Loading...
HomeMy WebLinkAboutC-1991 - Professional Engineering Services for San Joaquin Hills Road and Jamboree Road - free right turn lane)October 10, 1978 CITY COUNCIL AGENDA ITEM NO. H-2(a) TO: CITY COUNCIL FROM: Public Works Department SUBJECT: SAN JOAQUIN HILLS ROAD AND JAMBOREE ROAD FREE RIGHT -TURN LANE (C -1991) RECOMMENDATION: Adopt a resolution authorizing the Mayor and the City Clerk to execute an agreement for engineering services with Williamson and Schmid for the design of the subject project. DISCUSSION: On December 12, 1977, the Council certified the Environmental Impact Report -- Negative Declaration for the subject project. A proposal has been requested and received from the firm of Williamson and Schmid to provide the engineering services necessary for the design and preparation of plans and specifications to construct the free right -turn lane. Compensation will be based on standard hourly rates, with the maximum fee not to exceed $14,700 (rate schedule is attached). Funds in the amount of $13,000 have been provided in the currently budgeted Gas Tax project for "Prepare Plans for Construction of Right -turn Lane at San Joaquin Hills Road and Jamboree Road." A budget amendment for the remaining $1,700 will be prepared for Council consideration at a later date should the additional funds be required. It is anticipated that the project will be included in the 1979 -80 Arterial Highway Financing Program (AHFP), with funding of 50% County AHFP and 50 °% City Gas Tax funds. A project can be advertised for bids in July 1979, with construction by September 1979. Attached is a sketch showing the project limits and typical section. a4vw_ / �. 7 -� Benjamin B. Nolan Public Works Director JW:jd Att. STANDARD HOURLY RATES EFFECTIVE AUGUST 1, 1978 PRINCIPAL ENGINEER DESIGN ENGINEER ASSISTANT ENGINEER DESIGN DRAFTSMAN DRAFTSMAN SECRETARY /DELIVERY 3-MAN SURVEY PARTY 2 -MAN SURVEY PARTY RATES OVERTIME'S $50 $38 $48 $33 $42 $28 $36 $24 $30 $12 $16 $92 $114 $72 $88 BLUEPRINTS AT COST 'CHARGED ONLY IF AUTHORIZED BY CLIENT 17782 SKY PARK BOULEVARD IRVINE, CALIFORNIA 92714 (714) 549 -2222 L ~" R =a 3 - -AO 00AIS7 n/orEs 1 ' Co vsi. 4CIA8 P� 4'0'tr'+" 2 Const. l.c.c. c`u.Gi6aMzr- 3 Conat. P.C.C. S.4* Lc it t I r " 4 cans+ B/ocA Rr►. tj&II I Cons +. 18" S.D. p, 1 Nc 2 Con s t. c,, r & /n/&i- 3 i 0 roost. ST. L�yb 7F W 11 4 78 0 1 � ' 6 1 2 �v•IS 72.5' _ SA n/ a 0 q e/I/v PLAN w FOe co �� SECT /oN A_A -----Al. T. S. CITY OF REIMPORT BEACH PUBLIC WORKS DEPARTMENT 5AA1 J0AQVA,t1 i1 /LL S Rp. � .fgM6oREE RQ R16Hi- rvt.v LAVr- DRAWN QLW DATE APPROVED PUBLIC WORKSAXRECTOR R.E. NO. DRAWING NO. Ex 1"11-,17- "A �� Byx"n:a .. .. C.:... 0 RESOLUTION NO LA `;9/4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT BETWEEN THE CITY OF NEWPORT BEACH AND WILLIAMSON AND SCHMID FOR ENGINEERING SERVICES IN CONNECTION WITH THE DESIGN OF THE SAN JOAQUIN HILLS ROAD AND JAMBOREE ROAD FREE RIGHT -TURN LANE PROJECT, CONTRACT NO. 1991 WHEREAS, there has been presented to the City Council of the City of Newport Beach a certain agreement between the City of Newport Beach and Williamson and Schmid for engineering services in connection with the design of the San Joaquin Hills Road and Jamboree Road free right -turn lane project; and WHEREAS, the City Council has considered the terms and conditions of said agreement and found them to be fair and equitable, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Newport Beach that said agreement for engineering services above described is approved, and the Mayor and City Clerk are hereby authorized and directed to execute the same on behalf of the City of Newport Beach. ADOPTED this 10th day of October , 1978. yor ATTEST: City Clerk DDO /kb 10/2/78 � c:Y i December 8, 1980 � CITY COUNC L AGENDA u� , - 8 1980 ITEM NO. . y BY +ha G i Y COUNCIL CITY OF NEWPORT BEACH TO: CITY COUNCIL FROM: Public Works Department SUBJECT: SAN JOAQUIN HILLS ROAD AND JAMBOREE ROAD FREE RIGHT -TURN LANE (C -1991) RECOMMENDATION: Adopt a resolution requesting the County of Orange to increase the Fiscal Year 1979 -80 Arterial Highway Financing Program allocation for the construction of San Joaquin Hills Road and Jamboree Road free right -turn lane (C- 1991). DISCUSSION: On December 11, 1978, the City Council requested the County of Orange to include the subject project in the 1979 -80 Arterial Highway Financing Program, and provide $82,750 as the County's share of the project. Construction of the project was completed in September 1980, and final accounting indicates that the County's portion of the project cost is $101,022.95. AHFP guidelines require that the City Council must adopt a resolution requesting the additional funding if project cost exceeds the original allocations by more than 15 %. Benjamin B. Nolan Public Works Director JSW:jd . RESOLUTION NO. 9y3f D`'' 8 1980 A RESOLUTION OF THE CITY COUNCIL OF THE CITY By 4ha CITY COUhICILOF NEWPORT BEACH REQUESTING THE COUNTY OF CITY OF kIEWBORT BEAdJfANGE TO INCREASE THE FISCAL YEAR 1979 -80 ARTERIAL HIGHWAY FINANCING PROGRAM (AHFP) ALLOCATION FOR CONSTRUCTION OF THE SAN JOAQUIN HILLS ROAD AND JAMBOREE ROAD FREE RIGHT -TURN LANE (C -1991) WHEREAS, on December 11, 1978, the City Council adopted Resolution No. 9478 requesting the County to provide $82,750.00 for construction of the San Joaquin Hills Road and Jamboree Road free right -turn- lane in its 1979 -80 Arterial Highway Financing Program (AHFP), Project No. 1007; and WHEREAS, based on the final project accounting, the County's share of costs needs to be increased further to $101,022.95; and WHEREAS, the County has requested that the City adopt a resolution requesting the increased allocation for AHFP Project No. 1007, NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Newport Beach hereby requests that the County of Orange increase the AHFP allocation for Project No. 1007 to $101,022.95. ADOPTED this day of Mayor ATTEST: 1980. City Clerk kv 120280 o� CITY OF NEWPORT BEACH CALIFORNIA City Hall 7700 W. Newport 91vd. Area Code 714 DATE October 13, 1978 TO: FINANCE DIRECTOR FROM: City Clerk SUBJECT: Contract No. 1991 Description of Contract San Joaquin Hills Road and Jamboree Road Free ig - urn Lane. Authorized by Resolution No. 9440 , adopted on October 10, 1978 Effective date of Contract October 12, 1978 Contract with Williamson and Schmid Address 17782 Sky Park B "oulevard Irvine, CA 92714 Amount of Contract See agreement At�-- Clerc E October 13, 1978 TO: Public Works Department FROM: City Clerk's Office E SUBJECT: San Joaquin Hills Road and Jamboree Road Free Right -Turn Lane (C -1991) Attached are two copies of the agreement between the City and Williamson and Schmid, authorized by Resolution No. 9440. Please send one copy to Williamson and Schmid and the other copy is for your file. C� a AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES FOR SAN JOAQUIN HILLS ROAD AND JAMBOREE ROAD FREE RIGHT TURN LANE THIS AGREEMENT is made and entered into this z�) day of October, 1978, by and between the CITY OF NEWPORT BEACH, a municipal corporation, hereinafter referred to as "CITY ", and the firm of WILLIAMSON AND SCHMID, hereinafter referred to as "ENGINEER" W I T N E S S E T H WHEREAS, CITY's Circulation Element - Master Plan of Streets and Highways has designated San Joaquin Hills Road and Jamboree Road as major roads; and WHEREAS, the City desires to construct a right -turn lane from westbound San Joaquin Hills Road to northbound Jamboree Road, as shown on Exhibit "A" attached hereto and by this reference made a part hereof, under a project to be cooperatively financed with County of Orange Arterial Highway Financing Program (AHFP), hereinafter referred to as "PROJECT "; and WHEREAS, ENGINEER has submitted a proposal to CITY (dated August 25, 1978) to perform engineering services in connection with the design of PROJECT; and WHEREAS, CITY desires to accept said proposal; NOW, THEREFORE, in consideration of the foregoing, the parties hereto agree as follows: 1. General A. CITY engages ENGINEER to perform the services hereinafter described for the compensation herein stated. B. ENGINEER agrees to perform said services upon the terms hereinafter set forth. II. Services to be performed by ENGINEER ENGINEER hereby agrees to perform the following services: A. Gather and review existing record maps, improvement plans, and other documentation affecting the project. B. Perform any additional field survey work necessary to check and reestablish the existing street right -of -way boundaries in which the project is to be constructed. -1- C N 0 0 Perform any additional field survey work to obtain complete topography of the project area. Work to include establishing lines for horizontal and vertical control beneficial to future construction staking. The horizontal control estab- lished will be shown on one of the sheets included within the set of final design improvement plans. Prepare final design for the project on standard City of Newport Beach improvement plan sheets having a plan view scale of 1" = 20'. E. Prepare the necessary special provisions and bid proposals, using the CITY's Standard Plans and Special Provisions as well as the "STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION," 1976 Edition, on Xerox masters suitable for use by the CITY in calling for competitive bids. F. Prepare a final ENGINEER's estimate based on the quantities used in the bid proposal. G. Provide professional consultation for interpretation of plans and specifications and advice during construction of the PROJECT. H. Review existing hydrology and hydraulic studies affecting the project area and prepare final design for storm drain improvements to be constructed as part of this project. I. Complete an investigation of underground utilities affect- ing the PROJECT. III. Duties of CITY CITY hereby agrees to supply ENGINEER with the following informa- tion and materials: A. Title, plan, and plan and profile sheets as needed for the PROJECT. B. Materials investigations,required pavement sections, and soils information necessary to design retaining walls. C. General geometric requirements for the street improvements. D. Available records pertaining to existing street improve- ments and City -owned utilities. IV. Time of Completion Final design, including all plans and other documents for the - 2 - 0 L PROJECT shall be submitted to the Public Works Director of the CITY for final review by December 15, 1978. V. Ownership of PROJECT Documents Original drawings, reports, notes, maps, and other documents shall become the property of the CITY and may be reproduced and utilized as deemed necessary by the Public Works Director. VI. Engineer in Charge Gail P. Pickart, RCE No. 19832, shall be the Engineer in charge of PROJECT design. VII. Right of Termination CITY reserves the right to terminate this agreement at any time by giving ENGINEER seven (7) days' prior written notice; notice shall be deemed served upon deposit in the United States Mail, postage prepaid, addressed to the ENGINEER's business office at 17782 Skypark Boulevard, Irvine, California 92714. In the event of termination due to errors, omissions, or negligence of ENGINEER, CITY shall be relieved of any obligation to compensate ENGINEER for that portion of the work affected by such errors, omissions, or negligence of the ENGINEER. If this agreement is terminated for any other reason, CITY agrees to compensate ENGINEER for the actual services performed up to the effective date of the notice of termination, on the basis of the fee schedule contained herein. VIII. Fee Schedule and Payment In consideration of the performance of the above - described engineering services, CITY hereby agrees to pay ENGINEER an amount based upon the hourly rate schedule set forth below. In no event shall said amount be greater than Fourteen Thousand Seven Hundred Dollars ($14,700.00) except as otherwise provided herein. A. Hourly rates for office and field personnel shall be as follows: - 3 - 9 0 Rates *Overtime PRINCIPAL ENGINEER $50.00 /hour DESIGN ENGINEER 38.00 /hour 48.00 /hour ASSISTANT ENGINEER 33.00 /hour 42.00 /hour DESIGN DRAFTSMAN 28.00 /hour 36.00 /hour DRAFTSMAN 24.00 /hour 30.00 /hour SECRETARY 12.00 /hour 16.00 /hour 3 -MAN SURVEY PARTY 92.00 /hour 114.00 /hour 2 -MAN SURVEY PARTY 72.00 /hour 88.00 /hour *Charged only if authorized by client. These hourly rates will be subject to an increase August 1, 1979. B. The contract amount shall be paid to ENGINEER as follows: 1. Monthly partial payments shall be based on the amount earned each month, as determined by the fee schedule. The sum of the monthly partial payments shall not exceed ninety -five percent (95 %) of the maximum fee; 2. Balance of the total amount earned to be paid upon completion of work specified in Section II (Services to be Performed by ENGINEER), or by January 1, 1980, whichever occurs first; 3. In addition, CITY agrees to reimburse ENGINEER for the actual cost of reproduction of copies of said plans and related documents, as well as cost of aerial photography, materials' cost related to survey work, and other related costs authorized in advance by the Public Works Director and advanced by ENGINEER. IX. Additional Work Should ENGINEER complete any additional work not outlined in this agreement, but authorized by CITY, the extra work shall be performed on an hourly basis in accordance with the hourly rate standard fee schedule set forth in Section VIII (Fee Schedule and Payment) above. X. PROJECT Scope Revisions The scope of the PROJECT may be changed and the maximum fee revised upon prior written approval of the Public Works - 4 - 0 0 Director if the increase in the maximum fee does not exceed One Thousand Four Hundred and Seventy Dollars ($1,470.00). If the revisions to the scope of the PROJECT would result in an increase in the maximum fee exceeding One Thousand Four Hundred and Seventy Dollars ($1,470.00), an amendment provid- ing for such revisions shall be processed and executed by the parties hereto. XI. Hold Harmless ENGINEER shall indemnify and save harmless CITY and its officers and employees from any damage or liability arising from any errors, omissions, or negligence in the ENGINEER's performance of the engineering work and services required by this agreement except for that portion of the work prepared and provided by the CITY and defined in Section III D. IN WITNESS WHEREOF, the parties hereto have executed this agreement on the date first above written. ATTEST: 1 By City Clerk APPROVED AS TO FORM- By ssi an t orney CITY OF NEWPORT BEACH WILLIAMSON AND SCHMID By ENGINEER By ✓ ✓v—' S ENGINEER - 5 - •CONST. AlOTE5 1 ' A lovsl. qC /AB rl7Lp'i' 1 Const. LC.C. Cur1,7TQr Cc n -St. PCX. S ^A wo 110, I r Corgi. e%</, Rai. Wall 1 \ Cons +. /8" S.D. Pi I 1 N�c 2 Const, C'1,rb In /,Lr 3 Cons t. ST. 41yAt ' 4 � I o d, � 0 ..�\ P 'ice. 3 I \ 4 Ij 6 2. N 72S' — Al ✓ 0 4 9G'lN Ni LG - PL A Al w I _ --------- - of SECrioN A -A N. T . CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT 5AA1 J0AQU1A1 *1lZ 5 Ro. f J4maoREE RR /9/GN7- T111VA/ LANE 'I v kip 1, DRAWN T, W, DATE APPROVED PUBLIC WORKS.DIRECTOR R.E. NO. DRAWING NO. EX /-1//3/T " A ii • 0 RESOLUTION NO. 9 44 0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT BETWEEN THE CITY OF NEWPORT BEACH AND WILLIAMSON AND SCHMID FOR ENGINEERING SERVICES IN CONNECTION WITH THE DESIGN OF THE SAN JOAQUIN HILLS ROAD AND JAMBOREE ROAD FREE RIGHT -TURN LANE PROJECT, CONTRACT NO. 1991 WHEREAS, there has been presented to the City Council of the City of Newport Beach a certain agreement between the City of Newport Beach and Williamson and Schmid for engineering services in connection with the design of the San Joaquin Hills Road and Jamboree Road free right -turn lane project; and WHEREAS, the City Council has considered the terms and conditions of said agreement and found them to be fair and equitable, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Newport Beach that said agreement for engineering services above described is approved, and the Mayor and City Clerk are hereby authorized and directed to execute the same on behalf of the City of Newport Beach. ADOPTED this 10th day of October Mayor ATTEST: City Clerk 1978. DDO /kb 10/2/78