HomeMy WebLinkAboutC-2462 - Finley Tract Street Reconstruction (3)TO: FINANCE DIRECTOR
CITY OF NEWPORT BEACH
FROM: CITY CLERK
DATE: October 24, 1984
SUBJECT: Contract No. C -2462
OFFICE OF THE CITY CLERK
(714'640.2251
�6 /I-
/ o/.� qlp�
Description of Contract Agreement for Professional Services for
Finley'Tract Street Reconstruction
Effective date of Contract October 24, 1984
Authorized by Minute Action, approved on October 22., 1984
Contract with Fuscoe, Williams, Lindgren & Short
Address 601 N. Parkcenter Drive, Suite 104
Santa Ana, CA 92705
Amount of Contract (See Agreement)
Wanda E. Andersen
City Clerk
WEA:1r
attach.
City Hall • 3300 Newport Boulevard, Newport Beach, California 92663
C - z4z
AGREEMENT FOR PROFESSIONAL SERVICES
FOR
FINLEY TRACT
STREET RECONSTRUCTION
THIS AGREEMENT is made and entered into this C /7U day of October,
1984 by and between the City of Newport Beadh, a municipal corporation hereinafter
known as "CITY" and the firm of Fusrc , Williams t#ndgren.. &:Shor°t, hereinafter
known as "ENGINEER."
W I T N E S S E T H
WHEREAS, CITY desires to construct roadway and drainage improvements
in Finley Tract, including 34th, 35th, 36th and Short Streets, Finley and
Clubhouse Avenues, and tract alleys; such improvements hereinafter known as
"PROJECT "; and
WHEREAS, CITY desires to have contract documents prepared for PROJECT:
and
WHEREAS, ENGINEER has submitted a proposal to CITY, dated October 2,
1984, to provide professional services and prepare contract documents for
PROJECT; and
WHEREAS, CITY desires to accept said proposal;
NOW, THEREFORE, in consideration of the foregoing, the parties hereto
agree as follows:
I. GENERAL
1. CITY engages ENGINEER to perform professional services herein-
after described for the compensation hereinafter stated.
2. ENGINEER agrees to perform said services upon the terms
hereinafter set forth.
II. SERVICES TO BE PERFORMED BY ENGINEER
ENGINEER hereby agrees to perform the following services:
1. Centerline Control and Tie -Out
Recovery of centerline control, closure of traverse, monumen-
tation tie -out and field note submittal. Includes pre- survey
research.
2. Topographical Survey
Collection of detailed field information over PROJECT area.
Includes, but is not limited to, locating and elevating
1 of 4
•
existing curb, roadway, valley gutters, driveways, meter
boxes, utility poles, storm drains and inlet structures.
3. Base Maps
Preparation of base maps reflecting field conditions at a
scale of 1" = 10', to be used for design purposes.
4. Street Plans
Preparation of grading - paving - demolition plan for PROJECT
area, complete with plan and profile views, special pro-
visions to the standard specifications, quantities and an
ENGINEER'S cost estimate.
5. Utility Coordination
Consult with appropriate utility companies and coordinate
the relocation and /or temporary services required as a
result of PROJECT.
6. Consultation
Consultation with CITY staff and their contractors during
design and construction phases of PROJECT. Includes office
and field meetings.
III. DUTIES OF CITY
CITY hereby agrees to provide ENGINEER with the following informa-
tion and materials free of charge:
1. CITY'S standard mylar plan and profile sheets and title
sheet;
2. Samples of previous CITY contract documents for similar types
of construction; and
3. Copies of Public Works improvement records relevant to PROJECT.
IV. TIME OF COMPLETION
All services to be performed by ENGINEER shall be completed within
120 calendar days from the date of this agreement.
V. OWNERSHIP OF CONTRACT DOCUMENTS
Field notes, calculations, and contract documents, such as original
construction drawings, special provisions, etc., generated by
ENGINEER under the terms of this agreement shall become the pro-
perty of CITY, and may be utilized by CITY as deemed necessary.
VI. RIGHT OF TERMINATION
CITY reserves the right to terminate this agreement at any time
by providing ENGINEER seven days' prior written notice. Notice
2of4
VII
VIII
shall be deemed served upon deposit in United States mail,
postage paid, addressed to ENGINEER'S business office at 601
N. Parkcenter Drive, Suite 104, Santa Ana, CA 92705. In the
event of termination due to error, omission or negligence of
ENGINEER, CITY shall be relieved of any obligation to compen-
sate ENGINEER for that portion of this agreement affected by
such error, omission or negligence. If this agreement is
terminated for any other reason, CITY agrees to compensate
ENGINEER for actual service performed up to the effective
date of the notice of termination, on the basis of Section
VII, as hereinafter set forth.
FEE SCHEDULE, TOTAL COMPENSATION AND PAYMENT
1. In consideration of the performance of services specified
in Section II, CITY hereby agrees to compensate ENGINEER
based upon the following fee schedule:
CLASSIFICATION OF PERSONNEL
HOURLY RATE
Principal $ 60.00
Supervising Engineer /Surveyor $ 46.00
Designer /Survey Tehcnician $ 38.00
Drafting $ 30.00
Twb= Mah'Survey Crew $103.00
Three -Man Survey Crew $129.00
Clerical /Support Services $ 20.00
2. Additionally, CITY shall compensate ENGINEER for reproduc-
tion at direct costs and for vehicle use at $.2.0 per mile
e"
for all reproduction and mileage expenses attributed to
performance of services specified in Section II.
3. In no event shall total compensation to ENGINEER be greater
than Twenty -five Thousand Dollars ($25,000), except as
otherwise provided for hereinafter.
4. CITY shall remit payments to ENGINEER within 30 days after
receipt of ENGINEER'S invoice. Invoice shall include classi-
fications of personnel, dates and hours worked in the per-
formance of services specified in Section II.
ADDITIONAL SERVICES
In consideration of the performance of additional services
authorized by CITY in writing, CITY hereby agrees to compensate
ENGINEER an amount based upon the hourly rate shown in Fee
3of4
i •
Schedule hereinabove; except that an increase in total compen-
sation exceeding Two Thousand Five Hundred Dollars ($2,500)
shall require that an amendment for such additional services
by processed and executed by the parties hereto.
IX. ASSIGNMENT
This agreement or any portion thereof shall not be assigned
without authorization by CITY in writing.
X. HOLD HARMLESS
ENGINEER shall assume the defense of and indemnify and hold
harmless CITY and its officers and employees from damage or
liability arising from error, omission or negligence in
ENGINEER'S performance of service required by this agreement.
IN WITNESS WHEREOF, the parties hereto have executed this agreement
on the date first above written.
ATTEST:
City Clerk
i
FUSCOE, WILLIAMS, LINDGREN & SHORT
744, It
CITY 0 NEW BEACH
'Kayor
4of4
VW-4
I e -.
BY THE CITY COUNCIL
CITY OF NEWPORT BEACH
OCT 221984
TO: CITY COUNCIL APPROVED
FROM: Public Works Department
SUBJECT: tOI U.;*� T'RECO*StRUCTIflr! tt 462)4
RECOMMENDATION:
October 22, 1984
CITY COUNCIL AGENDA
ITEM NO. F-3(a)
Authorize the Mayor and the City Clerk to execute a professional
services agreement with Fuscoe, Williams, Lindgren & Short.
DISCUSSION:
The current budget contains an appropriation for the redesign of
streets and alleys within the Finley Tract. The redesign is needed in order
to provide for better drainage, adequate curb heights, replacement of broken
or deteriorated improvements, and completion of the original improvement.
Accordingly, staff has obtained a proposal from Fuscoe, Williams,
Lindgren and Short (FWLS) to provide the following professional services
for the project:
1. Provide centerline control and tie -out,
2. Prepare topographical survey,
3. Prepare master base maps,
4. Prepare construction plans and specifications,
5. Utility coordination, and
6. Consultation during design and construction.
Compensation would be in accordance with FWLS's rate schedule (attached)
with a total fee for services specified above not to exceed $25,000. Adequate
funds are budgeted in Account No. 02- 3397 -309 to compensate the consultant.
The contract documents should be completed this spring. Funds will
be requested in the FY 1985 -86 budget so that reconstruction may begin after
nit summer, if desired.
Benjamin B. Nolan
Public Works Director
LRD:jd
Att.
FUSCOE
WILLl, MS
LINDGaREN
& SHORT
C, d En.;mn•, • I. ,nd $ioi new
.A IRA,,,, DL", . N:w, l,N
Cmi� Ana. Caiilrniin �?;�'�
RATE SCHEDULE
Effective 8 -1 -84
CLASSIFICATION
HOURLY RATE
Principal
$ 60.00
Supervising Engineer /Surveyor
46.00
Designer /Survey Technician
38.00
Drafting
30.00
Clerical /Support Services
20.00
2 -Man Survey Crew
103.00
3 -Man Survey Crew
129.00
Reproduction and otner reimbursables will be cnarged
in addition to the above rates.
..I