HomeMy WebLinkAboutC-2129 - Construction of City Water Main Line and Storm Drain in Conjunction with Bayside Drive Trunk Sewer010 60
CITY OF NEWPORT BEACH
CALIFORNIA
City ball
3300 W. Newport Blvd.
Area Code 714
DATE: January 9, 1980 .
TO: FINANCE DIRECTOR
FROM: City Clerk
SUBJECT: Contract No. 2129
Description of Contract Construction of City Water Main and Stom Drain /
Bayside Drive Trunk Sewer
Authorized by Resolution No. 9680 , adopted on November.12. 1979
Effective date of Contract November 14 1979
Contract with County Sanitation District No. 5 of Orange County
Address P. O. Box 8127
Fountain Valley, Ca. 92708
Amount of Contract see contract
A-t-� - Lg� A..9
City Clerk
_ rM
AGREEMENT
THIS AGREEMENT, for purposes of identification, is hereby dated and
effective the 14thday of November
BY AND BETWEEN
AND
1979, and is
COUNTY SANITATION DISTRICT NO. 5
OF ORANGE COUNTY, CALIFORNIA,
hereinafter referred to as "District ";
CITY OF NEWPORT BEACH, herein-
after referred to as "Newport Beach ".
WITNESSETH:
WHEREAS, District contemplates replacement of its existing trunk sani-
tary sewer in Bayside Drive between the approximate limits of Carnation Avenue
and one -half mile northwesterly of Carnation Avenue; and
WHEREAS, Newport Beach desires to include water line construction,
storm drain construction, and certain curb construction, all hereinafter referred
to as "Newport Beach Improvements ", along Bayside Drive in conjunction with
said sanitary sewer construction; and
WHEREAS, it is mutually advantageous at this time to accomplish the
Newport Beach Improvements at Newport Beach expense as an adjunct of the
sanitary sewer construction.
NOW, THEREFORE, it is mutually agreed by and between District and
Newport Beach, as follows:
Section 1: District shall have contract plans and specifications prepared
for all of the work, hereinafter referred to as "Project ".
Section 2: District shall include, in the contract plans and specifications
for the Project, the Newport Beach Improvements, which shall include but not be
r
limited to water line construction, storm drain construction, and curb construc-
tion, except for construction of any portion of those items which is needed solely
due to District's sanitary sewer construction.
Section 3: District, upon approval of plans and specifications for Project
by Newport Beach, shall promptly undertake and perform all the work of
advertising for bids and awarding a contract under applicable provisions of law
governing such award.
Section 4: District shall furnish a resident engineer during construction
who shall be responsible for contract administration and for securing completion
of the work in accordance with the approved plans and specifications. Newport
Beach may furnish an inspector to consult with District's resident engineer
regarding construction, but the decisions of District's resident engineer shall be
final with regard to matters of contract administration and with regard to
District's sanitary sewer facilities. Newport Beach's determinations regarding
Newport Beach Improvements shall be final.
Section 5: District shall arrange for any modifications, relocations or
reconstruction of utilities and for the construction of any detours necessary for
the construction of Project; and Newport Beach shall cooperate to the extent of
its powers in making arrangements and official notices concerning utility
relocations.
Section 6: After award of contract for Project, District shall invoice
Newport Beach and within thirty (30) days after receipt of invoice, Newport
Beach shall pay to District its respective share of Project costs as outlined
herein based on bid prices and estimated contract quantities.
Section 7: Newport Beach shall pay the costs as specified below:
a. The total contract cost actually paid the contractor for all water
line construction, storm drain construction, and curb construction, except
2
MM
for such construction of any portion of those items which is solely due to
District's sanitary sewer construction;
b. The actual cost billed to District by District's consulting engineer
for preparation of the plans and specifications for Newport Beach Improve-
ments.
c. The lump sum of Two Thousand ($2,000.00) Dollars to cover
District's cost of inspection, field engineering, and contract administration.
d. Fifty (50 %) percent of the total cost of pavement restoration
within the Project limits where District and Newport Beach Improvements
construction overlap. District shall be solely responsible for the cost of
pavement restoration in areas where there is no construction of Newport
Beach Improvements.
Section 8: Upon completion of construction and filing of a Notice of
Completion, District shall submit to Newport Beach a statement of the actual
total cost of Project and Newport Beach Improvements based on bid prices and
final contract quantities, including the final obligations of Newport Beach.
Section 9: If Newport Beach's total obligation exceeds the initial deposit,
Newport Beach agrees to pay to District the full amount of the remainder within
thirty (30) days after receipt of invoice from District. If Newport Beach's total
obligation is less than the initial deposit, District shall reimburse Newport Beach
within thirty (30) days after filing a Notice of Completion.
Section 10: District shall be the "Lead Agency" within the context of the
Environmental Quality Act of 1970 as amended, and District shall be responsible
for complying with environmental requirements and filing required notices,
except that Newport Beach shall be responsible for completing the environ-
mental procedures relating to construction of Newport Beach Improvements.
Section 11: Newport Beach shall indemnify and hold District harmless
3
from any liability imposed as a result of any alleged negligence by Newport
Beach or its agents arising out of Newport Beach's performance under this
Agreement.
Section 12: District shall indemnify and hold Newport Beach harmless
from any liability imposed by any alleged negligence by District or its agents
arising out of District's performance under this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
on dates opposite their respective signatures.
COUNTY SANITATION DISTRICT NO. 5
CITY NEWPOrRT/B�EtjCH
Date: �C (R e_ �1 i 19 2j By GvL -� V :
Mayor '
ATTEST:
City Clerk (/
APP VED ASffiO F RM:
ugh 1<dffih,`& y-
TLW:pj
New. Beach D:1
11/28/79
4
C
a E.. i •y R�
ts' •
ox
au
[gyp — c\'S'"' 4 \•
r;
US /OS .b
L Z-a4f O
® Prop. SAree,74 /i omveinenf
- -- Prop.. SD. /�provernen�
— Prof /2 "f' /BNfYafer �Ylain
-- — Prop. GNlyafsr /Y g
"4. `..
8
CITY OF NEWPORT BEACH DRAWN
PUBLIC WORKS DEPARTMENT APPROVED
DATE
V.
o:
SAYS /DE D!P /d/E l�Yoy�`er /Ylai�, PUSIAC W=3 DIRECTOR
Sfreef and Orainaye .Qeo %ernenf R.E. NO.
DRAWING NO.
Ti
. o
@
COUNTY SANI ATION DISTRICTS
OF ORANGE COUNTY, CALIFORNIA
P. O. BOX 8127, FOUNTAIN VALLEY, CALIFORNIA 92708
10844 ELLIS AVENUE (EUCLID OFF -RAMP. SAN DIEGO FREEWAY)
January 7, 1980
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
Attention: City Clerk
Subject: Agreement for Construction of City Water Main and Storm Drain
in conjunction with Districts' Bayside Drive Trunk Sewer,
Contract No. 5 -22
Enclosed herewith please find one fully- executed copy of subject agreement
for your records.
Enclosure
cc: Ray E. Lewis
Tom Dawes
Rita J. Brown
Assistant to the Secretary
of the Board
TELEPHONES:
AREA CODE 714
540 -2910
962 -2411
JAN '980 ►
COUNTY SANITATION DISTRICT•-
OF ORANGE COUNTY, CALIFORNIA
R. C. BOX 5127. FOUNTAIN VALLEY, CALIFORNIA 92706
1OB44 ELLIS AVENUE (EUCLID OFF -RAMP, SAN DIEGO FREEWAY)
o�
u�
TELEPHONES:
AREA CODE 714
540 -2910
962 -2411
December 13, 1979
nf' 2
4. C/ly�j �bf0
DFC1?
� _ o lgj9�
City of Newport Beach ORTr
3300 Newport Boulevard L </F FgOH
Newport Beach, CA 92663 - v
Attention: City Clerk
Subject: Agreement for Construction of City Water Main and
Storm Drain in conjunction with Districts' Bayside
Drive Trunk Sewer, Contract No. 5 -22
We are transmitting herewith four copies of subject agreement
which was approved by the Board of Directors of District No. 5
at its regular meeting on November 14, 1979. Mr. Rycko£f executed
this agreement as Chairman of the District and on behalf of the
City as Mayor. Would you please have the City Attorney approve
and sign and affix your signature on the agreements also. Please
return all copies to the undersigned and one fully- executed copy
will be returned for your records. If you have any questions,
please do not hesitate to call.
Enclosures
cc: Ray E. Lewis
Tom Dawes
Rita J Q
Assistant to the Secretary
of the Board —
/ t.,.
r�
TO: CITY COUNCIL
LAZ
�1 r . J i5 l 00
NOV 19, 1974
By the CITY COUNCIL
CITY OF NEWPORT BEACH
FROM: Public Works Department
November 12, 1979
CITY COUNCIL AGENDA
ITEM NO. H -2(d)
SUBJECT: WATER LINE AND STORM DRAIN CONSTRUCTION IN BAYSIDE DRIVE- -
JOINT PROJECT WITH COUNTY SANITATION DISTRICT NO. 5 (C -2129)
RECOMMENDATION:
Adopt a resolution approving a cooperative agreement for the work
with Orange County Sanitation District No. 5; and authorizing the
Mayor and the City Clerk to execute the agreement.
DISCUSSION:
Orange County Sanitation District No. 5 is currently preparing a
project for replacement of their existing trunk sewer in Bayside Drive from
Carnation Avenue to a point about 1/2 mile westerly of Carnation Avenue. Be-
cause of the restricted roadway width and the substantial size of the construc-
tion project, it will be necessary to close the street to through vehicular
traffic for much of the construction period.
The City also contemplates construction on Bayside Drive in the same
area. A project for replacement of an inadequate existing storm ,drain at an
estimated cost of $45,000 is included in the current budget; and replacement
of existing water lines with a new 12- inch - diameter ductile iron pipe is pro-
posed for the current $200,000 water main replacement program.
In order to better coordinate the work and reduce the amount of in-
convenience to the public, it is felt that the work could best be accomplished
under a single project administered by the Sanitation District. The District's
consulting engineer would prepare the plans for the City's portion of the work;
and incorporate the plans with the District's, for construction under a single
contract. Each agency will be responsible for the design and construction costs
for its respective facilities.
Construction is scheduled by the District to begin in approximately
February, 1980. The work should be complete before substantial construction
begins on CalTrans' project for replacement of the Upper Bay Bridge.
an, c / 4;�,(�
Benjamin B. Nolan
Public Works Director
::
RESOLUTION NO. 9680
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF NEWPORT BEACH AUTHORIZING THE MAYOR AND
CITY CLERK TO EXECUTE A COOPERATIVE AGREEMENT
BETTA`EEN THE CITY OF NEWPORT BEACH AND ORANGE
COUNTY SANITATION DISTRICT NO. 5 IN CONNECTION
WITH THE WATER LINE AND STORM DRAIN CONSTRUCTION
IN BAYSIDE DRIVE.
WHEREAS, there has been presented to the City
Council of the City of Newport Beach a certain Cooperative
Agreement between the City of Newport Beach and Oiange County
Sanitation District No. 5 in connection with the water line
and storm drain construction in Bayside Drive; and. ,
WHEREAS, the City Council. has reviewed- the terms and
conditions of said agreement and finds them to be satisfactory
and that it would be in the best interest of the City to
execute said agreement,
NOW, THEREFORE, BE IT RESOLVED by the City Council
of the City of Newport Beach that the agreement above- described
is approved, and the Mayor and City Clerk are hereby authorized
and directed to execute the same on behalf of the City of
Newport Beach.
ADOPTED this 12th day of November, 1979.
ATTEST:
CITY CLERK
MAYOR — -
HRC /ap
11/13/79