HomeMy WebLinkAboutX2020-2920 - MiscCONSULTING October 28, 2021 Eagle Development and Construction, Inc. 31352 Via Colinas, Suite 101 Westlake Village, California 91362 Attention: Mr. Zachary Eglit Subject: Earthwork Observation/Testing Report Slope/Embankment Erosion Failure Mitigation 1201 Dolphin Terrace Tract 1700, Lot 5 Corona del Mar, California References: See attached list INC File No: 8595-10 Report No: Ri-8595 This report presents the results of our observation and testing services performed during the Slope/Embankment Erosion Failure Mitigation at the property primarily located at 1201 Dolphin Terrace in Newport Beach, California. The purpose for our geotechnical services was to observe and document the grading operations as part of the slope repair. The slope failure was due to a water main break in front of 1207 Dolphin Terrace in early 2018 that resulted in an erosional washout of soil on the slope below 1201 and 1207 Dolphin Terrace. Based on our observations and review of the test results, it is our opinion that the slope grading was performed in substantial conformance with our recommendations, the City of Newport Beach and project grading requirements. PROJECT DATA Site: 1201 Dolphin Terrace, Lot 5, Tract 1700 1207 Dolphin Terrace, Parcel 1, Tracts 1700 and 2334 City of Newport Beach Easement along Bayside Drive Corona del Mar, California Contractor: DP Reynolds Corp Civil Engineer: Forkert Engineering & Surveying, Inc. Regulatory Agency City of Newport Beach Grading Plans: Precise Grading Plan, prepared by Forkert Engineering & Surveying, Inc., - -- - _ IN 8935 10/8/18; Sheets C-5. Observation Period: March 25, 2020, through July 21, 2020 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 Phone 949 629 2539 1 Email info@rmccarthyconsulting.com October 28, 2021 SITE LOCATION File No: 8595-10 Report No: RI -8595 Page: 2 The area of the subject slope repair reported herein is shown on the Geotechnical Plot Plan, Figure 1. The site slope is located below 1201 Dolphin Terrace and 1207 Dolphin Terrace in the Irvine Terrace community of Corona del Mar within the City of Newport Beach, California as shown on the attached Location Map, Figure 2 and Aerial Photo Map, Figure 3. The property is bordered to the northwest and southeast by similar developed residential lots. The northeasterly side of the lot fronts Dolphin Terrace. The southwesterly portion of the lot is an approximately 66 -foot high graded slope that descends to Bayside Drive. The repaired area is on the lower slope along the southeast boundary of the site and extending partially into 1207 Dolphin Terrace and the city easement along Bayside Drive. Additional history and site descriptions are provided in the referenced reports. BACKGROUND The background and purpose for the repair was stated previously in the referenced reports including the following paragraph from Reference 4, dated June 5, 2018: Based on our geotechnical review, the slope has experienced a sulf1cial failure that is presently a relatively shallow feature. The deeper upslope feature was repaired shortly atter the water main break and erosion event by filling the undercut void areas with a sand -cement slurry backfill. The remaining damaged portions of the slope should be mitigated to avoid progressive erosion damage... The erosion washout on the slope was caused by a singular event due to a concentrated, rapid Now of water from a nearby broken water main. The existing condition of the slope failure area leaves adjoining areas unsupported or poorly supported. The slope failure area should therefore be repaired in a manner that restores support and the integrity of the overall slope. A. General The vegetation within the slope repair area was cleared from the property prior to and during grading. The site excavation exposed previously constructed fill soils (Afo). Site conditions were generally as expected based on preliminary exploration as reported in the attached references. B. Preparation of Existina Ground The site was graded by keying and benching into competent undisturbed soil. Erosional areas were cut to a flat grade at the removal depths of approximately 3 to 6 feet, with minimum 2 foot high benches. Disturbed soil from the previous embankment erosion washout was removed to competent undisturbed fill soil. Subsequent ground preparation consisted of overexcavation of existing earth materials to expose competent soil. This included the lower fill key area and bench cuts as the fill was placed for the embankment. The in-place, previously placed engineered fill materials exposed in the R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 October 28, 2021 14 YU �'�Ju File No: 8595-10 Report No: RI -8595 Page: 3 excavations and benching were observed by our field geologist and determined to be suitable for support of the cement -treated fill soils. C. Lower Key Backfill The toe -of -slope key excavation within the City easement was cut approximately 4 to feet below the adjacent grade at an approximate bottom elevation of 16 feet. In coordination with the city officials, the key was subsequently filled with a 3 -sack sand cement slurry to within 12 to 18 inches from the top of the key. On-site sandy silt fill soils mixed with 4 percent cement (by weight) were utilized as fill material to bring the slope to grade above the fill key. D. Fill Placement and Compaction The new embankment was constructed with on-site and imported, cement -treated fill soils. Fill soils were generally placed in 6- to 8 -inch loose lifts, brought to near optimum moisture content and compacted. Geo -grid reinforcement (Miragrid 5XT) was installed at two feet vertical intervals as the fill slope was constructed. The initial layer of geo-grid was installed at an approximate elevation of 20.7 feet. Geogrid layers were lapped at joints where necessary with a minimum 24 -inch overlap. The fill slope was overbuilt by at least 12 -inches at the outer face and subsequently trimmed back to final surface grade. This was generally accomplished by backfilling against a temporary pipe and board installation at the slope edge. The soil was then trimmed back to slope grade after removal of the board. Test results indicated that a minimum of 95 percent relative compaction, as determined by ASTM D1557, was achieved. The maximum depth of fill placed was on the order of 8 feet. Fill material consisted of cement -treated on-site and imported sandy silt and silty sand. The soil was mixed on-site and compacted before the cement set. Equipment used for earthwork and compaction included a small excavator (Takeuchi TB 216), Bomag BPR 60/65D Vibratory Plate, and hand -operated mechanical devices. Water was provided by a water hose. A 2013 Terex TS60 crane was used to transport large bags of on-site and imported soil to the work area when grading progressed to the upper portions of the slope repair. Representative samples of the site soils used as fill were returned to the laboratory for testing. Laboratory tests for maximum density and optimum moisture content were performed in accordance with ASTM: D1557 (the Five Layer Method). The results are presented in Table 2, Laboratory Maximum Dry Density/Optimum Moisture Relationship. Based on the results of our field density testing, it is our opinion that a minimum of 95 percent relative compaction was achieved within the areas tested. Density tests were performed in accordance with ASTM D1556 (Sand Cone Method) and/or ASTM D6938 (Nuclear Gauge Method). Areas prepared by benching were also probed to check compaction. Field Density Test Results are tabulated in Table 1, Results of Field Density Tests. The approximate locations of density tests are included on the Geotechnical Plot Plan, Figure 1. R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 October 28, 2021 File No: 8595-10 Report No: Ri-8595 Page: 4 Testing was performed on representative areas to render a professional opinion as to the compaction of fill materials. It is our opinion that sufficient testing was performed to arrive at the conclusions stated herein; however, this is an opinion and is not a warranty that all fill materials are at 95 percent relative compaction. E. Subdrainaae Subdrains consisting of 4 -inch diameter PVC Schedule 40 perforated pipe, surrounded by approximately 2 cubic feet/ foot of 3/4 -inch crushed gravel wrapped in Mirafi 140N geofabric were installed at 2 locations. The lower subdrain was installed at the base of the first bench excavation at approximate elevation 20. The mid slope subdrain was installed at approximate elevation 40. The chimney drain was installed continuously down the center of the repair along the vertical and horizontal benches. The chimney drain consists of a pre -manufactured, Miradrain 4 -foot wide drain board enclosed in filter fabric. The upper subdrain perforated pipes feed into a 4 -inch solid outlet pipe that cannons to the slope face and then downslope, above grade, to the concrete encased outlet structure. The lower subdrain perforated pipes exit to a solid outlet pipe that connects to the below grade portion of the outlet structure. From the lower outlet structure the drains eventually exit to the curb face along Bayside Drive via two 4 -inch diameter solid pipes as indicated on Sheet C-5, the referenced Civil Engineering drawing. CONCLUSIONS AND RECOMMENDATIONS General Based upon field observations and test results, it is our opinion that grading and compaction for the Slope/Embankment Erosion Failure Mitigation described herein was accomplished in accordance with the project requirements and the grading requirements of the City of Newport Beach. Field density testing indicated that a minimum of 95 percent relative compaction was achieved at the locations tested as part of the slope reconstruction. Based on our observations, as previously reported in 2018, the soil voids within the upper portions of the slope were sufficiently filled with the grout to provide support for the upper slope. Based on the observations and testing as described herein, the geogrid reinforced, cement - treated fill materials placed as part of the repair are suitable for the intended use. The slurry backfill placed within the upper slope voids as part of the previous emergency repair in early 2018 renders the upper portions of the slope as supported and suitable for the intended use. The slope repairs described herein and in our referenced reports removed the erosional features and damage that resulted from the off -property, February 2018 water main break for the property at 1201 Dolphin Terrace. Subsurface drainage has been installed and provided to reduce buildup of hydrostatic pressures in the mitigated slope soils. Shear strengths for the mitigated area provide the safety factors for the repaired portion of the slope as indicated in our R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newpoit Beach, CA 92660 October 28, 2021 File No: 8595-10 Report No: RI -8595 Page: 5 "r I/V referenced reports. It is our opinion that the factors of safety for the repaired area meet or exceed those factors of safety that were present on the slope prior to the damage caused by the February 2018 water line break. It is our further conclusion that the repaired slope should not adversely affect, or be adversely affected by, adjacent properties, including the structural improvements at the top of slope, providing appropriate slope care and maintenance are exercised. Slopes and Slope Drainage Devices Maintenance of slopes and drainage devices is important to their long term performance. The following is a list of suggested procedures provided as a guide for slope maintenance. 1. Drainage Devices Associated with Hillsides • Graded berms, swales, area drains, and slopes are designed to carry surface water from pad areas and should not be blocked or destroyed. Water should not be allowed to pond in pad areas, or overtop and flow onto graded or natural slopes. • Sources of uncontrolled water, such as leaky water pipes or drains, should be repaired if identified. • Devices constructed to drain and protect slopes, including brow ditches, berms, terrace drains and down drains should be maintained regularly, and in particular, should not be allowed to clog such that water can flow unchecked over slope faces. • Subdrain outlets should be maintained to prevent burial or other blockage. 2. Slopes Slopes in the southern California area should be planted with appropriate drought - resistant vegetation as recommended by a landscape architect. Planting is not necessary within the cement -treated repair area; however, surrounding areas should be planted and manintained. Rodent activity should be controlled on the slope and within yard areas along the top of the slope as burrowing may introduce paths for transfer of water into the subsurface soils and out to the slope face. Lot and Building Pad Drainage 1. Roof drains should collect water into a tight -lined drainage system of area drains. When area drain systems are not feasible, roof drain water should be diverted by swales and sloping ground to approved outlet areas. Where planters or unimproved ground are located next to building foundations or slab -on -grade construction, roof drain outlets should be extended at least 3 feet away from the structure. Outlets and infiltration of roof water next to structures is not acceptable and should be eliminated by drainage devices. 2. Area drain inlet grates should be properly installed and maintained. The inlets need to be -properly located at lower grade collection points around yard areas. The grate should be installed low enough to quickly transfer collecting water into the area drain pipe system. It should also be installed high enough to not be easily buried, silted over or choked out by vegetation. R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 October 28, 2021 File No: 8595-10 Report No: RI -8595 Page: 6 3. Drainage inlet grates should be regularly inspected and cleaned/replaced as necessary to allow free flow of water into the drain system while effectively blocking larger detritus from entering risers and flow pipes. 4. Area drain pipes should be periodically checked for blockage and cleaned as necessary. 5. Landscape grades should be maintained or improved to allow efficient drainage to approved surface water outlets and into the storm drain system. Modifications to designed or existing drainage grades should be made as necessary when ponds of excess water, standing water, low flows, etc. are noticed. An experienced landscape contractor or landscape architect should be consulted if necessary to provide recommendations for drainage improvements. 6. As yard improvements are made to existing residential properties, it is common for unlicensed landscape contractors, laborers or the homeowner to alter the flow patterns that were designed for site drainage. Such actions however can be harmful to the property. Adverse infiltration and surface flows may cause damage to foundations, slabs, concrete hardscape, slopes, neighboring properties, etc. and result in large repair costs or litigation. Water Use 1. Irrigation of on-site vegetation should be properly controlled. Excessive watering should be avoided not only to save water, but also to protect property. 2. Water leaks should be repaired quickly when identified. 3. Broken sprinkler heads, broken pipes, leaks at joints, or other breaches should be immediately repaired when identified. It is incumbent upon the hillside property owners to maintain their property in a manner which will assure the continued stability of the property. The following guidelines are recommended for slope and yard maintenance in graded hillside areas: 1. Maintain irrigation systems in working order. 2. Swales which direct water around the house into area drain inlets should be maintained so that they will not become ineffective. 3. Catch basins, grates, and subsurface drainage piping should be kept free of silt and debris. 4. Roof gutters and downspouts should be provided and inspected periodically to assure that they are not broken or clogged. It is important that the roof drainage be tight - lined into the area drain system that carries water toward the front of the lot and away from sloping hillside terrain. 5. All non-erosive drainage devices should be kept clean and in good repair. 6. Separations within concrete hardscape at joints or cracks should be routinely cleaned and treated with an appropriate elastomeric filler that will prevent water intrusion into the subgrade soils. Separations and cracks tend to worsen when water penetrates into the supporting soil. 7. Future extensive landscaping revision to the property may alter the civil engineering design which includes surface drainage. When landscaping, homeowners should avoid disrupting existing flow patterns that carry water away from the top of the slope. R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 October 28, 2021 l'u-11Y File No: 8595-10 Report No: Ri-8595 Page: 7 Existing, deep-rooted vegetation on the sloping ground should not be removed unless replaced with an approved alternate planting. 8. Heavy irrigation at any location on this or neighboring lots can damage slopes and should be avoided. Lateral migration of subsurface water can adversely impact slopes. 9. Future construction of structural footings or features such as pools, fountains, spas, columns or other elements that impose a load on the soil should not be allowed on slopes without additional geotechnical consultation and investigation. 10. Any problems such as erosion or slumping should be repaired immediately in order that more serious problems may be averted. 11. Existing deep-rooted vegetation is protecting the slope to some degree and should be maintained if feasible. 12. Rodent activity should be controlled to prevent water penetration and loosening of the soil on slopes. 13. Care should be exercised to prevent loose fill from being placed on slopes by subcontractors during landscaping or construction activities. 14. Drains at the top of slopes should be checked periodically to assure that they are clear and that water will not overflow the slope, causing erosion. Irrigation and supply lines that are under pressure for water and natural gas should be routinely inspected for damages, including separations and breaches that result in leaks. 15. Hoses and sprinklers should be used cautiously. Water hoses should not be left unattended when turned on and should be fitted with an auto shutoff nozzle. During the rainy season, little, if any, irrigation may be required. Over -saturation of the ground should be avoided and may result in slope damage. 16. Be on the alert for water backup of drains inside the house and toilets during a rainy season since this may indicate drain or sewage blockage. 17. Water should not be allowed to collect or pond within the yard areas of your property. Ponded water may seep into the ground and travel laterally. This could result in erosion on the slope and weaken the natural ground. 18. If erosion is observed or reported on your lot or the neighboring properties, measures should be implemented immediately to arrest the condition and seek the assistance of a registered, licensed engineer or geologist. Once erosion has started it is difficult to control and severe damage may result rather quickly. 19. Hoses and sprinklers should not be left running on or near a slope, particularly during the rainy season. This may saturate the ground and cause damage. 20. Exercise ordinary precaution. Your house and building site were constructed to meet certain standards to protect against various natural occurrences and ordinary accidents. You as the homeowner must also do your part in maintaining the property. LIMITATIONS Our description of grading operations, as well as observations and testing, has been limited to those grading operations observed between March 25, 2020 and July 21, 2020. This report does not include line and grade survey results. Elevations and locations used in this report are estimated based on field surveys done by others. The opinions rendered apply to conditions in the subject areas observed by us as of the date of our indicated site visits. We are not responsible for any changes in the conditions that may occur after that date and outside our purview. Our work was provided consistent with and R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 October 28, 2021 File No: 8595-10 Report No: Ri-8595 Page: 8 limited to the standard of care applicable to such services, which is that services were consistent with the professional care and skill ordinarily provided by consultants practicing in the same or similar locality under the same or similar circumstances. No other warranty is expressed or implied. The opportunity to be of service is appreciated. If you have any questions, please call. Respectfully submitted, R MCCARTHY CONSULTING, INC. i RoertM0 Geotechnical Engineer Registration Expires 3-31-22 Date Signed: 10/28/2021 Attachments: Table 1— Results of Field Density Tests Table 2 — Laboratory Maximum Dry Density/Optimum Moisture Relationship References Figure 1, Geotechnical Plot Plan Figure 2, Location Map Figure 3, Aerial Photo Map Sheet C-5, Referenced R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 1W^'jy October 28, 2021 File No: 8595-10 Report No: RI -8595 Page: 9 TABLE 1 - RESULTS OF FIELD DENSITY TESTS Test No. Test Date Location Estimated Elevation (feet) Soil Type Moisture Content (%) Dry Density (pcf) Relative Compaction 1* 4/13/20 Slope 19.2 1 17.4 120.1 98 2* 4/13/20 Slope 18.7 1 20.0 120.3 98 3* 4/14/20 Slope 19.7 1 18.0 120.3 98 4* 4/16/20 Slope 20.7 1 14.9 120.1 98 5* 4/16/20 Slope 21.7 2 15.7 122.8 98 6* 4/20/20 Slope 22.7 2 14.2 122.4 98 7* 4/21/20 Slope 23.7 2 16.0 121.4 97 8* 4/23/20 Slope 24.7 2 16.5 120.2 96 9* 4/23/20 Slope 25.7 2 16.5 122.2 98 10* 4/24/20 Slope 26.7 1 17.7 119.7 97 11* 4/24/20 Slope 27.7 1 18.5 120.9 98 12* 4/24/20 Slope 28.7 2 15.4 122.4 98 13* 4/27/20 Slope 29.7 2 20.2 120.3 96 14* 4/27/20 Slope 30.7 2 17.1 120.7 97 15 4/28/20 Slope 20.0 1 16.8 119.0 97 16 4/28/20 Slope 22.0 1 16.5 118.1 96 17* 4/28/20 Slope 31.7 2 17.7 121.5 97 18 4/28/20 Slope 32.0 1 16.1 118.5 96 19* 4/29/20 Slope 32.7 1 14.5 120.3 98 20* 4/29/20 Slope 32.7 1 15.0 118.3 96 21* 4/29/20 Slope 25.0 2 15.0 120.8 97 22 4/29/20 Slope 28.0 2 14.9 119.7 96 23* 4/29/20 Slope 33.7 2 16.1 121.8 97 24* 4/30/20 Slope 34.7 2 15.3 122.2 98 25* 4/30/20 Slope 35.7 2 16.8 120.0 96 26* 4/30/20 Slope 36.7 2 17.8 120.7 97 27* 5/1/20 Slope 37.7 2 15.8 121.2 97 28* 5/1/20 Slope 38.7 2 17.9 120.0 96 29* 5/1/20 Slope 39.7 2 17.0 123.2 99 30* 5/4/20 Slope 40.7 2 17.5 120.8 97 31* 5/7/20 Slope 41.7 2 16.0 120.7 97 32* 5/8/20 Slope 42.7 2 17.4 120.4 96 33* 5/12/20 Slope 43.7 2 14.4 122.3 98 34* 5/13/20 Slope 44.7 2 14.3 121.3 97 35* 5/18/20 Slope 45.7 2 15.1 120.9 97 36 1 5/18/20 Slope 32.0 2 1 16.8 1 120.5 96 R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 October 28, 2021 File No: 8595-10 Report No: Ri-8595 Page: 10 Test No. Test Date Location Estimated Elevation (feet) Soil Moisture Type Content (%) Dry Density (pcf) Relative Compaction 37 5/18/20 Slope 36.0 2 16.4 119.7 96 38 5/18/20 Slope 40.0 2 17.1 121.5 97 39 5/18/20 Slope 44.0 2 16.7 120.8 97 40* 5/19/20 Slope 46.7 2 15.2 120.7 97 41* 5/20/20 Slope 47.7 2 16.7 121.0 97 42* 6/3/20 Slope 48.7 3 17.4 120.4 96 43* 6/3/20 Slope 49.7 3 15.9 120.9 96 44* 6/12/20 Slope 50.7 3 12.8 121.3 96 45* 6/12/20 Slope 51.7 1 12.8 118.8 97 46* 6/12/20 Slope 52.7 3 14.9 122.1 97 47* 6/12/20 Slope 53.7 1 12.1 120.4 98 48* 6/15/20 Slope 54.7 3 11.3 120.0 95 49* 6/22/20 Slope 55.7 3 13.4 119.4 95 50* 6/22/20 Slope 56.7 4 14.3 121.3 95 51* 6/22/20 Slope 57.7 4 12.7 121.4 95 52 6/22/20 Slope 56.0 3 12.2 120.5 96 53 6/22/20 Slope 52.0 3 13.9 120.0 95 54* 6/23/20 Slope 58.7 3 12.0 120.8 96 55* 6/23/20 Slope 59.5 3 13.6 120.3 95 56 6/23/20 Slope 59.0 4 13.0 121.8 95 57 6/23/20 Slope 48.0 2 11.0 119.7 96 Notes: *indicates Sand Cone Test; all other tests Nuclear Gauge Method Depth indicated is below finished pad grade FG = Finished Grade R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 �U -q-m October 28, 2021 File No: 8595-10 Report No: RI -8595 Page: 11 TABLE 2 — LABORATORY MAXIMUM DRY DENSITY/ OPTIMUM MOISTURE RELATIONSHIP ASTM D1557 Soil Optimum Maximum Type Description Moisture Dry Density Content (%) (pco Cement -Treated** Light Brown Sandy SILT/ Silty 1 SAND 12 123 2 Cement -Treated** Brown Sandy SILT/ Silty SAND 11.5 125 3 Cement -Treated" Red Brown Silty SAND (Import) 10 126 4 Cement -Treated" Red Brown Silty SAND (Import) 9.5 128 ** Cement -treated 4% by dry weight REFERENCES 1. Precise Grading Plan, 2018, prepared by Forkert Engineering & Surveying, Inc., JN 8935, 10/8/18, Sheet C-5. 2. R McCarthy Consulting, Inc., 2018, "Response to City Second Review Comments, Slope/Embankment Failure Mitigation, 1201 Dolphin Terrace, Tract 1700 Lot 5, Corona del Mar, California," File No: 8240-10, Report No: 20180912-1, October 2. 3. R McCarthy Consulting, Inc., 2018, "Response to City First Review Comments, Slope/Embankment Failure Mitigation, 1201 Dolphin Terrace, Tract 1700 Lot 5, Corona del Mar, California," File No: 8240-00, Report No: 20180717-1, August 30. 4. R McCarthy Consulting, Inc., 2018, "Geotechnical Report, Slope/Embankment Failure Mitigation, 1201 Dolphin Terrace, Tract 1700 Lot 5, Corona del Mar, California," File No: 8240-10, Report No: 20180605-1, June 5. 5. R McCarthy Consulting, Inc., 2016, "Geotechnical Investigation, Proposed Residential Construction, 1201 Dolphin Terrace, Corona del Mar, California," File No: 8065-00, Report No: 20151217-1, April 7. R McCarthy Consulting, Inc. 23 Corporate Plaza, Suite 150, Newport Beach, CA 92660 [ | 3 o m | - =2@pl; §\}(k�) \ k \ \ ( d | )()a ) 5a 5a 5, 5, §J 2z- -n *J� § 2kE CD ! e CD 2 {| / ° � j k (D 0 9. ! k\2 & ~ 7 [! k cz §`� \ /\ /\ §] < )} . � �— «--2----------- ��� § wwlllm F . ' X1,U'W � 1P124 T H r m 00 Ln tD cn O m o -mo �w 0 7 0 N r=im J r O N Z m� OE3 m 0 w a m N O 3 °1 0 2 O � N � o 6roo. r r - a� rororo v ..� �v 9° f �' M , 'O�gr Z { 1 MARINE AVE 1011 i €$ 110 ,1 1008 a l] 1ffJJt - k 00 %o SA TA 4DR M m d fj p� rtT . • � i� ♦,V goo ,k�. >, ' •;r �, J'�.� ATOLTj'A { j130, _ 1301 1*t ft1 w Y! t repo 7 _ o t/ 0 o ,'�^,. 1�1n /,al? j �v��Z 1 *5_ larsf ✓Z ,nh caro 0 ' �''`� � •_-, `'int~�'*,,..: r er i '� a"c oo •-� � f J o� r m z O w Lri kD Ul 4 0 I W m N O N I Ili - ] ! �• . . J ; ) �15 /{ > :, )( \\}. [m °� ) �15