DATE March 28, 1980
TO: FINANCE DIRECTOR
FROM: City Cleric
SUBJECT: Contract No. 2161
Description of Contract Water main re_placerlent in Jamboree Road between
Poad and 1200 feet north of Ford Poa .
Authorized by Resolution No. City,- Mdnsger , adopted on March 27, 1980
Effective date of Contract March 27, 1980
Contract with Robert Bein, William Frost and Pzsociates
Address 1401 Ouail, P.O. Box 2590, Newport Beach, CH 92663
Amount of Contract $7500.00
City Clerc
March 27, 1980
TO: CITY MANAGER
FROM: Public Works Department
SUBJECT-. WATER MAIN.REPLkEMENT IN JAMBOREE ROAD BETWEEN FORD ROAD
AND 1200 FEET NORTH OF FORD ROADf (C- 21:6.1)
RECOMMENDATION:
Execute an agreement for engi-neer' th
ing services wi
Robert Betn,, William Frost and Assocfates for design
of the subject projiect.
Ultimate improvements are-scheduled . to :be constructed ajong.
h e east side of
Jamboree. R664 between Ford Road and .'Bison A.vehuexL
-S
a, conditi:64 of demelopment for the, Ford Aerospace 'int6mmunications
�corpQral.tfl .o , P. ThP Citys 18 -inch
water transmJs:ston 'main in Ji a m
o,
re e
Ruad-needs to be replaced, and the water mai:n construction w -11 'b e
....
'Completed prior to the street improvements under a separate pro-ject to
be administered d by the City.
A proposal.ha,s been requested.and received from the firm of
..Robert. B.ei.n, William Frost and Associates. to pro,vide engineering'ser-
vices.- necessary for the design and preparat-16n. of plans and specifi.ca-
tions, to :,construct the new water main. :Compensation' will be �based On
standard hourly rates, with maximum. fee not to exceed $71500 (rate:
schedul e As attached) Funds for design are available in the current
W-6ter'main-replacement program. Funds for construction have been pro-
vided.in the 1980-81 water main repTacementprogram.
A. project can be advertised for.. bids in July 1980, with
completion by September 1980.
IPI
-Benjamin B. Nolan
Public Works Director
JW:jd
Att. V
0 0
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
FOR
WATER MAIN REPLACEMENT
IN
JAMBOREE ROAD
BETWEEN
FORD ROAD AND 1200 FEET NORTH OF FORD ROAD
THIS AGREEMENT is made and entered into this day of
March, 1980, by and between the CITY OF NEWPORT BEACH, a municipal corpora-
tion, hereinafter referred to as "CITY," and the firm of ROBERT BEIN,
WILLIAM FROST AND ASSOCIATES, hereinafter referred to as "ENGINEER."
W I T N E S S E T H
WHEREAS, ultimate roadway improvements are scheduled to be con-
structed along the east side of Jamboree Road between Ford Road and Bison
Avenue as a condition of development of the adjacent private property; and
WHEREAS, the CITY's 18 -inch water transmission main in Jamboree
Road between Ford Road and 1200 feet north of Ford Road needs to be replaced;
T- Ire
WHEREAS, the CITY desires to replace the existing water main with
a new 16 -inch water main prior to construction of the street improvements and
under a separate project to be administered by the CITY, hereinafter referred
to as "PROJECT "; and
WHEREAS, ENGINEER has submitted a proposal to CITY (dated
February 21, 1980) to perform engineering services in connection with the
design of PROJECT; and
WHEREAS, CITY desires to accept said proposal;
NOW, THEREFORE, in consideration of the foregoing, the parties hereto
agree as follows:
I. General
A. CITY engages ENGINEER to perform the services hereinafter
described for the compensation herein stated.
B. ENGINEER agrees to perform said services upon the terms
hereinafter set forth.
0 0
II. Services to be performed by ENGINEER
ENGINEER hereby agrees to perform the following services:
A. Gather and review available existing record maps,
improvement plans, utility plans, and other documentation
affecting the project.
B. Coordinate the investigation of underground utilities which
may affect the PROJECT and arrange for potholing to be
performed by the utility owner in the event that available
records are inadequate.
C. Perform field topographic surveys necessary for completion of
PROJECT design.
D. Design and prepare construction plans for the PROJECT on
standard City of Newport Beach improvement plan and profile
sheets.
E. Prepare the necessary special provisions and bid proposals,
using the CITY's Standard Plans and Special Provisions
as well as the "STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION ", 1979 Edition, on Xerox masters suitable for
use by the CITY in calling for competitive bids.
F. Prepare final ENGINEER's estimate based on the quantities used
in the bid proposal.
G. Review the required shop fabrication drawings and provide
professional consultation for interpretation of plans and
specifications and advice during construction of the PROJECT.
III. Duties of CITY
CITY hereby agrees to supply ENGINEER with the following
information and materials:
A. Title, plan, and plan and profile sheets as needed for the
PROJECT.
B. Available records pertaining to existing street improvements
and City -owned utilities.
IV. Time of Completion
Final design, including all plans and other documents for the
PROJECT shall be submitted to the Public Works Director of the
CITY for final review by May 2, 1980.
-2-
V. Ownership of PROJECT Documents
VI
VII
Original drawings, reports, notes, maps, and other documents
shall become the property of the CITY and may be reproduced and
utilized as deemed necessary by the Public Works Director.
Right of Termination
CITY reserves the right to terminate this Agreement at any time
by giving ENGINEER seven (7) days' prior written notice; notice
shall be deemed served upon deposit in the United States Mail,
postage prepaid, addressed to the ENGINEER's business office at
1401 Quail Street, P. 0. Box 2590, Newport Beach, California
92663. In the event of termination due to errors, omissions, or
negligence of ENGINEER, CITY shall be relieved of any obligation
to compensate ENGINEER for that portion of the work affected by
such errors, omissions, or negligence of the ENGINEER. If this
Agreement is terminated for any other reason, CITY agrees to
compensate ENGINEER for the actual services performed up to the
effective date of the notice of termination, on the basis of the
fee schedule contained herein.
Fee Schedule and Payment
In consideration of the performance of the above - described
engineering services, CITY hereby agrees to pay ENGINEER an
amount based upon the hourly rate schedule set forth below.
In no event shall said amount be greater than Seven Thousand
Five Hundred Dollars ($7,500.00) except as otherwise provided
herein.
A. Hourly rates for office and field personnel shall be as
follows:
Rates
Professional Consultation 60.00 /hr.
Registered Engineer 45.00 /hr.
Engineering (Design Calc's & Supervision) 35.00 /hr.
Drafting 24.00 /hr.
Technician 15.00 /hr.
Field Survey Crew (3 -man) 99.00 /hr.
Consultation in connection with litaga-
tion and appearance before courts and /or
commissions 125.00 /hr.
- 3 -
0 0
B. The contract amount shall be paid to ENGINEER as follows:
1. Monthly partial payments shall be based on the amount
earned each month, as determined by the fee schedule.
The sum of the monthly partial payments shall not
exceed ninety -five percent (95 %) of the maximum fee;
2. Balance of the total amount earned to be paid upon
completion of work specified in Section II (Services
to be Performed by ENGINEER), or by January 1, 1981,
whichever occurs first;
3. In addition, CITY agrees to reimburse ENGINEER for the
actual cost of reproduction of copies of said plans
and related documents, as well as cost of aerial photog-
raphy, materials' cost related to survey work, and
other related costs authorized in advance by the Public
Works Director and advanced by ENGINEER.
VIII. Additional Work
Should ENGINEER complete any additional work not outlined in
this Agreement, but authorized by CITY, the extra work shall be
performed on an hourly basis in accordance with the hourly rate
standard fee schedule set forth in Section VII (Fee Schedule
and Payment) above.
IX. PROJECT Scope Revisions
The scope of the PROJECT may be changed and the maximum fee
revised upon prior written approval of the Public Works Director
if the increase in the maximum fee does not exceed One Thousand
Dollars ($1,000.00). If the increase in the maximum fee would
exceed $1,000, an amendment providing for such revisions shall
be processed and executed by the parties hereto.
- 4 -
• •
X. Hold Harmless
ENGINEER shall indemnify and save harmless CITY and its officers
and employees from any damage or liability arising from any
errors, omissions, or negligence in the ENGINEER's performance
of the engineering work and services required by this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
on the date first above written.