requirements below: a. Residential automatic time -switch controls have program backup capabilities that prevent the loss of the device's schedule for at least 7 days, and the device's date and time for at least 72 hours if power Is interrupted. b. Commercial automatic time -switch controls meet the following requirements: I. Has program backup capabilities that prevent the loss of the device's schedule for at least 7 days, and the device's date and time for at least 72 hours if power is interrupted II. Is capable of providing manual override to each connected load and shall resume normally scheduled operation after manual override is initiated within 2 hours for each connected load and iii. Incorporates an automatic holiday shutoff feature that turns off all connected loads for at least 24 hours and then resumes normally scheduled operation. r 2. Astronomical Time -Switch Controls meeting all requirements for Astronomical Time -Switch Control devices in the Title 20 Appliance Efficiency Regulations, including the requirements below: a. Meets the requirements of an automatic time -switch control b. Has sunrise and sunset prediction accuracy within plus -or -minus 15 minutes and timekeeping accuracy within 5 minutes per year c. Is capable of displaying date, current time, sunrise time, sunset time, and switching times for each step during programming d. Has an automatic daylight savings time adjustment; and e. Has the ability to Independently offset the on and off for each channel by at least 99 minutes before and after sunrise or sunset. r 3. Multi -Level Astronomical Time -Switch Controls, in addition to meeting all of the requirements for Astronomical Time -Switch Controls, includes at least 2 separately programmable steps per zone. r F. The EMCS or Lighting Control System functions as one or more of the Daylighting Controls listed below: ��@(` �` p�"iS C81119tfi'I ll�,vari_C9�U ryg �. nr Cdrdfnl3;Tlafiln9 P rem` This is page 2 of 5 r 1. Automatic Daylight Controls meet all requirements for Automatic Daylight Control devices in the Title 20 Appliance Efficiency Regulations, including the following: a. Is capable of reducing the power consumption in response to measured daylight either directly or by sending and receiving signals; b. If the system includes a dimmer, complies with the Dimmer Control device requirements in the Title 20 Appliance Efficiency Regulations. c. Automatically return to its most recent time delay settings within 60 minutes when put in calibration mode; d. Has a set point control that easily distinguishes settings to within 10 percent of full scale adjustment; e. Has a light sensor that has a linear response within 5 percent accuracy over the range of illuminance measured by the light sensor; f. Has a light sensor that Is physically separated from where the calibration adjustments are made, or is capable of being calibrated in a manner that the person initiating the calibration is remote from the sensor during calibration to avoid influencing calibration accuracy; and g. Complies with the Title 20 requirements for photo controls if the system contains a photo control component. r 2. Photo Controls meet all requirements for Photo Control devices in the Title 20 Appliance Efficiency Regulations, including the following that it does not have a mechanical device that permits disabling of the control. r G. The EMCS or Lighting Control System functions as a Dimmer and meets all requirements for a Dimmer Control device in the Title 20 Appliance Efficiency Regulations, including the following: 1. Is capable of reducing power consumption by a minimum of 65 percent when the dimmer is at its lowest level; 2. Includes an off position which produces a zero lumen output; and 3. Does not consume more than 1 watt per lighting dimmer switch leg when in the off position. 4. Dimmer controls that can directly control lamps provide electrical outputs to lamps for reduced flicker operation through the dimming range so that the light output has an amplitude modulation of less than 30 percent for frequencies less than 200 Hz without causing premature lamp failure. 5. If designed for use in three way circuits is capable of turning lights off, and to the level set by the dimmer if the lights are off. r H. The EMCS or Lighting Control System meets the following requirements: 1. Is capable of automatically turning off controlled lights in the area no more than 30 minutes after the area has been vacated; 2. Allows all tights to be manually turned off regardless of the status of occupancy; and 3. Has a visible status signal that indicates that the device is operating properly, or that it has failed or malfunctioned. The visible status signal may have an override switch that turns off the signal. 4. All occupant sensing devices that utilize ultrasonic radiation for detection of occupants meet the Ultrasound Maximum Decibel Values in the Title 20 Appliance Efficiency Regulations 5. All occupant sensing devices that utilize microwave radiation for detection of occupants meet the radiation requirements in the Title 20 Appliance Efficiency Regulations 6. Occupant sensing devices incorporating dimming comply with the requirements for dimmer controls in the Title 20 Appliance Efficiency Regulations 7. The EMCS or Lighting Control System functions as one or more of the Occupant Sensing Controls Checked Below: r a. Occupant Sensors meeting all applicable requirements for Occupant Sensor Control devices in the Title 20 Appliance Efficiency Regulations r b. Motion Sensors meeting all applicable requirements for Motion Sensor Controls devices in the Title 20 Appliance Efficiency Regulations, including that motion sensors are rated for outdoor use. r c. Vacancy Sensors meeting all applicable requirements for Vacancy Sensor Controls devices in the Title 20 Appliance Efficiency Regulations, including the following: I. Does not turn on lighting automatically and does not incorporate DIP switches, or other manual means, for conversion between manual and automatic functionality; ii. Has a grace period of no more than 30 seconds and no less than 15 seconds to turn on lighting automatically after the sensor has timed out; and III. Does not have an override switch that disables the sensor. This is page 3 of 5 d. Partial -ON Sensors meeting all applicable requirements for partial on sensing devices in the Title 20 Appliance Efficiency Regulations, including the following: L Has two poles each with automatic -off functionality; il. Has one pole that is manual -on and does not incorporate DIP switches, or other manual means, for conversion between manual and automatic functionality; and iii. Has one pole that is automatic -on and is not be capable of conversion by the user to manual -on functionality. p7l e. Partial -OFF Sensors meet all applicable requirements for partial off sensing devices in the Title 20 Appliance Efficiency Regulations, including the following: 1. Has two poles; U. Has one pole that is manual -on and manual off; and ill. Has one pole that is automatic -on and automatic -off and is not capable of conversion by the user to manual -on only functionality. r f. Occupant Sensing Control systems consist of a combination of single or multi -level Occupant, Motion, or Vacancy Sensor Controls, and all components installed to comply with manual -on requirements are not capable of conversion by the user from manual -on to automatic -on functionality. PART 3 Requirements for which the control is being installed to complied with: Identify all requirements in the Standards for which the EMCS or Lighting Control System is installed to function as and complies with: Check all that are applicable. F A. Section 130.1(a) Area Controls. R B. Section 130.1(b) Multi -Level Lighting Controls I7 C. Section 130.1 (c) Shut -OFF Controls D. Section 130.1 (d) Automatic Daylighting Controls. I' E. Section 130.1 (e) Demand Responsive Controls. r F. Section 130.5 (d) Circuit Controls for 120-Volt Receptacles. r G. To qualify for the PAF for a Partial -ON Occupant Sensing Control in TABLE 140.6-A r H. To qualify for the PAF for an occupant sensing control controlling the general lighting in large open plan office areas above workstations, in accordance with TABLE 140.6-A F. I. To qualify for the PAF for a Manual Dimming System PAF or a Multiscene Programmable Dimming System PAF in TABLE 140.6-A r J. To qualify for the PAF for a Demand Responsive Control in TABLE 140.6-A r K. To qualify for the PAF for Combined Manual Dimming plus Partial -ON Occupant Sensing Control in TABLE 140.E-A This is page 4 of 5 CIFINSTALLATION DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Acceptance document Is accurate and complete. Documentation Author Company Name Name David Kornaff Advanced Compliance P Address City PO Box 5755 Whittier Zip Code Phone 90602 (562)254-5250 applicable) out, 04/06/2022 Author Signature RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certiflcate of Acceptance. 2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or Installation of features, materials, components, or manufactured devices for the scope of work Identified on this Certificate of Acceptance and attest to the declarations In this statement (responsible acceptance person). 3. The information provided on this Certiflcate of Acceptance substantiates that the construction or Installation Identified on this Certificate of Acceptance compiles with the acceptance requirements indicated In the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified In Reference Nonresidential Appendix NA]. 4. I have confirmed that the Certiflcate(s) of Installation for the construction or Installation Identified on this Certificate of Acceptance has been completed and Is pasted or made available with the building permlt(s) Issued for the building. 5. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permlt(s) Issued for the building, and made available to the enforcement agency for all applicable Inspections. I understand that a signed copy of this Certificate of Acceptance Is required to be Included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance David Korneff Company Name Advanced Compliance Person Name P Address: PO Box 5255 City Whittier Zip Code 90607 Phone (562)254-5250 CSLB License Position with Company Owner (Title) Responsible Acceptance Person Signature Date of Signature: 04/06/2022 This is page 5 of 5 General Information Building Type: Nonresidential r High -Rise Res (Common Area) r Hotel/Motel (Common Area) Phase of Construction: 117, New Construction F Addition W Alteration f-- Unconditioned Scope of Responsibility Enter the date of approval by enforcement agency of the Certificate of Compliance that provides the specifications for the energy efficiency measures for the scope of responsibility for this Installation Certificate. Date: 9/21/2021 12:00:00 AM Lighting Details I E Sheets 1 9/21/2021 12:00:00 AM This is page I of 2 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Acceptance document Is accurate and complete. Name Documentation Author David Korneff Company Name Advanced Compliance PO Box 5255 Zip Code 90607 City Whittler Phone (562)254-5250 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. I am the Field Technician, or the Field Technician Is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. I am eligible under Division 3 of the Business and Professions Code In the applicable classification to accept responsibility for the system design, construction or Installation of features, materials, components, or manufactured devices for the scope of work Identified on this Certificate of Acceptance and attest to the declarations In this statement (responsible acceptance person). 3. The Information provided on this Certificate of Acceptance substantiates that the construction or Installation Identified on this Certificate of Acceptance complies with the acceptance requirements Indicated In the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified In Reference Nonresidential Appendix NA2. 4. I have confirmed that the Certiflcate(s) of Installation for the construction or Installation Identified on this Certificate of Acceptance has been completed and Is posted or made available with the building permlt(s) Issued for the building. S. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permlt(s) Issued for the building, and made available to the enforcement agency for all applicable Inspections. I understand that a signed copy of this Certificate of Acceptance is required to be Included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance David Korneff Company Name Advanced Compliance Person Name P Address: PO Box 5255 City Whittier Zip Code 90607 CSLB License Respon Date of Phone (562)254-5250 Position with Company nw a This is page 2 of 2