Loading...
HomeMy WebLinkAboutX2020-2588 - MiscAppendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: ( 1) I am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at 1221 BERKSHIRE ________________________ (provide address or parcel number(s)) was installed by me or under my supervision. (3). The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for ' the efficient use of water in the landscape. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. x Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. _x_ Yes No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 33 street DAVID PEDERSEN Print Name Signature 11-10-22 Date 3895 License Number 3400 ll<VINE AVE., STE. 203 NEWPORT BEACH CA. 92660 Address 949-251-8999 Telephone Landscape Design Professional's Stamp (If Appropriate) 34 DAVE@DPLANDSCAPE.COM E-mail Address WATERING GUIDELINES FOR - 1221 BERKSHIRE EffRlive Irrigation syst.m dnign. instllflatlorl .-.nd maint9f'lanoe are important Spril"lkler5 should MMt only thtt 1'9qUired turf .arus and not spray on buildir'Qs, fences or non-landscaped arus. Excess water on sidewalks. pavement and block walls c.uHS d.amage. increases liability and wastes water. Watering should be don• bebw sunriM to reduc• •v.aporatlon losHS. Turf .areas, pl.ant.rs, trNs .and slvubs shoutd be watered s.parately to meet varying water nffds. Always irrigat• th• •ntir9 depth and width of thtt root ZOM r99ardless of th9 time of y •• r Automatic times and moistur. Mnsor5 mak• it Hsi4tr to manage irrigations. Onoe or twa a 19ar. water twic• as lof'g to Inch out salts and buildup in our soils Landscape Watering Guidelines Seasonal Frequency - Days Between Waterings Spring Summer Fall Winter Water Mar- May May-Oct Oct- Dec Dec- Mar This Deeply Trees Desert Adapted 14-30 days 7-21 days 14-30 days 30-60days 24"-36" High Water Use 7-12 days 7 -10 days 7 -12 days 14- 30 days 24" -36" Shrubs Desert Adapted 14-30days 7-21 days 14-30 days 30-45 days 18" - 24" High Water Use 7-10 days 5- 7 days 7-10 days 10- 14 days 18" -24" Groundcovers Desert Adapted 14-30days 7-21 days 14-30 days 21-45 days 8"-12" and Vines High Water Use 7-10 days 2- 5 days 7 -10 days 10- 14 days 8"-12" Cacti and Succulents 21-45days 14-30 days 21 -45 days If needed 8" - 12" Annuals 3- 7 days 2-5 days 3- 7 days 5- 10 days 8"-12" Warm Season Grass 4-14 days 3-6 days 6-21 days 15-30days 6" - 10" (Bermuda, etc) Cool Season Grass 3- 7 days None 3-10 days 7 - 14 days 6"-10" (Rye, Fescue) These guidelines are for established plants (1 year for shrubs, 3 years for trees). Additional water is needed for new plantings or unusually hot or dry weather. Less water is needed during cool or rainy weather. Drip run times are typically 2 hours or more for each waterino. Watering Schedule for Newly Planted Desert Adapted Plants How much and Spring Summer Fall Winter How Often Mar-May May-Oct Oct- Dec Dec-Mar Weeks 1 and 2 every 3 - 4 days every 1 - 2 days every 3 - 4 days every 3 - 4 days Weeks 3 and 4 every 6 - 7 days every 3 - 4 days every 6 - 7 days every 6 - 7 days Weeks5and6 every 7 - 1 O days every 4 - 6 days every 7 - 1 O days every 7 - 10 days Weeks 7 and 8 every 10- 14 days every 7 days every 10- 14 days every 10-14 days AfterWeek8 Gradually extend the time between irrigations until plants are established. NOTE: After the eighth week, move the drip emitters to the outer edge of the root ball. High water-use plants may require more frequent irrigations. Water deeply to 24 - 36 inches for trees, 18 - 24 inches for shrubs, 8 - 12 inches for ground cover, vines, cactus, succulents and annuals, and 6- 10 inches for warm and cool season grasses. LANDSCAPE IRRIGATION AUDIT REPORT Project Name: Phuoc Phan Residence Address: 1221 Berkshire Lane, Newport Beach CA Design / Installation: Dave Pedersen 20271 Acacia St., Ste 120 Newport Beach, CA 92660 949.251.8999 Certified Landscape Irrigation Auditor (CLIA): BIG PICTURE LANDSCAPE Michael McMillen / 714.394.6126 / Bigpicturelandscape@gmail.com CLIA #014256 All of the zones / hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request, we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape Ordinance (MWELO). SUMMARY This audit was inspect the overall site irrigation systems within the limits of construction. The irrigation systems are new systems utilizing POTABLE water. IRRIGATION PLANS: Each hydrozone identified on the plans were executed in the field, (Total valve qty. 4). Each system layout, components and functionality have met all the requirements of the Irrigation Plans. MWELO: The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for new construction and irrigation installations based on AB1881. UNIFORMITY: Since the dripline is subterranean and the planting material is already installed and would be damaged if the dripline was unearthed, a drip catch can test was not performed. In lieu of the catch can test, the standard 90% efficiency for pressure compensating drip & low-flow irrigation per the Irrigation Association’s Landscape Irrigation Auditor, 3rd edition book was used for the report. Shrub ZONES / STATION A1-A4 · Irrigated Area: Zones separated based on Full sun South/ West side of project · Plant Material: Shrubs - Low water · Plant Condition: Traditional · Microclimate: Full Sun · Soil Category: Silty Clay Loam · Root Depth: Approximately 3 - 8” · Slope: Overall site 2% to 2:1 at back of property. · Compaction: yes · Runoff: No runoff observed · Standing Water: None · Hydrozone Separation: Yes · Mulch in Beds: Yes · Pressure Regulation: Not required / Isolation valve installed per plan · Controller: Toro TMC-424E controller w/ Climate logic. · Valves: Installed per plans ( 4 west front) · Emitter Type: Netafim TLHCVXR5-12 w/ Techline fittings (.53 gph @ 12” o.c row spacing @ 12” o.c.) · Max Flow: 6.7 GPM · Distribution Uniformity: .90 · Precipitation Rate: 0.6 Punch list Items: 11/16/2022 (Compliance based on the following corrects during the maintenance period) · Contractor to provide owner with controller charts. Zone Audit Conclusion: PASS, project IS within compliance to begin maintenance. The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and MWELO requirements. The MWELO is a calculation noted on your landscape construction documents. This state required calculation defines landscape irrigation estimated and maximum water used for the landscape. The state of California is currently in a government declared drought and water use restrictions are being enforced statewide. It is the responsibility of the Homeowner (Person maintaining the landscape), to determine when a plant material is established, and the irrigation schedule should be adjusted as needed to sustain the plant while being water efficient. Respectfully, Michael McMillen Certified Irrigation Auditor #014256 Big Picture Landscapes Respectfully, Michael McMillen Certified Irrigation Auditor #014256 Big Picture Landscapes