Loading...
HomeMy WebLinkAboutX2021-0832 - Landscape 33 Appendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) I am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at (provide street address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. _____ Yes ____ No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. _____ Yes ____ No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 900 Newport Center Drive X X 34 Print Name Date Signature License Number Address Telephone E-mail Address Landscape Design Professional’s Stamp (If Appropriate) Matthew MacLeod 3/1/23 307 S Cedros, Solana Beach CA 858 794 7204 Matt@burton-studio.com 5822 900 Newport Center Drive | Newport Beach, CA 92660 T 543.765.3124 | E info@veanewportbeach.com VEANEWPORTBEACH.COM Weathermatic Smart Link Network Ready Irrigation Controller Program Controller #1 (Total Stations 36) Program A Start time 1:10am Water days Mon/Wed/Fri 100% water budget Waters: Drip Valves schedule 10 - 18 minutes each depending on the exposure to Sun. Spray Stations for Sod scheduled 5 minutes each. Program B Start time 2am Water days Mon/Wed/Sat 100% Water budget Waters:Tree Bubbler valves scheduled 3 - 5 Minutes each. Controller # 2 (Total Stations 39) Program A Start time 3am Water Days Mon/ Wed/Fri 100%Water budget Waters: Drip Valves schedule 8 - 18 minutes each depending on the exposure to Sun. Program B Start time 2am Water days Mon/Wed/Sat 100% Water budget Waters: Tree Bubbler valves scheduled 3 - 5 Minutes each. Program C Start time 4am Water days Mon/ Wed/Sat 100% Water budget Waters: Spray Stations for Sod scheduled 5 minutes each.