AMENDED AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
FOR THE WIDENING AND REALIGNMENT
OF SUPERIOR AVENUE, COAST HIGHWAY TO 1200'± NORTH OF COAST HIGHWAY
THIS AGREEMENT is made and entered into this �k_�{ 1 ) day of
1982, by and between the CITY OF NEWPORT BEACH, a municipal corporation,
hereinafter referred to as "CITY" and the firm of WILLIAMSON AND SCHMID, here-
inafter referred to as "ENGINEER."
W I T N E S S E T H
WHEREAS, CITY's Circulation Element - Master Plan of Streets and
Highways has designated Superior Avenue between Coast Highway and 1200'±
north of Coast Highway, a Primary Road (four lanes divided); and
WHEREAS, the roadway improvements for Superior Avenue between Coast
Highway and 1200'± north of Coast Highway have not been completed to a Primary
Road cross section and CITY desires to complete these improvements and to re-
align the roadway, as shown on Exhibit "A" attached hereto and by this ref-
erence made a part hereof, under a project to be cooperatively financed with
the County of Orange Arterial Highway Financing Program (AHFP), hereinafter
referred to as "PROJECT "; and
WHEREAS, ENGINEER has substantially completed engineering services
for design of the PROJECT under terms of an agreement with the City dated
September 29, 1980; and
WHEREAS, CITY desires to modify design of the PROJECT to include an
additional right -turn lane from southbound Superior Avenue to westbound Coast
Highway, a merging lane on westbound Coast Highway and a separate right -turn
lane from westbound Coast Highway to northbound Superior Avenue; and
WHEREAS, ENGINEER has submitted a proposal to CITY (dated May 20,
1982) to perform engineering services in connection with design modification
of the PROJECT; and
WHEREAS, CITY desires to accept said proposal;
NOW, THEREFORE, in consideration of the foregoing, the parties hereto
agree as follows:
I. General
A. CITY engages ENGINEER to perform the services hereinafter
described for the compensation herein stated.
1 of 6
a
B. ENGINEER agrees to perform said services upon the terms
hereinafter set forth.
II. Services to be Performed by ENGINEER
ENGINEER hereby agrees to perform the following services
necessary to revise PROJECT improvement plans, specifica-
tions, right -of -way drawings and legal descriptions:
A. Perform field survey as necessary to verify and tie out
points of control and other physical monumentation.
B. Perform topographic field survey for precise locations
of flow lines, edge of pavement, utility structures, etc.
C. Prepare a "right -of -way acquisition map" to be used as
the basis for preparing specific legal descriptions of
street easements, slope easement, right -of -way vacations,
etc. Prepare legal descriptions and accompanying sketches
for specific parcels necessary for conveyance of the
property.
D. Prepare a mass grading plan for inclusion in the project
drawings. The plan will be drawn at a scale of 1" = 40'
and will show the cut for the new roadway as well as the
removal of the existing roadway pavement. Construction
of terrace drains, downdrains, and subdrains will be in-
cluded on these plans. Regrading of adjacent undeveloped
properties are not comtemplated as being within the
scope of the plan.
E. Prepare erosion control and desiltation plans. Two sets
of plans are contemplated - -one for implementation with
each of the two anticipated construction phases.
F. Prepare a horizontal control plan for inclusion in the
project drawings. The plan will benefit both the design
and construction staking phases of the project.
G. Prepare detailed street improvement plans including a
title sheet, detail sheets, plan and profile sheets,
street lighting sheet, retaining wall profile and detaila,
and median barrier investigation and design.
2of6
• r
H. Retain a traffic engineering consultant to prepare traffic
signal modification plans and specifications, a striping
and signing plan for the new realigned street, and detour
plans showing striping and signing for use during con-
struction of the new street improvements. It is antici-
pated that the detour plans will show three arrangements,
each one corresponding to a different stage of the
construction.
I. Prepare detailed plan and profile storm drain improvement
plans. Prepare a hydrology map and supporting hydrology
and hydraulic calculations.
J. Prepare a plan for the landscaping of the cut and fill
slopes created as part of this PROJECT. Prepare an
accompanying plan for the temporary irrigation of the
slope planting. Installation of the water service to
supply the irrigation system will be part of the street
improvement plans.
K. Prepare quantity and cost estimates for the project.
Prepare a bid proposal and PROJECT special provisions
for inclusion in the contract documents.
III. Duties of City
CITY hereby agrees to supply ENGINEER with the following in-
formation and materials:
A. Title, plan, and profile sheets as needed for PROJECT.
B. Materials investigations and required pavement section.
C. Available records pertaining to existing street improve-
ment and City -owned utilities.
IV. Time of Completion
Final design, including all plans and other documents for the
PROJECT shall be submitted to the Public Works Director of
the CITY for final review by October 1, 1982.
V. Ownership of Project Documents
Original drawings, reports, notes, maps and other documents
shall become the property of the CITY and may be reproduced
and utilized as deemed necessary by the Public Works Director.
3of6
• r
VI. Right of Termination
CITY reserves the right to terminate this Agreement at any
time by giving ENGINEER seven (7) days' prior written notice;
notice shall be deemed served upon deposit in the United
States Mail, postage prepaid, addressed to the ENGINEER's
business business office at 17782 Sky Park Boulevard, Irvine,
California 92714. In the event of termination due to errors,
omissions, or negligence of the ENGINEER, CITY shall be re-
lieved of any obligation to compensate ENGINEER for that
portion of the work affected by such errors, omissions, or
negligence of the ENGINEER. If this Agreement is terminated
for any other reason, CITY agrees to compensate ENGINEER
for the actual services performed up to the effective date
of the notice of termination, on the basis of the fee sched-
ule contained herein.
VII. Fee Achedule and Payment
In consideration of the performance of the above - described
engineering services, CITY hereby agrees to pay ENGINEER an
amount based upon the hourly rate schedule set forth below.
In no event shall said amount be greater than Seventeen
Thousand Five Hundred Dollars ($17,500.00), except as other-
wise provided herein.
A. Hourly rates for office and field personnel shall be as
follows:
Principal Engineer $65.00 /hr.
Project Engineer $56.00/hr.
Assistant Engineer $46.00 /hr.
Design Draftsperson $39.00 /hr.
Draftsperson
$33.00 /hr.
Secretary /Delivery
$18.00 /hr.
3 -man survey crew
$128.00 /hr.
2 -man survey crew
$99.00 /hr
Computer processing time
$25.00 /hr.
Plotter time
$10.00 /min.
"Total Station" survey equipment
$1.0.00 /hr.
4of6
• 0
B. The contract amount shall be paid to ENGINEER as follows:
1. Monthly partial payments shall be based on the amount
earned each month, as determined by the Fee Schedule.
The sum of the monthly partial payments shall not
exceed Ninety -five Percent (95 %) of the maximum fee;
2. Balance of the total amount earned to be paid upon
completion of work specified in Section II (services
to be performed by ENGINEER), or by July 1, 1983,
whichever occurs first;
3. In addition, CITY agrees to reimburse ENGINEER for the
actual cost of reproduction of copies of said plans
and related documents and any other related costs
authorized in advance by the CITY and advanced by
ENGINEER.
VIII. Additional Work
Should ENGINEER complete any additional work not outlined
in this Agreement, but authorized by CITY, the extra work
shall be performed on a hourly basis in accordance with
the hourly rate standard Fee Schedule set forth in
Section VII (Fee Schedule and Payment) above.
IX. Project Scope Revisions
The scope of the PROJECT may be changed and the maximum
fee revised upon prior written approval of the Public
Works Director, if the increase in the maximum fee does
not exceed One Thousand Seven Hundred Fifty Dollars
($1,750.00). If the revisions to the scope of the
PROJECT would result in an increase in the maximum fee
exceeding One Thousand Seven Hundred Fifty Dollars
($1,750.00), an amendment providing for such revisions
shall be processed and executed by the parties hereto.
5of6
a
n
U
X
0
Hold Harmless
ENGINEER shall indemnify and save harmless CITY and its
officers and employees from any damage or liability
arising from any errors, omissions, or negligence in the
ENGINEER's performance of the engineering work and ser-
vices required by this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this
Agreement on the date first above written.
ATTEST:
4:.
ity Clerk
APPIR-OVDED AS TO FORM:
City Attorney
CITY OF NEWPORT BEACH
f�
ayo
WILLIAMSON AND SCHMID
6of6
August 23, 1982
CITY COUNCIL AGEN'
ITEM NO.
AUG 23 1982
TO: CITY COUNCIL :;j uvt COUNCIL
FROM: Public Works Departmeiitto' p!'vTORT BEACH
SUBJECT: SUPERIOR AVENUE IMPROVEMENTS FROM COAST HIGHWAY TO 1200 FEET NORTH
OF COAST HIGHWAY (C -2119)
RECOMMENDATION:
Authorize the Mayor and the City Clerk to execute an amended
agreement for engineering services with Williamson and Schmid
for the design of additional right -turn lanes and merging lanes
for the subject project.
DISCUSSION:
On September 22, 1980, the City Council adopted a resolution
authorizing the Mayor and the City Clerk to execute an agreement with
Williamson and Schmid for the design of the subject project. Since that time,
plans have been completed which provide for the widening of Superior Avenue
on a new alignment creating a more nearly right angle intersection at Coast
Highway. The realigned roadway was designed for two travel lanes in each
direction, a raised median, a separate left -turn lane from southbound Superior
Avenue to eastbound Coast Highway, a separate right -turn from southbound
Superior Avenue to westbound Coast Highway, sidewalk -bike trail, safety light-
ing, drainage systems and modified traffic signal. The realignment also
provides for the widening of Coast Highway on the northerly side to its
ultimate width at a later date. See the attached sketch for the location and
limits of the work.
Since that time, traffic phasing plan studies in conjunction with
proposed new developments in the area have indicated that additional turning
lanes would be required at the intersection of Superior Avenue and Coast Avenue.,
The additional lanes are a second right -turn lane from southbound Superior
Avenue to westbound Coast Highway, with a necessary merging lane on Coast High-
way, and a separate right -turn lane from westbound Coast Highway to northbound
Superior Avenue, it is desirable to combine the additional work with the
currently scheduled project.
A proposal has been requested and received from the engineering
firm of Williamson and Schmid for providing the engineering services necessary
to modify the existing improvement plans, right -of -way drawings, right -of -way
descriptions and specifications to include the additional turning and merging
lanes. Compensation will be based on standard hourly rates with maximum fee
not to exceed $17,500 (rate schedule attached). Funds for the agreement will
come from the currently budgeted gas tax project. The gas tax account will
later be reimbursed by funds received from the developers that are obligated
to do the additional improvements.
It is anticipated that a project for the combined work can be
advertised fo in January or February 1983.
i ��
Benjamin B. Nolan JW:rb
Public Works Director Att.
AMH LSVoo J1310 Vd ?1
3AV 80183dn,, %3 3J
ft;
1'0,
d
1-
m
i
W
u�
Q
I{
Q
w
f
r
N
Mo
3�
W
(n
w
� �-
- _ Nl 'd(j
30V8831
ft;
1'0,
d
1-
m
i
W
0
C O N S U L T 1 N G C 1 V 1 L F N G 1 N E i H S A V 1) A N I) ,S' U R V I Y l) H S
STANDARD HOURLY RATES
EFFECTIVE
AUGUST 3, 1981
OVERTIME
PRINCIPAL ENGINEER
$ 65
PROJECT ENGINEER
55
$ 65
ASSISTANT ENGINEER
46
56
DESIGN DRAFTSPERSON
39
48
DRAFTSPERSON
33
42
JUNIOR DRAFTSPERSON
25
32
SECRETARY / DELIVERY
18
24
3 -MAN SURVEY CREW
128
160
2 -MAN SURVEY CREW
99
120
ADDITIONAL CHARGES
I COMPUTER PROCESSING TIME $25 /HOUR
PLOTTER TIME $!0/F.41, TjTE
"TOTAL STATION" SURVEY EQUIPMENT $10 /HOUR
COURT APPEARANCES AND DEPOSITIONS $100 /HOUR
BLUEPRINTS AND XEROX AT COST
17782 SKY PARK BOULEVARD IRVINE, CALIFORNIA 92714 (714) 549 -2222
P.
CITY OF NEWPORT BEACH
Date 9 -30 -80
TO: Public Works Department
FROM: City Clerk
SUBJECT: Contract No. 2119
Project Enaine reali nment
of Superior Ave to 1200 ft, nor of Coast Hiahwav
Attached is signed copy of subject contract for transmittal to the contractor
Contractor: Williamson and Schmid
Address: 17782 Sky Park Blvd., Irvine.92714
Amount: $ see contract
Effective Date: 9 -29 -80
Resolution No. 9884
Doris Geo e
Att.
cc: Finance Department In
City [Tall 3300 Newport Boulevard, Newport Beach, California 92663
0 i
CITY OF NEWPORT BEACH
CALIFORNIA
DATE 9 -30 -80
TO: FINANCE DIRECTOR
FROM: City Cleric
SUBJECT: Contract No• 2119
Description of Contract Engineering Services
Authorized by Resolution No. 9884 , adopted on 9 -22 -80
Effective date of Contract 9 -29 -8
Contract with Williamson and Schmid
Address 11782 Sky Park Blvd
X4�4ne, CA
Amount of Contract see contract
City Clerk
City Flall
3300 W. Newport Blvd.
Area Code 714
0
7_�
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
FOR THE WIDENING AND REALIGNMENT
OF SUPERIOR AVENUE, COAST HIGHWAY TO 1200'± NORTH OF COAST HIGHWAY
THIS AGREEMENT is made and entered into this day of
September, 1980, by and between the CITY OF NEWPORT BEACH, a municipal cor-
poration, hereinafter referred to as "CITY" and the firm of WILLIAMSON AND
SCHMID, hereinafter referred to as "ENGINEER."
W I T N E S S E T H
WHEREAS, CITY's Circulation Element - Master Plan of Streets and
Highways has designated Superior Avenue between Coast Highway and 1200'±
north of Coast Highway, a Primary Road (four lanes divided); and
WHEREAS, the roadway improvements for Superior Avenue between Coast
Highway and 1200'± North of Coast Highway have not been completed to a
Primary Road cross section and CITY desires to complete these improvements
and to realign the roadway, as shown on Exhibit "A" attached hereto and by
this reference made a part hereof, under a project to be cooperatively
financed with the County of Orange Arterial Highway Financing Program (AHFP),
hereinafter referred to as "PROJECT "; and
WHEREAS, ENGINEER has submitted a proposal to CITY (dated
September 5, 1980) to perform engineering services in connection with the
design of the PROJECT; and
WHEREAS, CITY desires to accept said proposal;
NOW, THEREFORE, in consideration of the foregoing, the parties
hereto agree as follows:
I. General
A. CITY engages ENGINEER to perform the services hereinafter
described for the compensation herein stated.
B. ENGINEER agrees to perform said services upon the terms
hereinafter set forth.
II. Services to be Performed by ENGINEER
ENGINEER hereby agrees to perform the following services:
A. Perform field survey as necessary to verify and tie out
! points of control and other physical monumentation.
-1-
B. Perform topographic field survey for precise locations
of flow lines, edge of pavement, utility structures, etc.
C. Prepare a "right -of -way acquisition map" to be used as
the basis for preparing specific legal descriptions of
street easements, slope easement, right -of -way vacations,
etc. Prepare legal descriptions and accompanying sketches
for specific parcels necessary for conveyance of the
property.
D. Prepare a mass grading plan for inclusion in the project
drawings. The plan will be drawn at a scale of 1" = 40'
and will show the cut for the new roadway as well as the
removal of the existing roadway pavement. Construction
of terrace drains, downdrains, and subdrains will be
included on these plans. Regrading of adjacent undevel-
oped properties are not contemplated as being within the
scope of the plan.
E. Prepare erosion control and desiltation plans. Two sets
of plans are contemplated - -one for implementation with
each of the two anticipated construction phases.
F. Prepare a horizontal control plan for inclusion in the
project drawings. The plan will benefit both the design
and construction staking phases of the project.
G. Prepare detailed street improvement plans including a
title sheet, detail sheets, plan and profile sheets,
street lighting sheet, retaining wall profile and details,
and median barrier investigation and design.
H. Retain a traffic engineering consultant to prepare traf-
fic signal modification plans and specifications, a
striping and signing plan for the new realigned street,
and detour plans showing striping and signing for use
during construction of the new street improvements. It
is anticipated that the detour plans will show three
arrangements, each one corresponding to a different stage
of the construction.
- 2 -
I. Prepare detailed plan and profile storm drain improvement
plans. Prepare a hydrology map and supporting hydrology
I
and hydraulic calculations.
J. Prepare a plan for the landscaping of the cut and fill
slopes created as part of this PROJECT. Prepare an
accompanying plan for the temporary irrigation of the
slope planting. Installation of the water service to
supply the irrigation system will be part of the street
improvement plans.
K. Prepare quantity and cost estimates for the project.
Prepare a bid proposal and PROJECT special provisions for
inclusion in the contract documents.
III. Duties of City
CITY hereby agrees to supply ENGINEER with the following in-
formation and materials:
A. Title, plan, and profile sheets as needed for PROJECT.
B. Materials investigations and required pavement section.
C. Available records pertaining to existing street improve-
ment and City -owned utilities.
IV. Time of Completion
! Preliminary plans and cost estimate shall be submitted to the
CITY for review by November 14, 1980. Final design, including
all plans and other documents for the PROJECT shall be sub-
mitted to the Public Works Director of the CITY for final re-
view by February 15, 1980.
V. Ownership of Project Documents
Original drawings, reports, notes, maps and other documents
shall become the property of the CITY and may be reproduced
and utilized as deemed necessary by the Public Works Director.
VI. Right of Termination
CITY reserves the right to terminate this Agreement at any
time by giving ENGINEER seven (7) days' prior written notice;
notice shall be deemed served upon deposit in the United States
Mail, postage prepaid, addressed to the ENGINEER's business
- 3 -
office at 17782 Sky Park Boulevard, Irvine California 92714.
In the event of termination due to errors, omissions, or negligence
of the ENGINEER, CITY shall be relieved of any obligation to com-
pensate ENGINEER for that portion of the work affected by such
errors, omissions, or negligence of the ENGINEER. If this
Agreement is terminated for any other reason, CITY agrees to
compensate ENGINEER for the actual services performed up to the
effective date of the notice of termination, on the basis of the
fee schedule contained herein.
VII. Fee Schedule and Payment
In consideration of the performance of the above - described
engineering services, CITY hereby agrees to pay ENGINEER an
amount based upon the hourly rate schedule set forth below. In
no event shall said amount be greater than Sixty Thousand dollars
($60,000.00), except as otherwise provided herein.
A. Hourly rates for office and field personnel shall be as follows:
Principal Engineer $ 60.00 /hr.
Project Engineer $ 50.00 /hr.
Assistant Engineer $ 42.00 /hr.
Design Draftsperson $ 36.00 /hr.
Draftsperson $ 30.00 /hr.
Secretary /Delivery $ 16.00 /hr.
3 -man survey crew $116.00 /hr.
2 -man survey crew $ 90.00 /hr.
Computer processing time $ 25.00 /hr.
Plotter time $ 10.00 /min.
"Total Station" survey equipment $ 10.00 /hr.
These hourly rates are in effect until August 1, 1981.
B. The contract amount shall be paid to ENGINEER as follows:
1. Monthly partial payments shall be based on the amount
earned each month, as determined by the Fee Schedule.
The sum of the monthly partial payments shall not exceed
ninety -five percent(95q) of the maximum fee;
- 4 -
0 0
2. Balance of the total amount earned to be paid upon
completion of work specified in Section II (services to
be performed by ENGINEER), or by July 1, 1982, whichever
occurs first;
3. In addition, CITY agrees to reimburse ENGINEER for the
actual cost of reproduction of copies of said plans and
related documents and any other related costs authorized
in advance by the CITY and advanced by ENGINEER.
VIII. Additional Work
Should ENGINEER complete any additional work not outlined in
this Agreement, but authorized by CITY, the extra work shall
be performed on an hourly basis in accordance with the hourly
rate standard fee schedule set forth in Section VII (Fee
Schedule and Payment) above.
IX. Project Scope Revisions
The scope of the PROJECT may be changed and the maximum fee
revised upon prior written approval of the Public Works Director,
if the increase in the maximum fee does not exceed Six Thousand
Dollars ($6,000.00). If the revisions to the scope of the PROJECT
would result in an increase in the maximum fee exceeding Six
Thousand Dollars ($6,000.00), an amendment providing for such
revisions shall be processed and executed by the parties hereto.
X. Hold Harmless
ENGINEER shall indemnify and save harmless CITY and its officers
and employees from any damage or liability arising from any
errors, omissions, or negligence in the ENGINEER'S performance
of the engineering work and services required by this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this
Agreement on the date first above written.
ATTEST:
City Clerk —�
APPROVED AS TO FORM:
CITY OF NEWPORT BEACH
1
Ma? '
WILLIAMSON AND SCHMID
r
i
By
i y� - 5 -
�s
i
i
S1,P 29 1980
By 4h* CITY COUNCIL
CITY OF NEWIOI T lWH
TO: CITY COUNCIL
FROM: Public Works Department
0
September 22, 1980
CITY COUNCIL GEND
ITEM NO. �,GJ
SUBJECT: SUPERIOR AVENUE IMPROVEMENTS FROM COAST HIGHWAY TO 1200 FEET NORTH
OF COAST HIGHWAY (C -2119)
RECOMMENDATION:
Adopt a resolution authorizing the Mayor and the City Clerk to exe-
cute an agreement for engineering services with Williamson and
Schmid for the design of the subject project.
DISCUSSION:
On December 10, 1979, the Council adopted a resolution requesting that
the project be included in the 1980 -81 Orange County Arterial Highway Financing
Program (AHFP). The Environmental Impact Report- Negative Declaration was ac-
cepted by the Council after a public hearing on January 7, 1980.
The proposed project provides for safer and more efficient traffic flow
by widening Superior Avenue and creating a more nearly right angle intersection
at Coast Highway. The realigned roadway will provide two travel lanes in each
direction, a raised median, a separate left -turn lane from southbound Superior
Avenue to eastbound Coast Highway, a separate right turn -lane from southbound
Superior Avenue to westbound Coast Highway, sidewalk -bike trail, safety lighting,
drainage system and modified traffic signal. See the attached sketch for the
location and limits of the work. The realignment is also necessary to enable the
widening of Coast Highway on the northerly side to its ultimate configuration at
a later date.
The new alignment will require that approximately 3.75 acres of the
vacant CalTrans property west of existing Superior Avenue be dedicated. Approxi-
mately 2.5 acres of the existing right -of -way which will not be needed after the
realignment would be vacated. At this time, it is anticipated that CalTrans will
dedicate the required right -of -way, but no commitment from CalTrans has been
received.
The estimate construction cost for the project is $1,042,000. It is
proposed to finance the improvements with Gas Tax Funds and County AHFP Funds
over a two -year period. Phase "I" work, which includes all engineering and rough
grading for the new roadway, has been approved by the County and is provided for
in the current budget. Phase "II ", which will include the remaining fine grading
and construction of the new improvements will be submitted to the County in
December 1980, for inclusion in the 1981 -82 AHFP.
A proposal has been requested and received from the engineering firm
of Williamson and Schmid for providing the engineering services necessary for
design and preparation of plans and specifications to realign and widen Superior
Avenue. Compensation will be based on standard hourly rates with maximum fee
not to exceed $60,000 (rate schedule attached). Funds for the agreement will
September 22, 1980
Subject: Superior Avenue Improvements
of Coast Highway
Page 2
from Coast Highway to 1200 Feet North
will come 50% from County AHFP and 50% from the currently budgeted gas tax proj-
ect.
It is anticipated that a project for Phase I can be advertised for bids
in April 1981. Depending on right -of -way acquisition and funding for Phase II
work, it may become a practical alternate to combine the work into one contract
which could be advertised for bids in January 1982. This second bid date would
eliminate the need for interim erosion control and the cost for administering
two construction contracts.
Benjamin B. Nolan
Public Works Director
JW:jd
Att.
Q
H
'AMH 1SV00 01310Vd 3J CD
Z
l v
/ w
3/\V 60I83dns 'X3 7J
I e Q
o I G w
Z — J
O ¢ {F N N
2 I Z
O I n12 O_ O
m Z
Z lo' U
H I M!o w
X
3 .. cn
NI 8 3JVVaa31 ry
�ry
y'y 4A (�
It i
OT
' r'r..; ., buy ��`. .��y�-�71 ✓ -�a 7 ���rrr � `
T ;
, E
j� 0
;a v 74
.Ln w
Ww
d
^rya �`"C. o a' �• k a y a s F" t ! t i f a .b
°aa 1 �� �', ! ar'�:a • -` t � 4a� .,�. � { �r F F+ .�,s- Y m.^fs ��#'r. .
a„! }� ,. f , 31tl K x a IN
pp
t a a1 Nil,
3,
E
0
STANDARD HOURLY RATES
EFFECTIVE
AUGUST 4, 1980
OVERTIME
PRINCIPAL ENGINEER
$ 60
PROJECT ENGINEER
50
$ 60
ASSISTANT ENGINEER
42
52
DESIGN DRAFTSPERSON
36
45
DRAFTSPERSON
30
38
SECRETARY / DELIVERY
16
22
3 -MAN SURVEY CREW
116
144
2 -MAN SURVEY CREW
90
110
ADDITIONAL CHARGES
COMPUTER PROCESSING TIME $25 /HOUR
PLOTTER TIME $10AUNUTE
"TOTAL STATION" SURVEY EQUIPMENT $10 /HOUR
COURT APPEARANCES AND DEPOSITIONS $100 /HOUR
BLUEPRINTS AND XEROX AT COST
17782 SKY PARK BOULEVARD IRVINE, CALIFORNIA 92714 (714) 549 -2222
,
4 0
SEP 22 1960
BY, fh. CITY COUNCIL
CITY Do ?g#MT uwka
RESOLUTION NO. 9864
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
NEWPORT BEACH AUTHORIZING THE MAYOR AND CITY
CLERK TO EXECUTE AN ENGINEERING AGREEMENT
BETWEEN THE CITY OF NEWPORT BEACH AND
WILLIAMSON AND SCHMID IN CONNECTION WITH
SUPERIOR AVENUE IMPROVEMENTS FROM COAST HIGHWAY
TO 1200 FEET NORTH OF COAST HIGHWAY (C -2119)
WHEREAS, there has been presented to the City Council
of the City of Newport Beach a certain Engineering Agreement
between the City of Newport Beach and Williamson and Schmid in
connection with Superior Avenue Improvements from Coast Highway
to 1200 feet north of Coast Highway; and
WHEREAS, the City Council has reviewed the terms and
conditions of said Agreement and finds them to be satisfactory
and that it would be in the best interest of the City to execute
said Agreement,
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Newport Beach that the Agreement above described is
approved, and the Mayor and City Clerk are hereby authorized and
directed to execute the same on behalf of the City of Newport
Beach.
ADOPTED this day of 1980.
Mayor
ATTEST:
City Clerk