HomeMy WebLinkAboutC-2470(A) - Professional Engineering Services Agreement for Design 31st StreetT0: FINANCE DIRECTOR
FROM: CITY CLERK
CITY OF NEWPORT BEACH
OFFICE OF THE CITY CLERK
(7141640-2251
DATE: October 18, 1984
SUBJECT: Contract No. 2470
Description of Contract Agreement for Professional Engineering
Services for Design of 31st Street Improvements
and Processing of the 1911 ACT
Effective date of Contract October 12, 1984
Authorized by Minute Action, approved on October 9, 1984
Contract with Norris- Repke, Inc.
Address Engineer's Business Office
17662 Irvine Blvd., Suite 7
Tustin, CA 92680
Amount of Contract (See Agreement)
Wanda E. Andersen
City Clerk
WEA:lr
attach.
City Hall • 3300 Newport Boulevard, Newport Beach, California 92663
y
1r�U
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
FOR
DESIGN OF 31st STREET IMPROVEMENTS
AND PROCESSING OF THE 1911 ACT
THIS AGREEMENT is made and entered into this day of
, 1984, by and between the CITY OF NEWPORT BEACH, a municipal
corporation, hereinafter referred to as "CITY," and the firm of NORRIS- REPKE,
INC., hereinafter referred to as "ENGINEER."
WITNESSETH:
WHEREAS, CITY intends to have complete street improvement plans pre-
pared for 31st Street between Newport Boulevard and Villa Way and have necessary
services provided for processing the project under the 1911 Act;
WHEREAS, ENGINEER has submitted a proposal to CITY (dated August 3,
1984) to perform engineering services in connection with the design of PROJECT;
and
WHEREAS, CITY desires to accept said proposal;
NOW THEREFORE, in consideration of the foregoing, the parties hereto
agree as follows:
�I. General
A. CITY engages ENGINEER to perform the services hereinafter
described for the compensation herein stated.
B. ENGINEER agrees to perform said services upon the terms
hereinafter set forth.
II. Services to be performed by ENGINEER
ENGINEER hereby agrees to perform the following services:
A. Perform a partial topographic survey to supplement the
CITY's 1976 survey as necessary to prepare accurate plans
and specifications.
B. Prepare plans, specifications and engineer's estimate
(PS & E) for construction to complete the roadway improve-
ments (curb, gutter, sidewalk, new pavement, street lights,
and drainage devices including catch basins in Newport
Boulevard and Villa Way at the intersections), fitting
existing public improvements as practical and fitting private
improvements definitely.
M
C. Provide the appropriate services necessary for processing
as a 1911 Act project, specifically items 3, 7, 8, 9, 11.1,
13, 15, 16, 19.1 and 19.2 of the "Procedure for Improvement
Act of 1911," attached.
All of the above are with reference to preliminary studies
by the CITY, including a colored plan, cross - sections and
profiles, and discussion with CITY staff (Dick Hoffstadt)
in the office and at the site.
III. Duties of CITY
CITY hereby agrees to supply ENGINEER with the following informa-
tion and materials:
A. Available records pertaining to existing street improvements
and CITY -owned utilities.
B. CITY crews to pothole underground facilities that might inter-
fere with the construction.
C. Any other additional available information which the parties
hereto agree may be beneficial to the design of the PROJECT.
IV. Time of Completion
Final design, including all plans and other documents for the
PROJECT shall be submitted to the Public Works Director of the
CITY for final review by April 1, 1985, unless otherwise approved
by the Public Works Department.
V. Ownership of Project Documents
Original drawings, reports, notes, maps, and other documents
shall become the property of CITY and may be reproduced and
utilized as deemed necessary by the Public Works Director.
VI. ENGINEER in Charge
Jack P. Norris, RCE No. 15446, shall be the ENGINEER in Charge
of project design.
VII. Riqht of Termination
CITY reserves the right to terminate this Agreement at any time
by giving ENGINEER seven (7) days' prior written notice; notice
shall be deemed served upon deposit in the United States Mail,
postage prepaid, addressed to the ENGINEER's business office at
17662 Irvine Boulevard, Suite 7, Tustin, California 92680. In
the event of termination due to errors, omissions, or negligence
of ENGINEER, CITY shall be relieved of any obligation to compen-
sate ENGINEER for that portion of the work affected by such
errors, omissions, or negligence of the ENGINEER. If this
Agreement is terminated for any other reason, CITY agrees to
compensate ENGINEER for the actual services performed up to the
effective date of the notice of termination, on the basis of the
fee schedule contained herein.
VIII. Fee Schedule and Payment
In consideration of the performance of the above - described
engineering services, CITY hereby agrees to pay ENGINEER an
amount based upon the hourly rate schedule set forth below. In
no event shall said amount be greater than Ten Thousand Dollars
($10,000) except as otherwise provided herein.
A. Hourly rates for office and field personnel shall be as
follows:
Classification
Fee
Registered Engineer
$
57.00
Licensed Land Surveyor
$
53.00
Designer and Supervisor
$
47.00
Draftsman and Technician
$
38.00
Clerical
$
26.00
Survey Crew (3 -man) $128.00
(2 -man) $102.00
(1 -man) $ 72.00
The above fees will be escalated 6% on each August 1, begin-
ning August 1, 1985, for any work uncompleted at the time
through no fault of ENGINEER. Outside agency fees, reproduc-
tions, photographs, and long distance phone changes are not
included in above fees and will be billed at cost plus 10 %.
Periodic progress billings will be made for work completed.
B. The contract amount shall be paid to ENGINEER as follows:
1. Monthly partial payments shall be based on the amount
earned each month, as determined by the fee schedule.
The sum of the monthly partial payments shall not exceed
ninety -five percent (95 06) of the maximum fee:
2. Balance of the total amount earned to be paid upon com-
pletion of work specified in Section II (Services to be
performed by ENGINEER).
IX. Additional Work
Should ENGINEER complete any additional work not outlined in
this Agreement, but authorized by CITY, the extra work shall
be performed on an hourly basis in accordance with the hourly
rate standard fee schedule set forth in Section VIII (Fee
Schedule and Payment) above.
X. Project Scope Revisions
The scope of the project may be changed and the maximum fee
revised upon prior written approval of the Public Works Director
if the increase in the maximum fee does not exceed One Thousand
Dollars ($1,000). If the revisions to the scope of the project
would result in an increase in the maximum fee exceeding One
Thousand Dollars ($1,000), an amendment providing for such
revisions shall be processed and executed by the parties hereto.
XI. Insurance
A. Professional Liability Insurance
ENGINEER shall provide Professional Liability (errors and
omissions) insurance in the minimum amount of Two Hundred
Fifty Thousand Dollars ($250,000).
B. General Liability Insurance
ENGINEER shall maintain in full force and effect during
the term of this Agreement the following insurance in the
minimum amounts specified below:
Bodily Injury or Death. . . . . $ 300,000 each person
$1,000,000 each occurrence
Property and Project Damage $ 500,000 each occurrence
$1,000,000 aggregate
The policy or policies shall contain the following endorse-
ment:
"The City of Newport Beach and the State of California,
their officers, employees and agents are hereby declared
to be additional insureds under the terms of this policy,
as to activities of both the City and the State in respect
to project, and this policy shall not be cancelled without
Thirty (30) days' prior written notice to the City and the
State."
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
on the date first above written.
ATTEST:
APP OVED dTO M
C y Attorney
CITY OF NEWPORT BEACH
By
Mclyor CITY
NORRIS- REPKE,
INC.
By j
i
rest ent
amw
_re c y
ENGINEER
ATTACHMENT
OCEDURE FOR IMPROVEMENT ACT OF *1
i
1. IMPROVEMENT OF
2. REQUEST RECEIVED FROM PETITIONER
3. MAIL "PETITION OF PROPERTY OWNERS" TO PETITIONER (EXHIBIT "A ").
4. PETITION FILED WITH CLERK
MUST BE SIGNED BY MORE THAN 60% OF OWNERS UNLESS_COUNCIL DETERMINES.OTHERWISE.
5. MEMO FROM P.W. DEPT. TO CITY COUNCIL RECOMMENDING THAT STAFF BE DIRECTED TO
NOTIFY OWNERS TO CONSTRUCT (EXHIBIT "B ").
6. COUNCIL ACCEPTS PETITION; ORDERS CITY ENGINEERS TO PROCEED
7. PREPARE PLANS, SPECIFICATIONS AND ESTIMATE.
8. PREPARE "NOTICE TO CONSTRUCT" ON A CARD NOT LESS THAN 8" X 10" (EXHIBIT "C").
SET DATE FOR PUBLIC HEARING -- MINIMUM 10 DAYS AFTER GIVING NOTICE.
9. MAIL WRITTEN NOTICE (ATTACH NOTICE TO CONSTRUCT) TO EACH PROPERTY OWNER AS SHOWN
ON ASSESSMENT ROLL (EXHIBIT "D ").
10. POST NOTICE TO CONSTRUCT IN CITY HALL; PUBLISH TWICE IN ENSIGN.
11. MEMO FROM P.W. DEPT. TO CITY COUNCIL:
1. HOLD PUBLIC HEARING TO HEAR PROTEST.
2. DIRECTS STAFF TO CONSTRUCT THE ALLEY PER THE PLANS.
12. ADVERTISE, OPEN BIDS, AWARD CONTRACT.
13. UPON COMPLETION OF CONTRACT, PREPARE ASSESSMENT OF COSTS.
14. PUBLIC WORKS DIRECTOR FILES A REPORT WITH CITY COUNCIL (EXHIBIT "E").
MEMO FROM P.W. DEPT. TO CITY COUNCIL, REPORTING ON COST OF WORK AND RECOMMEND-
ING THAT A PUBLIC HEARING BE SCHEDULED TO HEAR PROTEST (EXHIBIT "F ").
15. PREPARE "NOTICE OF COST" (EXHIBIT "G ") ON A CARD NOT LESS THAN 8" X 10"
SET DATE FOR PUBLIC HEARING -- MINIMUM 10 DAYS AFTER GIVING NOTICE.
16. MAIL WRITTEN NOTICE (EXHIBIT "H ") (ATTACH NOTICE OF COST) TO EACH PROPERTY OWNER
AS SHOWN ON ASSESSMENT ROLL.
17. POST "NOTICE OF COST" IN CITY; PUBLISH TWICE IN ENSIGN.
18. MEMO FROM P.W. DEPT. TO CITY ATTORNEY REQUESTING ATTORNEY TO PREPARE A RESOLUTION
ASSESSING THE COST OF CONSTRUCTION (EXHIBIT "I").
19. MEMO FROM P.W. DEPT. TO CITY COUNCIL:
1. HEAR PROTESTS (EXHIBIT "J ").
2. ESTABLISHING ASSESSMENTS.
1 20. CITY COUNCIL ADOPTS A RESOLUTION OF ASSESSMENT (EXHIBIT "K ").
21. MEMO FROM P.W. DEPT. TO FINANCE DEPT. REQUESTING THAT FINANCE DEPT. CORRECT
ASSESSMENTS.
n
f
September 28, 1984
TO: (1) CITY ATTORNEY
(2) CITY CLERK
FROM: Public Works Department
SUBJECT: AGREEMENTS FOR CANNERY VILLAGE AREA
Attached are the following:
1. Original and two copies of an Agreement for the Design of the
Cannery Village Area Street Improvements.
2. Original and two copies of an Agreement for the Design of
31st Street Improvements and Processing of the 1911 Act.
The Public Works Department has reviewed the Agreements and has
found them to be in order and sufficient.
Action requested:
1. City Attorney
a. Approve Agreements as to form.
b. Forward all copies to City Clerk.
2. City Clerk
a. Present Agreements to City Council for approval.
b. Have Mayor execute the Agreements.
c. Retain original of Agreements for your files and return
all copies to Public Works Department.
Benjamin B. Nolan
Public Works Director
RLH:jw
Attachments
TO: CITY COUNCIL
FROM: Public Works Department
0
October 9, 1984
CITY COUNCIL AGENDA
ITEM NO. _ f— b z2rQ)
SUBJECT: CANNERY VILLAGE STREET IMPROVEMENT MASTER PLAN
RECOMMENDATIONS:
Authorize the Mayor and the City Clerk to execute a consultant
agreement with Norris - Repke, Inc., for the preparation of plans,
specifications and cost estimates for the master plan street
improvements for Cannery Village.
2. Authorize the Mayor and the City Clerk to execute a consultant
agreement with Norris - Repke, Inc. for the preparation of plans
specifications and cost estimate for 31st Street between Newport
Boulevard and Villa Way.
DISCUSSION:
Cannery Village,which is bounded by Newport Boulevard, 32nd Street,
the Rhine Channel and 28th Street has been a source of continual complaints re-
garding the general condition of the public right -of -way and the need for
public improvements in the area to resolve drainage problems and reduce poten-
tial liability.
In order to improve the Cannery Village area, a master.plan for the
area must be formulated that can be used for completing the public improve-
ments.
The Public Works Department has received two proposals from Norris -
Repke, Inc. The first proposal is for the preparation of detailed plans, speci-
fications and engineering estimates for the construction of the ultimate street
improvements for the Cannery Village area. The lump sum fee for the engineer-
ing work is $20,000.
The major parts of the scope of the service provided in the agreement
are as listed below:
1. Review of all available improvement plans, atlases, record maps
and any other similar maps.
2. Determine the most used elevation datum for use in surveys and
provide equations for conversion of elevations on existing plans.
3. Compile horizontal control.
4. Provide additional surveying as needed for horizontal control
and supplemental topography.
5. Provide complete plans, specifications and cost estimate for
construction of ultimate improvements on 30th Street from
Newport Boulevard to Lafayette Avenue, 29th Street from
- ., 0
0
October 9, 1984
Subject: Cannery Village Street Improvement Master Plan
Page 2
5. (cont'd)
Newport Boulevard to Lafayette Avenue, Villa Way from 29th
Street to Lafayette Avenue, west side of Lafayette Avenue from
Villa Way northerly 150 feet to the first alley, the four
alleys bounded by Newport Boulevard, 28th, Lafayette Avenue and
30th Street, and the alley between 30th and 31st Streets from
Villa Way to Lafayette Avenue.
The second proposal is for the preparation of detailed plans, speci-
fications and cost estimate for 31st Street between Villa Way and Newport
Boulevard, as well as providing services for the processing of the Chapter 27
procedure of the Improvement Act of 1911 for construction of the property owner
share of the public improvements. The lump sum fee for the engineering work is
$10,000.
The major parts of the scope of the service provided in the agreement
are as listed below:
1. Perform a partial topographic survey to supplement the City's
1976 survey as necessary to prepare accurate plans and speci-
fications.
2. Prepare plans, specifications and engineer's estimate for con-
struction to complete the roadway improvements (curb, gutter,
sidewalk, new pavement, street lights and drainage devices),
fitting existing public improvements as practical and fitting
private improvements definitely.
3. Provide appropriate services necessary for the processing as a
Chapter 27 1911 Act project.
A local agency /consultant agreement has been executed by the civil
engineering firm, Norris - Repke, Inc. for each proposal to provide the engi-
neering services described above.
The agreement for the Cannery Village master plan street improvements
will be funded from Account No. 02- 2797 -279.
The agreement for the 31st ,Street improvements will be funded from
Account No. 02- 3397 -310.
The consultant is prepared to commence work immediately upon the City's
written notification to proceed.
Attached is a sketch showing the streets included in the two contracts.
Benjamin B. Nolan
Public Works Director
RLH:jd
Att.
- I
000
1. 1, t)
I
,2
CC)
wu
10
G) Ao
CV
C
Ul
co Z� tp
10
cn
co
5v?
110
k Lv
0
eIN, e- 6 s 10
X9 C3 `e
77
-ia
eo 0
1419
911
NO, fO
Sheet of
PETITION OF PROPERTY OWNERS
The Honorable City Council
City of Newport Beach, California
Gentlemen:
We, the undersigned, being owners of property abutting partially improved 31st Street
between Villa Way and Newport Boulevard, do hereby request the City Council of Newport
Beach to complete the public street improvements (curb, gutter and sidewalk) on 31st
Street using the procedure set forth in Section 5875 through 5985 of the Streets and
Highways Code of the State of California.
We understand that upon the filing of petitions signed by the owners of more than 60%
of the front footage abutting 31st Street, all the property owners with unimproved
frontages abutting said street shall have the duty of constructing said street improve-
ments upon notice to do so by the Superintendent of Streets.
We also understand that if construction is not commenced within 60 days after notice
is given, the superintendent of: streets shall cause the construction to be done, and
the cost shall be a lien upon the property.
We also request that if the work is constructed by the city, the property owners be
allowed up to five years to pay the assessments and that the maximum rate of inter-
est to be paid on the unpaid balance shall not exce4d 12% per year.
Name of Property Owner Mailing Address Lot Number
Date Signed and Address
on 31st Str
1 0 io
2.
3.
5.
6. -
_ PETITION OF PROPERTY OWNERS •
(cont'd)
Name of Property Owner Mailing Address Lot Number
Date Signed and Address
on 31st Street
Pe �
2 •
F:.
3
M
5
Cg
7
8.
9.
10.
11.
12.
I 13.
• PETITION OF PROPERTY OWNERS •
t ( cont'd)
Name of Property Owner Mailing Address
Date Signed
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Lot Number
and Address
on 31st Street
i
feet
PETITION OF PROPERTY OWNERS
The Honorable City Council
City of Newport Beach, California
Gentlemen.
of
We, the undersigned, being owners of property abutting partially improved 31st Street
between Villa Way and Newport Boulevard, do hereby request the City Council of Newport
Beach to complete the public street improvements (curb, gutter and sidewalk) on 31st
Street using the procedure set forth in Section 5875 through 5985 of the Streets and
Highways Code of the State of California.
We understand that upon the filing of petitions signed by the owners of more than 60%
of the front footage abutting 31st Street, all the property owners with unimproved
frontages abutting said street shall have the duty of constructing said street improve-
ments upon notice to do so by the Superintendent of Streets.
We also understand that if construction is not commenced within 60 days after notice
is given, the superintendent of streets shall cause the construction to be done, and
the cost shall be a lien upon the property.
We also request that if the work is constructed by the city, the property owners be
allowed up to five years to pay the assessments and that the maximum rate of inter-
est to be paid on the unpaid balance shall not exceed 12% per year.
Name of Property Owner
Date Signed
Mailing Address Lot Number
and Address
on 31st Str
2.�
3.
6.
i
0 *Sheet of
PETITION OF PROPERTY OWNERS
The Honorable City Council
City of Newport Beach, California
Gentlemen:
We, the undersigned, being owners of property abutting partially improved 31st Street
between Villa Way and Newport Boulevard, do hereby request the City Council of Newport
Beach to complete the public street improvements (curb, gutter and sidewalk) on 31st
Street using the procedure set forth in Section 5875 through 5985 of the Streets and
Highways Code of the State of California.
We understand that upon the filing of petitions signed by the owners of more than 60/
of the front footage abutting 31st Street, all the property owners with unimproved
frontages abutting said street shall have the duty of constructing said street improve-
ments upon notice to do so by the Superintendent of Streets.
We also understand that if construction is not commenced within 60 days after notice
is given, the superintendent of streets shall cause the construction to be done, and
the cost shall be a lien upon the property.
We also request that if the work is constructed by the city, the property owners be
allowed up to five years to pay the assessments and that the maximum rate of inter-
est to be paid on the unpaid balance shall not exceed 12% per year.
Name of Property Owner
Date Signed
Mailing Address
2.
3. ,.
i
4.
5.
6.
z1 2- 1 -3 s St-r, e,
1?
Lot Number
and Address
on 31st Street
Sheet of
PETITION OF PROPERTY OWNERS
The Honorable City Council
City of Newport Beach, California
Gentlemen:
We, the undersigned, being owners of property abutting partially improved 31st Street
between Villa Way and Newport Boulevard, do hereby request the City Council of Newport
Beach to complete the public street improvements (curb, gutter and sidewalk) on 31st
Street using the procedure set forth in Section 5875 through 5985 of the Streets and
Highways Code of the State of California.
We understand that upon the filing of petitions signed by the owners of more than 60%
of the front footage abutting 31st Street, all the property owners with unimproved
frontages abutting said street shall have the duty of constructing said street improve-
ments upon notice to do so by the Superintendent of Streets.
We also understand that if construction is not commenced within 60 days after notice
is given, the superintendent of streets shall cause the construction to be done, and
the cost shall be a lien upon the property.
We also request that if the work is constructed by the city, the property owners be
allowed up to five years to pay the assessments and that the maximum rate of inter-
est to be paid on the unpaid balance shall not exceed 12% per year.
Name of Property Owner
Date Signed
Mailing Address
I_ J
2. Z /L/ 3! 'r Sty - «ir
3.
5.
Al
Lot Number
and Address
on 31st Street
' I i
• Sheet
PETITION Oi- PROPERTY OWNERS
The Honorable City Council
City of Newport Beach, California
Gentlemen:
of
We, the undersigned, being owners of property abutting partially improved 31st Street
between Villa Way and Newport Boulevard, do hereby request the City Council of Newport
Beach to complete the public street improvements (curb, gutter and sidewalk) on 31st
Street using the procedure set forth in Section 5875 through 5985 of the Streets and
Highways Code of the State of California.
We understand that upon the filing of petitions signed by the owners of more than 60�
of the front footage abutting 31st Street, all the property owners with unimproved
frontages abutting said street shall have the duty of constructing said street improve-
ments upon notice to do so by the Superintendent of Streets.
We also understand that if construction is not commenced within 60 days after notice
is given, the superintendent of streets shall cause the construction to be done, and
the cost shall be a lien upon the property.
We also request that if the work is constructed by the city, the property owners be
allowed up to five years to pay the assessments and that the maximum rate of inter-
est to be paid on the unpaid balance shall not exceed 12% per year.
Name of Property Owner
Date Signed
Mailing Address
Lot Number
and Address
on 31st Street
2. ><: - 3'/ �� l l /r l! •r7 /- �, L� L -3 i
l
Z',� -1
Y O z 3 i �-
XL(/L-(
1331 Llr �2 L�i/
X 6. L,
• *Sheet
PETITION OF PROPERTY OWNERS
The Honorable City Council
City of Newport Beach, California
Gentlemen:
of
We, the undersigned, being owners of property abutting partially improved 31st Street
between Villa Way and Newport Boulevard, do hereby request the City Council of Newport
Beach to complete the public street improvements (curb, gutter and sidewalk) on 31st
Street using the procedure set forth in Section 5875 through 5985 of the Streets and
Highways Code of the State of California.
We understand that upon the filing of petitions signed by the owners of more than 60`'.�
of the front footage abutting 31st Street, all the property owners with unimproved
frontages abutting said street shall have the duty of constructing said street improve-
ments upon notice to do so by the Superintendent of Streets.
We also understand that if construction is not commenced within 60 days after notice
is given, the superintendent of streets shall cause the construction to be done, and
the cost shall be a lien upon the property.
We also request that if the work is constructed by the city, the property owners be
allowed up to five years to pay the assessments and that the maximum rate of inter-
est to be paid on the unpaid balance shall not exceed 12% per year.
Name of Property Owner
Date Signed
Mailing Address
S
3.
I)
5/
6.
Lot Number
and Address
on 31st Street
Sheet of
PETITION OF PROPERTY OWNERS
The Honorable City Council
City of Newport Beach, California
Gentlemen:
We, the undersigned, being owners of property abutting partially improved 31st Street
between Villa Way and Newport Boulevard, do hereby request the City Council of Newport
Beach to complete the public street improvements (curb, gutter and sidewalk) on 31st
Street using the procedure set forth in Section 5875 through 5985 of the Streets and
Highways Code of the State of California.
We understand that upon the filing of petitions signed by the owners of more than 60%
of the front footage abutting 31st Street, all the property owners with unimproved
frontages abutting said street shall have the duty of constructing said street improve-
ments upon notice to do so by the Superintendent of Streets.
We also understand that if construction is not commenced within 60 days after notice
is given, the superintendent of streets shall cause the construction to be done, and
the cost shall be a lien upon the property.
We also request that if the work is constructed by the city, the property owners be
allowed up to five years to pay the assessments and that the maximum rate of inter-
est to be paid on the unpaid balance shall not exceed 12% per year.
Name of Property Owner Mailing Address Lot Number
Date Signed and Address
on 31st Street
P At
2.
3.
4.
5.
6.
• PETITION OF PROPERTY OWNERS •
(cont'd)
• I
Name of Property Owner Mailing Address Lot Number
Date Signed and Address
on 31st Street
i
�+ 2 `
3.
Y 4.
i
1
;y 5.
6.-
i
Y 7.-
8.
9.
10.
i
11.
12.
13.
e c Q r' E C q(iyl�F.yc��
410 �j. y/o ,R"f , j6
Annk /'d Al v, lvv,l- )6/2 /2A
�n
im
I �
I ``
� n
�i
i
w
4
Otl V�
c'/
r
°b /
\ \r
1'
r
r
r
r
lc
\ VV
DO ,
?W
c
1 •Sheet
PETITION OF PROPERTY OWNERS
The Honorable City Council
City of Newport Beach, California
Gentlemen:
of
We, the undersigned, being owners of property abutting partially improved 31st Street
between Villa Way and Newport Boulevard, do hereby request the City Council of Newport
Beach to complete the public street improvements (curb, gutter and sidewalk) on 31st
Street using the procedure set forth in Section 5875 through 5985 of the Streets and
Highways Code of the State of California.
We understand that upon the filing of petitions signed by the owners of more than 60%
of the front footage abutting 31st Street, all the property owners with unimproved
frontages abutting said street shall have the duty of constructing said street improve-
ments upon notice to do so by the Superintendent of Streets.
We also understand that if construction is not commenced within 60 days after notice
is given, the superintendent of streets shall cause the construction to be done, and
the cost shall be a lien upon the property.
We also request that if the work is constructed by the city, the property owners be
allowed up to five years to pay the assessments and that the maximum rate of inter-
est to be paid on the unpaid balance shall not exceed 12% per year.
Name of Property Owner
Date Signed
Mailing Address Lot Number
and Address
on 31st Str
2. q2- 1
3
N
X 5jl '
6.
0
l'
• PETITION OF PROPERTY OWNERS•
( cont'd)
Name of Property Owner Mailing Address Lot Number
Date Signed and Address
on 31st Street
3020 lyuu,1] ZZA� & ycl 3 l 5h S t—
X 3.
3090
5.
6.
7.
B.
9.
10.
11.
12.
13.
I
PETITION OF PROPERTY OWNERS
(cont'd)
Name of Property Owner Mailing Address Lot Number
Date Signed and Address
on 31st Street
1.
2.
3.
4.
5.
6.
I '
7.
I
8.
g
10.
11.
12.
13.