Loading...
HomeMy WebLinkAboutX2022-0036 - MiscStantec January 6, 2022 City of Newport Beach 453 Newport Center Drive Newport Beach, CA Stantec Consulting Services Inc. 38 Technology Drive Irvine CA 92618-5312 Dear To whom it may concern, Reference:. New Sewer Improvement Permit (pc# 0046-2022) �Gli Nr✓� While it may be unnecessary, I wanted to provide a cover letter with this new submittal to clarify the intent. Originally this scope was to be part of a combo permit (pc# 2508-2021) but was subsequently separated from that request in order to expedite approval for the sewer improvements so construction could begin on that scope only. I don't mean to confuse anyone, but rather, intended to ensure those who might have reviewed that plan previously that we have addressed the prior comments made there. Aside from the that, and other minor formatting, the sewer scope/ plan remains relatively the same. (NOTE: the respective scope will be removed from the prior permit request). Oliver (PLUMBING): 1. Per our discussion, please see note added (on sheet 2) to ensure all grease waste line are to have a minimum 2% slope. All slope notation(s) indicate such on the plan as well. 2. We added a Grease Interceptor schedule (on sheet 2) to identify compacity, of the specified interceptors as request. 3. We added a general note to indicate "FOG permit through the City's Utility Department is required to be shown to the Building Inspector at the time of final inspection." as requested (see note 5, sheet 2). Rodi (PUBLIC WORKS): 1. We added a note to the plans indicating "An approved encroachment permit is required for all work activities within the public right-of-way or on City -owned utilities." (See sheet 1 — Title Sheet) 2. We revised the indication for the 6" VCP pipe servicing this address to indicate such (rather than PVC indicated previously). 3. We added provision for a concrete pad around the proposed MH relocation near Newport Center Drive as requested (See sheet 2 for detail added). Hopefully I have added clarity as to our intent. Given our need and desire to obtain permit, timely, please reach out if there is any need for further clarification or concerns I might address immediately. Respectfully, Brandon Ostrom PE Project Manager Mobile: (949) 294-9074 brandon.ostrom@stantec.com Design with community in mind