Loading...
HomeMy WebLinkAboutX2022-0850 - Calcs�20� w �rny eve . CALCULATIONS FOR SOLAR PHOTOVOLTAIC PANELS: Owner: Westbay Residence Address: 1209 W Bay Avenue Newport Beach CA 92661 INDEX TO CALCULATIONS Sheet Item 1-2 Wind parameters 3-4 Seismic parameters and determination of Fp 5 design loads, roof member check, wind uplift check, deflection 6 attachment check, rail span check 7 lateral check Engineering Calculations Performed By: Doug Engineering 5 Via Belmonte, Rancho Santa Margarita, CA 92688 949-285-5104 Engineering Calculations For: Bright Life Solar 933 Newhall Street, Costa Mesa, CA 92627 (908)489-3933 Project Number: BLS -1867 Date: 311/2022 BASIS FOR DESIGN �� 4 a ---. CODE: 2019 California Building Code ASCE 7-16 16 LIVE LOADS * EXP. 06/30/22 ROOF 20.0 psf req CIVIC Q SNOW 0.0 psf Or CA4\E� BUILDING DIVISION MAR 2 4 2022 BY. D.A. ASCE 7-16 FLUSH MOUNTED SOLAR PANELS Type of Roof Hip Roof Slope - 6 = Angle of plane of roof from horizontal, in degrees 9 = 19 deg Mean Roof Height - Eave height will be used for 0 <= 10deg h = 22 ft Building dimensions sl = 30 ft s2 = 40 ft a = 10% of least horizontal dimension or 0.4h, whichever is smaller, but not less than 4% of the least horizontal direction or 3 ft a= 3 f B = Horizontal dimension of building normal to wind direction, in ft. B = 30 ft Horizontal dimension of building Attachment Spacing Effective Area A = 12 ftz p = gh(GCp)(YE)(Ya) 29.4-7 FIGURE 30.3-2E Components & Cladding h<= 60 ft: External Pressure Coefficients, (GCp), for Enclosed and Partially Enclosed Buildings - Hip roofs 7<=20deg (Roof) FIGURE 30.3-2F Components & Cladding h<= 60 ft: External Pressure Coefficients, (GCp), for Enclosed and Partially Enclosed Buildings - Hip roofs 7<=20deg (Overhang) Velocity pressure Exposure Coefficient: ROOF OVERHANG Wind Exposure C (GCp)down = 0.67 0.67 Kit = 1 (GCp)upzl = -1.69 -2.19 Kd = 0.85 (GCp)upz2r = -2.19 -2.86 Kz = 0.85 (GCp)upz2e = -2.46 -2.89 Ke = 1 (GCp)upz3 = -2.46 qh = 0.00256K,K,tKdKeV2 qh = 22.4 psf p = 17.248 -(GCp) -3.42 YE _ Ya = V= 1 0.77 110 mph 1 ASCE 7-16 Diagrams a� M t� rt IQ @1 nCi Y 7 t t PLAN Natation Wind Pressures Wind Down - All Zones Zone 1 Zone 2r Zone 2c Zone 3 All panels are in Zones 1 and 2e Use 0.6*W 11.6 ROOF -29.15 psf -37.77 psf -42.43 psf -42.43 psf ROOF -37.77 psf -22.7 psf f3 B EL8VATION psf 10 psf, MIN OVERHANG -37.77 psf -49.33 psf -49.85 psf -58.99 psf OVERHANG -49.85 psf -29.9 psf E ASCE 7-16 Soil Site Class = D Seismic Use Group = I SS = 1.613 Mapped Spectral Response acceleration in short periods S1 = 0.592 Mapped Spectral Response acceleration at one second periods Table 1613.2.3(1) Values of Site Coefficient Fa SITE CLASS SS< 0.25 SS= 0.5 SS= 0.75SS= 1.0 SS>1.25 SS>1.5 A 0.8 0.8 0.8 0.8 0.8 0.8 B 0.9 0.9 0.9 0.9 1.0 1.0 C 1.3 1.3 1.2 1.2 1.2 1.2 D 1.6 1.4 1.2 1.1 1.0 1.0 E 2.4 1.7 1.3 - - - F - - - - Fa = 1.200 (interpolated) SMS = Fa*SS = 1.936 Min. 1.2 per 11.4.3 Table 1613.2.3(2) _ Values of Site Coefficient Fv SITE CLASS S1< 0.1 S1= 0.2 S1= 0.3 S11=0.4 S1>0.5 S1>0.6 A 0.8 0.8 0.8 0.8 0.8 0.8 B 0.8 0.8 0.8 0.8 0.8 0.8 C 1.5 1.5 1.5 1.5 1.5 1.4 D 2.4 2.2 2.0 1.6 1.5 1.7 E 4.2 - - - - - F - - - Fv = SDS = 2/3 *SMS = 1.684 (interpolated) ill SDS RISK CATEGORY I, II III > 1,11 III IV 0 A A A 0.167 B B C 0.33 C C D 0.5 D D D Seismic Design Category = D SM1 = Fv*S1 = 0.997 SD1 = 2/3 *SM1 = 0.665 SD1 > RISK CATEGORY I, II III IV 0 A A A 0.067 B B C 0.133 C C D 0.2 D D D ASCE 7-16 Seismic Use Group = I Seismic Design Category = D 1 = 1 SS = 1.613 S1 = 0.592 SMS = 1.936 SM1 = 0.997 R = 6.5 Height = 11.375 T = 0.035*hnA.75 = 0.21679 r (Reliability/Redundancy Factor) = 1 SDS = 1.29 SDI = 0.665 (ASCE 7-16 12.8-2) Cs = SDS/(R/1) = 0.1985 W (ASCE 7-16 12.8-3) Cs <= SD1/[(R/I)T] = 0.472 W (ASCE 7-16 12.8-5) Cs >=.01 = 0.01 W If S1>0.6g (ASCE 7-16 12.8-5) Cs >= 0.5*S1/[R/1] = 0.000 W V(controls) = 0.1985 W Determine Fp for seismic loading on attachments Seismic Load on Nonstructural Components Spacing of attachments 4.67 ft Tributary width of attachments = 1/2 Panel length = 34.3 in Ap = 13.3 ft` PV unit weight including racking = 3 psf WP = 40.04525 Ib Other mechanical/electrical components ap = 1 Fp = 0.4apSDS*Wp/(RP/lp)(1+2z/h) RP = 1.5 Ip = 1 Fp <= 1.6SDS*IPWp SDS = 1.290 Wp = 40.04525 Ib Fp >= 0.3SDS*IPWp Z= 22 ft h= 22 ft 41.33 Ib 13.3-1 82.65 lb 13.3-2 15.50 Ib 13.3-3 01c PROJECT: PV Panels for Westbay Residence OF 7 CLIENT: Bright Life Solar JTE: 1/2022 BY: Doug Engineering NO BLS -1867 DESIGN LOADS Dead Loads Uplift Roof 0.6WL STANDING SEAM 0.6 one nd 2e -22.7 psf, MIN 10 PSF 5/8" Ply shtg C.O Overhang -29.9 psf Rf Frm'g PWLd. = 11.6 psf 10 psf, MIN 10 PSF Misc. Uplift 0.6DL+0.6WL (N) PV System Zone 1 0.6*3 -22.7 -20.9 psf Zone 2 0.6*3 -29.9 -28.1 psf Total DL 12.7 psf Downward DL+0.6WL LL 20.0 psf PDL+WL= 13.0 psf SNOW 0.0 psf Rafter Check Existing 2x12 RAFTERS @ 16" o.c Spacing 1.33 ft Trib panel width = 4.67 ft E 1500000 psi Fb= 900*1*1.15 1035 psi 1 178.0 in^4 M.Ho„V,nd = 4366 ft -Ib Spent 13.00 ft M.H.LL= 3411 ft -Ib Span2 0.00 ft See below for Wind Uplift loads Span3 0.00 ft due to concentated loads at attachments Span4 0.00 ft d Wind Mmax Wind P= (Distance Load Trib W Uplift wind(ft- Down PVDL P = DL+WL to Art. Pts) a b R1 (Ib) R2 (lb (psf) (ft) (Ib) Ib) (Ib) (Ib) (Ib) 0.00 1 1.00 1.00 12.00 279.3 23.3 22.7 4.7 302.6 279 133.29 40.0 173.3 2 4.71 4.71 8.29 193.0 109.6 22.7 4.7 302.6 909 133.29 40.0 173.3 3 6.71 6.71 6.29 146.4 156.1 22.7 4.7 302.6 982 133.29 40.0 173.3 4 10.42 10.42 2.58 60.1 242.4 22.7 4.7 302.6 626 133.29 40.0 173.3 11.42 Span 1 Uniform DL 13.00 50.4 50.4 5.8 psf 1.3 7.8 plf 163.9 Reactions at Spent 729.3 581.9 Negative values are uplift reactions Mmaxwindup = 1757 ft -Ib < 4366 ft -Ib OK Mmaxwinddown = 1541 ft -Ib < 4366 ft -Ib OK For DL+LL including the PV system weight point loads w = 39.6 plf P = 40.0 Ib 1129 ft -Ib < 3411 ft -Ib OK Deflection Check DDL=5wL4/(384EI) (5*12.7*1W4)*1728 = 0.041 in = L/ 3827.3 OK 384*1.5E6*178 PROJECT: PV Panels for Weslbay Residence SHEET: 6 OF 7 CLIENT: Bright Life Solar DATE: 3/1/2022 BY: Doug Engineering DE JOB NO.: BLS -1867 CHECK S -S -N CLAMP ATTACHMENTS FOR WIND UPLIFT Load Testing results from the website www.s-5.com specifically for NU -TECH Machine standing metal seam roofing The connection uses the S -S -U which clamps to the standing seam Allowable tensile load (uplift) = 485 Ib P,„,Pi;fl = 302.6 Ib 5 5 U Mmi TTAor Me6ats wrsa Span 14ga Swat 115 1457 C,b 485 CHECK SCREW ATTACHMENTS FOR SHEAR DUE TO SEISMIC Fp Fp = 41.33 Ib Fp sin(ang) Roof slope/module tilt 19 deg / Shear = Fp*cos( 19 ) = 39.1 Ib Tension = Fp*sin( 19 ) = 13.5 Ib Fp cos(ang) 5-5U TaAor Metal Wua-Span 24g=Ske(::' 115 2349 B 1174 Shear capacity 1174 Ib Interaction Equation fr/F,+f„/F,, 0.624 + 0.033 = 0.657 < 1 OK RAIL SPAN CHECK Ironridge Railing Check Load for half a panel = 27 Wxa10= 62.1 plf Per the Ironridge Structural Analysis of the Ironridge XR10 Rail for 110 mph and 0 psf snow, the max span for XR10 Ironridge Rails is 79" for Exposure C Use XR10 Rails with a spacing of 56" o.c. max for attachment points. PROJECT: PV Panels for Westbay Residence CLIENT: Bright Life Solar BY: Doug Engineering SHEET: 7 OF 7 DATE: 3/1/2022 DE JOB NO.: BLS -1867 LATERAL ANALYSIS DETERMINE ADDITIONAL LOAD COMPARED TO EXISTING FOR LATERAL LOADING Aroofexisting= = 800 sf Wpanel = 41.0 Ib Wroofexisting = 9.7*800 = 7760 Ib 24 *Wpanel = 984 Ib Wwaliexisting= 15*80*6 = 7200 lb Wrestofanay= 420 lb Wexisgng= 14960 lb Warray= 1404 lb V = 0.198 W Vroofexisting = 2962 Ib Existing Total Lateral Force Vmofwpanels = 3240 Ib New Total Later Force % increase = 3240 *100%_100% = 9% increase which results in less than a 10% increase in the 2962 stress of existing lateral resisting elements OK 1E CALCULATIONS FOR SOLAR PHOTOVOLTAIC PANELS: Owner: Westbay Residence Address: 1209 W Bay Avenue, Newport Beach, CA 92661 INDEX TO CALCULATIONS Sheet Item 1-2 Wind parameters 3-4 Seismic parameters and determination of Fp 5 design loads, roof member check, wind uplift check, deflection 6 attachment check, rail span check 7 lateral check Engineering Calculations Performed By: Doug Engineering 5 Via Belmonte, Rancho Santa Margarita, CA 92688 949-285-5104 Engineering Calculations For: Bright Life Solar 933 Newhall Street, Costa Mesa, CA 92627 (908)489-3933 Project Number: BLS -1867 Date: 3/1/2022 BASIS FOR DESIGN CODE: 2019 California Building Code ASCE 7-16 LIVE LOADS ROOF 20.0 psf SNOW 0.0 psf a ASCE 7-16 FLUSH MOUNTED SOLAR PANELS Type of Roof Hip Roof Slope - 0 = Angle of plane of roof from horizontal, in degrees 0 = 19 deg Mean Roof Height - Eave height will be used for0 <= 10deg h= 22 ft Building dimensions sl = 30 ft s2 = 40 ft a = 10% of least horizontal dimension or 0.4h, whichever is smaller, but not less than 4% of the least horizontal direction or 3 ft a= 3 f B = Horizontal dimension of building normal to wind direction, in ft. B = 30 ft Horizontal dimension of building Attachment Spacing Effective Area A = 12 ftZ p = gh(GCP)(YE)(Ya) 29.4-7 FIGURE 30.3-2E Components & Cladding h<= 60 ft: External Pressure Coefficients, (GCp), for Enclosed and Partially Enclosed Buildings - Hip roofs 7<=20deg (Roof) FIGURE 30.3-21' Components & Cladding h<= 60 ft: External Pressure Coefficients, (GCp), for Enclosed and Partially Enclosed Buildings - Hip roofs 7<=20deg (Overhang) Velocity pressure Exposure Coefficients ROOF OVERHANG Wind Exposure C (GCp)down = 0.67 0.67 Kt = 1 (GCp)upzl = -1.69 -2.19 Kd = 0.85 (GCp)upz2r = -2.19 -2.86 KZ = 0.85 (GCp)upz2e = -2.46 -2.89 Ka = 1 (GCp)upz3 = -2.46 qh = 0.00256K,KztKdKeV2 qh = 22.4 psf p = 17.248 "(GCP) -3.42 YE _ Ya = V= 1 0.77 110 mph I Diagrams 4 'mR��jm�m _ s A r lal PLAN Notation Wind Pressures Wind Down - All Zones Zone 1 Zone 2r Zone 2c Zone 3 All panels are in Zones 1 and 2e Use 0.6*W ASCE 7-16 9 le I � :LRV i 11.6 psf 10 psf, MIN ROOF OVERHANG -29.15 psf -37.77 psf -37.77 psf -49.33 psf -42.43 psf -49.85 psf -42.43 psf -58.99 psf ROOF OVERHANG -37.77 psf -49.85 psf -22.7 psf -29.9 psf 2 ASCE 7-16 Soil Site Class = D Seismic Use Group = I SS = 1.613 Mapped Spectral Response acceleration in short periods S1 = 0.592 Mapped Spectral Response acceleration at one second periods Table 1613.2.3(1) Valnec of Sita Cneffirirnt Fa SITE CLASS SS< 0.25 SS= 0.5 SS= 0.75 SS= 1.0 SS>1.25 SS>1.5 A 0.8 0.8 0.8 0.8 0.8 0.8 B 0.9 0.9 0.9 0.9 1.0 1.0 C 1.3 1.3 1.2 1.2 1.2 1.2 D 1.6 1.4 1.2 1.1 1.0 1.0 E 2.4 1.7 1.3 - - - F - - - - Fa = 1.200 (interpolated) SMS = Fa*SS = 1.936 Min. 1.2 per 11.4.3 Table 1613.2.3(2) Valnec of Site Cneffiniant Fv SITE CLASS S1<0.1 S1=0.2 51=0.3 S1=0.4 S1>0.5 S1>0.6 A 0.8 0.8 0.8 0.8 0.8 0.8 B 0.8 0.8 0.8 0.8 0.8 0.8 C 1.5 1.5 1.5 1.5 1.5 1.4 D 2.4 2.2 2.0 1.6 1.5 1.7 E 4.2 - - - - - F - - - Fv = SDS = 2/3 *SMS = 1.684 (interpolated) 1.29 SDS RISK CATEGORY > I, II III IV 0 A A A 0.167 B B C 0.33 C C D 0.5 D D D Seismic Design Category = D SM1 = Fv*S1 = 0.997 SDI = 2/3 *SM1 = 0.665 SDI > RISK CATEGORY I, II III IV 0 A A A 0.067 B B C 0.133 C C D 0.2 D D D ASCE 7-16 Seismic Use Group = I Seismic Design Category = D 1 = 1 SS = 1.613 S1 = 0.592 SMS = 1.936 SM1 = 0.997 R = 6.5 Height = 11.375 T = 0.035*hnA.75 = 0.21679 r (Reliability/Redundancy Factor) = 1 SDS = 1.29 SDI = 0.665 (ASCE 7-16 12.8-2) Cb = SDS/(R/1) _ 0.1985 W (ASCE 7-16 12.8-3) Cs <= SD1/[(R/I)T] = 0.472 W (ASCE 7-16 12.8-5) Cs >_ .01 = 0.01 W If S1>0.6g (ASCE 7-16 12.8-5) Cs >= 0.5*S1/[R/1] = 0.000 W V(controls) = 0.1985 W Determine Fp for seismic loading on attachments Seismic Load on Nonstructural Components Spacing of attachments 4.67 ft Tributary width of attachments = 1/2 Panel length = 34.3 in Ap = 13.3 ft` PV unit weight including racking = 3 psf WP = 40.04525 Ib Other mechanical/electrical components ap = 1 Fp = 0.4apSDS*Wp/(RP/lp)(1+2z/h) RP = 1.5 Ip = 1 Fp <= 1.6SDS*IPWP SDS = 1.290 WP = 40.04525 Ib Fp >= 0.3SDS*IPWP Z= 22 ft h= 22 ft 41.33 Ib 13.3-1 82.65 lb 13.3-2 15.50 Ib 13.3-3 PROJECT: PV Panels for Westbay Residence CLIENT: Bright Life Solar BY: Doug Engineering SHEET: 5 OF 7 DATE: 3/1/2022 DE JOB NO.: BLS -1867 DESIGN LOADS Dead Loads Uplift Roof 0.6WL STANDING SEAM 3.5 psf 0.6WL Zone 1 and 2e -22.7 psf, MIN 10 PSF 5/8" Ply shtg 1.9 Overhang -29.9 psf Rf Frm'g 2.8 PWLd.. = 11.6 psi 10 psf, MIN 10 PSF Misc. 1.5 Uplift 0.6DL+0.6WL (N) PV System 3.0 Zone 1 0.6*3 -22.7 -20.9 psf Zone 2 0.6*3 -29.9 -28.1 psf Total DL 12.7 psf Downward DL+0.6WL LL 20.0 psf PDL+WL = 13.0 psf SNOW 0.0 psf Rafter Check Existing 2x12 RAFTERS @ 16" o.c Spacing 1.33 ft Trib panel width = 4.67 ft E 1500000 psi Fb = 900*1 *1.15 1035 psi 1 178.0 in A4 MallmWma = 4366 ft -Ib Span1 13.00 ft Mapm,LL= 3411 ft -Ib Span2 0.00 ft See below for Wind Uplift loads Span3 0.00 ft due to concentated loads at attachments Span4 0.00 ft d Wind Mmax Wind P= (Distance Load TribW Uplift wind(ft- Down PVDL P=DL+WL to Aft. Pts) a b R1 (Ib) R2 (Ib (psf) (ft) (lb) Ib) (Ib) (Ib) (Ib) 0.00 1 1.00 1.00 12.00 279.3 23.3 22.7 4.7 302.6 279 133.29 40.0 173.3 2 4.71 4.71 8.29 193.0 109.6 22.7 4.7 302.6 909 133.29 40.0 173.3 3 6.71 6.71 6.29 146.4 156.1 22.7 4.7 302.6 982 133.29 40.0 173.3 4 10.42 10.42 2.58 60.1 242.4 22.7 4.7 302.6 626 133.29 40.0 173.3 11.42 Span 1 Uniform DL 13.00 50.4 50.4 5.8 psf 1.3 7.8 plf 163.9 Reactions at Spent 729.3 581.9 Negative values are uplift reactions Mmaxwindup = 1757 ft -Ib < 4366 ft -Ib OK Mmaxwinddown = 1541 ft -Ib < 4366 ft -Ib OK For DL+LL including the PV system weight point loads w = 39.6 plf P = 40.0 Ib Mmax = 1129 ft -Ib < 3411 ft -Ib OK Deflection Check DDL = 5wL4/(384EI) (5*12.7*13A4)*1728 = 0.041 in = L/ 3827.3 OK 384*1.5E6*178 PROJECT: PV Panels for Westbay Residence SHEET: 6 OF 7 CLIENT: Bright Life Solar DATE: 3/1/2022 BY: Doug Engineering DE JOB NO.: BLS -1867 CHECK S -S -N CLAMP ATTACHMENTS FOR WIND UPLIFT Load Testing results from the website www.s-5.com specifically for NU -TECH Machine standing metal seam roofing The connection uses the S -S -U which clamps to the standing seam Allowable tensile load (uplift) = 485 Ib PmPi;a = 302.6 Ib .. 5-5-l9 Kfina Taywr i ietaEs 'Versa -Span 24 ga Sted 115 1457 G O 48S CHECK SCREW ATTACHMENTS FOR SHEAR DUE TO SEISMIC Fp Fp = 41.33 Ib Fp sin(ang) Roof slope/module tilt 19 deg Shearn Fp*cos( 19 ) = 39.1 Ib / Tension = Fp"sin( 19 ) = 13.5 Ib Fp cos(ang) 5-5-U Tgtor Meats Versa Spn 24ga5teei'.; 115 2544 B 1174 Shear capacity 1174 Ib Interaction Equation fWFr+f,/F. 0.624+ 0.033 = 0.657 < 1 OK RAIL SPAN CHECK Ironridge Railing Check Load for half a panel = 2.7' WMIDO 62.1 plf Per the Ironridge Structural Analysis of the Ironridge XR10 Rail for 110 mph and 0 psf snow, the max span for XR10 Ironridge Rails is 79" for Exposure C Use XR10 Rails with a spacing of 56" o.c. max for attachment points. PROJECT: PV Panels for Westbay Residence CLIENT: Bright Life Solar BY: Doug Engineering SHEET: 7 OF 7 DATE: 3/1/2022 DE JOB NO.: BLS -1867 LATERAL ANALYSIS DETERMINE ADDITIONAL LOAD COMPARED TO EXISTING FOR LATERAL LOADING Aroofexisting = 800 sf Wpanel= Wroofexisting= 9.7`800 = 7760 Ib 24 `Wpanel = Wwallexisting = 15'80`6 = 7200 Ib Wrestofaaay = Wexistine = 14960 Ib Warfay = V = 0.198 W Vroofexisting = 2962 Ib Existing Total Lateral Force Vroofwpanels= 3240 Ib New Total Later Force 41.0 Ib 984 Ib 420 Ib 1404 Ib % increase = 3240 '100%-100% = 9% increase which results in less than a 10% increase in the 2962 stress of existing lateral resisting elements OK